Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “cost effectiveness tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Refinement and demonstration of a coupled BISON-Griffin workflow for designing targeted TRISO transient experiments in TREAT

The U.S. nuclear industry is expected to deploy tristructural isotropic (TRISO) particle fuel technologies for commercial reactors within the next decade. In previous work, we defined a preliminary transient design space for TRISO fuels, identified potential gaps in the available data, and began to develop multiphysics modeling tools that could be applied to design targeted Transient Reactor Test Facility (TREAT) experiments to fill these gaps. Here, this work builds on that foundation by (1) updating BISON fuel performance and Griffin reactor physics models to reflect the current TREAT experiment tube and capsule designs, (2) coupling the codes to improve the accuracy and usability of the transient design analyses, and (3) demonstrating their use over an expanded design space that includes fuel burnup. The simulated mechanical responses of the TRISO particles were complex functions of fission product accumulation, fission gas release, and irradiation-induced dimensional change in the pyrolytic carbon layers. The predicted tangential stresses in the particles' silicon carbide layers were least compressive for preheated tests involving fresh fuels but remained compressive throughout the ranges of temperature, heat rate, and burnup considered in this work. Finally, comparisons between the potential TREAT transients and historical test reactor irradiations showed that the TREAT tests would produce significantly lower average energy deposition rates, yielding less severe transients with greater relevance to near-term commercial applications. The use of these predictive capabilities has the potential to increase the value of each test, improving the overall efficiency and cost-effectiveness of transient testing for TRISO and other advanced fuels.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Bell Creek Test Site - Development of a Cost-Effective, Long-Term Monitoring Strategy

The Bell Creek oil field is operated by Denbury Onshore LLC (Denbury) as a commercial enhanced oil recovery (EOR) project which provides an opportunity to improve the understanding of associated carbon dioxide (CO 2 ) storage that occurs as a natural part of the EOR process as well as provides a large-scale CO 2 injection site that can be used to inform carbon storage in deep saline formations (DSFs). The Plains CO 2 Reduction (PCOR) Partnership Bell Creek project, which is conducted in collaboration with the commercial project, provides a substantive opportunity for the validation of viable monitoring, verification, and accounting (MVA) strategies with applicability to both large-scale carbon storage in DSFs and associated carbon storage through EOR. In collaboration with Denbury, a 5-year research MVA program was conducted to demonstrate 16 MVA techniques with applications to geologic CO 2 storage scenarios. The program represents 1.5 years of preinjection and over 3 years of operational MVA activities coinciding with the first 3.2 million tons of associated CO 2 storage. Insights provided through the Bell Creek project and investigation into a long-term monitoring plan have resulted in an ongoing field demonstration of two emerging geophysical techniques, the Krauklis seismic wave (K-wave) and scalable, automated, semipermanent seismic array (SASSA), through complementary projects. These techniques show promise for providing more cost-efficient, lower-impact, near-real-time solutions for long-term monitoring. If proven successful, these techniques will provide additional techniques compatible with long-term monitoring strategies. While the development of a long-term monitoring plan for the Bell Creek project will take into consideration specific operations and benefits to the project, the case study will provide recommendations that are expected to be broadly applicable for commercial carbon storage projects throughout the PCOR Partnership region and the wider deployment of carbon capture and storage.

02 PETROLEUM↗

Development and in-flight performance of the Mariner 9 spacecraft propulsion system

On November 14, 1971, Mariner 9 was decelerated into orbit about Mars by a 1334-newton (300-lbf) liquid bipropellant propulsion system. The development and in-flight performance are described and summarized of this pressure-fed, nitrogen tetroxide/monomethyl hydrazine bipropellant system. The design of all Mariner propulsion subsystems has been predicated upon the premise that simplicity of approach, coupled with thorough qualification and margin-limits testing, is the key to cost-effective reliability. The qualification test program and analytical modeling of the Mariner 9 subsystem are discussed. Since the propulsion subsystem is modular in nature, it was completely checked, serviced, and tested independent of the spacecraft. Proper prediction of in-flight performance required the development of three significant modeling tools to predict and account for nitrogen saturation of the propellant during the six-month coast period and to predict and statistically analyze in-flight data. The flight performance of the subsystem was excellent, as were the performance prediction correlations. These correlations are presented.

