Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Development of an integrated platform for hardware-in-the-loop evaluation of microgrids prior to site commissioning

This paper presents an integrated hardware-in-the-loop (HIL) platform for testing the operation and control of a real-world microgrid system prior to site commissioning. The proposed testing approach shows the value of setting up an integrated HIL platform to test multiple hardware devices (including the system-level controller, device controllers, and field devices). A test bed developed for the Borrego Springs community microgrid is used as an example to demonstrate the feasibility of the integrated platform. Comprehensive tests are carried out using the Borrego Springs test bed to validate the platform, meet the test objectives, and gain valuable insight prior to site commissioning. The selected test scenarios, initial conditions, events, test metrics, etc., are similar to those defined in IEEE P2030.8. The test objectives are to evaluate the microgrid controller and the operation of the microgrid. The HIL platform presented in this paper shows good value for microgrid testing in terms of its flexibility and scalability for testing various microgrids; its accuracy in its representation of the field; the comprehensiveness of the testing capability; and the efficiency of testing, which can reduce risks prior to field deployment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Off-line commissioning of the St. Benedict radiofrequency quadrupole cooler-buncher

The St. Benedict ion trapping system, which aims to measure the β - v angular correlation parameter in superallowed-mixed mirror transitions, is under construction at the University of Notre Dame. These measurements will provide much-needed data to improve the accuracy of the V ud element of the CKM matrix. One of the major components of this system is the radio frequency quadrupole cooler-buncher, which is necessary to create low-emittance ion bunches for injection into the measurement Paul trap. The off-line commissioning of the cooler-buncher, using a potassium ion source, determined that the device could produce cooled ion bunches characterized by a 50-ns full-width-half-maximum time width at its exit. The commissioning results also determined the trapping efficiency to be 93(1)% and the trapping half-life to be 20.0(5) s.

Paul trap↗

Initial tests of Accelerator Mass Spectrometry with the Argonne Gas-Filled Analyzer and the commissioning of the MONICA detector

As the scope of Accelerator Mass Spectrometry (AMS) expands, there is an increased need to extend the capability of isobaric separation to the medium-heavy mass region. Existing AMS facilities are limited in their ability to separate radioactive nuclei in the A = 100–200 range of interest from their neighboring stable isobars, as such measurements require higher energies than available in most facilities. ATLAS is one of the highest energy system used for AMS based experiments and has enabled isobaric discrimination for medium to heavy nuclides, notably via the Gas-Filled Magnet technique. Further, a preparatory experiment performed in November, 2019, successfully demonstrated isobaric separation of 92 Zr- 92 Mo using the Argonne Gas-Filled Analyzer (AGFA) with high magnetic rigidity. Since that time, MONICA, an eight-anode ionization chamber that measures both energy loss and position with two sets of split anodes, has been developed to aid in AMS experiments at AGFA and has undergone four commissioning runs at the Nuclear Science Laboratory at the University of Notre Dame utilizing Si, Fe/Ni, and Mn beams. This report presents the AGFA AMS run (November 2019) and the subsequent commissioning runs of the MONICA detector, including preliminary measurements on the long-lived isotopes 39 Ar (268 y) and for the first time on 42 Ar (33 y).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Development of the high energy engineering X-ray (HEX) superconducting wiggler, magnetic measurement, installation, and commissioning

The High energy Engineering X-ray (HEX) diffraction beamline at the National Synchrotron Light Source II (NSLS-II) at Brookhaven National Lab (BNL) is the first high-energy beamline capable of reaching 200 keV for a monochromatic beam. With the 3 GeV electron beam energy for the NSLS-II ring, only the superconducting wiggler (SCW) producing greater than 4 T peak field can cover these ranges with a sufficient number of photons. The 1.2 m-long HEX-SCW has a period length of 70 mm and a field strength on-axis of 4.3 T. It utilizes no liquid helium, and the vertical aperture size of the electron beam vacuum chamber is 8 mm. Unlike regular undulators/wigglers, there is no standard configuration for the magnetic measurement system for superconducting insertion devices. The NSLS-II Insertion Devices group has developed, in collaboration with the vacuum group, a novel in-vacuum Hall mapper with a 1.75 m in-vacuum linear motor and an in-vacuum flip coil system utilizing many commercial-off-the-shelf products. The measurements were conducted at the BNL, and the device was installed in the ring and commissioned. Here, this paper provides a description of the SCW and its magnetic measurement systems, as well as a brief account of the installation and commissioning efforts.

