Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “capital”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Economics of polysilicon processes

Techniques are being developed to provide lower cost polysilicon material for solar cells. Existing technology which normally provides semiconductor industry polysilicon material is undergoing changes and also being used to provide polysilicon material for solar cells. Economics of new and existing technologies are presented for producing polysilicon. The economics are primarily based on the preliminary process design of a plant producing 1,000 metric tons/year of silicon. The polysilicon processes include: Siemen's process (hydrogen reduction of trichlorosilane); Union Carbide process (silane decomposition); and Hemlock Semiconductor process (hydrogen reduction of dichlorosilane). The economics include cost estimates of capital investment and product cost to produce polysilicon via the technology. Sensitivity analysis results are also presented to disclose the effect of major paramentes such as utilities, labor, raw materials and capital investment.

Yaws, C. L.↗

Technical and economic study of Stirling and Rankine cycle bottoming systems for heavy truck diesel engines

Bottoming cycle concepts for heavy duty transport engine applications were studied. In particular, the following tasks were performed: (1) conceptual design and cost data development for Stirling systems; (2) life-cycle cost evaluation of three bottoming systems - organic Rankine, steam Rankine, and Stirling cycles; and (3) assessment of future directions in waste heat utilization research. Variables considered for the second task were initial capital investments, fuel savings, depreciation tax benefits, salvage values, and service/maintenance costs. The study shows that none of the three bottoming systems studied are even marginally attractive. Manufacturing costs have to be reduced by at least 65%. As a new approach, an integrated Rankine/Diesel system was proposed. It utilizes one of the diesel cylinders as an expander and capitalizes on the in-cylinder heat energy. The concept eliminates the need for the power transmission device and a sophisticated control system, and reduces the size of the exhaust evaporator. Results of an economic evaluation indicate that the system has the potential to become an attractive package for end users.

Kubo, I.↗

Extraterrestrial resources: Implications from terrestrial experience

Terrestrial mining experience indicates that the overwhelming criterion of a potentially economic deposit is its recoverable concentration of the desired mineral or element. Recovery can be based on contrast in physical and/or chemical properties, but processes based on physical properties are typically less expensive. As several processes generally are used in sequence, they have a profound effect on extraction costs. These criteria will also apply to extraterrestrial resources. Although the extreme cost of access to space makes even ordinary materials extremely valuable, this inaccessibility also makes capital and maintenance costs extremely high. The following four development stages will apply, especially with the additional unknowns of an extraterrestrial environment: (1) Exploration for the highest grade of the mineral or element desired (because the extraction plant must be simple, cheap, and rugged to minimize capital and maintenance costs, high grade is extremely important); (2) Laboratory testing of various physical and/or chemical separation techniques on the possible ore to determine if the material can indeed be recovered economically; (3) a pilot plant test, in which a large sample is dug from the deposit to determine excavation rates, power requirements, and equipment wear. (This sample is then run through a pilot mill designed on the basis of the laboratory testing. Pilot plant testing must be carried out at increasing scales, but several trials are generally necessary at each scale before the size of operations can be increased. Moreover, pilot testing is necessary for each new mineral deposit); and (4) Last is the full-scale mine and plant start-up. (New problems invariably occur at this point, but they can be kept to a minimum if the pilot plant tests were realistic). If such a development plan is followed rigorously, major cost overruns, with their potentially disastrous effects on resource developments, can be avoided.

Kuck, David L.↗

Analysis of EDP performance

The objective of this contract was the investigation of the potential performance gains that would result from an upgrade of the Space Station Freedom (SSF) Data Management System (DMS) Embedded Data Processor (EDP) '386' design with the Intel Pentium (registered trade-mark of Intel Corp.) '586' microprocessor. The Pentium ('586') is the latest member of the industry standard Intel X86 family of CISC (Complex Instruction Set Computer) microprocessors. This contract was scheduled to run in parallel with an internal IBM Federal Systems Company (FSC) Internal Research and Development (IR&D) task that had the goal to generate a baseline flight design for an upgraded EDP using the Pentium. This final report summarizes the activities performed in support of Contract NAS2-13758. Our plan was to baseline performance analyses and measurements on the latest state-of-the-art commercially available Pentium processor, representative of the proposed space station design, and then phase to an IBM capital funded breadboard version of the flight design (if available from IR&D and Space Station work) for additional evaluation of results. Unfortunately, the phase-over to the flight design breadboard did not take place, since the IBM Data Management System (DMS) for the Space Station Freedom was terminated by NASA before the referenced capital funded EDP breadboard could be completed. The baseline performance analyses and measurements, however, were successfully completed, as planned, on the commercial Pentium hardware. The results of those analyses, evaluations, and measurements are presented in this final report.

