Engineering PapersSearch

SEARCH · Engineering Papers

Results for “clean energy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Energy Servers Deliver Clean, Affordable Power

K.R. Sridhar developed a fuel cell device for Ames Research Center, that could use solar power to split water into oxygen for breathing and hydrogen for fuel on Mars. Sridhar saw the potential of the technology, when reversed, to create clean energy on Earth. He founded Bloom Energy, of Sunnyvale, California, to advance the technology. Today, the Bloom Energy Server is providing cost-effective, environmentally friendly energy to a host of companies such as eBay, Google, and The Coca-Cola Company. Bloom's NASA-derived Energy Servers generate energy that is about 67-percent cleaner than a typical coal-fired power plant when using fossil fuels and 100-percent cleaner with renewable fuels.

Source record

Energy Technology Proving Ground Program Plan

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY

Energy Technology Proving Ground FY-2026 Program Plan (Rev.1)

New methods of energy production and distribution are required to meet clean energy goals and demands across all U.S. energy sectors. Idaho National Laboratory’s (INL) Integrated Energy Systems (IES) initiative is enabling clean energy research, development, and demonstration (RD&D) activities. To date, IES demonstration programs have been limited by distributed infrastructure and a lack of large-scale facilities to accommodate industry-scale research of Technical Readiness Level (TRL) 6-8 technologies. The IES initiative plans to eliminate these constraints by establishing a new research complex at INL known as the Energy Technology Proving Ground (Proving Ground) to be led by the Energy and Environment Science and Technology Directorate. The Energy and Environment Science and Technology (EES&T) directorate, one of five Idaho National Laboratory (INL) RD&D organizations, focuses on clean energy technologies that anchor the industry-enabling research of the Proving Ground. The Proving Ground will combine diverse clean energy systems into lean integrated test bed of independent multiscale capabilities available to the government and commercial industries to perform research; and will enable INL’s goal of becoming a Net-Zero entity by 2031. This program encompasses existing and new research space at both the in-town Research and Education Campus (REC) and the Arco desert site (the Site). The Proving Ground will support the maturation of IES technologies from TRL 1 through 8 by providing the infrastructure and capabilities needed to sustain a continuum of RD&D from basic science to industry-scale. To establish The Proving Ground and meet INL’s net-zero goals by 2031, nine research program areas have been identified within the IES initiative that require expanded and new capital infrastructure. This program plan provides guidance for establishing the Proving Ground at the Site for plug-and-play pilot testing and proofing of integrated energy system functionality including fission and renewable energy sources for industry driven application platforms.

29 ENERGY PLANNING, POLICY, AND ECONOMY

IBR Digital Supply Chain Gap Analysis and Recommendations

The adoption of clean energy technologies, including solar photovoltaics, continues to introduce non-traditional stakeholders to the operations and planning of the electric system. Stakeholders such as manufacturers, vendors, owners, aggregators, and others are enabling the adoption, integration, and optimum operations of solar technologies at accelerated rates. Inverters form the foundation of many digitally controlled energy sources for clean energy technologies, including Solar, Battery Energy Storage Systems, Hybrid Systems, and Hydrogen Fuel Cells. Their supply chain is complex, a series of microchips, electronic switches and other components making up its primary functions. The complexity of this space and the growing digitization associated with these components can create supply chain cyber risks. One measure to mitigate cybersecurity attacks is proper digital supply chain security. The U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO), in partnership with the Cybersecurity, Energy, Security, and Emergency Response (CESER) office, is hosting a workshop to bring together solar vendors and services providers to discuss digital supply chain security for solar systems and challenges and opportunities in the transitioning to a fully domestic supply chain for solar energy in the U.S. This workshop will support the Securing Solar for the Grid (S2G) and Energy Cyber Sense program activities. During the workshop, industry experts and researchers from DOE National Laboratories will discuss the current solar supply chain landscape and the transition to domestic manufacturing of solar components in the U.S. Tools and techniques to better manage and secure the digital supply chain of solar devices and systems will be discussed.

cybersecurity

Is Clean Hydrogen Production a Good Fit for Questa? (Final Economic Impact Results) [Slides]

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN

Is Clean Hydrogen Production a Good Fit for Questa? Final Economic Impact Results

