Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “design considerations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fusion energy technology and design-specific safety considerations

Design of commercial fusion energy technology must be done in a manner safe to the general public. This presentation is intended to cover the major non-radiological categories which must be considered for adequate safety of fusion devices.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Fusion energy technology and design-specific safety considerations

Design of commercial fusion energy technology must be done in a manner safe to the general public. This presentation is intended to cover the major non-radiological categories which must be considered for adequate safety of fusion devices.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Iodine solid sorbent design: a literature review of the critical criteria for consideration

Designing sorbents for iodine capture in different conditions requires selection and optimization of a large and diverse range of variables. These variables fall into general categories (or features) of sorbent activity, sorbent stability, and the fate of the loaded material in terms of the disposal (waste form) options available. To illustrate, silver-loaded, high-porosity sorbents make for maximized iodine capture and less pressure drop in a column-based sorption system approach, however, this high porosity can lead to less mechanically stable sorbents. Additionally, waste forms containing silver must also be compliant with additional criteria for hazardous waste disposal. Thus, all these aspects must be considered simultaneously when selecting a sorbent for utilization under specific conditions. Information is given for different types of sorbent design considerations for different operating conditions and some emphasis is also given on promising alternatives for silver as the active (chemisorption-based) getter metal. Discussion is given around demonstrated options for waste forms for different metal-iodide compounds.

36 MATERIALS SCIENCE↗

California Price Response Potential Study

California's energy landscape is undergoing a significant transformation, driven by the increasing integration of renewable energy sources, the increased adoption of distributed energy resources, the electrification of end-use loads, and the growing need for grid efficiency. To address these challenges, recent revisions to the State’s Load Management Standards (LMS) require all of California’s large utilities and community choice aggregators (CCAs) to offer dynamic electricity pricing options to customers by 2027. Dynamic pricing, which involves varying electricity rates based on real-time supply and demand conditions, offers a promising solution for optimizing grid operations, reducing costs, and incentivizing efficient use of grid capacity. Effective implementation of dynamic pricing requires understanding the potential impacts on customer bills, system load, and the cost-effectiveness of automation technologies. This study aims to evaluate the load response of various end-use devices to hourly dynamic prices. The end-uses studied here are space cooling, space heating, water heating, crop irrigation, pool and spa pumps, and electric vehicle (EV) charging, all for both residential and commercial applications, except for crop irrigation. In 2030, these end uses are forecasted to account for 18% of annual electricity demand in the state, but 40% of demand in the peak net load hour. By modeling possible price-responsive load dispatch algorithms and assessing the resulting impacts on both individual bills and the overall grid, we seek to inform policymakers and utilities about the potential benefits and challenges associated with dynamic pricing, and considerations for the design of dynamic pricing tariffs. Additionally, we will explore the cost effectiveness of adopting automation technologies to enable devices to respond more effectively to real-time price signals. This study considers a range of price profiles, accounting for differences across utilities and customer classes, and presents scenarios for dynamic price design via variation in the percentage of total customer electric costs that are allocated dynamically (versus constituting a fixed portion of the hourly volumetric price). We present results focused primarily on 2030, forecasting electricity prices under both low and high-cost scenarios, to inform longer-term tariff design considerations. We design tariffs by starting with 2019 prices that were calculated according to CalFUSE guidance (CPUC, 2022) and that have been used in recent studies; these prices are all-in volumetric rates that vary by utility and are revenue-neutral to each customer class. They are developed by considering six electricity cost components that are allocated hourly based on system load indicators (gross and net load, and wholesale prices). These prices are forecasted to 2030 for low and high cost scenarios, considering recent trends in total electricity costs with and without years of substantial wildfire mitigation investments. These tariffs, which allocate all costs on an hourly basis, are considered our “Full” dynamic tariff design scenario, while two additional scenarios explore allocating a portion of costs as a flat volumetric charge: the “Medium” scenario allocates 50% of revenue dynamically (and keeps 50% flat), while the “Mild” scenario allocates 20% of revenue dynamically. The 20% dynamic allocation on the Mild scenario aims to represent a case where only the marginal operating costs of the grid are included in the dynamic price.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Proximity Portability and in Transit , M-to-N Data Partitioning and Movement in SENSEI [Book Chapter]

