Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “deployment timelines”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Latest Strategic Surface Metering System and Progress Status in CLT

This presentation provides description of the field evaluation of surface metering deployed by NASA in Charlotte International Airport (CLT) that began with a more tactical decision timeline and progressively expanded toward more strategic timelines. This will include an update on the latest status of the ongoing research and lessons learned.

surface metering↗

Novel PV Array System Design to Accelerate Solar Deployment, Reduce LCOE, Reduce Land Use Competition, and Increase Siting Flexibility

The increasing demand for solar energy faces significant barriers, including inefficient construction processes, high project costs limiting LCOE reductions, and diminishing availability of "good" sites with favorable interconnection. Conventional solar installations are often constrained by long construction timelines and the need for flat, large plots. Furthermore, the industry struggles with a shortage of skilled labor. Planted Solar aims to address these challenges by fundamentally transforming solar deployment from a construction project into a streamlined manufacturing process. Our novel approach combines high-density racking, integrated terrain-following design software, and installation automation. Unlike competing solutions that either assist with standard array assembly or offer dense packing without terrain adaptability or automation, Planted's technology uniquely brings together a new array product with in-place automated manufacturing to achieve the lowest possible cost, greater site flexibility, and accelerated deployment.

14 SOLAR ENERGY↗

WLCG Transition from X.509 to Tokens. Status, Plans, and Timeline

Since 2017, the Worldwide LHC Computing Grid (WLCG) has been working towards enabling token-based authentication and authorization throughout its entire middleware stack. Following the initial publication of the WLCG Token Schema v1.0 in 2019, OAuth2.0 token workflows have been integrated across grid middleware. There are many complex challenges to be addressed before the WLCG can be end-to-end token-based, including not just technical hurdles but also interoperability with the wider authentication and authorization landscape. This paper presents the status of the WLCG coordination and deployment work, and how it relates to software providers and partner communities. The authors also detail how the WLCG token transition timeline has progressed, and how it has changed since its publication.

97 MATHEMATICS AND COMPUTING↗

Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated with the MSC via voice and text messaging. They also provided scientific instrument data, still imagery, video streams from chest-mounted cameras, GPS location tracking information. The MSC monitored and reviewed incoming data from the field across delay and provided recommendations for pre-sampling and sampling tasks based on their collective expertise. The scientists used dynamic priority ranking lists, referred to as dynamic leaderboards, to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards throughout the EVA were relayed regularly to the IV crewmembers. The use of these leaderboards enabled the crew to track the dynamic nature of the MSC recommendations and helped minimize crew idle time (defined as time spent waiting for input from Earth during which no other productive tasks are being performed). EVA timelines were strategically designed to enable continuous (delayed) feedback from an Earth-based Science Team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA timeline data, ground assimilation times (defined as the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.↗

International Space Station Satellite Deployment: Jettison Policy and Best Practices for Satellite Payload Developers

The International Space Station (ISS) deploys dozens of small satellites into Low Earth Orbit (LEO) each year. This presentation and associated paper cover the ISS Jettison Policy requirements and review/approval process, as well as best practices for satellite Payload Developers who have satellites manifested for deployment from ISS. Specifically, topics will include ISS Jettison Policy requirements to limit generation of orbital debris, limit risk of collision with ISS, and limit risk of collision with ISS visiting vehicles. The paper will include details on the ISS Program jettison candidate analysis and approval process, timelines for data submittal to ISS Program, resources for small satellite developers, and design & analysis recommendations for small satellite developers to maximize their likelihood of successful deployment from ISS. New Station deploy capabilities and ways the ISS Program addresses and facilitates innovations in small satellite technology, including propulsion systems, deorbit devices, constellation development, and novel tech demos, will also be explored. The 2024 session topic that best fits this abstract is Orbital Debris, SSA & STM. The ISS Jettison Policy intends to quantify and control the risks of deploying and operating small satellites, not only to ensure the safety of the humans flying in space, but also to preserve the orbital environment for world space activities and enable the significant benefits brought by such utilization. The ISS Program is committed to working with smallsat providers to address their challenges and enable safe, accessible, innovative missions. The Policy has grown with the industry, with each deploy yielding hard-earned lessons learned that improve our process – not only for the next deploy campaign, but with applicability and adaptability for future applications in LEO and beyond.

