Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Clean Energy Microgrids: Considerations for State Energy Offices and Public Utility Commissions to Increase Resilience, Reduce Emissions, and Improve Affordability

In fall 2019, the National Association of Regulatory Utility Commissioners (NARUC) and the National Association of State Energy Officials (NASEO) initiated a joint Microgrids State Working Group (MSWG), funded by the U.S. Department of Energy (DOE) Office of Electricity (OE). The MSWG aims to bring together NARUC and NASEO members to explore the capabilities, costs, and benefits of microgrids; discuss barriers to microgrid development; and develop strategies to plan, finance, and deploy microgrids to improve resilience. This report, Clean Energy Microgrids: Considerations for State Energy Offices and Public Utility Commissions to Increase Resilience, Reduce Emissions, and Improve Affordability, focuses specifically on how clean energy microgrids can achieve both resilience and clean energy benefits. The paper provides an overview of the challenges faced by clean energy microgrids, outlines benefits that clean energy microgrids can provide, and details economic and cost considerations for the development of clean energy microgrid projects. Outlined in the paper are the necessary technological components of a clean energy microgrid, including generation, storage, energy efficiency measures, and smart controls. Current technologies are highlighted, along with potential configurations of clean technologies that are approaching cost competitiveness with commercially available options. The paper concludes with both policy and regulatory considerations for State Energy Offices and Public Utility Commissions to enhance the development and deployment of clean energy microgrids. Although it touches on the clean energy microgrids’ role in integrating distributed energy resources (DERs) into the larger grid, this is not the focus of this paper.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Water-based Ria Testing in TREAT: Commissioning and Early Results

We have completed a series of reactivity-initiated accident commissioning tests with the static water capsule in the Transient Reactor Test Facility and completed some visual and non-destructive post-irradiation examinations on the fuel rods. The test campaign included a calibration test followed by five tests in the Static Environment Rodlet Transient Test Apparatus capsule. The conditions varied from room temperature and pressure up to 200°C and 2.5 MPa, with energy depositions varying between ~500–1100 J/gUO2. The series of tests allowed for a number of instrumentation qualifications and demonstrations, including cladding thermometry, rodlet plenum pressure, cladding elongation, and an electro-impedance boiling detector. This paper documents the design of the capsule and highlights some results from the commissioning tests and post-transient examination.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Enabling Solar Cybersecurity Solutions Through State Energy Office and Public Utility Commission Engagement with Private Sector Partners (Final Technical Report)

Between 2020 and 2025, the National Association of State Energy Officials (NASEO), together with the National Association of Regulatory Utility Commissioners (NARUC) established and managed the Enabling Solar Cybersecurity Solutions Through State Energy Office and Public Utility Commission Engagement with Private Sector Partners project, later informally retitled and recognized as the Cybersecurity Advisory Team for State Solar (CATSS). This effort convened State Energy Offices, Public Utility Commissions, and critical private sector and federal partners to inform the development of solar cybersecurity education and action-oriented resources for states. This is the final report.

14 SOLAR ENERGY↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab] (ORCID:0000000235719205)↗

Toward Trustworthy Detectors Detector Characterization for SuperCDMS SNOLAB Commissioning

SuperCDMS SNOLAB is a next generation direct detection experiment searching for low mass dark matter using cryogenic germanium and silicon detectors operated at millikelvin temperatures. As commissioning begins, establishing stable, predictable detector response to energy deposits is a prerequisite for future physics analysis. This work studies detector stability and calibration for four SuperCDMS SNOLAB detectors, det 7 and det 15 (germanium) and det 11 and det 14 (silicon), using Barium-133 calibration data (356 keV gamma ray reference) and low background data (ambient radiation, no external source). The Ba-133 data show no distinct line at the expected energy, and the low background data show a baseline that drifts and oscillates rather than remaining flat, consistently across multiple channels, suggesting a shared, detector wide cause. These observations point to the cryogenic support system as the likely source, since small temperature fluctuations could couple into the temperature sensitive detectors, informing the ongoing commissioning effort.

O'Hanlon, Vika [Skidmore Coll.]↗

Beam Commissioning Result of Polarized Target at SpinQuest

SpinQuest is a fixed-target experiment at Fermilab to measure the Drell-Yan process using transversely polarized NH$_3$ and ND$_3$ targets and unpolarized 120-GeV proton beam. In the Drell-Yan process, a quark in one scattering hadron and an anti-quark in the other hadron annihilate into a virtual photon and then decay into a muon (lepton) pair. The angular distribution of final-state muon pairs with respect to the target polarization is sensitive to the Sivers function of light antiquarks in the nucleon, which is one of the eight Transverse Momentum Dependent (TMD) parton distribution functions. The intensity of the proton beam is as high as $10^{12}$ protons/second, in order to accumulate the required statistics of Drell-Yan events. The polarized target system at SpinQuest has been carefully designed to accommodate such a high beam intensity. It is equipped with an evaporation refrigerator with a cooling power of around 5 W at 1 K. The target temperature is maintained at 1 K even under heat load caused by the proton beam and the DNP microwave. The target system and the spectrometer were commissioned with the proton beam from May through July 2024. The experimental setup of SpinQuest and the performance of the target system during the beam commissioning is reported.

Nakano, Kenichi [Virginia U.]↗

Towards a New μ→eγ Search with the MEG II Experiment: From Design to Commissioning

The MEG experiment represents the state of the art in the search for the Charged Lepton Flavour Violating μ + →e + γ decay. With its first phase of operations at the Paul Scherrer Institut (PSI), MEG set the most stringent upper limit on the BR (μ + →e + γ) ≤ 4.2×10 –13 at 90% confidence level, imposing one of the tightest constraints on models predicting LFV-enhancements through new physics beyond the Standard Model. An upgrade of the MEG experiment, MEG II, was designed and it is presently in the commissioning phase, aiming at a sensitivity level of 6×10 –14 . The MEG II experiment relies on a series of upgrades, which include an improvement of the photon detector resolutions, brand new detectors on the positron side with better acceptance, efficiency and performances and new and optimized trigger and DAQ electronics to exploit a muon beam intensity twice as high as that of MEG (7×10 7 μ + /s). This paper presents a complete overview of the MEG II experimental apparatus and the current status of the detector commissioning in view of the physics data taking in the upcoming three years.

79 ASTRONOMY AND ASTROPHYSICS↗

Commissioning the H i Observing Mode of the Beam Former for the Cryogenically Cooled Focal L-band Array for the GBT (FLAG)

We present the results of commissioning observations for a new digital beam-forming back end for the Focal plane L-band Array for the Robert C. Byrd Green Bank Telescope (FLAG), a cryogenically cooled Phased Array Feed (PAF) with the lowest measured T {sub sys}/η of any PAF outfitted on a radio telescope to date. We describe the custom software used to apply beam-forming weights to the raw element covariances to create research-quality spectral-line images for the new fine-channel mode, study the stability of the beam weights over time, characterize FLAG’s sensitivity over a frequency range of 150 MHz, and compare the measured noise properties and observed distribution of neutral hydrogen emission from several extragalactic and Galactic sources with data obtained with the current single-pixel L-band receiver. These commissioning runs establish FLAG as the preeminent PAF receiver currently available for spectral-line observations on the world’s major radio telescopes.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning & Characterization of Magnetized Gridded Thermionic Electron Source

Collaborative efforts to design and fabricate a magnetized gridded thermionic electron source have been conducted between Xelera and Jefferson Lab. Commissioning and characterization of an electron gun fabricated by Xelera was performed to benchmark the viability of future electron source designs and capabilities. The work involved simulation, installation, trouble-shooting, modifications of the design, commissioning, characterization, and magnetization of the electron beam produced. A specially designed cavity as well as novel diagnostic tools and methods were developed, implemented, and experimentally tested. Finally, the gun was used to demonstrate a previously unachieved current of magnetized electron beam from a gridded thermionic source of this uniquely compact size. This thesis addresses the following scientific and technological challenges: building a compact gridded thermionic electron source, producing high current magnetized electron beam, and demonstrating novel characterization measurements for magnetized beam.

Stefani, Mark↗

Monitoring Based Commissioning: Step-by-Step Approach to Implementation in Chiller Plants

Chilled water systems consume a significant portion of the energy in manufacturing, and inefficient operation could significantly influence utility bills and the environmental footprint of a facility. One way to ensure long-term energy-efficient plant operation is to ensure that chilled water system equipment, such as chillers, cooling towers, and pumps, are running at their best. Periodic operational assessments help to meet efficiency objectives for cooling plants. However, occasional set point and operational changes resulting from short-term fluctuations cause the plant operation to deviate from optimal. These changes accumulate over time, and operational efficiency deteriorates. Significant energy efficiency improvement potential in chilled water systems can be achieved by operational changes alone. Recent developments in information technology and the industrial internet of things data processing ability have overcome traditional problems and given rise to a new paradigm: monitoring-based commissioning (MBCx). Commissioning platforms and fault detection and diagnostics capabilities have evolved over time and presented more sophisticated abilities to efficiently control process cooling plants. The typical architectures of the MBCx process and a detailed approach to implement the process for chilled water systems are presented. A case study highlighting the energy-and cost-savings potential of MBCx systems is also presented.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Construction of the sPHENIX Detector and Status of Its Commissioning

sPHENIX is the first new major detector at RHIC in over twenty years. It is designed for pioneering studies of the Quark Gluon Plasma and Cold QCD phenomena using high-pT jet and heavy flavor probes with a broad kinematic reach and a capability to take large statistics sets of A+A, p+p and p+A data. sPHENIX construction was completed in April 2023. It was commissioned and took first Au+Au data in the RHIC 2023 Run. This paper describes the details of the detector design, challenges of sPHENIX construction, progress on the commissioning and first data from the RHIC 2023 run.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Investigation and Mitigation of a Prominent Off-Axis Stray Light Path in Rubin Observatory Commissioning

The "scratched tape" stray light feature is the most prominent and prevalent stray light artifact identified during the commissioning of the Vera C. Rubin Observatory. The scratched tape feature originates when light from large off-axis angles (~20 deg) passes between the mid-level and center-section light baffles, reflects off the primary mirror, and illuminates the LSST Camera focal plane. This scenario represented an unobstructed stray light path to the sky during Rubin commissioning due to delays in the integration of the dome slit light-wind screen. This document describes the identification, modeling, characterization, and mitigation of the scratched tape stray light artifact.

Drlica-Wagner, Alex [Fermilab; Chicago U., Astron.↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

Vacuum commissioning and operation result after the KSTAR PFC upgrade

The first vacuum commissioning after the installation of new tungsten mono-block cassette divertor has been successfully conducted in KSTAR. The tungsten divertor has been installed in the lower divertor region to handle the high divertor heat loads up to 10 MW/m 2 . On the one hand, the plasma facing components except for the tungsten divertor in the KSTAR vacuum vessel still consists of graphite tiles. Thus, it was much more challenging to maintain high-quality vacuum condition mainly because of various possible impurity sources inside the vessel compared with previous experiment campaigns. In this paper, the detailed procedure for securing vacuum condition of the KSTAR tokamak after the installation of the new tungsten divertor is presented. The vacuum condition is also examined regarding the plasma start-up and the long-pulse high-performance quality.

KSTAR↗

Design and commissioning of an e-beam irradiation beamline at the Upgraded Injector Test Facility at Jefferson Lab

We report the Upgraded Injector Test Facility (UITF) at Jefferson Lab is a continuous-wave superconducting linear accelerator capable of providing an electron beam with energy up to 10 MeV. A beamline for electron-beam irradiation has been designed, installed and successfully commissioned at this facility, aimed at the degradation study of 1,4-dioxane and per- and polyfluoroalkyl substances (PFAS) in wastewater treatment. A solenoid with a peak axial magnetic field of up to 0.28 T and a set of raster coils were used to obtain a Gaussian beam profile with a transverse standard deviation of ~ 15.0 mm at the target location. Monte-Carlo simulations using FLUKA were carried out to calculate the total absorbed dose and the dose distribution in the sample volume inside the target cell. The simulations were benchmarked experimentally by dosimetry mapping using optichromic dosimeters. The results of the irradiation experiments showed a ~ 95% reduction of 1,4-dioxane in ultra-pure water for a dose of 1 kGy, demonstrating the potential of electron-beam irradiation towards addressing growing challenges in environmental remediation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