High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Studying the Impact of IBR Modeling on the Commonly Applied Transmission Line Protective Elements

It is a well-accepted fact that detailed inverter-based resource (IBR) models are needed for electromagnetic transient (EMT) studies, especially for protection studies and protection designs. However, it is not clear which modeling aspects should be included in the EMT model to accurately represent the IBR fault responses. Therefore, this paper addresses this gap by evaluating the impact of key modeling aspects (DC source, inverter model, power control, current/voltage control, and current limiting) on the response of protective relay elements both qualitatively and quantitatively. Both grid-following (GFL) and grid-forming (GFM) IBR models are comprehensively evaluated through a simplified real-world transmission network by varying the IBR modeling aspects, fault locations, and types. The insights and findings from this paper will benefit the power system protection community because this work provides modeling requirements and guidelines for IBR modeling so that correct IBR models will be used for protection scheme settings design.

grid-following inverter↗

Adaptive Threshold-Based Zonal Isolation of Faults in a Multiterminal DC Using Local Measurements

Fast and accurate methods of fault detection and isolation are a pre-emptive measure in multiterminal dc (MTdc) systems. Zonal isolation of faults is necessary to prevent any misopertation of the dc breakers that can lead to a shutdown of the network. Existing techniques require fast-communication or data synchronization methods have their own disadvantages. This article proposes a method for efficient fault zone isolation without the need of a communication link that prevents any misoperation of the dc breakers in a radial MTdc. This method provides individual local measurement-based control to the hybrid dc circuit breakers (dcCB). Faults created outside the zone of protection for a breaker create a change in the rate of change of current or voltage leading to misoperation. To avoid detection using a fixed threshold, an adaptive threshold based approach is suggested that updates the threshold based on the present operating status. Sensitivity analysis by varying the current limiting inductance and fault location is performed. In conclusion, a three terminal radial model of an MTdc is used for zonal isolation using power system computer aided design/electromagnetic transients including dc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Control Oriented Models for Co-Design: Technical Overview of MT HVDC, MVDC, and Solid State Transformer Building Blocks

The electric power system is shifting toward a power electronics–enabled grid, where converter based “building blocks” (e.g., high voltage direct current (HVDC) links, multi terminal HVDC (MT HVDC) networks, medium voltage DC (MVDC) links, and solid state transformers (SSTs)) provide fast, precise control of power flows, voltage, and frequency. This report develops and applies publicly shareable electromagnetic transient (EMT) and phasor models to examine how such building blocks can be composed and coordinated to support offshore wind integration, inter area transfers, feeder support, and resilience. Section 2 documents a modular multilevel converter (MMC)–based MT HVDC modeling framework and two use cases: a compact WSCC/IEEE 9 bus test system and a 240 bus “mini WECC” case with five offshore wind plants (OWFs). Phasor to EMT transfer, initialization, and sanity checks are summarized, and neutral demonstrations of normal and contingency operation are reported. Section 3 frames the problem of wind plant inertial frequency response (IFR): shaping energy release and recovery to improve nadir while avoiding aerodynamic stall; representative simulations illustrate the issues without disclosing proprietary control. Section 4 develops MVDC concepts through an IEEE 16 bus loop and an Olympic Peninsula case study that compares AC vs. MVDC corridors and shows how feeder headroom can be pooled via DC couplers. Section 5 surveys SST architectures and identifies a gap: scalable, communication free coordination of multiple SSTs for islanded feeder networks. Across the report, novel methods and configurations under separate publication and IP review are not disclosed; only topic oriented, replicable setups and non proprietary results are shown. These models and use cases are intended as foundations for future publications and co design studies on architecture, control, and coordination of PE enabled grids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DC Microgrids Under Denial of Service Attacks: Feasibility and Stability Issues

Distributed control has been extensively studied for a DC microgrid to coordinate multiple grid assets where each asset can generate its own control decisions based on communications within its neighborhood. Nevertheless, such a control strategy usually has a strong dependence on active information exchange and needs to always maintain a pre-determined communication graph. This makes it vulnerable to cyber attacks, especially denial of service (DoS) attacks that block communication channels that effectively change the communication graph. In this paper, we study two potential impacts of DoS attacks: the inability to maintain steady-state and dynamical generation-demand balance, i.e. the feasibility and stability issues. We develop a mathematical model to describe the cyber-induced system steady-state and dynamical performance. The model reveals the impacts of DoS attacks and enables formal analysis. Case studies are shown to verify the proposed work.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Adaptive Fault Current-Limiting Control of MMC for Protection of Multiterminal HVDC Systems

