Cost Methodology for Biomass Feedstocks: Herbaceous Crops and Agricultural Residues

This report describes a set of procedures and assumptions used to estimate production and logistics costs of bioenergy feedstocks from herbaceous crops and agricultural residues. The engineering-economic analysis discussed here is based on methodologies developed by the American Society of Agricultural and Biological Engineers (ASABE) and the American Agricultural Economics Association (AAEA). An engineering-economic analysis approach was chosen due to lack of historical cost data for bioenergy feedstocks. Instead, costs are calculated using assumptions for equipment performance, input prices, and yield data derived from equipment manufacturers, research literature, and/or standards. Cost estimates account for fixed and variable costs. Several examples of this costing methodology used to estimate feedstock logistics costs are included at the end of this report.

09 BIOMASS FUELS↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Availability in Appliance Standards and Labeling Program Development and Evaluation

In this report, we describe the necessary data inputs for both standards development and program evaluation and perform an initial assessment of the availability and uncertainty of those data inputs in China. For standards development, we find that China and its standards and labeling program administrators currently has access to the basic market and technical data needed for conducting market and technology assessment and technological and economic analyses. Some data, such as shipments data, is readily available from the China Energy Label product registration database while the availability of other data, including average unit energy consumption, prices and design options, needs improvement. Unlike some other countries such as the United States, most of the necessary data for conducting standards development analyses are not publicly available or compiled in a consolidated data source. In addition, improved data on design and efficiency options as well as cost data (e.g., manufacturing costs, mark-ups, production and product use-phase costs) – key inputs to several technoeconomic analyses – are particularly in need given China’s unconsolidated manufacturing industry. For program evaluation, we find that while China can conduct simple savings evaluations on its incentive programs with the data it currently has available from the Ministry of Finance – the program administrator, the savings estimates produced by such an evaluation will carry high uncertainty. As such, China could benefit from an increase in surveying and metering in the next one to three years to decrease the uncertainty surrounding key data points such as unit energy savings and free ridership.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Fuel Cycle Cost Basis Report: Module D1-7 Contact-Handled Pelletized Pressurized Heavy Water (PHWR) UOX Fuel Fabrication (Rev.1)

In addition to literature-based pressurized heavy-water reactor (PHWR) fuel price information in the 2017 AFC-CBR, the what-it-takes (WIT) unit cost data in this update is informed by new analysis and escalation of the 1978 PHWR-UOX fuel life cycle cost (LCC) data from ORNL reports prepared for the 1977–1980 Nonproliferation Alternative Systems Assessment Program (NASAP). (These reports are referenced and summarized in detail in Module D1-PR.) The PHWR fuel fabrication LCC data in these reports is scaled from a bottom-up cost estimate for a reference technology pressurized-water reactor (PWR)—uranium oxide (UOX) fuel fabrication plant by using algorithms that consider the manufacturing process complexity, fuel design complexity, plant floor space requirements, and the radiation and health, safety, and environmental (HS&E) regulatory environment of PHWR-UOX fuel production vis-à-vis light-water reactor (LWR)-UOX production (PWR fuel in this case). The module name has been changed from “Canadian Deuterium Uranium (CANDU)” to the more generic PHWR fuel fabrication in recognition that not all power reactors that might use this fuel type are considered. Unfortunately, the detailed algorithms and their design bases were not archived at the end of the NASAP effort of the commercial CANDU concept specifically developed in the middle of the last century by Atomic Energy of Canada Limited (AECL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SMART Task 6: Evaluation of the Costs of Geologic CO2 Storage for the Illinois Basin Decatur Project Site Using the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) Model

This is a presentation featuring an analysis related to SMART Task 6 in which CO2 storage costs are presented. The National Energy Technology Laboratory has developed the NRAP/SMART Technoeconomic and Liability Evaluation for Storage (TALES) model to provide quantitative cost-based insights to support developers planning CO2 injection and storage projects. TALES calculates the revenues, costs, and financial performance of candidate CO2 saline storage project based on site-specific activity costs and financial parameters. TALES is being integrated as a module pertaining to storage cost as part of the broader SMART Visualization and Decision Support Platform (SVDSP). In this study, the TALES model was applied using real activity cost data associated with the development and operations at the Illinois Basin Decatur Project (IBDP) CO2 storage project site. Scenario analysis was implemented in which crucial operational and cost attributes were varied and the associated cost implications observed. Key results data and project cost summary metrics like first-year breakeven price of CO2 ($/tonne) and net present value (NPV) are presented in similar fashion to how they will appear in the SVDSP.

