Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Balancing Authority Data Reformatted

We collect the data from the electricity balancing authorities (BAs) that operate the grid. A balancing authority ensures, in real time, that power system demand and supply are finely balanced. This balance is needed to maintain the safe and reliable operation of the power system.

17 WIND ENERGY↗

Application of the Licensing Modernization Project Approach to the Authorization of the Versatile Test Reactor

The Licensing Modernization Project (LMP) has created a risk-informed, performance-based process for nonlight water reactor licensing under the U.S. Nuclear Regulatory Commission (NRC). Adoption of the LMP process has been recommended by the Advisory Committee on Reactor Safeguards (ACRS) [2] and the NRC has issued a draft regulatory guide [3]. The LMP process utilizes risk information to justify the regulatory treatment of event sequences, the classification of structures, systems, and components (SSCs), and to assist with the evaluation of defense-in-depth (DID). The Versatile Test Reactor (VTR) seeks to leverage the efforts of the LMP to develop a risk-informed, performance-based approach for reactor authorization under the U.S. Department of Energy (DOE). Due to differing rules and regulations between the NRC and DOE, modifications to the LMP process are necessary for the VTR authorization approach. However, the goals regarding risk-informed event categorization, SSC classification, and DID evaluation, remain the same.

Grabaskas, David↗

Decommissioning of the Dragon High Temperature Reactor (HTR) Located at the Former United Kingdom Atomic Energy Authority (UKAEA) Research Site at Winfrith - 13180

The Dragon Reactor was constructed at the United Kingdom Atomic Energy Research Establishment at Winfrith in Dorset through the late 1950's and into the early 1960's. It was a High Temperature Gas Cooled Reactor (HTR) with helium gas coolant and graphite moderation. It operated as a fuel testing and demonstration reactor at up to 20 MW (Thermal) from 1964 until 1975, when international funding for this project was terminated. The fuel was removed from the core in 1976 and the reactor was put into Safestore. To meet the UK's Nuclear Decommissioning Authority (NDA) objective to 'drive hazard reduction' [1] it is necessary to decommission and remediate all the Research Sites Restoration Ltd (RSRL) facilities. This includes the Dragon Reactor where the activated core, pressure vessel and control rods and the contaminated primary circuit (including a {sup 90}Sr source) still remain. It is essential to remove these hazards at the appropriate time and return the area occupied by the reactor to a safe condition. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposing of High-Level Radioactive Waste in Germany - A Note from the Licensing Authority - 12530

Following the national German consensus on the termination of utilisation of nuclear energy in the summer of 2011, the Federal and Laender Governments have declared their intention to work together on a national consensus on the disposal of radioactive waste as well. Projected in the early 1970's the Federal Government had started exploring the possibility to establish a repository for HLW at the Gorleben site in 1977. However, there is still no repository available in Germany today. The delay results mainly from the national conflict over the suitability of the designated Gorleben site, considerably disrupting German society along the crevice that runs between supporters and opponents of nuclear energy. The Gorleben salt dome is situated in Lower Saxony, the German state that also hosts the infamous Asse mine repository for LLW and ILW and the Konrad repository project designated to receive LLW and ILW as well. With the fourth German project, the Morsleben L/ILW repository only 20 km away across the state border, the state of Lower Saxony carries the main load for the disposal of radioactive waste in Germany. After more than 25 years of exploration and a 10 year moratorium the Gorleben project has now reached a cross-road. Current plans for setting up a new site selection procedure in Germany call for the selection and exploration of up to four alternative sites, depending only on suitable geology. In the meantime the discussion is still open on whether the Gorleben project should be terminated in order to pacify the societal conflict or being kept in the selection process on account of its promising geology. The Lower Saxony Ministry for Environment and Climate Protection proposes to follow a twelve-step-program for finding the appropriate site, including the Gorleben site in the process. With its long history of exploration the site is the benchmark that alternative sites will have to compare with. Following the national consensus of 2011 on the termination of nuclear energy utilisation, it is now the time to reach a national consensus on the disposal of radioactive waste as well. This is a task that the country and society, federal and state governments, political parties and the citizens will have to jointly master within the current generation and within German territory. The basis for the consensus will be a reset to the beginning of this process. It has to start with a new site selection procedure that will take into account and compare up to four alternative sites. This procedure will have to follow the principle of highest possible security. It should be based on a stepwise approach, strictly following scientific criteria. Public confidence in the process and trust can only be achieved by a transparent procedure allowing for the participation of the public and the stakeholders. It is therefore mandatory to consult, both on a national and regional level, all involved parties (public authority, scientist and citizen). The national consensus must also include a decision on the future of the Gorleben exploratory site. The site selection procedure must therefore take this site into account as well. Furthermore, the final decision on safe disposal of German radioactive wastes must be made by sovereign rule by Federal Parliament and Federal Council. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Authorization to proceed with production engineering for the waste treatment and immobilization plant's high-level waste facility - 15595