A crucial requirement of the protection system for multi-terminal high-voltage DC (MTDC) transmission is that it is capable of selectively isolating the faulty area from the healthy part of the network using DC circuit breakers (DCCBs), while ensuring continuous operation of converter stations in the healthy part of the network. But in the half-bridge modular multilevel converters (HB-MMCs) based MTDC system, since HB-MMCs do not have fault current absorption capability, when a DC fault occurs, the rising fault currents can quickly reach the blocking threshold within a few milliseconds and disrupt the operation of the MMCs in the healthy part. To facilitate fault-ride-through capability of MTDC system, large DC reactors are often considered in series with DCCBs to reduce the rate of rise of the fault current and prevent blocking the MMCs in the healthy part of the DC networks; however, large DC reactors prohibitively increase the cost of the system, introduce stability issues and can create post-fault oscillations. This paper presents an adaptive fault current-limiting control method for MMCs to avoid their blocking and enable the continuous operation of the healthy part of MTDC systems. The method contains two parts: The first part is based on circulating current feedforward control, which emulates virtual reactors in each arm of an MMC, and is immediately activated when the fault current starts to increase to reduce the rate of rise of the fault current. The second part temporarily bypasses all the submodules when the fault current exceeds a preset threshold, complementing the fault current-limiting effect of the first part. Neither part requires fault detection signals, and they are automatically activated during faults. Simulation case studies of a four-terminal bipolar MMC-based high-voltage DC system are presented to demonstrate the effectiveness of the proposed control methods.

active fault current limiting↗

Decentralized Carrier Phase Shifting for Optimal Harmonic Minimization in Asymmetric Parallel-Connected Inverters

This paper presents a carrier phase shifting technique for minimizing the aggregate harmonics in networks of asymmetric parallel-connected inverters for distributed power generation system applications. The proposed technique is: 1) implemented in a decentralized manner, relying only on local voltage and current measurements, and 2) optimal in the sense that it minimizes a cost function representing the carrier-frequency current harmonics. The analysis indicates that the proposed optimal carrier phase shifting technique can enable order-of-magnitude reductions in harmonic power, and also universal improvements compared to symmetric carrier interleaving for asymmetric inverter networks. Moreover, compared to existing methods that require either centralized communication or information exchange between inverters to coordinate carriers, the proposed technique is completely decentralized, which provides important practical benefits for implementation, including improved robustness and reduced cost. The technique is experimentally validated on a network of three single-phase 2-kW inverters and demonstrates a 36.5% reduction in the weighted total harmonic distortion factor of the aggregate inverter current, and the ability to converge to the optimal carrier phase spacing dynamically in less than one line frequency cycle (16.7 ms) in steady state and transient operating conditions.

42 ENGINEERING↗

A simulation framework for evaluating electronic order workflows in integrated health records

Electronic health record (EHR) systems are critical to modern healthcare delivery, yet the dynamic workflows that govern electronic order processing remain underexplored. Inefficiencies in these digital pathways can cause delays in care, repetitive workloads, and even patient harm. This study presents a discrete-event simulation framework used to reconstruct and evaluate EHR-based order workflows in a large integrated healthcare system. Using real-world data extracted from the Veterans Health Administration’s Corporate Data Warehouse, the authors mapped order events to standardized state transitions and modeled their progression across different facilities of varying complexity levels. After being calibrated with empirical distributions of transition times and validated against observed time-in-system metrics, the simulation demonstrates close alignment with historical performance. Scenario analyses reveal that resource capacity constraints significantly amplify the impact of electronic order surges, which are reflected in the disproportionate growth in backlogs and processing delays. Adjustments in transition probabilities further increased recirculation and extended workflow paths. Network-based analysis identified Reserved, InProgress, and Completed as structurally critical states that function as hubs within the process network but the transitions in-between also act as major bottlenecks. These results showcased the effectiveness of simulation-based approaches in monitoring EHR order processing performance and evaluating consequences of workflow changes on healthcare network resources planning. The proposed simulation framework provides a scalable data-driven tool to support operational decision-making and improve the efficiency of electronic order management in complex healthcare environments.

Engineering↗

Evaluating Utility-Scale PV-Battery Hybrids in an Operational Model for the Bulk Power System

Systems that combine solar photovoltaic and battery energy storage technologies (PV-BES) are increasingly being proposed and deployed on the bulk power system. The operations and value of PV-BES systems have been extensively studied from the project developer's perspective through analyses that maximize plant-level revenue. However, PV-BES hybrids' operational characteristics are seldom studied from the perspective of bulk power system operators, who seek to optimize the performance of a suite of generation and storage assets that are connected via the transmission network. This work presents modeling approaches for representing and evaluating PV-BES hybrids in a model that optimizes operations across the bulk power system. Its novel contributions include demonstrating a technique to modify a unit commitment and dispatch model to represent the operational synergies of PV-BES hybrids. In particular, we describe the challenges and an approach for representing so-called DC-coupled PV-BES - which utilize a single bi-directional inverter - as a dispatchable resource in a commercial, production cost model (PCM), PLEXOS. We demonstrate this technique in a PCM study of the Los Angeles Department of Water and Power (LADWP) test system, by replacing existing PV and battery generators on the test system with our PV-BES hybrids. We then pursue scenario analysis that is designed to isolate the various drivers of operational strategies for DC-coupled PV-BES hybrids, including the nature of coupling, PV penetration on the system, and varying inverter loading ratios (or degrees of over-sizing of the PV field). Results from the analysis include utilization profiles for the PV DC energy across available pathways, dispatch profiles for the battery component, and the hybrid technologies' impacts on system-wide production costs. The approach presented in this paper can be used in any PCM that is looking to study PV-BES hybrids as a resource in different power system configurations and services.