Jettison Policy↗

SolarAPP+ Performance Review (2022 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have those specifications automatically reviewed for code compliance, and receive instant approval for code-compliant systems. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. SolarAPP+ is available to authorities having jurisdiction (AHJs) at no cost. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through conventional AHJ permitting processes. As of the end of 2022, the National Renewable Energy Laboratory (NREL) had contacted over 1,500 AHJs with significant solar permitting volume regarding SolarAPP+. Of those, 607 AHJs had at least expressed interest in the platform. 16 AHJs had begun piloting the platform and 15 of these had publicly launched the platform by the end of 2022. In 2022, 206 installers submitted 11,092 permits through the SolarAPP+ platform, including 708 permits for solar+storage systems. SolarAPP+ permits accounted for around 37% of all permits issued in participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 8 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved between 3,500 and 13,900 hours of AHJ staff time in 2022. Finally, we find evidence that SolarAPP+ may improve inspection outcomes, with SolarAPP+ projects failing inspections about 28% less frequently than traditional projects.

14 SOLAR ENERGY↗

InSight Robotic Arm Testing Activities for HP3 Mole Anomaly Recovery on Mars

The InSight lander’s Heat Flow and Physical Properties Package (HP3 ) was deployed on Mars in February 2019 and began attempting to penetrate to its target depth range of 3-5 meters shortly thereafter. However, the mole’s downward progress stopped after only 35 cm of penetration. In response, the project convened an Anomaly Response Team (ART) and since then has been attempting to diagnose the problem and assist the mole using the tools available on Mars. The key asset used in this effort has been the Instrument Deployment System (IDS), which includes two cameras and a robotic Instrument Deployment Arm (IDA). Since the IDS was originally intended only to deploy InSight’s primary instruments to the Martian surface, new testbed setups, experiments, and operational protocols (e.g., command sequences) were required and had to be developed on a short timeline. The HP3 Mole ART first focused on gathering all observable data on Mars about the state of the mole and Support Structure Assembly (SSA), as well as the physical properties of the Martian regolith. This included using the robotic arm to point the IDC (Instrument Deployment Camera) at the SSA during diagnostic hammering attempts to observe motion of the SSA and science tether. Images taken during these attempts revealed some motion of the SSA, but no apparent change in mole depth. At JPL, the IDS and Testbed teams re-created the hardware configuration on Mars based on limited knowledge of the mole’s state. They devised and tested techniques to use the robotic arm and cameras to accomplish previously untested activities on Mars, including imaging the HP3 , using the IDA to interact with the terrain, and using the IDA to move the SSA away from the partially-embedded mole. The team executed the more promising techniques on Mars. After diagnostic hammering on Mars, the team decided to move the SSA to gain visibility of the mole’s configuration and access to the soil around the mole. After developing the technique and practicing the maneuver in the InSight testbed, the team lifted the SSA on Mars and placed it behind the mole. This revealed a pit surrounding the now exposed mole, observations of which provided essential clues for determining the root cause of the mole’s lack of progress. The IDS and Testbed teams altered the testbed to match the situation on Mars. They devised IDA techniques to determine the Martian soil properties and assist the mole’s descent. They tested these techniques in the testbed and executed the more promising ones on Mars. These include using the robotic arm to alter the regolith near the mole and to push on the mole while it hammers. This paper discusses the anomaly resolution testing in the testbed at JPL, describes how the IDS team prepared for the anomaly recovery activities on Mars, and provides preliminary results of the efforts to assist the HP3 mole on Mars.

Kim, Junggon↗

Mars Science Laboratory Overview and MSL EDL Challenges

An overview of Mars Science Laboratory (MSL) Entry, Descent and Landing (EDL) challenges is presented. The topics include: 1) MSL Project Overview; 2) Mars Science Laboratory Top Level Schedule (Single Launch); 3) EDL Challenges; 4) MSL Surface System; 5) Mars Rover Wheel Family Tree; 6) Gusev Comparisons; 7) Mars Surface Accessibility; 8) Atlas V 401 Launch Performance; 9) Parachute Deployment Altitude Variation with Time of Year and Latitude; 10) Dust Storms and Winds; 11) Nominal MSL EDL Timeline; and 12) Specific EDL Challenges.