The Village of Questa, New Mexico is aiming to become a regional clean energy hub with robust and diverse employment opportunities for the local community supported by the energy sector and by other businesses inspired or attracted by abundant clean energy, outdoor recreation, and cultural opportunities. A coalition of stakeholders in the Village of Questa, comprising the Village, Kit Carson Electric Cooperative (KCEC), Questa Economic Development Fund, and Chevron, is exploring options to develop hydrogen production facilities as an opportunity to create jobs, provide reliable clean energy, and utilize former mine resources. Questa is home to a molybdenum mine owned by Chevron that closed in 2014. Several residents in Questa and surrounding communities lost their jobs when the mine closed and transitioned from active operations into environmental remediation. Although remediation efforts have been ongoing since 2014 and are expected to continue for at least 16 more years, the number of jobs with Chevron is much smaller now than it was before the closure. Between available workforce, brownfield land, and water rights formerly supporting mine operations but now in a transition period, there are considerable local resources that could be directed toward clean energy generation. Questa's electricity supply is already 100% solar during daylight hours thanks to Kit Carson Electric Cooperative's (KCEC's) strategic decision-making and partnering over the last decade. Now, Questa, KCEC, and Chevron are exploring the potential costs and benefits of siting an electrolytic hydrogen production facility and additional solar photovoltaic (PV) capacity in Questa to further advance the region's clean energy economy. In this report, we estimated the potential economic impacts (i.e., jobs, value added, gross output, tax revenue) of constructing and operating a combined hydrogen (32 MW polymer electrolyte membrane electrolizer + 7.5 MW fuel cell) and solar facility (22.5 MW) in the Village of Questa, as well as the resulting economic spillovers to Taos County and the state of New Mexico. We employ an input-output model that leverages IMPLAN's economic data for the region complemented by construction and operating expenses estimated by NREL and feedback from the local coalition to evaluate the direct, indirect and induced effects of the project construction (transient impacts) and operation (more permanent impacts). Based on the area's average trade profile, feedback from the coalition and current market conditions, these projects are expected to support 487 full-time equivalent jobs during construction, generating $\$24$ million in income for those workers and $\$82$ million in local economic activity in the state. Of those jobs, 106 are expected to be construction sector jobs. These investments are also estimated to add $\$36.5$ million to New Mexico's gross state product (GSP). In the Village of Questa, we estimate 16 jobs will be supported in construction and transportation industries, generating $\$0.9$ million in earnings. In Taos County, the construction phase is expected to support 285 jobs primarily in construction and professional services, while manufacturing jobs dominate the results for the Rest of New Mexico. The Village is also estimated to receive $\$0.9$ million in tax revenue from the construction phase alone. Once in operation, the project continues to impact the state and Questa. Around 20 jobs (full-time equivalent for each year of operation) are supported across New Mexico, with approximately 11 directly employed in Questa by both facilities. The total annual local economic activity supported by ongoing operations is just over $\$1.3$ million/yr, generating $\$1.6$ million/yr in additional income in the state. Annual operations are estimated to add $\$2.1$ million to the state's GSP. The Village is expected to receive around $\$43,000$/yr in tax revenue. Impacts vary significantly depending on which businesses are supplying materials, equipment and services, and where construction workers reside. Choosing local suppliers will most benefit Questa and the New Mexico economy, adding up to 500 jobs during construction and 13 long-term jobs. Local and state governments may consider ways to incentivize local businesses in order to maximize economic benefits.

08 HYDROGEN

Review of Feasibility and Cost Drivers for Floating Offshore Wind Energy in Washington State

The state of Washington must double its clean electricity supply by 2050 to meet its clean energy goals and comply with the Clean Energy Transformation Act. With more than 6.6 GW of technical resource potential in federal waters where Bureau of Ocean Energy Management has leasing authority, offshore wind energy could play an important role in diversifying Washington State's clean energy mix, reducing dependence on out-of-state energy sources, and helping meet state decarbonization goals. Decision makers need technology-specific information to assist with long-term energy system planning, so the Bureau of Ocean Energy Management requested that the National Renewable Energy Laboratory provide an overview of several drivers of offshore wind energy feasibility and cost in Washington. This study summarizes some of the existing engagement efforts and perspectives on offshore wind energy in the region and quantifies the offshore wind resources in Washington as well as technology costs and performance of potential projects. Furthermore, this report reviews existing grid and port infrastructure and discusses infrastructure needs along with information gaps. This study also explores opportunities and barriers to Washington entities supporting the broader floating offshore wind energy supply chain along the U.S. West Coast. Note that this study is not part of a formal project planning process or official engagement effort, nor does it assess environmental or economic impacts from potential offshore wind energy development.