Evans, D. D.↗

Development and in-flight performance of the Mariner 9 spacecraft propulsion system

On November 14, 1971, Mariner 9 was decelerated into orbit about Mars by a 1334 N (300 lbf) liquid bipropellant propulsion system. This paper describes and summarizes the development and in-flight performance of this pressure-fed, nitrogen tetroxide/monomethyl hydrazine bipropellant system. The design of all Mariner propulsion subsystems has been predicted upon the premise that simplicity of approach, coupled with thorough qualification and margin-limits testing, is the key to cost-effective reliability. The qualification test program and analytical modeling are also discussed. Since the propulsion subsystem is modular in nature, it was completely checked, serviced, and tested independent of the spacecraft. Proper prediction of in-flight performance required the development of three significant modeling tools to predict and account for nitrogen saturation of the propellant during the six-month coast period and to predict and statistically analyze in-flight data.

Evans, D. D.↗

Monitored background radiometer

The infrared (IR) testing of the Olympus thermal model has provided a capability to perform cost effective thermal balance testing of satellites and satellite components. A high-accuracy monitored background radiometer was developed for the measurement of absorbed radiation heat flux encountered during IR thermal vacuum testing of spacecraft. The design, development, and calibration of this radiometer is described.

Ruel, C.↗

MISSE Results Used for RF Plasma Ground Testing-To-Space-Exposure Correlation for Coated Kapton

The ability to predict the durability of materials in the low Earth orbit (LEO) environment by exposing them in ground-based facilities is important because one can achieve test results sooner, expose more types of materials, and do it much more cost effectively than to test them in flight. However, flight experiments to determine the durability of groups or classes of materials that behave similarly are needed in order to provide correlations of how much time in ground-based facilities represents certain durations in LEO for the material type of interest. An experiment was designed and flown on the Materials International Space Station Experiment (MISSE) 2 (3.95 yr in LEO) and MISSE 4 (1.04 yr in LEO) in order to develop this type of correlation between ground-based RF plasma exposure and LEO exposure for coated Kapton. The experiment consisted of a sample of Kapton H (DuPont) polyimide coated with 1300 of silicon dioxide by Sheldahl, Inc. The samples were exposed to atomic oxygen in a radio frequency (RF) generated atomic oxygen plasma. Mass change was measured for the samples and then the same samples were exposed in flight on MISSE and the mass change was again recorded post-flight. After documentation, the samples were exposed again in the ground-based RF plasma in order to determine if the erosion would be the same as it had been in the same facility pre-flight which would indicate whether or not the sample had been damaged during flight and if the defects on the surface were those that were there preflight. The slopes of the mass change versus fluence plots were then used to develop a correlation factor that can be used to help predict the durability of coated Kapton in ground-based isotropic atomic oxygen plasma systems. This paper describes the experiment and presents the correlation factor results.

Miller, Sharon K. R.↗

The Use of Environmental Test Facilities for Purposes Beyond Their Original Design

Increasing demands from space flight project offices are requiring environmental testing facilities to become more versatile with increased capabilities. At the same time, maintaining a cost-effective approach to test operations has driven efforts to use these facilities for purposes beyond their original design. This paper presents an overview of the Jet Propulsion Laboratory's efforts to provide JPL's space flight projects with test facilities to meet unique test requirements and to serve the needs of selected outside customers. The large number of recent Mars Missions, including the Mars Pathfinder project, have required testing of components and systems in a Martian surface environment in facilities originally designed for deep space testing. The unique problems associated with performing these tests are discussed, along with practical solutions. Other unique test requirements are discussed including the use of space simulation chambers for testing high altitude balloon gondolas and the use of vacuum chambers for system level test firing of an ion propulsion engine.