Vikara, Derek↗

Jobs and Economic Development Impact (JEDI) User Reference Guide: Fast Pyrolysis Biorefinery Model

This guide -- the JEDI Fast Pyrolysis Biorefinery Model User Reference Guide -- was developed to assist users in operating and understanding the JEDI Fast Pyrolysis Biorefinery Model. The guide provides information on the model's underlying methodology, as well as the parameters and data sources used to develop the cost data utilized in the model. This guide also provides basic instruction on model add-in features and a discussion of how the results should be interpreted. Based on project-specific inputs from the user, the JEDI Fast Pyrolysis Biorefinery Model estimates local (e.g., county- or state-level) job creation, earnings, and output from total economic activity for a given fast pyrolysis biorefinery. These estimates include the direct, indirect and induced economic impacts to the local economy associated with the construction and operation phases of biorefinery projects.Local revenue and supply chain impacts as well as induced impacts are estimated using economic multipliers derived from the IMPLAN software program. By determining the local economic impacts and job creation for a proposed biorefinery, the JEDI Fast Pyrolysis Biorefinery Model can be used to field questions about the added value biorefineries might bring to a local community.

09 BIOMASS FUELS↗

Cost and Performance Baseline for Fossil Energy Plants - Volume 2: Coal to Synthetic Natural Gas and Ammonia [Slides]

Presentation of Volume 2: This report establishes performance and cost data for coal fueled plants producing synthetic natural gas and ammonia. The plants are based on a dry-feed entrained-flow gasifier and include cases using bituminous, sub-bituminous, and lignite coals. All configurations were studied with and without carbon sequestration. The analyses were performed on a consistent technical and economic basis that accurately reflects current market conditions for plants starting operation in 2012. This is believed to provide the most comprehensive set of cost and performance data available in the public literature to date. The cost and performance data were compiled from published reports, information obtained from vendor quotes and users of the technology, and data from designing and building projects.

01 COAL, LIGNITE, AND PEAT↗

Cost and Performance Baseline for Fossil Energy Plants - Volume 2: Coal to Synthetic Natural Gas and Ammonia

This report establishes performance and cost data for coal fueled plants producing synthetic natural gas and ammonia. The plants are based on a dry-feed entrained-flow gasifier and include cases using bituminous, sub-bituminous, and lignite coals. All configurations were studied with and without carbon sequestration. The analyses were performed on a consistent technical and economic basis that accurately reflects current market conditions for plants starting operation in 2012. This is believed to provide the most comprehensive set of cost and performance data available in the public literature to date. The cost and performance data were compiled from published reports, information obtained from vendor quotes and users of the technology, and data from designing and building projects.

01 COAL, LIGNITE, AND PEAT↗

Advanced Fuel Cycle Cost Basis Report: Module D1-2 LWR Pelletized MOX Fuel Fabrication

Nature of this 2021 Module update from previous AFC-CBRs: Use of U,Pu MOX life cycle cost data from late 1970s Non-proliferation Assessment Systems Analysis Program (NASAP). This archived data has been updated in 2018-2019 to reflect today’s regulatory and economic conditions and is presented in 2017. For the lower unit cost MOX fabrication case the PuO 2 from the reprocessed LWR SNF is assumed to be fabricated immediately after aqueous PUREX reprocessing, thus minimizing the time for undesirable actinide radioisotopes, from the standpoint of radiation safety, to build in. Fabricated MOX utilizing separated and multi-year stored Pu from aqueously reprocessed SNF has also been added to this Module as a second LWR MOX fabrication variant, requiring additional and more costly glovebox design and operations to protect personnel. This new NASAP-informed data augments historical data and unit cost projections appearing in the 2009 (Shropshire et al 2009), 2012 (Dixon et al 2012), and 2017 Dixon et al 2017) AFC-CBRs. The “What-it-takes” 2017 unit fabrication cost values based on the updated NASAP studies are escalated to 2020$ for this 2021 Update Report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

I'll take that to go: Big data bags and minimal identifiers for exchange of large, complex datasets