17 WIND ENERGY

EverGREEN 2045: An Energy mix to Decarbonize Washington State

The Clean Energy Transformation Act transitions Washington State to 100% clean energy by 2045. As the future resource mix will likely include intermittent renewables, hydropower, and new, carbon-free, flexible technologies including advanced nuclear reactors and enhanced geothermal systems, we assess the cost and feasibility of the future resource mix with proprietary cost data from our industry partners for new technologies. For plausible future resource mix scenarios, we find that revenues are sufficient to cover variable operations and maintenance costs for most technologies, but capacity payments or power purchase agreements will be necessary for new, flexible resources to participate in the future resource mix.

clean energy, energy policy, energy transition, re

Battery Storage Unlocked: Lessons Learned From Emerging Economies

The Clean Energy Ministerial (CEM) is a global forum that promotes policies and programs that advance clean energy technology. The CEM's mission is to bring together a community of global leaders to scale clean energy, amplifying the impact to all the sectors of the economy and applying a whole-of-society approach to meet collective climate and clean energy goals. At COP28 in Dubai, United Arab Emirates, the CEM announced the Supercharging Battery Storage Initiative as a vehicle to accelerate battery storage deployment around the world. The initiative supports countries around the world in co-creating strategies that enhance policy, regulation, supply chain, manufacturing, and financing solutions for battery energy storage deployment. Additionally, the initiative seeks to reduce the cost of the technology and promote diversified, sustainable, and secure supply chains (CEM n.d.). Through international collaboration, the initiative supports the integration of renewable energy globally, while securing the stability and reliability of the electricity grid.

batteries

Future grid mix impacts on whole-building life cycle assessment

Building construction and operation are a significant contribution to global greenhouse gas emissions, so understanding and mitigating emissions is crucial for reliable and realistic emissions accounting. Whole-building Life Cycle Assessment (WBLCA) is an emissions accounting method that considers lifetime environmental impacts of a building during its construction, operation, and eventual end-of-life. When performing WBLCAs, emission calculations from the building's operation over the entire building lifespan are typically based on today's energy grid mixes. This method does not consider changes or advancements in the clean energy proportion within the grid mix and can over or under-inflate results, skewing the ratio of embodied vs. operational environmental impacts. While a variety of prediction tools estimate what future grid emissions might be, predictions can vary widely. To predict the clean energy ratio within future grid mixes and the potential impact these changes might have on WBLCA, annual data from several existing U.S. grid models was averaged and probabilistic modeling was used to extend the usable projections of shorter forecasts. Results show that clean energy sources will likely continue to increase over time, although the rate of growth varies by model. On average, by 2085, the clean energy penetration of the grid is projected to reach ~81% and renewable energy is projected to reach ~71%, although no widespread consensus is reached. To understand how the future grid mix impacts lifetime building emissions within a WBLCA context, the team analyzed two 2021 IECC-compliant all-electric residential buildings: one built from traditional materials and construction processes and the other built with carbon sequestering materials and modular assembly, with a portion of energy generated on site. The results indicate that a moderate estimate of future electricity grid mixes shows a reduction of yearly operational emissions for traditional residential buildings of 55% between 2025 and 2085, and a corresponding reduction of 48% of total emissions over a 60 year building lifespan. This study offers a nuanced approach to account for the variability of future grid mix models and provides an average trend-line based on a robust collection of scenarios.

Life Cycle Assessment (LCA)

Finding ways to reduce nuclear waste: searching for the unknown one step at a time