36 MATERIALS SCIENCE↗

Design and commissioning of resistive foil bolometer diagnostics on the ST40 tokamak

Following successful campaigns on the compact high field spherical tokamak ST40, resistive gold foil bolometers have now been installed to measure the radiated power profile. Positioned on the midplane, two bolometer cameras offer perspectives of the horizontal and vertical planes, while the third camera, situated above the midplane, provides a vertical view of the top divertor plates, including the X-point and the strike points. Further, these cameras use a commercial off-the-shelf data acquisition platform with modules specifically designed for bolometers in a Wheatstone bridge configuration, providing both phase sensitive detection and in situ calibration. This paper presents an overview of the design and functionality of all three cameras and the commissioning of the horizontal plane camera. The commissioning of the horizontal camera shows data from a range of plasma pulses, presenting a positive correlation between the relative profiles measured from the bolometer camera and an absolute extreme ultraviolet diode camera viewing along similar lines of sight.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Qualification and Commissioning of Helium Flow Loop Experiment for Blanket Design Measurements

Sufficient cooling of plasma-facing materials remains an outstanding challenge in the design of fusion reactor blankets in commercial power demonstration plants. Due to its chemical inertness and low neutron interaction cross section, pressurized helium is a candidate coolant fluid for such systems; however, helium has a small thermal mass compared to liquid coolants, potentially reducing heat removal performance. To address this need, a number of heat transfer enhancements have been proposed to improve the cooling efficiency of such components, thereby decreasing pumping power needs and improving overall plant efficiency. Toward this end, a helium flow loop experiment (HFLE) has been designed and commissioned to test advanced passive heat transfer enhancements in unit-cell test sections, providing necessary data for model validation and subsequent system design. The HFLE is designed to provide flow of pressurized (up to 4 MPa) helium at flow rates up to 80 g/s, enabling heat transfer and pressure drop measurements in test pieces at Reynolds numbers in excess of 180 000. To explore the effects of novel and complex heat transfer enhancements, test sections are produced via additive manufacturing, providing geometries not typically obtainable by conventional machining. Here in this work, we present results from HFLE commissioning and the initial thermal-hydraulic tests of an additively manufactured rifled-rib test section. Results are compared to smooth pipe correlations, and plans are described for future HFLE measurements. These preliminary experiments indicate the utility of the HFLE for heat transfer enhancement testing and simulation validation activities.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The ProtoDUNE-SP LArTPC electronics production, commissioning, and performance

The ProtoDUNE-SP detector is a large-scale prototype of the Single-Phase (SP) Liquid Argon Time Projection Chamber (LArTPC) design proposed for the Deep Underground Neutrino Experiment (DUNE). 15,360 LArTPC wires are instrumented with low electronic noise pre-amplifier and digitization ASICs integrated into Front End Motherboards (FEMBs) operating at cryogenic temperature within the cryostat. The large number of electronics channels and high performance specifications required a large-scale production electronics quality control effort, careful installation into Anode Plane Assemblies (APAs), and rigorous detector commissioning. This successful collaboration-wide effort achieved a working LArTPC electronics channel percentage of 99.7% (15,318 of 15,360 channels in total), whose operating performance exceeded expectations. We summarize the ProtoDUNE-SP cold electronics design and quality control, installation, and commissioning efforts that enabled this excellent electronics performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design, construction and commissioning of a technological prototype of a highly granular SiPM-on-tile scintillator-steel hadronic calorimeter

The CALICE collaboration is developing highly granular electromagnetic and hadronic calorimeters for detectors at future energy frontier electron-positron colliders. After successful tests of a physics prototype, a technological prototype of the Analog Hadron Calorimeter has been built, based on a design and construction techniques scalable to a collider detector. The prototype consists of a steel absorber structure and active layers of small scintillator tiles that are individually read out by directly coupled SiPMs. Each layer has an active area of 72 × 72 cm^2 and a tile size of 3 × 3 cm^2. With 38 active layers, the prototype has nearly 22,000 readout channels, and its total thickness amounts to 4.4 nuclear interaction lengths. The dedicated readout electronics provide time stamping of each hit with an expected resolution of about 1 ns. The prototype was constructed in 2017 and commissioned in beam tests at DESY. It recorded muons, hadron showers and electron showers at different energies in test beams at CERN in 2018. In this paper, the design of the prototype, its construction and commissioning are described. The methods used to calibrate the detector are detailed, and the performance achieved in terms of uniformity and stability is presented.