Source record↗

A catalogue of potentially bright close binary gravitational wave sources

This is a current print-out of results of a survey, undertaken in the spring of 1985, to identify those known binary stars which might produce significant gravitational wave amplitudes at earth, either dimensionless strain amplitudes exceeding a threshold h = 10(exp -21), or energy fluxes exceeding F = 10(exp -12) erg cm(exp -2) s(exp -1). All real or putative binaries brighter than a certain limiting magnitude (calculated as a function of primary spectral type, orbital period, orbital eccentricity, and bandpass) are included. All double degenerate binaries and Wolf-Rayet binaries with known or suspected orbital periods have also been included. The catalog consists of two parts: a listing of objects in ascending order of Right Ascension (Equinox B1950), followed by an index, listing of objects by identification number according to all major stellar catalogs. The object listing is a print-out of the spreadsheets on which the catalog is currently maintained. It should be noted that the use of this spreadsheet program imposes some limitations on the display of entries. Text entries which exceed the cell size may appear in truncated form, or may run into adjacent columns. Greek characters are not available; they are represented here by the first two or three letters of their Roman names, the first letter appearing as a capital or lower-case letter according to whether the capital or lower-case Greek character is represented. Neither superscripts nor subscripts are available; they appear here in normal position and type-face. The index provides the Right Ascension and Declination of objects sorted by catalogue number.

Webbink, Ronald F.↗

Weapons to widgets: Organic systems and public policy for tech transfer

Large cuts in defense spending cause serious repercussions throughout the American economy. One means to counter the negative effects of defense reductions is to redirect federal dollars to temporarily prop up defense industries and, over the longer-term, stimulate growth of new nondefense industries. The creation of non-defense products and industries by channeling ideas from public laboratories into the private sector manufacturing facilities, known as technology transfer, is being undertaken in a massive program that has high visibility, large amounts of money, and broad federal agency involvement. How effectively federal money can be directed toward stimulating the creation of non-defense products will define the strength of the economy, (i.e., tax base, employment level, trade balance, capital investments, etc.), over the next decade. Key functions of the tech transfer process are technology and market assessment, capital formation, manufacturing feasibility, sales and distribution, and business organization creation. Those, however, are not functions typically associated with the federal government. Is the government prepared to provide leadership in those areas? This paper suggests organic systems theory as a means to structure the public sector's actions to provide leadership in functional areas normally outside their scope of expertise. By applying new ideas in organization theory, can we design government action to efficiently and effectively transfer technologies?

Cargo, Russell A.↗

Effective Transition Management: The Seamless System

In this age of shrinking resources, cost avoidance has become as critical as direct cost savings. There is no doubt that Effective Transition Management (ETM) achieves this aim. What then, is ETM and how does it achieve its goal? It is the introduction and use of a hierarchical decision model and computerized tracking system which successfully integrates capital acquisition into the support base. You will discover that because this proven system is generic, compatible and flexible, its applications are virtually unlimited. It is this highly dynamic process which I would like to share with you. Skilled specialists are now rotated rapidly through acquisition programs on a requirements-driven basis. Managers continue their quest for inefficient areas to trim, slash or cut. However, there is one area of operations in every major corporation and government department that, as yet, has not received the attention it deserves. This essential element is Transition Management. Capital acquisitions, at some point, must be handed off to a support matrix for the 'in-service' phase of their life cycle. Most of us who have been on the receiving end can usually cite outrageous examples of adjustment, recovery or disaster. This means buying what amounts to a second initial sparing package, re-aligning the range and depth of inventory to match a changed maintenance concept, interpreting contractor-developed configuration control data or ensuring that the latest information is contained in the technical publications. This list is endless. For major purchases, this 'in-service' phase is often fifteen, twenty or more years. The least desirable, yet most common condition, is to suffer up to five years of recovering from errors or omissions after the transition to the support matrix occurs. Without ETM, making new equipment fully operational may thus become a long and costly process.