The U.S. Department of Energy restricted certain engineering, procurement, and construction work on the Waste Treatment and Immobilization Plant's (WTP) Pretreatment Facility, and to a lesser degree the High-Level Waste (HLW) Facility in 2012 and early 2013 because of the impact of unresolved technical issues on the facility design, and a misalignment between the facility design and nuclear safety basis. The U.S. Department of Energy, Office of River Protection (ORP) needed a way to minimize project management risk, while continuing limited critical path construction work for the HLW Facility and resolving the technical and safety basis issues. ORP developed a process to systematically address and resolve the technical, management, and quality issues that led DOE to restrict HLW Facility production activities in 2012 and 2013. This process provided for a phased resumption of HLW engineering, procurement, and construction activities on an incremental basis and a final decision for release to full production. In August 2014, ORP provided authorization for the WTP contractor to resume all engineering work necessary to finalize the HLW Facility design. The decision to proceed with production engineering in the HLW Facility, representing the first of two decision points, was based on significant progress in resolving HLW technical issues and improving work processes to align the HLW design and safety basis. Full release for HLW equipment procurements and construction is forthcoming based on conditions that must be fully satisfied and demonstrated during a transition period expected to continue for the next few years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Islip Housing Authority Energy Efficiency Turnover Protocols, Islip, New York (Fact Sheet)

More than 1 million HUD-supported public housing units provide rental housing for eligible low-income families across the country. A survey of over 100 PHAs across the country indicated that there is a high level of interest in developing low cost solutions that improve energy efficiency and can be seamlessly included in the refurbishment process. Further, PHAs, have incentives (both internal and external) to reduce utility bills. ARIES worked with two public housing authorities (PHAs) to develop packages of energy efficiency retrofit measures the PHAs can cost effectively implement with their own staffs in the normal course of housing operations at the time when units are refurbished between occupancies. The energy efficiency turnover protocols emphasized air infiltration reduction, duct sealing and measures that improve equipment efficiency. ARIES documented implementation in ten housing units. Reductions in average air leakage were 16-20% and duct leakage reductions averaged 38%. Total source energy consumption savings was estimated at 6-10% based on BEopt modeling with a simple payback of 1.7 to 2.2 years. Implementation challenges were encountered mainly related to required operational changes and budgetary constraints. Nevertheless, simple measures can feasibly be accomplished by PHA staff at low or no cost. At typical housing unit turnover rates, these measures could impact hundreds of thousands of unit per year nationally.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hydrogen technology for maritime applications: A review of challenges, opportunities, and lessons from the port authority of New York and New Jersey

The maritime industry faces increasing demand for energy security, operational efficiency, and environmental performance improvements. Hydrogen technology, considered a potential energy carrier, is being explored for port operations, including cargo-handling equipment, heavy-duty vehicles, and stationary power systems. This review evaluates the feasibility, challenges, and potential benefits of hydrogen integration within port infrastructure, using the Port Authority of New York and New Jersey as a representative case study. Drawing on case studies, technical reports, and policy analyses, this study examines the infrastructural, regulatory, and operational factors influencing large-scale deployment, emphasizing supply chain development, storage requirements, and refueling infrastructure. By situating hydrogen within broader maritime energy transition efforts, this review provides an evidence-based assessment of its role in port operations and energy diversification strategies. In conclusion, the findings outline key barriers to adoption and emphasize the need for coordinated efforts among stakeholders to determine hydrogen's role alongside other emerging energy technologies.