In my home country, Venezuela, research has been stagnant. Due to the political turmoil and the crisis, many educated people have left the country in search for a better life. This has caused a deficit in any technological and scientific advances, making Venezuela one of the first South American countries to have its rate of publications decline by 29% in 2013. Currently, Venezuela lacks the infrastructure and the means to keep up with the research progress as compared to other countries in South America, such as Brazil. Since coming to the United States (US), and currently working for a national laboratory, the active research environment endorses a wide range of careers and engineering programs that allow researchers to thrive at any given field. Researchers have access to funds and tools to succeed in developing materials for the future. There are 17 national laboratories in the US, and all of these have a different research focus/objective. As examples, Los Alamos National Laboratory and Sandia National Laboratory focus is on national homeland security, weapon science, radiation effects, among others. Argonne National Laboratory focuses on nuclear energy, energy storage, high performance computing, etc. At Idaho National Laboratory (INL) the research focuses on innovating nuclear energy and clean energy resources, critical infrastructure materials, along with fuel cycle solutions to manage, dispose and find ways to recycle current and future radiological waste. Compared to other national laboratories, INL focuses slightly more on applied processes and how nuclear energy can be innovated to next reactor design and technologies. The research being conducted at INL made me apply for a Seaborg distinguished postdoctoral position. For the position itself, the researcher must submit a proposal related to actinide chemistry on a research field area. In this position, 50% of my time will be focused on my own proposal. The proposal that I am working on is focused on the innovation of nuclear energy and fuel cycle recycling, which is why I was mainly interested on working at this national laboratory. To give a bit more context of what my proposal is about, a little bit of background is necessary: After the nuclear fuel (UO2) is used in a reactor, the fuel matrix is then characterized by various fission products (FP). Among these FP (including rare earth elements, alkali/alkaline earths, and actinides), many can potentially be recovered through nuclear reprocessing technologies. In pyroprocessing, the used nuclear fuel undergoes electrochemical dissolution into a molten chloride salt mixture in an electrorefiner. Initially, uranium is reduced onto an inert cathode by applied potentials. However, numerous remaining FPs accumulate in the melt and pose challenges for recovery by an inert electrode, particularly the rare earth elements (e.g., Nd, Gd, Pr, Sm) due to their multivalent oxidation states and tendencies toward side reactions, leading to their dissolution in the electrolyte. These recovery challenges result in inefficiencies and necessitate the continual discarding of the molten chloride salt, thereby generating additional waste. Furthermore, the presence of rare earth elements and other fission products in the molten salt electrolyte alters its physical and chemical properties, affecting both uranium recovery efficiency and the longevity of the molten chloride salt. To improve the recovery efficiency of the FP, specifically rare earth elements, I am investigating the fundamental interactions between rare earth elements in the molten chloride salt and their metallic form. The kinetic pathways and the chemical reactions of these elements will give insights on how the recovery efficiency can be improved. The interactions and speciation of these elements are being studied by spectro-electrochemistry at high temperature environments in quartz and other ceramic materials (e.g., alumina crucibles). Some of the challenges I am facing specifically relates the reactivity of some of these elements with different glass and crucible materials. Although my research focuses on fundamental science, it will benefit the applied process by generating new scientific knowledge and closing the gap for an efficient recycling of the waste: one step at a time.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Climate and Health Impacts of US Emissions Reductions Consistent with 2 C

An emissions trajectory for the US consistent with 2 C warming would require marked societal changes, making it crucial to understand the associated benefits. Previous studies have examined technological potentials and implementation costs and public health benefits have been quantified for less-aggressive potential emissions-reduction policies, but researchers have not yet fully explored the multiple benefits of reductions consistent with 2 C. We examine the impacts of such highly ambitious scenarios for clean energy and vehicles. US transportation emissions reductions avoid approx.0.03 C global warming in 2030 (0.15 C in 2100), whereas energy emissions reductions avoid approx.0.05-0.07 C 2030 warming (approx.0.25 C in 2100). Nationally, however, clean energy policies produce climate disbenefits including warmer summers (although these would be eliminated by the remote effects of similar policies if they were undertaken elsewhere). The policies also greatly reduce damaging ambient particulate matter and ozone. By 2030, clean energy policies could prevent approx.175,000 premature deaths, with approx.22,000 (11,000-96,000; 95% confidence) fewer annually thereafter, whereas clean transportation could prevent approx.120,000 premature deaths and approx.14,000 (9,000-52,000) annually thereafter. Near-term national benefits are valued at approx.US$250 billion (140 billion to 1,050billion) per year, which is likely to exceed implementation costs. Including longer-term, worldwide climate impacts, benefits roughly quintuple, becoming approx.5-10 times larger than estimated implementation costs. Achieving the benefits, however, would require both larger and broader emissions reductions than those in current legislation or regulations.

policies

Dynamic and Responsive Distributed Energy Resource Education Solutions for Building, Fire, and Safety Department Officials (Final Technical Report)

From April 2021 through March 2024, the Interstate Renewable Energy Council (IREC) led a collaborative project to develop a free online clearinghouse of educational resources about solar photovoltaics (PV), energy storage systems (ESS), electric vehicle supply equipment (EVSE), and grid-interactive efficient building (GEB) technologies. Two websites—the Clean Energy Clearinghouse and CleanEnergyTraining.org—housed over 70 educational resources. Over the course of the three-year project, 154,272 unique visitors accessed the learning materials. Learner feedback was overwhelmingly positive. Even through the end of the project, there was sustained demand for education and communication. A primary innovation of the project was to drive multiple complementary audiences to the same place. Building owners, designers, installation contractors and developers, authorities having jurisdiction (AHJs), and fire service personnel all benefit from a shared understanding of clean energy technologies, including safety and code-related requirements. When considering the impact on the target audience, the project team worked with partners and advisors to inform resource creation and delivery in such a way as to address key motivational factors of the target audience and compel each user to seek additional information on the topic and return to the Clean Energy Clearinghouse website as their central location for more information. Resources were intentionally developed to be concise—five to 15 minutes—and accessible, meaning not overly technical. Providing basic information demystified the technologies and invited the professional to explore additional learning opportunities. Awardee and partner collaboration was key to project success. IREC facilitated collaboration among the other Topic 2 awardees, Southface and New Buildings Institute (NBI). The three awardees shared relevant information gained through discovery and validation questionnaires that informed product development and reduced duplication of effort by coordinating the development of complementary, and not competing, educational resources. Inspired by this collaboration, IREC brought on additional partners even in the final year of the project. Five regional energy efficiency organizations were part of the project, which expanded the connection between efficiency and distributed energy resources. We also included resources on the Clearinghouse that were developed through other federally funded projects, such as the Buildings Energy Efficiency Frontiers & Innovation Technologies (BENEFIT) program. The website was developed with the learner in mind, and not solely the funding source. Feedback from stakeholders throughout the project, and especially in its final year, indicated the need for continued education and facilitated communication among stakeholders to further the safe and widespread adoption of clean energy.