Burke, Marty↗

NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 68: Who is Managing Knowledge? The Implications for Knowledge Production and Management of Global Strategic Alliances in Knowledge Dependent Industries

Knowledge is the foundation upon which researchers build as they innovate. Innovation lies at the core of a state's or a firm's ability to survive in a competitive world. Indeed, some economic historians ever that technological innovation, not trade, is the engine to economic growth. Despite the centrality of knowledge to corporate success, analysts have only recently shown an interest in the "knowledge capital" or "intellectual capital" of the firm, often literally trying to assign a value to this resource.

Golich, Vicki L.↗

Airport Financing and User Charge Systems in the USA

This paper examines the financing of U.S. public airports in a turbulent era of change, and projects toward the future. It begins by briefly outlining historical patterns that have changed the industry, and airport facilities in particular. It then develops basic principles of public finance as applied to public infrastructure, followed by the applicable principles of management. Following that, the current airport financing system is analyzed and contrasted with a socially optimal financing system. A concluding section suggests policy reforms and their likely benefits. The principles of finance and management discussed here are elementary. However, their implications are radical for U.S. airport policy. There is a great deal of room to improve the allocation of aviation infrastructure resources. The application of these basic principles makes it evident that in many cases, current practice is wasteful, environmentally unsound, overly costly, and inequitable. Future investments in public aviation capital will continue to be wasteful until more efficient pricing systems are instituted. Thus, problem in the U.S. is not one of insufficient investment in airport infrastructure, but investment in the wrong types of infrastructure. In the U.S., the vast majority of publically-owned airports are owned by local governments. Thus, while the federal government bad a great deal of influence in financing airports, ultimately these are local decisions. The same is true with many other public infrastructure issues. Katz and Herman (1997) report that in 1995, U.S. net public capital stock equaled almost $4.6 trillion, 72% of which ($3.9 trillion) was owned by state and local governments, most of it in buildings, highways, Streets, sewer systems, and water supply facilities. Thus, public infrastructure finance is fundamentally a local government issue, with implications for federal and state governments in the design of their aid programs.

Bartle, John R.↗

Effectiveness of Loan Guarantees versus Tax Incentives for Space Launch Ventures

Over the course of the past few years, several new and innovative fully or partiailly reusable launch vehicle designs have been initiated with the objective of reducing the cost of space transportation. These new designs are in various stages hardware development for technology and system demonstrators. The larger vehicles include the Lockheed Martin X-33 technology demonstrator for VentureStar and the Space Access launcher. The smaller launcher ventures include Kelly Space and Technology and Rotary Rocket Company. A common denominator between the new large and small commercial launch systems is the ability to obtain project financing and at an affordable cost. Both are having or will have great difficulty in obtaining financing in the capital markets because of the dollar amounts and the risk involved. The large established companies are pursuing multi-billion dollar developments which are a major challenge to finance because of the size and risk of the projects. The smaller start-up companies require less capital for their smaller systems, however, their lack of corporate financial muscle and launch vehicle track record results in a major challenge to obtain financing also because of high risk. On Wall Street, new launch system financing is a question of market, technical, organizational, legal/regulatory and financial risk. The current limit of acceptable financial risk for Space businesses on Wall Street are the telecommunications and broadcast satellite projects, of which many in number are projected for the future. Tbc recent problems with Iridium market and financial performance are casting a long shadow over new satellite project financing, making it increasingly difficult for the new satellite projects to obtain needed financing.

Scottoline, S.↗

ASK Talks with W. Scott Cameron

This paper presents an interview with Scott Cameron who is the Capital Systems Manager for the Food and Beverage Global Business Unit of Procter and Gamble. He has been managing capital projects and mentoring other project managers for the past 20 years at Procter and Gamble within its Beauty Care, Health Care, Food and Beverage, and Fabric and Home Care Businesses. Scott also has been an Academy Sharing Knowledge (ASK) feature writer since Volume One.

