One third of the world - A review of Pacific islands telecommunications requirements

This paper describes the Pacific Basin Communications Study, an assessment of Pacific islands telecommunications requirements, recently completed by the Public Service Satellite Consortium under contract with the National Aeronautics and Space Administration (NASA). The study describes extant and planned telecommunications systems in the region, examines user needs in terms of the development of governmental, social and commercial activities, and proposes and describes alternative technological solutions to communications problems. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed. This paper describes user requirements based on six months of field investigation and technological options for improving telecommunications in the Pacific islands.

Hurd, J. N.↗

Pacific Basin Communications Study, Volume 1

The Pacific Basin Communications Study describes and assesses extent telecommunications systems in the Pacific Islands region. The study examines user needs in terms of the development of social services and commercial activities. Alternative technological solutions to communications problems are proposed and described. Recommendations include the augmentation and improvement of existing systems allowing for increased communications capacity. Regional cooperation will be required to accommodate the specific, unique requirements of individual nations. Questions of financing, implementation, management, costs and benefits of a regional telecommunications system are discussed.

Young, E. L.↗

Space Station Engineering and Technology Development. Proceedings of the Panel on Program Performance and Onboard Mission Control

An ad-hoc committee was asked to review the following questions relevant to the space station program: (1) onboard maintainability and repair; (2) in-space research and technology program and facility plans; (3) solar thermodynamic research and technology development program planning; (4) program performance (cost estimating, management, and cost avoidance); (5) onboard versus ground-based mission control; and (6) technology development road maps from IOC to the growth station. The objective of these new assignments is to provide NASA with advice on ways and means for improving the content, performance, and/or effectiveness of these elements of the space station program.

Source record↗

Shuttle Ground Operations Efficiencies/Technologies (SGOE/T) study. Volume 3: Final presentation material

Charts used in the Final Phase 1 Oral Briefing at Kennedy Space Center on April 6, 1987, and to the Space Transportation Architecture Study (SPAS) Interim Program Review (IPS-5) held at MSFC on April 8, 1987, are contained. Topics discussed include: identification of existing or new technologies to reduce cost; management approaches; recommendations for research or development of specific technology for future use; and identification of new management techniques.

Scholz, A. L.↗

Teaming for Exploration

A multibillion-dollar NASA contracting effort, the largest since the Apollo, shuttle, and space station developments, is formally underway with the release of the draft request for proposals for the Crew Exploration Vehicle (CEV) to replace the shuttle and eventually return astronauts to the Moon as a stepping-stone to Mars. With guidance from the draft request for proposals (RFP) now in hand, contractors are beginning a flurry of activity to posture for formal bids and to align their earlier in-house concepts with major new exploration program specifics, including strong guidelines on managing cost and risk. And Lockheed Martin will announce this week that it is teaming with EADS Space Transportation for the CEV contract. Should this team win, Europe's largest aerospace contractor would be in line for a key role in developing a replacement for the shuttle and renewed human operations on the lunar surface.

Covault, Craig↗

NASA Space Technology Roadmaps and Priorities: Restoring NASA's Technological Edge and Paving the Way for a New Era in Space

Success in executing future NASA space missions will depend on advanced technology developments that should already be underway. It has been years since NASA has had a vigorous, broad-based program in advanced space technology development, and NASA's technology base is largely depleted. As noted in a recent National Research Council report on the U.S. civil space program: Future U.S. leadership in space requires a foundation of sustained technology advances that can enable the development of more capable, reliable, and lower-cost spacecraft and launch vehicles to achieve space program goals. A strong advanced technology development foundation is needed also to enhance technology readiness of new missions, mitigate their technological risks, improve the quality of cost estimates, and thereby contribute to better overall mission cost management. Yet financial support for this technology base has eroded over the years. The United States is now living on the innovation funded in the past and has an obligation to replenish this foundational element. NASA has developed a draft set of technology roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist. The NRC appointed the Steering Committee for NASA Technology Roadmaps and six panels to evaluate the draft roadmaps, recommend improvements, and prioritize the technologies within each and among all of the technology areas as NASA finalizes the roadmaps. The steering committee is encouraged by the initiative NASA has taken through the Office of the Chief Technologist (OCT) to develop technology roadmaps and to seek input from the aerospace technical community with this study.

Source record↗

Integrating Existing Simulation Components into a Cohesive Simulation System

A tradition of leveraging the re-use of components to help manage costs has evolved in the development of complex system. This tradition continues on in the Joint Polar Satellite System (JPSS) Program with the cloning of the Suomi National Polar-orbiting Partnership (NPP) satellite for the JPSS-1 mission, including the instrument complement. One benefit of re-use on a mission is the availability of existing simulation assets from the systems that were previously built. An issue arises in the continual shift of technology over a long mission, or multi-mission, lifecycle. As the missions mature, the requirements for the observatory simulations evolve. The challenge in this environment becomes re-using the existing components in that ever-changing landscape. To meet this challenge, the system must: establish an operational architecture that minimizes impacts on the implementation of individual components, consolidate the satisfaction of new high-impact requirements into system-level infrastructure, and build in a long-term view of system adaptation that spans the full lifecycle of the simulation system. The Flight Vehicle Test Suite (FVTS) within the JPSS Program is defining and executing this approach to ensure a robust simulation capability for the JPSS multi-mission environment

McLaughlin, Brian J.↗

Workforce for the Future Development of Space Access Vehicles

The development of advanced vehicles that will travel between planetary surfaces with atmospheres and space requires the availability of experimental and computational capabilities that accomplish the research leading to new technologies and the development, test, and evaluation (RDT&E) of new flight systems. The United States is at risk of not having the required RDT&E workforce – qualified and in sufficient numbers – in place and ready to meet the future market’s commercial and defense needs. Systemic challenges include uncertain Federal budgets that limit and interrupt government research and development, the projectized nature of new space access systems that drive boom/bust cycles, an aging aerospace workforce (compounded by a mid-age demographic gap), limited to declining investment in sustaining and advancing experimental and computational tools infrastructure, lack of standards for sharing (and leveraging) data, dramatically changing technologies, changing social norms, and potentially large increases in commercial market needs. Flight systems have mission-based trajectories to and from space and designers must ensure risk is properly assessed across the entire trajectory. Thus, physics questions must be answered at each stage of flight, which requires a suite of experimental and computational tools. The RDT&E workforce utilizing these tools include subject matter experts from the producers, interested in acquiring data and information on the product, and from the capabilities being utilized, interested in addressing the product customer’s needs (providing robust data collection techniques, data quality, timeliness – available when needed, efficient with cost management, and teaming on data analysis). This requires a range of skills – in addition to aerospace, other engineers, and software developers, a highly trained and certified craft and technician workforce is critical to future success. This paper will present a human resources construct that addresses the system of needs for people – including, but more than just technical skills and an application of that construct in the hypersonic Test and Evaluation (T&E) community. This is part of a larger AIAA effort to document challenges and associated best practices for the aerospace RDT&E workforce.

Steven C Dunn↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, management insight benefits, and provides lessons learned from past IBRs. The appendices contain example documentation typically used in connection with an IBR. Note: Appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

Christopher Lewis Sadler↗

Exploring the Clouds of Venus: Science Driven Aerobot Missions to Our Sister Planet

Venus is essential to our understanding of the evolution and habitability of Earth-size planets throughout the galaxy. The selection of the VERITAS, EnVision, and DAVINCI missions by NASA and ESA in June 2021 is an important step in advancing the science. However, addressing many of the most challenging questions will require in situ platforms that can operate in the Venus environment for extended periods in order to capture the full complexity of our sister planet. Aerobots are aerial vehicles that exploit buoyancy to achieve long-duration operation in the Venus cloud layer where environmental conditions are comparatively benign. Buoyancy control, explained in more detail in a companion paper at this conference, allows aerobots to change altitude with little energy expenditure enabling new scientific measurement opportunities. These include atmospheric chemistry, dynamics, geophysical measurements of the crust and interior and geological investigations enabled by high resolution surface imaging. One aspect to our approach to defining missions that fit within the resource constraints of competitive missions is keeping the scale small. Today’s science-driven appetite for sophisticated measurements and large volumes of data is driving size upwards but advances in technology can enable aerobots that can be delivered to Venus at manageable costs. The other aspect is supporting the aerobot at Venus with orbiters providing data relay, localization and synergistic science. The recently selected orbiters, equipped with low-cost proximity relay systems routinely used at Mars may obviate the need for dedicated orbiters thereby enabling Discovery mission candidates. Four aerobot mission concepts have been defined which fit comfortably within the current New Frontiers (NF) cost cap ($900M in $FY22). One of these concepts would also be a candidate for a Discovery mission if that cost cap ($500M in $FY19) were raised. Raising the NF cost cap would enable more capable aerobot missions combining both altitude control with synergistic orbital observations. Investigations of surface geology at high resolution with subcloud NIR nightside imaging and dropsondes on the dayside of Venus could also benefit from collaborations with foreign contributions.