Umland, Jeffrey W.↗

The Near Earth Object Scout Spacecraft: A Low Cost Approach to in-situ Characterization of the NEO Population

In this paper we describe a micro/nano satellite spacecraft and a supporting mission profile and architecture designed to enable preliminary in-situ characterization of a significant number of Near Earth Objects (NEOs) at reasonable cost. The spacecraft will be referred to as the NEO Scout. NEO Scout spacecraft are to be placed in GTO, GEO, or cis-lunar space as secondary payloads on launch vehicles headed for GTO or beyond and will begin their mission after deployment from the launcher. A distinguishing key feature of the NEO scout system is to design the mission timeline and spacecraft to rendezvous with and land on the target NEOs during close approach to the Earth-Moon system using low-thrust/high- impulse propulsion systems. Mission feasibility and preliminary design analysis are presented along with detailed trajectory calculations. The use of micro/nano satellites in low-cost interplanetary exploration is attracting increasing attention and is the subject of several annual workshops and published design studies (1-4). The NEO population consists of those asteroids and short period comets orbiting the Sun with a perihelion of 1.3 astronomical units or less (5-8). As of July 30, 2013 10065 Near-Earth objects have been discovered. The spin rate, mass, density, surface physical (especially mechanical) properties, composition, and mineralogy of the vast majority of these objects are highly uncertain and the limited available telescopic remote sensing data imply a very diverse population (5-8). In-situ measurements by robotic spacecraft are urgently needed to provide the characterization data needed to support hardware and mission design for more ambitious human and robotic NEO operations. Large numbers of NEOs move into close proximity with the Earth-Moon system every year (9). The JPL Near-Earth Object Human Space Flight Accessible Targets Study (NHATS) (10) has produced detailed mission profile and delta V requirements for various NEO missions ranging from 30 to 420 days in duration and assuming chemical propulsion. Similar studies have been reported assuming high power electric propulsion for manned NEO rendezvous missions (11). The delta V requirement breakdown and mission profile data from references 10 and 11 are used as a basis for sizing the NEO Scout spacecraft and for conducting preliminary feasibility assessments using the Tsiokolvsky rocket equation, a (worst-case) delta V requirement of 10 km/sec, and a maximum spacecraft dry mass of 20 kg. Using chemical propellant for a 10 km/sec delta V drives spacecraft wet mass well above 300 kg so that chemical propulsion is a non-starter for the proposed mission profile and spacecraft wet mass limits. In contrast, a solar electric propulsion system needs only 8 kg of Xe propellant to accelerate the spacecraft to 10 km/sec in 163 days with 0.02 N of thrust and 500 W of power from1.6 sq m of 29% efficient solar panels. In a second example, accelerating a 4 kg payload to 7 km/sec over 180 days requires about 6.7 kg of propellant and 1.2 kg of solar panels (12 kg total spacecraft wet mass).

Koontz, Steven L.↗

Grid Optimization Competition Challenge 3 Problem Formulation

This report contains the problem formulation for the Grid Optimization (GO) Competition Challenge 3. The Grid Optimization Competition is run by a team of researchers from a number of organizations, including the sponsor Advanced Research Projects Agency - Energy (ARPA-E), lead organization Pacific Northwest National Laboratory (PNNL), and technical contributors from Los Alamos National Laboratory (LANL), National Renewable Energy Laboratory (NREL), Texas A&M University (TAMU), Georgia Institute of Technology (GT), University of Wisconsin (UW), and others. The GO Competition poses challenge problems in the field of power grid management, invites entrants to develop solvers for these problems, invokes the solvers on a set of problem instances using common hardware, ranks the solvers according to their performance, and awards prizes according to the rankings. The overall goal of the GO Competition is to spur innovative research on high impact and computationally challenging problems in power grid management from initial development through commercial deployment. Complete information about the GO Competition can be found online at [2]. The webpage covers previous Challenges, rules, timeline, registration information, data formats, scoring methods, computational platform information, information on supported solvers and languages, sponsor information, frequently asked questions, administrator contact information, publicly available problem instances, computer code for reading and evaluating problem and solution data, a sandbox for testing solvers, and a solver submission interface, results, and publications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

Source record↗

Web Application Software for Ground Operations Planning Database (GOPDb) Management

A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.

Lanham, Clifton↗

In‐operando thermal transport characterization of moving particle bed heat exchanger