Cameron, W. Scott↗

Proposal Drafted for Allocating Space-to-Space Frequencies in the GPS Spectrum Bands

Radionavigation Satellite Service (RNSS) systems such as the U.S. Global Positioning System (GPS) and the Russian Global Navigation Satellite System (GLONASS) are primarily being used today in the space-to-Earth direction (i.e., from GPS satellite to Earth user) for a broad range of applications such as geological surveying; aircraft, automobile, and maritime navigation; hiking and mountain climbing; and precision farming and mining. However, these navigation systems are being used increasingly in space. Beginning with the launch of the TOPEX/Poseidon remote-sensing mission in 1992, over 90 GPS receivers have flown onboard spacecraft for such applications as real-time spacecraft navigation, three-axis attitude control, precise time synchronization, precision orbit determination, and atmospheric profiling. In addition to use onboard many science spacecraft, GPS has been used or is planned to be used onboard the shuttles, the International Space Station, the International Space Station Emergency Crew Return Vehicle, and many commercial satellite systems such as Orbcomm, Globalstar, and Teledesic. From a frequency spectrum standpoint, however, one important difference between the space and terrestrial uses of GPS is that it is being used in space with no interference protection. This is because there is no frequency allocation for the space-to-space use of GPS (i.e., from GPS satellite to user spacecraft) in the International Telecommunications Union (ITU) regulatory table of frequency allocations. If another space-based or groundbased radio system interferes with a spaceborne GPS user, the spaceborne user presently has no recourse other than to accept the interference. Consequently, for the past year and a half, the NASA Glenn Research Center at Lewis Field and other Government agencies have been working within ITU toward obtaining a GPS space-to-space allocation at the next World Radio Conference in the year 2000 (WRC 2000). Numerous interference studies have been conducted in support of a primary space-tospace allocation in the 1215- to 1260-MHz and 1559- to 1610-MHz RNSS bands. Most of these studies and analyses were performed by Glenn and submitted as U.S. input documents to the international Working Party 8D meetings in Geneva, Switzerland. In the structure of the ITU, Working Party 8D is responsible for frequency spectrum issues in the RNSS and the mobile satellite service (MSS). The full texts of the studies are available from the ITU web site under Working Party 8D contributions. Note that because spaceborne RNSS receivers operate in a receive-only mode with navigation signals already being broadcast toward the Earth, the addition of a space-tospace allocation will not result in interference with other systems. A space-based RNSS receiver, however, could experience interference from systems of other services, including intraservice interference from other RNSS systems. The interference scenarios examined in the studies can be inferred from the following frequency allocation charts. In these charts, services labeled in all capital letters (e.g., "ARNS") have primary status, whereas those labeled with sentence-style capitalization (e.g., "Amateur radio") have secondary status (i.e., a service with secondary status cannot claim interference protection from or cause harmful interference to a service with primary status). Charts showing the ITU frequency allocations in the 960 to 1350 MHZ range and the 1525-1660 MHZ range are discussed and presented.

Spence, Rodney L.↗

Communicating Risk to Program Managers

Program Managers (PM) can protect program resources and improve chances of success by anticipating, understanding and managing risks. Understanding the range of potential risks helps one to avoid or manage the risks. A PM must choose which risks to accept to reduce fire fighting, must meet the expectations of stakeholders consistently, and avoid falling into costly "black holes" that may open. A good risk management process provides the PM more confidence to seize opportunities save money, meet schedule, even improve relationships with people important to the program. Evidence of managing risk and sound internal controls can mean better support from superiors for the program by building a trust and reputation from being on top of issues. Risk managers have an obligation to provide the PM with the best information possible to allow the benefits to be realized (Small Business Consortium, 2004). The Institute for Chartered Accountants in England and Wales sees very important benefits for companies in providing better information about what they do to assess and manage key business risks. Such information will: a) provide practical forward-looking information; b) reduce the cost of capital; c) encourage better risk management; and d) improve accountability for stewardship, investor protection and the usefulness of financial reporting. We are particularly convinced that enhanced risk reporting will help listed companies obtain capital at the lowest possible cost (The Institute of Chartered Accountants in England &Wales, June 2002). Risk managers can take a significant role in quantifying the success of their department and communicating those figures to executive (program) management levels while pushing for a broader risk management role. Overall, risk managers must show that risk management work matters in the most crucial place-the bottom line- as they prove risk management can be a profit center (Sullivan, 2004).