"O'Rourke, Joseph"↗

The Future of NASA Earth Science in the Commercial Cloud: Challenges and Opportunities

NASA produces a large volume and variety of data products that are used every day to support research, decision making, and education. The widespread use of NASA’s Earth Science data is enabled by NASA’s Earth Science Data System (ESDS) program, which oversees the archiving and distribution of these data and invests in the development of new data systems and tools. However, NASA’s current approach to Earth Science data distribution — based on distributed institutional archives with individual on-premises high-performance computing capabilities — faces some significant challenges, including massive increases in data volume from upcoming missions, a greater need for transdisciplinary science that synthesizes many different kinds of observations, and a push to make science more open, inclusive, and accessible. To address these challenges, NASA is aggressively migrating its Earth Science data and related tools and services into the commercial cloud. Migration of data into the commercial cloud can significantly improve NASA’s existing data system capabilities by (1) providing more flexible options for storage and compute (including rapid, as-needed access to state-of-the-art capabilities); (2) by centralizing and standardizing data access, which gives all of NASA’s institutional data centers access to all of each other’s datasets; and (3) by facilitating “analysis-in-place”, whereby users can bring their own computational workflows and tools to the data rather than having to maintain their own copies of NASA datasets. However, migration to the commercial cloud also poses some significant challenges, including (1) managing costs under a “pay-as-you-go” model; (2) incompatibility with existing tools and data formats with object-based storage and network access; (3) vendor lock-in; (4) challenges with data access for workflows that mix on-premise and cloud computing; and (5) standardization for highly diverse data as is present in NASA’s data archive. I conclude with two examples of recent NASA activities showcasing capabilities enabled by the commercial cloud: An interactive analysis and development platform for analyzing airborne imaging spectroscopy data, and a new collection of tools and services for data discovery, analysis, publication, and data-driven storytelling (Visualization, Exploration, and Data Analysis, VEDA).

Alexey N Shiklomanov↗

Integrated Baseline Review (IBR) Handbook

The purpose of this handbook is intended to be a how-to guide to prepare for, conduct, and close-out an Integrated Baseline Review (IBR). It discusses the steps that should be considered, describes roles and responsibilities, tips for tailoring the IBR based on risk, cost, management insight benefits, and provides lessons learned from past IBRs. The appendices contain example documentation typically used in connection with an IBR. Note: Appendices are examples only, and should be tailored to meet the needs of individual projects and contracts. Following the guidance in this handbook will help customers and suppliers preparing for an IBR understand the expectations of the IBR, and ensure that the IBR meets the requirements for both in-house and contract efforts.

Christopher Lewis Sadler↗

Cost and schedule management on the quiet short-haul research aircraft project

The Quiet Short-Haul Research Aircraft (QSRA) Project, one of the largest aeronautical programs undertaken by NASA to date, achieved a significant cost underrun. This is attributed to numerous factors, not the least of which were the contractual arrangement and the system of cost and schedule management employed by the contractor. This paper summarizes that system and the methods used for cost/performance measurement by the contractor and by the NASA project management. Recommendations are made for the use of some of these concepts in particular for future programs of a similar nature.

Wilcox, D. E.↗

Mission management, planning, and cost: PULSE Attitude And Control Systems (AACS)

The Pluto unmanned long-range scientific explorer (PULSE) is a probe that will do a flyby of Pluto. It is a low weight, relatively low costing vehicle which utilizes mostly off-the-shelf hardware, but not materials or techniques that will be available after 1999. A design, fabrication, and cost analysis is presented. PULSE will be launched within the first decade of the twenty-first century. The topics include: (1) scientific instrumentation; (2) mission management, planning, and costing; (3) power and propulsion systems; (4) structural subsystem; (5) command, control, and communication; and (6) attitude and articulation control.

Source record↗

Improving Space Project Cost Estimating with Engineering Management Variables

Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

Hamaker, Joseph W.↗

Life sciences payload definition and integration study. Volume 4: Appendix, costs, and data management requirements of the dedicated 30-day laboratory

The results of the updated 30-day life sciences dedicated laboratory scheduling and costing activities are documented, and the 'low cost' methodology used to establish individual equipment item costs is explained in terms of its allowances for equipment that is commerical off-the-shelf, modified commercial, and laboratory prototype; a method which significantly lowers program costs. The costs generated include estimates for non-recurring development, recurring production, and recurring operations costs. A cost for a biomedical emphasis laboratory and a Delta cost to provide a bioscience and technology laboratory were also generated. All cost reported are commensurate with the design and schedule definitions available.

Source record↗

Cost efficient command management

The design and implementation of a command management system (CMS) for a NASA control center, is described. The technology innovations implemented in the CMS provide the infrastructure required for operations cost reduction and future development cost reduction through increased operational efficiency and reuse in future missions. The command management design facilitates error-free operations which enables the automation of the routine control center functions and allows for the distribution of scheduling responsibility to the instrument teams. The reusable system was developed using object oriented methodologies.

Brandt, Theresa↗

A cost effective data management subsystem for the LST

The paper outlines the approach used in developing DMS (Data Management Subsystem) alternatives for the LST (Large Space Telescope) and in selecting the concept considered to be the most cost effective means of implementing the LST DMS requirements. Two candidate DMS concepts are discussed: a functionally integrated and a functionally separated one. For the single vehicle LST program, separation of the DMS functions best provides high reliability, operations flexibility, minimal interface complexity, and the least complex software development and verification task. The use of available hardware and NASA standard components is stressed.

Dougherty, J. A.↗