08 HYDROGEN↗

Evaluation of Production Cost Savings from Consolidation of Balancing Authorities in the US Western Interconnection under High Wind and Solar Penetration

This paper introduces a comprehensive analysis to quantify the potential savings in production cost due to consolidation of 32 US western interconnection Balancing Authorities (BAs). Three simulation scenarios are developed: current Western Electricity Coordinating Council (WECC) BAs structure, full copper-sheet consolidation, and full consolidation with transmission congestion considered. The study uses WECC Transmission Expansion Planning Policy Committee (TEPPC) model that was developed for the year 2020. The model assumes 8% wind and 3% solar energy penetration as percentage of total WECC demand in 2020. Sensitivity analyses are carried out to assess the impact of transmission hurdle rates between WECC BAs on potential benefits. The study shows savings that ranges from $400 Million (2.4% of total one year production cost) to $600 Million (3.2%) per year in thermal units production cost due to consolidation can be achieved. The copper sheet consolidation scenario shows an extra savings of $240 Million (1.4%) per year.

Balancing authorities, hurdle rates, economic disp↗

Small Wind Electric Systems: A Guide Produced for the Tennessee Valley Authority (Revised) (Brochure)

Small Wind Electric Systems: A Guide Produced for the Tennessee Valley Authority provides consumers with information to help them determine whether a small wind electric system can provide all or a portion of the energy they need for their home or business based on their wind resource, energy needs, and their economics. Topics discussed in the guide include how to make a home more energy efficient, how to choose the correct turbine size, the parts of a wind electric system, how to determine whether enough wind resource exists, how to choose the best site for a turbine, how to connect a system to the utility grid, and whether it's possible to become independent of the utility grid using wind energy. In addition, the cover of the guide contains a regional wind resource map and a list of incentives and contacts for more information.

17 WIND ENERGY↗

Orange County Transportation Authority Fuel Cell Electric Bus Progress Report (Feb-Jul 2020) [Slides]

This report presents early results from a deployment of fuel cell electric buses (FCEBs) operated by Orange County Transportation Authority (OCTA) in Southern California. The ten FCEBs, produced by New Flyer, feature an electric drive propulsion system powered by a Ballard fuel cell system. The project team is collaborating with the U.S. Department of Energy (DOE) and DOE's National Renewable Energy Laboratory (NREL) to evaluate the buses in revenue service. The goal of this evaluation is to compare the FCEB performance to that of conventional technology and to track progress over time toward meeting the technical targets set by DOE and the Department of Transportation (DOT). The FCEBs were delivered beginning in late-2019, and were placed in service on February 9, 2020. The data period covers February 2020 through July 2020. NREL collects data on ten 2016 model year compressed natural gas (CNG) buses as a baseline comparison at OCTA.

33 ADVANCED PROPULSION SYSTEMS↗

Port Authority of New York and New Jersey Sustainable Aviation Fuel Logistics and Production Study

The Port Authority of New York and New Jersey (PANYNJ) sustainability commitment is to meet the goals set by the Paris Agreement, with an interim greenhouse gas reduction target of 35% by 2025 and 80% by 2050. PANYNJ is seeking sustainable solutions to reduce carbon emissions for all public forms of transportation, including aviation. Similarly, the global aviation industry adopted the Carbon Offsetting and Reduction Scheme for International Aviation (CORSIA), which seeks to cap net carbon dioxide (CO 2 ) aviation emissions at 2020 levels through 2035. Industry has also set a goal of reducing CO 2 emissions by 50% compared to 2005 levels by 2050. Sustainable aviation fuel (SAF), made from non-petroleum feedstocks, is a near-term alternative fuel that reduces emissions from air transportation. The National Renewable Energy Laboratory (NREL) conducted a resource assessment and a techno-economic analysis to identify the potential for production in the port district. Although SAF could be sourced from other areas of the United States or imported, an evaluation of local production was conducted due to the potential positive impacts of a circular economy by converting local waste feedstocks into SAF for use at nearby airports. The study found that the highest volumes of feedstock nearby were municipal solid waste and woody biomass. SAF must be blended with Jet A up to certain percent determined by ASTM International fuel quality standards prior to use in aircraft. SAF from a stand-alone facility could be delivered by barge, rail, or truck to a Linden, New Jersey based terminal for blending with Jet A or it could be blended in the Gulf region and shipped via the Colonial pipeline to one of the terminals. The investment will take place at the terminal(s) to accommodate SAF/Jet A blends and it will be business as usual for the airports in how they receive fuel and distribute it to aircraft.