47 OTHER INSTRUMENTATION↗

Commissioning of Extended Electron Beam Ion Source at Brookhaven National Laboratory

Here, the Extended Electron Beam Ion Source (EEBIS) has been installed and commissioned at Brookhaven National Laboratory (BNL) hadron accelerator complex in the spring of 2023. EEBIS has replaced its predecessor, RhicEBIS, which provided ions for BNL hadron facilities for over a decade since 2009. The motivations for the source upgrade are to provide higher intensities of the Au 32+ ion beam for the Relativistic Heavy Ion Collider (RHIC) and to provide of an intense source of polarized 3 He 2+ ions for the future Electron Ion Collider (EIC) at BNL. EEBIS is and will continue to be the primary source for a variety of different ion species for the NASA Space Radiation Laboratory (NSRL) at BNL. EEBIS utilizes two identical, two-meter-long unshielded 5T warm bore superconducting solenoids, and it is operated with electron beam current up to 10 A, providing a high-capacity ion traps to fulfill the requirement for high intensity ion beams. The upstream solenoid contains a “short ion trap” with a length of 95 cm, while the “long ion trap” with a length of 178 cm is located inside the downstream solenoid bore. The main features of EEBIS are: * A Gas injection and ionization cell equipped with a Lorenz pulse valve * High-capacity ZAO non-evaporable getter (NEG) custom linear pumping units * In situ apparatus for pumping speed measurements to monitor NEG activation and saturation * “External drift tube” construction with differential pumping stages to provide space for Lorentz pulse valve and 3 He high-field polarization cell * A Ba oxide electron gun cathode. The design of EEBIS as well as the results of its commissioning and first-year operation are presented and discussed.

43 PARTICLE ACCELERATORS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Performance of Kitt Peak’s Mayall 4-meter telescope during DESI commissioning

In preparation for the Dark Energy Spectroscopic Instrument (DESI), a new top end was installed on the Mayall 4-meter telescope at Kitt Peak National Observatory. The refurbished telescope and the DESI instrument were successfully commissioned on sky between 2019 October and 2020 March. Here we describe the pointing, tracking and imaging performance of the Mayall telescope equipped with its new DESI prime focus corrector, as measured by six guider cameras sampling the outer edge of DESI's focal plane. Analyzing ~500,000 guider images acquired during commissioning, we find a median delivered image FWHM of 1.1 arcseconds (in the r-band at 650 nm), with the distribution extending to a best-case value of ~0.6 arcseconds. The point spread function is well characterized by a Moffat profile with a power-law index of β ~ 3.5 and little dependence of β on FWHM. The shape and size of the PSF delivered by the new corrector at a field angle of 1.57 degrees are very similar to those measured with the old Mayall corrector on axis. Here, we also find that the Mayall achieves excellent pointing accuracy (several arcseconds RMS) and minimal open-loop tracking drift (< 1 milliarcsecond per second), improvements on the telecope's pre-DESI performance. In the future, employing DESI's active focus adjustment capabilities will likely further improve the Mayall/DESI delivered image quality.