Shivers, C. Herbert↗

Messaging with Cost-Optimized Interstellar Beacons

On Earth, how would we build galactic-scale beacons to attract the attention of extraterrestrials, as some have suggested we should do? From the point of view of expense to a builder on Earth, experience shows an optimum trade-off. This emerges by minimizing the cost of producing a desired power density at long range, which determines the maximum range of detectability of a transmitted signal. We derive general relations for cost-optimal aperture and power. For linear dependence of capital cost on transmitter power and antenna area, minimum capital cost occurs when the cost is equally divided between antenna gain and radiated power. For nonlinear power-law dependence, a similar simple division occurs. This is validated in cost data for many systems; industry uses this cost optimum as a rule of thumb. Costs of pulsed cost-efficient transmitters are estimated from these relations by using current cost parameters ($/W, $/sq m) as a basis. We show the scaling and give examples of such beacons. Galactic-scale beacons can be built for a few billion dollars with our present technology. Such beacons have narrow "searchlight" beams and short "dwell times" when the beacon would be seen by an alien observer in their sky. More-powerful beacons are more efficient and have economies of scale: cost scales only linearly with range R, not as R(exp 2), so number of stars radiated to increases as the square of cost. On a cost basis, they will likely transmit at higher microwave frequencies, -10 GHz. The natural corridor to broadcast is along the galactic radius or along the local spiral galactic arm we are in. A companion paper asks "If someone like us were to produce a beacon, how should we look for it?"

Benford, James↗

Instrumentation for Lunar Volatile Analysis

Understanding the available lunar resources is key to incorporating their availability into exploration architectures. Previous lunar missions have provided insight into the potential resources on the moon as an initial step enabling in-situ resource utilization (ISRU). Orbiting missions, such as Clementine and Lunar Prospector, have mapped the lunar polar region and found enhanced hydrogen signals on kilometer-scale resolution. The Lunar Crater Observation and Sensing Satellite (LCROSS) mission provided the first direct measurement of water ice in a permanently shadowed region. Future missions will provide ground truth data to measure and quantify lunar volatiles.One approach to exploration capitalizes on commercial partnerships for Class D risk aware missions. Partnerships with commercial partners enable rapid design cycles, leveraging the investment of the commercial industry in instrument development. Modified Commercial off the Shelf (COTS) hardware can be utilized to enhance capabilities in exploration missions. The hardware under development at the Kennedy Space Center for availability within the Commercial Lunar Payload Services opportunities capitalizes on modified COTS, enabling an aggressive delivery schedule and low-cost development. The modified hardware has been integrated and tested in a thermal vacuum environment, with final flight modifications currently in work. The use of a modified COTS instruments will be discussed for space applications.

Captain, J.↗

Aerocapture: An Enabling Technology for Flagship-Class Uranus Orbiter and Probe Mission