Fisher, Terry C.↗

A mass additive technique for modal testing as applied to the Space Shuttle ASTRO-1 payload

Traditionally, a fixed base modal test has been performed as a means of verifying the coupled loads math model for Space Shuttle flight payloads. An alternate method, a free-free configured payload using mass loaded boundary conditions, is presented as a means of verifying the coupled loads model of the ASTRO-1 flight payload. This method allows evaluation of the influence of local load paths into the frequency range of the free-free test. The method is cost effective and does not contaminate the modal test results with fixture coupled modes or boundary condition uncertainties. This paper describes the mass additive modal test technique as applied to the Space Shuttle ASTRO-1 flight payload.

Coleman, A. D.↗

When is Testing Sufficient

The Software Assurance Technology Center (SATC) at NASA Goddard Space Flight Center has been investigating how projects can determine when sufficient testing has been completed. For most projects, schedules are underestimated, and the last phase of the software development, testing, must be decreased. Two questions are frequently asked: "To what extent is the software error-free? " and "How much time and effort is required to detect and remove the remaining errors? " Clearly, neither question can be answered with absolute certainty. Nonetheless, the ability to answer these questions with some acceptable level of confidence is highly desirable. First, knowing the extent to which a product is error-free, we can judge when it is time to terminate testing. Secondly, if errors are judged to be present, we can perform a cost/benefit trade-off analysis to estimate when the software will be ready for use and at what cost. This paper explains the efforts of the SATC to help projects determine what is sufficient testing and when is the most cost-effective time to stop testing.

Rosenberg, Linda H.↗

Statistical Modeling of Photovoltaic Reliability Using Accelerated Degradation Techniques (Poster)

We introduce a cutting-edge life-testing technique, accelerated degradation testing (ADT), for PV reliability testing. The ADT technique is a cost-effective and flexible reliability testing method with multiple (MADT) and Step-Stress (SSADT) variants. In an environment with limited resources, including equipment (chambers), test units, and testing time, these techniques can provide statisticallyrigorous prediction of lifetime and other interesting parameters, such as failure rate, warranty time, mean time to failure, degradation rate, activation energy, acceleration factor, and upper limit level of stress. J-V characterization can be used for degradation data and the generalized Eyring model can be used for the thermal-humidity stress condition. The SSADT model can be constructed basedon the cumulative damage model (CEM), which assumes that the remaining test united are failed according to cumulative density function of current stress level regardless of the history on previous stress levels.

14 SOLAR ENERGY↗

Thermal Propulsion Capture System Heat Exchanger Design

One of the biggest challenges of manned spaceflight beyond low earth orbit and the moon is harmful radiation that astronauts would be exposed to on their long journey to Mars and further destinations. Using nuclear energy has the potential to be a more effective means of propulsion compared to traditional chemical engines (higher specific impulse). An upper stage nuclear engine would allow astronauts to reach their destination faster and more fuel efficiently. Testing these engines poses engineering challenges due to the need to totally capture the engine exhaust. The Thermal Propulsion Capture System is a concept for cost effectively and safely testing Nuclear Thermal Engines. Nominally, hydrogen exhausted from the engine is not radioactive, but is treated as such in case of fuel element failure. The Thermal Propulsion Capture System involves injecting liquid oxygen to convert the hydrogen exhaust into steam. The steam is then cooled and condensed into liquid water to allow for storage. The Thermal Propulsion Capture System concept for ground testing of a nuclear powered engine involves capturing the engine exhaust to be cooled and condensed before being stored. The hydrogen exhaust is injected with liquid oxygen and burned to form steam. That steam must be cooled to saturation temperatures before being condensed into liquid water. A crossflow heat exchanger using water as a working fluid will be designed to accomplish this goal. Design a cross flow heat exchanger for the Thermal Propulsion Capture System testing which: Eliminates the need for water injection cooling, Cools steam from 5800 F to saturation temperature, and Is efficient and minimizes water requirement.

