Contractors Road Heavy Equipment Area (SWMU 055) 2022 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from June through December 2022. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with sitewide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; - Semiannual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act (RCRA) Corrective Action program. HydroGeoLogic, Inc. (HGL) prepared this report for the National Aeronautics and Space NASA) under contract number 80KSC019F0096/80KSC019D0012, Technical Directive-03. An Advance Data Package (ADP) presentation of the elements of this report received Team (KSCRT) agreement at the April 5, 2023, KSCRT meeting. The chlorinated volatile organic compound plume appears to be stable vertically and horizontally. Additional DPT groundwater sampling will be completed to support a remedial alternatives evaluation for potential means to expedite groundwater cleanup. There are per- and polyfluorinated alkyl substances in site groundwater, and assessment is planned in the future. Sub-slab soil gas monitoring results do not indicate any concerns with indoor vapor intrusion. Based on the 2022 annual groundwater sampling results, it is recommended that annual sampling continue to alternate with the wet and dry season, with the next sampling event planned for December 2023.

groundwater↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Component-Level Electronic-Assembly Repair (CLEAR) Analysis of the Problem Reporting and Corrective Action (PRACA) Database of the International Space Station On-Orbit Electrical Systems

The NASA Constellation Program is investigating and developing technologies to support human exploration of the Moon and Mars. The Component-Level Electronic-Assembly Repair (CLEAR) task is part of the Supportability Project managed by the Exploration Technology Development Program. CLEAR is aimed at enabling a flight crew to diagnose and repair electronic circuits in space yet minimize logistics spares, equipment, and crew time and training. For insight into actual space repair needs, in early 2008 the project examined the operational experience of the International Space Station (ISS) program. CLEAR examined the ISS on-orbit Problem Reporting and Corrective Action database for electrical and electronic system problems. The ISS has higher than predicted reliability yet, as expected, it has persistent problems. A goal was to identify which on-orbit electrical problems could be resolved by a component-level replacement. A further goal was to identify problems that could benefit from the additional diagnostic and test capability that a component-level repair capability could provide. The study indicated that many problems stem from a small set of root causes that also represent distinct component problems. The study also determined that there are certain recurring problems where the current telemetry instrumentation and built-in tests are unable to completely resolve the problem. As a result, the root cause is listed as unknown. Overall, roughly 42 percent of on-orbit electrical problems on ISS could be addressed with a component-level repair. Furthermore, 63 percent of on-orbit electrical problems on ISS could benefit from additional external diagnostic and test capability. These results indicate that in situ component-level repair in combination with diagnostic and test capability can be expected to increase system availability and reduce logistics. The CLEAR approach can increase the flight crew s ability to act decisively to resolve problems while reducing dependency on Earth-supplied logistics for future Constellation Program missions.

Oeftering, Richard C.↗

Biology-inspired Architecture for Situation Management

Situation Management is a rapidly developing science combining new techniques for data collection with advanced methods of data fusion to facilitate the process leading to correct decisions prescribing action. Current research focuses on reducing increasing amounts of diverse data to knowledge used by decision makers and on reducing time between observations, decisions and actions. No new technology is more promising for increasing the diversity and fidelity of observations than sensor networks. However, current research on sensor networks concentrates on a centralized network architecture. We believe this trend will not realize the full potential of situation management. We propose a new architecture modeled after biological ecosystems where motes are autonomous and intelligent, yet cooperate with local neighborhoods. Providing a layered approach, they sense and act independently when possible, and cooperate with neighborhoods when necessary. The combination of their local actions results in global effects. While situation management research is currently dominated by military applications, advances envisioned for industrial and business applications have similar requirements. NASA has requirements for intelligent and autonomous systems in future missions that can benefit from advances in situation management. We describe requirements for the Integrated Vehicle Health Management program where our biology-inspired architecture provides a layered approach and decisions can be made at the proper level to improve safety, reduce costs, and improve efficiency in making diagnostic and prognostic assessments of the structural integrity, aerodynamic characteristics, and operation of aircraft.

Jones, Kennie H.↗

The automatic human

An overview is presented of the growth and role of automation in civil aircraft operations for both cockpit management and ground control. NASA has initiated a research program centered on furthering automation and developing a consistent and rational philosophy of human centered aircraft and air traffic control automation. Introduction of the NASA Aviation Safety Reporting System (ASRS) has proved successful in bringing together pilots and ground controllers to report incidents of operational anomalies that can then be analyzed, leading to corrective action to prevent similar reoccurrences. Attention is given to the growing trend of extensive automation in the cockpit that appears to be leading to a diminution of management control of the aircraft by the decreasing number of flight crew members. A majority of reports indicate that there is a serious mismatch between new aircraft capabilities and ATC procedures, which were designed for older aircraft. ASRS has also kept research oriented toward real problems and community needs.

Billings, Charles↗

Knowledge based jet engine diagnostics

A fielded expert system automates equipment fault isolation and recommends corrective maintenance action for Air Force jet engines. The knowledge based diagnostics tool was developed as an expert system interface to the Comprehensive Engine Management System, Increment IV (CEMS IV), the standard Air Force base level maintenance decision support system. XMAM (trademark), the Expert Maintenance Tool, automates procedures for troubleshooting equipment faults, provides a facility for interactive user training, and fits within a diagnostics information feedback loop to improve the troubleshooting and equipment maintenance processes. The application of expert diagnostics to the Air Force A-10A aircraft TF-34 engine equipped with the Turbine Engine Monitoring System (TEMS) is presented.

Jellison, Timothy G.↗

Stress Analysis and Testing at the Marshall Space Flight Center to Study Cause and Corrective Action of Space Shuttle External Tank Stringer Failures

After the launch scrub of Space Shuttle mission STS-133 on November 5, 2010, large cracks were discovered in two of the External Tank intertank stringers. The NASA Marshall Space Flight Center, as managing center for the External Tank Project, coordinated the ensuing failure investigation and repair activities with several organizations, including the manufacturer, Lockheed Martin. To support the investigation, the Marshall Space Flight Center formed an ad-hoc stress analysis team to complement the efforts of Lockheed Martin. The team undertook six major efforts to analyze or test the structural behavior of the stringers. Extensive finite element modeling was performed to characterize the local stresses in the stringers near the region of failure. Data from a full-scale tanking test and from several subcomponent static load tests were used to confirm the analytical conclusions. The analysis and test activities of the team are summarized. The root cause of the stringer failures and the flight readiness rationale for the repairs that were implemented are discussed.

Wingate, Robert J.↗

Using SCOR as a Supply Chain Management Framework for Government Agency Contract Requirements

Enterprise Supply Chain Management consists of: Specifying suppliers to support inter-program and inter-agency efforts. Optimizing inventory levels and locations throughout the supply chain. Executing corrective actions to improve quality and lead time issues throughout the supply chain. Processing reported data to calculate and make visible supply chain performance (provide information for decisions and actions). Ensuring the right hardware and information is provided at the right time and in the right place. Monitoring the industrial base while developing, producing, operating and retiring a system. Seeing performance deep in the supply chain that could indicate issues affecting system availability and readiness.

Paxton, Joe↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Source record↗

Earned Value Management (EVM) Implementation Handbook

The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

Planning Package↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Schumann, Deborah C.↗

Earned Value Management (EVM) System Description

The purpose of this Earned Value Management (EVM) System Description is to provide guidance in NASA’s Earned Value Management Capability for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts. EVM is a project management process that effectively integrates a project’s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions. This system description contains detailed information on implementation of EVM processes, procedures, roles and responsibilities.

Christopher Lewis Sadler↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

General Services Administration Reclamation Yard Solid Waste Management Unit 010: 2022 Groundwater Monitoring Report Kennedy Space Center, Florida

This report presents a summary of the groundwater monitoring activities that occurred in September and October 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consist of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume were tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. Groundwater monitoring for VOCs in the Chlorinated VOC Plume area was discontinued following the December 2021 annual monitoring event. Annual groundwater monitoring for underground injection control (UIC) parameters continues for both the PCB/VOA Plume and the Chlorinated VOC Plume areas. The activities presented in this report include one field event: September and October 2022, which includes sitewide semi-annual water level measurements of 55 monitoring wells, redevelopment of all monitoring wells listed in the sampling plan, and groundwater sampling of 28 monitoring wells. The sampling and analysis demonstrated that the PCB/VOA plume is not expanding and is significantly reduced compared to before a 2018 source removal interim measure. Recommendations are made for the 2023 groundwater monitoring program.

groundwater↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

PCBs↗

Soil Interim Measures Implementation Report Q6 Radar Station – Solid Waste Management Unit 112 Locations of Concern 3 and 10 Kennedy Space Center, Florida

This report presents a summary of the soil interim measures (IM) implementation activities that occurred from January 23 through June 6, 2023, at the Q6 Radar Station (Q6RS) Solid Waste Management Unit (SWMU) 112, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. Assessment activities have previously been performed at 10 Q6RS Locations of Concern (LOCs), identified during a SWMU assessment in 2013 (NASA 2013). Since the SWMU assessment, further confirmatory sampling and assessment was conducted for each LOC, and based on the data collected during these assessments, it was determined that Resource Conservation and Recovery Act Facility Investigation to further evaluate soil and groundwater was to be conducted at two LOCs: LOC 1 – Former Underground Storage Tanks (groundwater) and LOC 3 – Radar Antenna Refurbishment Area (soil). The LOC 1 groundwater assessment is ongoing, and the results will be presented under a separate cover. It was also determined that soil IM would be completed at two of the LOCs, LOC 3 and LOC 10 – Compressor Building Condensate Discharge. A Soil IM Work Plan was prepared and submitted in October 2021 (NASA 2021). The plan proposed excavation and disposal of barium and copper impacted soil in the LOC 3 and 10 areas. This report presents a summary and results of the soil IM implementation activities conducted at LOCs 3 and 10. The site contaminates of concern for this soil IM are barium and copper. The activities presented in this report includes soil IM implementation and groundwater sampling. From January 23 through March 24, 2023, AECOM Technical Services, Inc. (AECOM) field personnel conducted IM implementation activities in the LOC 3 and 10 areas. As presented in the IM Work Plan, shallow soils, impacted with metals, were excavated to a depth of 2 feet below land surface in the central area of the site around the radar antenna and associated equipment. AECOM personnel excavated 77.43 tons of soil using hand tools and, when able, heavy equipment. The soils were placed into lined roll-off containers, which were covered and transported under manifest to the Cedar Trail Landfill in Bartow, Florida. The site was restored to original condition using certified clean backfill material (sand), with filter fabric, and gravel. Areas outside of the excavation were restored with grass seed. On June 6, 2023, AECOM field personnel conducted groundwater sampling activities within the soil IM excavation area. AECOM personnel collected one groundwater sample from monitoring well Q6RS-MW0003. The sample was submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 6020B for metals (barium and copper). Barium and copper were detected at 18 micrograms per liter (µg/L) and 14 µg/L, respectively, and were below the State of Florida Groundwater Cleanup Target Levels (GCTLs) for barium at 2,000 µg/L and copper at 1,000 µg/L.

Chadwick Sloan Lee↗

Shallow Soil Polychlorinated Biphenyl Site Assessment Report: General Services Administration Reclamation Yard Solid Waste Management Unit 010

This report presents a summary of the shallow soil polychlorinated biphenyl (PCB) site assessment activities that occurred from December 2020 through July 2022 at General Services Administration Reclamation Yard, Solid Waste Management Unit (SWMU) 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program, which also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, three separate shallow soil plumes, known as the Northeast Shallow Soil PCB Plume, Southeast Shallow Soil PCB Plume, and West Shallow Soil PCB Plume, were identified for this site. The activities presented in this report include seven field events conducted between December 2020 and July 2022, which include shallow soil sample collection in the Northeast, Southeast, and West Shallow Soil PCB Plumes. AECOM Technical Services, Inc., personnel collected 330 soil samples from 118 boring locations. The samples were collected at 0.5-foot depth intervals to various depths based on analytical results and depth to groundwater. The soil samples were submitted to a fixed-based laboratory for analysis by United States Environmental Protection Agency Method 8082A for total PCBs. Several soil samples had PCB concentrations above the State of Florida Direct Exposure Residential and Industrial Soil Cleanup Target Levels (SCTLs), and two soil samples had PCB concentrations above the State of Florida Leachability for Groundwater. No soil borings were located beneath impervious surfaces, such as concrete or asphalt. The current Land Use Control Implementation Plan (LUCIP) covers PCBs in soils above the residential SCTL, which includes the paved areas.

soil assessment↗

Software Assists in Extensive Environmental Auditing

The Base Enivronmental Management System (BEMS) is a Web-based application program for managing and tracking audits by the Environmental Office of Stennis Space Center in conformity with standard 14001 of the International Organization for Standardization (ISO 14001). (This standard specifies requirements for an environmental-management system.) BEMS saves time by partly automating what were previously manual processes for creating audit checklists; recording and tracking audit results; issuing, tracking, and implementing corrective-action requests (CARs); tracking continuous improvements (CIs); and tracking audit results and statistics. BEMS consists on an administration module and an auditor module. As its name suggests, the administration module is used to administer the audit. It helps administrators to edit the list of audit questions; edit the list of audit locations; assign manditory questions to locations; track, approve, and edit CARs; and edit completed audits. The auditor module is used by auditors to perform audits and record audit results: It helps the auditors to create audit checklists, complete audits, view completed audits, create CARs, record and acknowledge CIs, and generate reports from audit results.

Callac, Christopher↗