The project aimed to develop modulated photothermal radiometry (MPR) for conducting in-operando measurements of thermal transport in moving particle bed heat exchangers (MPBE) located at Sandia National Laboratory (SNL). The plan was to initially conduct lab-scale measurements on a 1-meter-long particle channel at UCSD, followed by in- operando measurements at SNL on a 20 kWth MPBE prototype built for this project, and if time permitting, potential final deployment on SNL’s 1 MWth G3P3 MPBE. The first two goals were successfully achieved but due to changes with commissioning timeline of the G3P3 MPBE, in-operando measurements on the G3P3 MPBE could not be conducted. The measurement campaigns have resulted in some promising results and the MPR tool has been handed over to trained SNL personnel for future use. MPR measurements on UCSD’s 1-meter-long particle channel showed a peculiar length dependence of the particle bed thermal conductivity and near-wall thermal resistance. The bed thermal conductivity increased, and the near-wall thermal resistance decreased, with increasing distance from the channel inlet, both eventually reaching a plateau. This was found to be due to hydrostatic pressure screening by the channel walls, known as the “Janssen effect”, and is the first experimental study on its role in granular heat transfer. A 20 kWth small-scale MPBE prototype, the first of its kind with 3 mm particle channels and 2 mm sCO2 plates, was designed and manufactured by Vacuum Process Engineering (VPE) for this project. This MPBE prototype was installed in SNL’s HEX test stand and the MPR tool was integrated into the test stand for in-operando measurements. Several modifications have been made to the MPR setup for facile installation and easy operation at SNL. Measurements with Carbo HSP40/70 particles were conducted with various particle and sCO2 temperatures and flow rates. Further, apart from regular MPBE operation, fault scenarios such as plate warping, particle stagnation, and choking were also detected and MPR showed excellent sensitivity to the detection of such conditions. Through the course of this project, MPR has evolved from a sensitive laboratory technique to a rugged industrial tool with various applications in high temperature measurements and diagnostics.

14 SOLAR ENERGY↗

The Near Earth Object (NEO) Scout Spacecraft: A Low-cost Approach to In-situ Characterization of the NEO Population

This paper describes a microsatellite spacecraft with supporting mission profile and architecture, designed to enable preliminary in-situ characterization of a significant number of Near Earth Objects (NEOs) at reasonably low cost. The spacecraft will be referred to as the NEO-Scout. NEO-Scout spacecraft are to be placed in Geosynchronous Equatorial Orbit (GEO), cis-lunar space, or on earth escape trajectories as secondary payloads on launch vehicles headed for GEO or beyond, and will begin their mission after deployment from the launcher. A distinguishing key feature of the NEO-Scout system is to design the spacecraft and mission timeline so as to enable rendezvous with and landing on the target NEO during NEO close approach (<0.3 AU) to the Earth-Moon system using low-thrust/high-impulse propulsion systems. Mission durations are on the order 100 to 400 days. Mission feasibility and preliminary design analysis are presented, along with detailed trajectory calculations.

Woeppel, Eric A.↗

The Lucy Spacecraft

The Lucy spacecraft is developed from a combination of heritage components used on other NASA deep space missions, combined with a set of newly developed hardware specific to Lucy’s mission, most critically the solar arrays. These components are configured into a spacecraft capable of launching on the least expensive Atlas launch vehicle, deploying into a power-safe configuration, executing the high-precision Trojan asteroid encounters, and surviving the 12-year mission timeline.

planetary↗

Patience is a virtue: A data-driven analysis of rooftop solar PV permitting timelines in the United States

© 2020 The Authors Local permitting can ensure the safe installation and operation of rooftop solar photovoltaic (PV) systems. At the same time, burdensome local permitting processes and local variation in requirements may pose challenges to PV deployment. In this article, we explore new data on the durations between key steps in the PV permitting process in the United States. The data suggest that a typical customer can expect to wait around 25–100 days from permit application until an installed system passes inspection. Permit durations vary significantly across jurisdictions, due in part to differences in local permitting policies. However, permit durations vary as significantly within jurisdictions as across them, in part due to significant variation across installers, suggesting that installer strategies and practices play an important role in permitting timelines. Permit durations have declined over time, reflecting progress from permit streamlining policies and jurisdiction learning-by-doing, though durations have stabilized in recent years. The data suggest that typical PV customers still face long and uncertain permitting timelines in the United States.

O'Shaughnessy, E↗

Autonomy @NASA

NASA's work in deploying autonomy technologies to improve aeronautics and space missions over the last 25 years. Widely disseminated examples are highlighted, mostly in a few timeline charts, but with a few specific examples.

Van Dalsem, William R.↗

The Big Plunge at Venus: The DAVINCI Descent Phase

DAVINCI (Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging) was selected as one of two new Discovery missions in summer of 2021 with the primary goals to study how the Venus atmosphere formed and changed over time. DAVINCI does this by making in situ measurements of the atmosphere, taking images below the cloud layer during the descent phase, and imaging the surface and clouds during two flyby science opportunities. The Descent Sphere is neither designed nor required to land on the surface so all critical science data must be taken and transmitted to a relay spacecraft prior to impact. This architecture drives the mission to a carefully-crafted concept of operations; deployments, instrument operations, and communications are choreographed to ensure the right data is gathered at the right altitude given the uncertainties in the trajectory and timeline. A complex flow of analyses and tests throughout development will validate the system’s ability to execute the mission goals. In the end DAVINCI will be ready for its one hour of descent time to meet its driving science goals.

DAVINCI↗