Richard, Evan M.↗

JV Task 119 - Effects of Aging on Treated Activated Carbons

For both the United States and Canada, testing has been under way for electric utilities to find viable and economical mercury control strategies to meet pending future mercury emission limits. The technology that holds the most promise for mercury control in low-chlorine lignite to meet the needs of the Clean Air Act in the United States and the Canada-Wide Standards in Canada is injection of treated activated carbon (AC) into the flue gas stream. Most of the treated carbons are reported to be halogenated, often with bromine. Under a previous multiyear project headed by the Energy & Environmental Research Center (EERC), testing was performed on a slipstream unit using actual lignite-derived flue gas to evaluate various sorbent technologies for their effectiveness, performance, and cost. Testing under this project showed that halogenated ACs performed very well, with mercury capture rates often {ge} 90%. However, differences were noted between treated ACs with respect to reactivity and capacity, possibly as a result of storage conditions. Under certain conditions (primarily storage in ambient air), notable performance degradation had occurred in mercury capture efficiency. Therefore, a small exploratory task within this project evaluated possible differences resulting from storage conditions and subsequent effects of aging that might somehow alter their chemical or physical properties. In order to further investigate this potential degradation of treated (halogenated) ACs, the EERC, together with DOE's National Energy Technology Laboratory, the North Dakota Industrial Commission (NDIC), the Electric Power Research Institute (EPRI), SaskPower, and Otter Tail Power Company, assessed the aging effects of brominated ACs for the effect that different storage durations, temperatures, and humidity conditions have on the mercury sorption capacity of treated ACs. No aging effects on initial capture activity were observed for any carbons or conditions in the investigation. As measured by the 50% breakthrough time, no changes in capacity were observed for Norit LH samples stored frozen and likely none for Norit LH samples stored under high humidity conditions. The major aging effects on capacity for the EERC brominated sample were seen as a decrease in capacity during the first week of storage under high humidity conditions. Storage of the Norit LH and the EERC 5% brominated samples under low humidity conditions resulted in slightly improved capacities. Storage of the 15% brominated sample under high humidity conditions also improved the capacity. Surface analysis using x-ray photoelectron spectroscopy (XPS) showed some migration of bromine to and from the surface occurred during storage, although no net loss of bromine was observed. The migration to the surface in the case of the 15% brominated carbon correlates with the increased capacity observed for this sample. The XPS elemental speciation data for the EERC brominated carbons showed a trend toward more bromide being formed at the expense of covalent bromine during storage. This was especially great for the 15% and the 5% stored in low humidity. The Norit LH samples did not show this increase in bromide concentration. This is consistent with the lack of change in capacity for the Norit LH during storage. The carbon speciation data showed generally more oxidization of carbon surfaces with storage, especially formation of carboxylate groups. The least increase in carboxylate groups was seen for the Norit LH stored under low humidity, which correlates with its increased capacity. In conclusion, the observed changes in surface chemistry can be related to the minimal changes in capacity observed, but the factors operate in different directions, so the relationships are complex. High-quality x-ray absorption fine structure spectra were obtained for most of the samples. Significant changes were observed in the x-ray absorption near edge structure and extended x-ray absorption fine structure spectra of the stored carbons, but proved difficult to interpret and correlate with structural changes.

01 COAL, LIGNITE, AND PEAT↗

Preliminary design of flight hardware for two-phase fluid research

This study defined the preliminary designs of flight software for the Space Shuttle Orbiter for three two-phase fluid research experiments: (1) liquid reorientation - to study the motion of liquid in tanks subjected to small accelerations; (2) pool boiling - to study low-gravity boiling from horizontal cylinders; and (3) flow boiling - to study low-gravity forced flow boiling heat transfer and flow phenomena in a heated horizontal tube. The study consisted of eight major tasks: reassessment of the existing experiment designs, assessment of the Spacelab facility approach, assessment of the individual carry-on approach, selection of the preferred approach, preliminary design of flight hardware, safety analysis, preparation of a development plan, estimates of detailed design, fabrication and ground testing costs. The most cost effective design approach for the experiments is individual carry-ons in the Orbiter middeck. The experiments were designed to fit into one or two middeck lockers. Development schedules for the detailed design, fabrication and ground testing ranged from 15 1/2 to 18 months. Minimum costs (in 1981 dollars) ranged from $463K for the liquid reorientation experiment to $998K for the pool boiling experiment.