47 OTHER INSTRUMENTATION↗

Coupled Thermal-Hydraulic and Fuel Performance Simulations of the TWIST LOCA Commissioning Test Series in TREAT

As the nuclear industry is looking to increase light water reactor (LWR) burnup limits, Idaho National Laboratory has developed an experiment vehicle for the Transient Reactor Test Facility (TREAT) to support high burnup fuel safety testing. One of the main purposes of this vehicle, known as the Transient Water Irradiation System for TREAT (TWIST), is to perform in-pile loss-of-coolant accident (LOCA) experiments on high burnup LWR fuel to investigate phenomena termed fuel fragmentation, relocation, and dispersal (FFRD). Prior to performing experiments on high burnup fuel specimens, a commissioning test series will be performed. The main purpose of the Loss-of-Coolant-Commissioning (LOC-C) test series is to qualify the TWIST device and validate the power coupling between TREAT and the TWIST fuel rod as well as validation of the thermal-hydraulic and fuel performance simulation predictions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Slow Extraction Beam Commissioning for the Mu2e Experiment at Fermilab

Following the successful completion of the Muon g-2 experiment run at Fermilab, the Muon Campus facility has been reconfigured from delivering 3 GeV muon beams to the g-2 storage ring to providing slow-extracted 8 GeV proton beam spills for the Mu2e experiment. The first full-scale commissioning run with slow extraction was conducted during the 2025 run, followed by the second run in early 2026. We present the results and current status of this commissioning campaign.

Nagaslaev, V. [Fermilab]↗

Lessons from commissioning and operations of the ICARUS cryogenic system at Fermilab

Results and lessons from three years of commissioning and operations of the cryogenic and purificationsystems of the ICARUS neutrino detector installed at the Fermilab are described. The detector uses liquid argon stored in two separate containers of about 275 m 3 each. The liquid argon must be kept in very stable thermal conditions, and the contamination of electronegative impurities must be consistently kept at small fractions of parts per billion. Since its fill in early 2020, the detector has been commissioned and then operated in neutrino beams at Fermilab for the search of sterile neutrinos and measurements of neutrino-argon cross sections. The results of operating the cryogenic and purification systems and lessons learned, including challenges in reaching the design electron lifetime in argon bath, operating and servicing liquid nitrogen and argon circulation pumps, argon condensers and purifiers, are described. Plans for future operations and list of recommendations are presented.

43 PARTICLE ACCELERATORS↗

Oak Ridge National Laboratory Technical Input for the Nuclear Regulatory Commission Review of the 2017 Edition of ASME Section III, Division 5, ‘High Temperature Reactors’

To assist the Nuclear Regulatory Commission in its decision making on endorsement of the American Society for Mechanical Engineers Boiler and Pressure Vessel Code Section III, Division 5 (2017 Edition) for development of advanced non-light water reactors, the following Division 5 portions were reviewed: Article HBB-2000 Material; Article HCB-2000 Material; Article HGB-2000 Material; Mandatory Appendix HBB-I-14 Tables and Figures; and, Nonmandatory Appendix HBB-U Guidelines for Restricted Material Specifications to Improve Performance in Certain Service Applications. In addition to the 2017 Edition, the same parts of the 2019 Edition have also been reviewed as indicated in various sections of the report. This review was conducted by a collaboration of national laboratory and private sector participants with significant industrial experience, including some heavy lifting and deep diving from Clarus Consulting, LLC., all intended to achieve an objective, independent, and practical perspective. The report provides recommendations, descriptions of the evaluation methods, and the source references for the data used. To build confidence required for endorsement of the Code, this review was conducted as a verification and validation of the above Code contents. The objective of verification is to ensure that the Code is free of error – direct or implied; contains the information needed for its use, including proper coverage of the Code-specified materials for the intended application, and completeness and adequacy of references to other portions of the Code. The objective of validation is to authenticate that the Code tabulations and graphs represent design inputs consistent with what are determined using rules and methods specified by the Code. The authentication process used data that were assembled and/or generated independent of Code development, while the methods of analysis followed Code-specified methods where appropriate. The designated portions for this review cover the five alloys codified for high temperature reactor applications in Division 5, i.e. 316 SS, 304 SS, 800H, 2¼Cr-1Mo, and 9Cr-1Mo-V, regarding their general requirements, permitted specifications and design stress intensity values for pressure-retaining applications, deterioration in service, fatigue acceptance test, permissible weld materials, tensile and yield strength, expected minimum stress-to-rupture values (including for Alloy 718), weld stress rupture factors, permissible materials for bolting use, and restricted specifications in certain service applications. Additionally, stress intensity values for bolting materials including 316 SS, 304 SS and alloy 718 were reviewed. Analysis and discussion are also provided on contents outside of these designated Code portions where it was deemed relevant and necessary to develop a technically sound understanding of issues relating to the designated portions. Due to unavailability of sufficient test data on welds during the review period, the weld stress rupture factors in Tables HBB-I-10.14A to E, which cover a total of ten tables for the five alloys welded with twenty-eight different weld metals (some with similar properties), have been deferred to a future review effort. The review identified mainly two types of issues. The first type includes instances where the Code is found factually incomplete or incorrect, such as obsolete materials specifications listings, missing tabulation of stresses for bolting. Changes to the Code are recommended in these cases. The second type of issue includes instances where the Code tabulations and graphs are found to be less conservative than the review analysis results. In these cases, recommendations are made for further review and consideration where the difference in conservatism exceeds 10%, which is our threshold for questioning technical adequacy, meriting a risk assessment by the Nuclear Regulatory Commission and/or reactor designers. It is noted that this effort has been executed using all available data and established methods of analysis, including methods and criteria specified and used by the Code. As such, the findings that are presented in quantitative detail, in a format for convenient comparison with the Code, and with identification of where further review is recommended, should provide a sound technical basis for decisions about quantifying the implications of the reduced design margins and technical adequacy/inadequacy to form a basis for conditioning specific Code tabulation values on endorsement. Recommendations for specific changes to the Code, however, entail design conservatism considerations beyond the scope of this review effort, and are not made in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Monte Carlo Simulations in Support of NorthStar Irradiation Facility Commissioning Procedure