Big data workflows often require the assembly and exchange of complex, multi-element datasets. For example, in biomedical applications, the input to an analytic pipeline can be a dataset consisting thousands of images and genome sequences assembled from diverse repositories, requiring a description of the contents of the dataset in a concise and unambiguous form. Typical approaches to creating datasets for big data workflows assume that all data reside in a single location, requiring costly data marshaling and permitting errors of omission and commission because dataset members are not explicitly specified. We address these issues by proposing simple methods and tools for assembling, sharing, and analyzing large and complex datasets that scientists can easily integrate into their daily workflows. These tools combine a simple and robust method for describing data collections (BDBags), data descriptions (Research Objects), and simple persistent identifiers (Minids) to create a powerful ecosystem of tools and services for big data analysis and sharing. We present these tools and use biomedical case studies to illustrate their use for the rapid assembly, sharing, and analysis of large datasets.

Chard, Kyle↗

NETL CO 2 Injection and Storage Cost Model

The basic framework for this model provides costs for compliance with various sections of EPA's Class VI regulation and Subpart RR of the GHG Reporting Program. Cost analysis at two levels is provided by this model: site specific where the modeler can enter their own reservoir and cost data and regional in the form of cost supply curves. This model includes costs from initial regional geologic evaluation through site characterization, permitting, injection/MVA operations, post-injection site care to final site closure and transfer to long-term stewardship. A geologic and cost database was developed to support this model.

54 ENVIRONMENTAL SCIENCES↗

Improving Land Cover Classification Using Extended Multi-Attribute Profiles (EMAP) Enhanced Color, Near Infrared, and LiDAR Data

Hyperspectral (HS) data have found a wide range of applications in recent years. Researchers observed that more spectral information helps land cover classification performance in many cases. However, in some practical applications, HS data may not be available, due to cost, data storage, or bandwidth issues. Instead, users may only have RGB and near infrared (NIR) bands available for land cover classification. Sometimes, light detection and ranging (LiDAR) data may also be available to assist land cover classification. A natural research problem is to investigate how well land cover classification can be achieved under the aforementioned data constraints. In this paper, we investigate the performance of land cover classification while only using four bands (RGB+NIR) or five bands (RGB+NIR+LiDAR). A number of algorithms have been applied to a well-known dataset (2013 IEEE Geoscience and Remote Sensing Society Data Fusion Contest). One key observation is that some algorithms can achieve better land cover classification performance by using only four bands as compared to that of using all 144 bands in the original hyperspectral data with the help of synthetic bands generated by Extended Multi-attribute Profiles (EMAP). Moreover, LiDAR data do improve the land cover classification performance even further.

58 GEOSCIENCES↗

Deep Learning for Land Cover Classification Using Only a Few Bands

There is an emerging interest in using hyperspectral data for land cover classification. The motivation behind using hyperspectral data is the notion that increasing the number of narrowband spectral channels would provide richer spectral information and thus help improve the land cover classification performance. Although hyperspectral data with hundreds of channels provide detailed spectral signatures, the curse of dimensionality might lead to degradation in the land cover classification performance. Moreover, in some practical applications, hyperspectral data may not be available due to cost, data storage, or bandwidth issues, and RGB and near infrared (NIR) could be the only image bands available for land cover classification. Light detection and ranging (LiDAR) data is another type of data to assist land cover classification especially if the land covers of interest have different heights. In this paper, we examined the performance of two Convolutional Neural Network (CNN)-based deep learning algorithms for land cover classification using only four bands (RGB+NIR) and five bands (RGB+NIR+LiDAR), where these limited number of image bands were augmented using Extended Multi-attribute Profiles (EMAP). The deep learning algorithms were applied to a well-known dataset used in the 2013 IEEE Geoscience and Remote Sensing Society (GRSS) Data Fusion Contest. With EMAP augmentation, the two deep learning algorithms were observed to achieve better land cover classification performance using only four bands as compared to that using all 144 hyperspectral bands.

58 GEOSCIENCES↗

Battery Energy Storage Market: Commercial Scale, Lithium-ion Projects in the U.S.

This slide deck presents current market data on the commercial scale li-ion battery storage projects in the U.S. It includes existing project locations, cost data and project cost breakdown, a map of demand charges across the U.S. and information about how the ITC and MACRS apply to energy storage projects that are paired with solar PV technology.

14 SOLAR ENERGY↗