Hustvedt, D. C.↗

Upgrades to Common Data Acquisition System Software Development for NASA's Rocket Propulsion Test Facilities and Software Reuse

Approximately five years ago, the National Aeronautics and Space Administration (NASA) Stennis Space Center (SSC) resumed operation of its large rocket engine test facilities after thirty years of contractor control. During this period, contactors used their own proprietary Data Acquisition System (DAS) to record and process rocket propulsion test data. The transition from a contractor managed facility to a NASA managed facility posed a difficult challenge. In order to support the commercial space launch initiative, SSC needed to develop a software replacement for the contractor proprietary DAS. This replacement software would enable SSC to operate propulsion test facilities more cost effectively and to be more readily able to adapt software for reuse, while at the same time provide internal and external customers with reliable population test data. Therefore, SSC developed in-house, a non-proprietary software suite of applications to replace the previously used proprietary DAS. The requirements for the DAS suite included recording and processing propulsion test data. This capability eliminates the necessity for customers to provide a DAS or rely on a competitor's DAS. An additional benefit of owning the software suite included enabling the ability to add additional features and functionality at a lower cost. The Rocket Propulsion Test (RPT) Program Office reviewed consideration for funding this project with the caveat that development of the software included availability for use with minimal modifications to all SSC test facilities and RPT centers: Marshall Space Flight Center (MSFC), White Sands Test Facility (WSTF), and Glenn Research Center (GRC) Plum Brook Station. Based upon this guideline, SSC created the NASA Data Acquisition System (NDAS) software suite. The ability to use the software at multiple centers, even though each field center uses differing DAS hardware with different capabilities, drove a requirement that the software design be portable with minimal modifications to the software. Then, with software release requirements, evaluations, and approvals completed, the NDAS software suite could also become available to other government agencies, corporations, universities, and the general United States public.

Herbert, Phillip W., Sr.↗

Gas-Centered Swirl Coaxial Liquid Injector Evaluations

Development of Liquid Rocket Engines is expensive. Extensive testing at large scales usually required. In order to verify engine lifetime, large number of tests required. Limited Resources available for development. Sub-scale cold-flow and hot-fire testing is extremely cost effective. Could be a necessary (but not sufficient) condition for long engine lifetime. Reduces overall costs and risk of large scale testing. Goal: Determine knowledge that can be gained from sub-scale cold-flow and hot-fire evaluations of LRE injectors. Determine relationships between cold-flow and hot-fire data.

Cohn, A. K.↗

Lessons Learned in Space Life Support System Testing

The earlier problems can be found and corrected, the easier and cheaper it is to fix them. Doing less testing saves cost and time but doing too little testing increases the risk of operational failures causing large costs and delays. Integrated test is necessary to determine if the subsystems work together and the overall architecture performs as intended. This report reviews the testing lessons learned from the NASA Systems Engineering Handbook, a National Research Council report, and five reviews of International Space Station (ISS) lessons learned. The five reviews all mention two important points. First, that testing should be performed on the final integrated system, one as close as possible to the intended flight system. Second, “test as you fly,” while operating as planned in an environment as close as possible to the expected flight environment. Other lessons are the need for extensive preflight ground testing, the need to establish and defend an adequate budget, the problems using protoflight hardware on ISS, and the benefit of having ISS as a zero gravity test bed. The major ISS life support systems, carbon dioxide removal, water recycling, and oxygen recovery, were protoflight systems with little testing before launch to ISS. The failure rates of these systems have been much greater than predicted and this has caused dissatisfaction with the protoflight approach. The more costly traditional approach builds qualification and test units in addition to flight units. The test units are used to find, analyze, and fix failure modes. Other work shows that there is an optimum cost-effective amount of testing when redundant systems must have a specified reliability and confidence.

Harry W. Jones↗