09 BIOMASS FUELS↗

Duluth Transit Authority Battery-Electric Bus Evaluation

Duluth Transit Authority (DTA) collaborated with the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) to evaluate a fleet of seven battery-electric buses (BEBs) in revenue service in Duluth, Minnesota. The focus of the evaluation was to compare performance and cost of the BEBs to that of conventional technology buses in similar service and track progress over time. DTA enlisted the help of the Center for Transportation and the Environment (CTE) to manage the project and provide technical services with the BEB fleet and infrastructure. This report summarizes the results of the BEB evaluation and contains a combination of analyses performed by NREL and by CTE during the overall data collection period of December 2018 through February 2022.

33 ADVANCED PROPULSION SYSTEMS↗

Projections of Hourly Meteorology by Balancing Authority Based on the IM3/HyperFACETS Thermodynamic Global Warming (TGW) Simulations

This dataset contains 40 years (1980-2019) of historical hourly meteorology and 80 years (2020-2099) of projected hourly meteorology for 54 Balancing Authorities (BAs) in the conterminous United States. Details about the scenarios and variables included in this dataset are in the readme.pdf file. This dataset is derived from the IM3/HyperFACETS Thermodynamic Global Warming (TGW) simulations (https://doi.org/10.57931/1885756). More details on the TGW approach can be found at: https://tgw-data.msdlive.org/. If you use this dataset please also cite the raw TGW dataset (Jones, A. D., Rastogi, D., Vahmani, P., Stansfield, A., Reed, K., Thurber, T., Ullrich, P., & Rice, J. S. (2022). IM3/HyperFACETS Thermodynamic Global Warming (TGW) Simulation Datasets (v1.0.0) [Data set]. MSD-LIVE Data Repository. https://doi.org/10.57931/1885756). To go from the TGW data to these BA-level aggregated data we first averaged the raw gridded data by county in the United States. That intermediate data step is also stored in MSD-LIVE (https://doi.org/10.57931/1960548). We then population-weight the county-level hourly data in order to create population-weighted meteorology time series for each BA. Historical populations are from the United States Census Bureau and the evolving future populations are based on Shared Socioeconomic Pathways (SSPs) 3 and 5. The four climate scenarios crossed with the two SSPs yield eight different future projections for each BA: rcp45cooler_ssp3, rcp45cooler_ssp5, rcp45hotter_ssp3, rcp45hotter_ssp5, rcp85cooler_ssp3, rcp85cooler_ssp5, rcp85hotterssp3, rcp85hotterssp5. For the historical period and each of the eight future scenarios the dataset has hourly estimates of the population-weighted average of five meteorological variables: Temperature, specific humidity, shortwave radiation, longwave radiation, and wind speed. All times are in Coordinated Universal Time (UTC). The code to go from the raw TGW data to county-level and then BA-level projections is available at: https://github.com/IMMM-SFA/im3components/tree/main/im3components/wrf_to_tell.

Balancing Authority↗

Developing a Natural Gas-Powered Bus Rapid Transit Service: A Case Study on Leadership: Roaring Fork Transportation Authority (Presentation); NREL (National Renewable Energy Laboratory)

The Roaring Fork Transportation Authority (RFTA) represents a series of unique successes in alternative fuel deployment by pushing the envelope with innovative solutions. In the last year, RFTA demonstrated the ability to utilize compressed natural gas buses at a range of altitudes, across long distances, in extreme weather conditions and in a modern indoor fueling and maintenance facility - allwhile saving money and providing high-quality customer service. This case study will highlight how the leadership of organizations and communities that are implementing advances in natural gas vehicle technology is paving the way for broader participation.

33 ADVANCED PROPULSION SYSTEMS↗

Technical Assistance for Guam Power Authority

Through the Energy Technology Innovation Partnership Project (ETIPP), Guam Power Authority learned approaches to evaluate existing infrastructure to maximize distributed local energy generation without damaging existing system components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Students authoring molecular case studies as a partial course-based undergraduate research experience (CURE) for lab instruction

Understanding the relationship between protein structure and function is a core-learning goal in biochemistry. Students often struggle to visualize proteins as three-dimensional objects that interact with other molecules to affect its biochemical consequences. We describe here a partial course-based undergraduate research experiences that has students exploring protein structure and function hands-on while authoring a molecular case study intended for others to use.

59 BASIC BIOLOGICAL SCIENCES↗