Introduction: The current decadal survey published by the National Academies of Sciences has informed National Aeronautics and Space Administration (NASA) to prioritize the study of the Ice Giants, especially Uranus. To gather the required data that addresses the science questions raised in this survey, a mission to Uranus with an orbiter and atmospheric probe must be designed. The Uranus Orbiter and Probe (UOP) study, which the survey identified as the flagship mission of this decade, proposes a 2031 launch to take advantage of a Jupiter fly-by and utilizes a fully propulsive orbit insertion design with an Earth-to-Uranus transit times ranging from 13 to 15 years. This fully propulsive orbit insertion at Uranus will be very fuel expensive (wet mass percentages of around 60-70\%) thereby leaving less mass for the scientific payload and additional planetary probes. In addition, scientists are more interested in visiting Uranus before 2049, when the Spring Equinox will occur, as it allows studying Uranus seasons not seen during Voyager 2's flyby in 1987. A NASA Flagship-Class mission would require at least 10 years of lead time prior to launch thereby making the 2031 launch to take advantage of the Jupiter fly-by extremely challenging. The consequence of missing the Jupiter fly-by and launching in the late 2030s is the challenge of a fully-propulsive mission like UOP to have a feasible alternative interplanetary trajectory that reaches Uranus before 2050. As an alternative, to address the shortcomings of the fully propulsive mission, one can design a mission to Uranus using aerocapture. What is aerocapture: Aerocapture is an atmospheric maneuver that uses aerodynamic forces generated by flight within a planetary atmosphere to decelerate and achieve orbit insertion. Using aerocapture allows one to provide the change in velocity (Delta V) needed to slow down from the approach hyperbolic trajectory to achieve the desired captured orbit around the target planet using aerodynamic forces of the vehicle (lift and drag). Using aerodynamic forces instead of fully-propulsive maneuvers results in significant savings in the fuel. Furthermore, aerocapture can also allow one to consider interplanetary trajectories with higher approach hyperbolic velocities, thus reducing the mission transit times. Aerocapture as an enabling technology: To use aerocapture as an enabling technology for the Uranus exploration mission, one would require an integrated system-level design, including a Thermal Protection System (TPS), hardware needed for aerodynamic modulation, and autonomous Guidance, Navigation, and Control (GNC) systems. Aerocapture has yet to be demonstrated, despite considering it for several past missions. Recent advancements in TPS and GNC capabilities show the potential for using rigid, heritage entry vehicle configurations already flown at other planetary bodies for Uranus aerocapture. Aerocapture can be a robust technology that can deliver spacecraft to Uranus science orbits while substantially increasing on-orbit payload mass (more than 40\%) that can enable robust atmospheric entry probes. Additionally, the aerocapture maneuver would reduce the interplanetary transit time by 2–5 years (15-30\%) relative to fully-propulsive orbit insertion. Recent work has shown that one can conduct a flagship-class mission in a shorter period than fully-propulsive missions if using aerocapture. What does aerocapture bring in for a Uranus Mission: Using aerocapture for a Uranus orbiter and atmospheric probe mission can provide one with considerable propellant savings. Spacecraft in interplanetary trajectories to Uranus typically need an Delta V in orders of kilometers per second to insert into science orbit. One would require thousands of kilograms of fuel to achieve such a Delta V using a traditional fully propulsive maneuver, leaving less mass for payload during the mission launch. Aerocapture can reduce the propulsion needs by dissipating energy in the sizable atmosphere of Uranus without a significant mass increase due to the need for an aeroshell. One can use the mass savings achieved using the aerocapture to reduce the launch vehicle requirements. In addition, one can also have additional science instruments on the orbiter or create a robust instrumentation suite on an atmospheric probe that can significantly increase the science outcome of the Uranus exploration mission. Furthermore, since aerocapture performance is relatively insensitive to increases in hyperbolic excess velocity, one can design the interplanetary trajectory to arrive at Uranus faster, reducing the interplanetary transit time and operations cost. All these savings, achieved using aerocapture, could help fit a larger class mission, such as the Uranus mission within a smaller capital, e.g., a Flagship-class orbiter mission in a New Frontiers class capital. Summary: This talk will provide an overview of how aerocapture can enable the Uranus exploration mission. Specifically, this talk will discuss the latest advancements made in the Uranus aerocapture study, such as investigating interplanetary trajectories with higher hyperbolic approach velocities and their implications on the aero heating and the TPS design, incorporating FNPAG (an advanced numerical-predictor guidance) and comparison of multiple navigation approaches. In addition, this talk will focus on mechanical design that can house more than one atmospheric probe and the six degrees of freedom simulation of aerocapture at Uranus. Findings from a recent NASA Space Technology Mission Directorate (STMD)-funded activity studying the aerocapture as an enabling technology for a Uranus orbiter will be presented. Using the science payload recommended by the Decadal Survey for Uranus exploration, this work shows many improvements over the baseline fully-propulsive mission. These improvements include a shorter cruise phase, flexibility in launch opportunities late into the 2030s while reaching Uranus before the 2050 equinox for the desired science opportunities, and lower propellant mass needs. This talk will highlight how aerocapture can be utilized for Uranus science orbit insertion using a lower-risk, heritage entry vehicle configuration used extensively as a Mars entry, descent, and landing vehicle. Furthermore, this talk will explore how the demonstration of aerocapture at Earth can benefit the aerocapture-enabled Uranus mission.

Aerocapture↗