NorthStar Medical Radioisotopes LLC is constructing an irradiation facility at which electron accelerators will induce photo-transmutation (i.e., neutron knockout) of molybdenum-100 (Mo-100) to produce medically useful Mo-99. The facility will house two high-intensity electron RhodotronTM accelerators developed by IBA Industrial. The nominal power of each Rhodotron is 125kW at 40 MeV beam energy. The production target is made of metallic molybdenum enriched with Mo-100 isotope. It will be irradiated by electron beams and will itself play a role in electron conversion to intense X-rays. A full description of the NorthStar target as well as the concept of radiation shielding of the facility can be found in our previous report. The NorthStar irradiation facility is under commissioning now. The goal of the present work is to support the commissioning process by: (1) Studying residual radiation and activation to minimize personnel exposure and inform radiation waste management; (2) Using computational fluid dynamics (CFD) of the irradiated target to ensure the facility design is safe and reliable; and (3) Helping to determine radiation protection requirements during operation. Monte Carlo simulations are used for the analyses. Most of the results are presented as 3D arrays representing spatial distribution of values across simulated geometries: radiation energy depositions, ambient doses, residual isotopes accumulated, and residual doses.

07 ISOTOPE AND RADIATION SOURCES↗

J. Robert Oppenheimer: The Atomic Energy Commission and His Security Clearance, Selected Documents

On April 14, 1954, Laboratory employees were formally notified by a “Special Bulletin to All Employees” (Appendix A) that the Atomic Energy Commission had convened a Personnel Security Board, at the request of J. Robert Oppenheimer, to investigate “substantial derogatory information” about their former director. Long on procedural detail and short on specifics, the Bulletin served primarily as an announcement that “A board was accordingly established for the purpose of hearing the case and advising the Commission as to whether or not suspension of clearance of Dr. Oppenheimer should be made permanent.”

99 GENERAL AND MISCELLANEOUS↗

Implementation Plan for Combined Heat and Power Systems VOLTTRON Controller: Performance Monitoring and Real-Time Commissioning Algorithm Verification

Building-integrated cooling, heating, and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV, and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of clean, efficient, reliable, and affordable next-generation integrated energy system. Previous report listed the components for which PM, real-time CxV, and AFDD algorithms will be developed, how the algorithms will be tested, and the metrics that will be used to validate the algorithms and their ease of deployment. Deployment of these algorithms in the field will result in a reduction in energy consumption of between 10% and 20% (for both CHP and conventional building systems). This report builds upon the previous report by detailing the process by which PNNL will implement performance monitoring and real-time commissioning algorithms for CHP systems in conjunction with the use of the VOLTTRON CHP economic dispatch agent in host facilities.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