In high-performance parallel in situ processing, the term in transit processing refers to those configurations where data must move from a producer to a consumer that runs on separate resources. In the context of parallel and distributed computing on an HPC platform one of the central challenges is to determine a mapping of data from producer ranks to consumer ranks. This problem is complicated by the heterogeneity that arises in producer-consumer pairs, such as when producer and consumer codes have different levels of concurrency, different scaling characteristics, or different data models. The resulting mapping and movement of data from M producer to N consumer ranks can have a significant impact on aggregate application performance, particularly when the data consumer requires only a subset of the overall data for its task. This chapter focuses on the design considerations that underlie SENSEI’s implementation to this challenging problem. These design considerations extend the core SENSEI architecture and include ideas like the need to accommodate flexibility in the choice of different partitioning methods, the ability for a data consumer to request and receive only the subset of data needed for its particular operation, and the ability to leverage any of several different data transport tools. The idea of proximity portability, being able to use different data transport methods as part of an in transit workflow, is illustrated through the use of three different transport layers where switching from one transport tool to another is accomplished with only a configuration file change. Here, the chapter also includes a performance analysis summary showing the performance gains that are possible in terms of multiple metrics, such as memory footprint, time to solution, and amount of data moved, when using optimized partitioners in an in transit setting, gains that are made possible by the implementation shaped by specific design considerations.

Bethel, E. Wes↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design of a high voltage delivery system for noble liquid time projection chambers

Noble liquid time projection chambers (TPCs) are a leading technology in the detection of ionizing radiation, particularly in applications such as accelerator neutrino physics, dark matter detection, and neutrinoless double beta decay. This work addresses the design considerations for implementing stable high voltage (HV) systems within large noble liquid TPCs, with a focus on the nEXO experiment. Utilizing insights from prior HV research and experimental investigations, we outline factors influencing HV stability and discuss design choices to improve stability and prevent electrical discharges. A novel HV delivery system concept is presented, tailored for the nEXO TPC, which incorporates these design considerations while also meeting the stringent radiopurity requirements of the nEXO neutrinoless double beta decay search. These design considerations and their specific implementation towards a HV delivery system offer guidance to future experiments applying high voltage in noble liquid environments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A multi-length-scale investigation of the applicability of ductility laws for annealed and work-hardened copper

Small-scale mechanical testing provides unique advantages over conventional testing in investigating the mechanical response of nuclear materials. While small-scale testing enables accelerated materials research, it raises the question of comparability to large-scale properties for engineering design considerations. Among different mechanical properties for structural design considerations such as yield and ultimate tensile stress, ductility is of critical importance with respect to structural component health. The effectiveness of using small-scale mechanical testing for probing these mechanical properties is dictated by understanding how the mechanical responses translate from the microscale to the engineering scale. Therefore, a better understanding of size scaling effects via gathering and analysis of experimental data is required to bridge length-scales. Further, this work builds upon previous reports to provide statistical data on how mechanical response changes as the size of the specimens are reduced from conventional sizes. One hundred twenty mesoscale tensile coupons of oxygen-free high thermal conductivity (OFHC) copper in work-hardened and annealed state have been manufactured using micro-wire electrical discharge machining (EDM) and tested under uniaxial tension. The mesoscale specimens have dimensions dictated by pre-selected geometric ratios (i.e., gauge section length over the square root of the cross-section area) with gauge length dimensions of 3 mm (or less) and sub-millimeter gauge widths and thicknesses. The mesoscale responses were compared to bulkscale properties to reveal the effect of specimen size on the mechanical response as a function of grain size and material state for a single phase face-centered cubic metal.

36 MATERIALS SCIENCE↗

Linear Reciprocating Tribometer for In Situ Neutron Reflectometry of Soft Matter

Neutron reflectometry is a technique for measuring structure near planar interfaces that has been previously used to non-destructively characterize the polymer density of hydrated, dilute, and soft materials. Previous investigations have conducted neutron reflectometry measurements of liquids, gels, emulsion, and polymer solutions at rest, in compression, and subject to shear stress. However, correlating structure with tribological properties of soft materials presents significant experimental challenges for prior instruments due to wall slip, sample thickness, and structural heterogeneity (e.g., depth-wise gradients). A linear reciprocating tribometer offers several advantages for in situ neutron reflectometry studies, including uniform velocity profiles, constant shear stress over large regions of interest, and independent control of normal force and sliding velocity during measurements. This work outlines basic considerations for the design of a custom linear reciprocating tribometer that operates in a neutron beamline and includes commissioning measurements. The tribometer is designed to compress soft and hydrated materials against linearly reciprocating silicon disks. The three key design considerations for this tribometer are (1) safety, (2) neutron transmission, and (3) sample positioning. This instrument design will enable in situ studies of soft matter and illuminate the role of interfacial structure on tribological phenomena.

42 ENGINEERING↗