14 SOLAR ENERGY↗

A Unified Photometric Redshift Calibration for Weak Lensing Surveys Using the Dark Energy Spectroscopic Instrument

The effective redshift distribution n(z) of galaxies is a critical component in the study of weak gravitational lensing. Here, we introduce a new method for determining n(z) for weak lensing surveys based on high-quality redshifts and neural-network-based importance weights. Additionally, we present the first unified photometric redshift calibration of the three leading stage-III weak lensing surveys, the Dark Energy Survey (DES), the Hyper Suprime-Cam (HSC) survey, and the Kilo-Degree Survey (KiDS), with state-of-the-art spectroscopic data from the Dark Energy Spectroscopic Instrument (DESI). We verify our method using a new, data-driven approach and obtain n(z) constraints with statistical uncertainties of the order of $σ_z$ ~ 0.01 and smaller. Our analysis is largely independent of previous photometric redshift calibrations and, thus, provides an important cross-check in light of recent cosmological tensions. Overall, we find excellent agreement with previously published results on the DES Y3 and HSC Y1 data sets, while there are some differences on the mean redshift with respect to the previously published KiDS-1000 results. We attribute the latter to mismatches in photometric noise properties in the COSMOS field compared to the wider KiDS self-organizing map-gold catalog. At the same time, the new n(z) estimates for KiDS do not significantly change estimates of cosmic structure growth from cosmic shear. Finally, we discuss how our method can be applied to future weak lensing calibrations with DESI data.

Lange, J. U. [American Univ., Washington, DC (Unit↗

Demonstration of Utility Managed Smart Charging for Multiple Benefit Streams (Final Report)

In the summer of 2020, the U.S. Department of Energy (DOE) awarded funding to Exelon’s Maryland utilities—Baltimore Gas and Electric (BGE), Delmarva Power & Light (DPL), and Potomac Electric Power Company (Pepco)—to implement the Smart Charge Management (SCM) pilot. This initiative aimed to design and implement managed electric vehicle (EV) charging strategies, evaluate the grid impacts of EV charging, and assess the utilities' ability to control EV load based on real-time grid conditions. The SCM pilot explored four aspects for continued improvement: (1) cybersecurity and managed charging functionality testing of two vendor platforms—WeaveGrid (telematics-based) and Shell Recharge Solutions (network-based)—which pursued charge scheduling and optimization through distinct approaches; (2) an analysis by Argonne National Laboratory (ANL) modeling team of three potential SCM enrollment scenarios within BGE and Pepco service territories over the next decade to assess future scalability; (3) employing customer engagement strategies, including surveys and a responsive pricing approach; and (4) the launch and implementation of pilots in Exelon’s Maryland territories in collaboration with WeaveGrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Multistage Stochastic Transmission Expansion Algorithm for Wide-Area Planning under Uncertainty

The overall objective for this project was to develop and demonstrate a set of methods for solving the transmission investment problem for a large network considering many possible scenarios of future conditions and multiple decision points when investments can be made. Project sub-objectives achieved this goal through a succession of extending the methods to apply to problems with increasing complexity or additional features, including the number of decision points, whether generation and transmission are co-optimized, and whether AC or DC power flow is used. A transmission model was developed for the Western Electric Coordinating Council (WECC) region, the high-voltage transmission system that serves the western third of the continental U.S. Using a dataset provided by WECC and by researchers from John Hopkins University, we have validated and demonstrated the model and used it to compare the new method for solving multi-stage stochastic transmission planning to several state-of-the-art techniques. The project has resulted in several key outcomes and achievements: The covariance-based method for choosing a small set of hours to represent short-term variability has superior performance in terms of accuracy to existing methods, including K-means clustering and Importance Sampling; The combined partitioning method for long-term uncertainty with the nested clustering approach for choosing representative hours for each long-term group has superior accuracy for equivalent computational effort compared with existing methods; Using the partitioning/clustering method combined with Sample Average Approximation provides both statistical bounds on the quality of the solution and at the same time, a complete investment plan for all contingencies in the full uncertainty set; no existing methods can provide both at the same time; The method is demonstrated to work well for choosing both transmission and generation investments; A variant on the method allows for both scenario selection and simultaneous correction for the error from the DC power flow approximation to provide a tractable method for AC power flow-based transmission planning under uncertainty; The method applied to the WECC case study demonstrates the additional value to the system operator and the consumer of identifying flexible investment options in the near-term decisions. In particular, the case study exhibits significant option value in postponing some transmission additions that appear useful but in some long-term system states create new congestion problems.

24 POWER TRANSMISSION AND DISTRIBUTION↗