14 SOLAR ENERGY

Coupled Investigation of Fracture Permeability Impact on Reservoir Stress and Seismic Slip Behavior (Final Technical Report)

Enhanced Geothermal Systems (EGS) produce clean energy by circulating fluid through hot rock deep underground and bringing that heat to the surface to generate electricity. For this process to work reliably, fluids must be able to move efficiently through networks of natural or engineered fractures in the rock. Enhancing and maintaining subsurface permeability over time is essential for sustainable energy production. However, fluid injection changes the underground temperature, pressure, rock stress, and chemistry, which can alter permeability and sometimes trigger earthquakes. Predicting these interconnected processes remains a key challenge. To address this, we combined high-temperature laboratory experiments with high-fidelity simulations to better understand how fractures in geothermal reservoirs evolve over time. Our experiments measured how fractures respond to stress, slip, slip rate, and chemical reactions under geothermal conditions. These data were integrated into coupled thermal-hydrological-mechanical-chemical and earthquake (THMC+E) models tailored to the Utah FORGE site. The validated modeling framework improves predictions of reservoir performance and seismic response and helps guide operational decisions. This work reduces technical risk and strengthens the scientific foundation needed to make geothermal energy a reliable and scalable clean energy resource.

15 GEOTHERMAL ENERGY

Equitable Resilience: Opportunities to Advance Solar Paired with Battery Storage in Historically Marginalized Communities

This report was produced as part of the Equitable Solar Communities of Practice program through the U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO). Clean Energy Group (CEG) managed the Resilience, Storage, and Grid Benefits Community of Practice, which aimed to research, evaluate, and identify opportunities to scale the meaningful benefits of solar paired with battery storage in historically marginalized communities. The report is designed to 1) educate a broad audience on the benefits of solar paired with battery storage, 2) identify barriers to deploying solar paired with battery storage in historically marginalized communities, 3) amplify early-adopters and innovative programs that support battery storage access across the nation, and 4) recommend best practices for programs and policies to adopt in advancing equitable access to solar and battery storage technologies.

14 SOLAR ENERGY

Long-term impact of electrification and retrofits of the U.S residential building in diverse locations

The U.S. buildings sector contributes 30% of operational carbon emissions, with residential buildings accounting for 56%. Reducing residential carbon emissions is crucial for achieving net-zero carbon goal. While many studies examine energy efficiency retrofit (EER) and electrification, few explore their long-term impacts across diverse climates and dynamic grid clean energy penetrations, as well as their economic effects on households. Here, this study proposes a method to assess how EER and electrification affect long-term decarbonization and economics across different climates, focusing on carbon emissions, energy burden (the percentage of household income spent on energy), and payback period in four locations: Tampa, San Diego, Denver, and Great Falls. The study also introduces the concept of implicit energy burden by considering investment costs. Results show that while electrification can reduce long-term emissions with increased clean energy penetration, it may not always achieve decarbonization due to mismatches between clean energy availability and demand. In cooling-dominant locations, electrification lowers energy burden and peak demand, but in heating-dominant locations, it increases energy burden to 8.24%, raises peak demand by 632.78%, and shifts it from summer to winter. After integrating investment costs, the implicit energy burden can reach 8.35% in cold climates. For already highly electrified buildings in Denver and Great Falls, the payback period of EER measures can be shortened by up to 48.98%. The study highlights a tradeoff between decarbonization and energy burden alleviation, showing that while EER measures can reduce the energy burden, they only achieve one-quarter of the carbon emission reduction of electrification.

24 POWER TRANSMISSION AND DISTRIBUTION

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley