Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “assets”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Online Monitoring of Plant Assets in the Nuclear Industry

Today’s online monitoring technologies provide opportunities to perform predictive and proactive health management of assets within many different industries, in particular the defense and aerospace industries. The nuclear industry can leverage these technologies to enhance safety, productivity, and reliability of the aging fleet of existing nuclear power plants. The U.S. Department of Energy’s Light Water Reactor Sustainability Program is collaborating with the Electric Power Research Institute’s (EPRI’s) Long-Term Operations program to implement online monitoring in existing nuclear power plants. Proactive online monitoring in the nuclear industry is being explored using EPRI’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software, a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. This paper focuses on development of asset fault signatures used to assess the health status of generator step-up transformers and emergency diesel generators in nuclear power plants. Asset fault signatures describe the distinctive features based on technical examinations that can be used to detect a specific fault type. Fault signatures are developed based on the results of detailed technical research and on the knowledge and experience of technical experts. The Diagnostic Advisor of the FW-PHM Suite software matches developed fault signatures with operational data to provide early identification of critical faults and troubleshooting advice that could be used to distinguish between faults with similar symptoms. This research is important as it will support the automation of predictive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

20 FOSSIL-FUELED POWER PLANTS↗

Prognostic and health management of active assets in nuclear power plants

This study presents the development of diagnostic and prognostic capabilities for active assets in nuclear power plants (NPPs). The research was performed under the Advanced Instrumentation, Information, and Control Technologies Pathway of the Light Water Reactor Sustainability Program. Idaho National Laboratory researched, developed, implemented, and demonstrated diagnostic and prognostic models for generator step-up transformers (GSUs). The Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software developed by the Electric Power Research Institute was used to perform diagnosis and prognosis. As part of the research activity, Idaho National Laboratory implemented 22 GSU diagnostic models in the Asset Fault Signature Database and two wellestablished GSU prognostic models for the paper winding insulation in the Remaining Useful Life Database of the FW-PHM Suite. The implemented models along with a simulated fault data stream were used to evaluate the diagnostic and prognostic capabilities of the FW-PHM Suite. Knowledge of the operating condition of plant asset gained from diagnosis and prognosis is critical for the safe, productive, and economical long-term operation of the current fleet of NPPs. This research addresses some of the gaps in the current state of technology development and enables effective application of diagnostics and prognostics to nuclear plant assets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Extracting dependencies between network assets using deep learning

A network analysis tool receives network flow information and uses deep learning—machine learning that models high-level abstractions in the network flow information—to identify dependencies between network assets. Based on the identified dependencies, the network analysis tool can discover functional relationships between network assets. For example, a network analysis tool receives network flow information, identifies dependencies between multiple network assets based on evaluation of the network flow information, and outputs results of the identification of the dependencies. When evaluating the network flow information, the network analysis tool can pre-process the network flow information to produce input vectors, use deep learning to extract patterns in the input vectors, and then determine dependencies based on the extracted patterns. The network analysis tool can repeat this process so as to update an assessment of the dependencies between network assets on a near real-time basis.

Carroll, Thomas E.↗

DISTRIBUTION TRANSFORMER ASSET MONITORING ON THE GRID EDGE USING SMART SENSOR DATA

As new loads such as rooftop photovoltaics, electric vehicles and other distributed energy resources become commonplace on the distribution grid, the stress on already aging assets begins to escalate. This increased loading and changing dynamics can exacerbate failure rates. While traditional monitoring efforts focus on transmission and generation assets, utilities are now beginning to pay close attention to distribution assets in order to increase reliability indices and reduce cost from unexpected outages. This research develops low-cost and scalable methods to monitoring the health of a critical distribution grid asset: the service transformer. Existing methods in literature are either invasive and thus difficult to implement or require the device to be tested offline in an expensive lab setting. Data from the ubiquitous smart meter as well as a novel Bluetooth based transformer monitor are leveraged to automatically notify the utility of deteriorating or damaged transformers. Voltage, temperature, and vibration are some of the signals measured and analyzed by the proposed algorithms to predict transformer failures. Furthermore, these algorithms are designed to keep the implementation and processing costs low by taking advantage of edge computing where possible.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Interconnection and Interoperability Requirements of Hydrogen Assets to Enable Grid Integration

Traditionally, the inverters used for distributed energy resources (DERs) including solar, energy storage and hydrogen fuel cells are grid following assets. Grid following assets track real power and reactive power setpoints decided by either a local autonomous controller or a remote controller like a microgrid controller. In the past five years, multiple challenges have increased the need for grid forming inverters that can interface to a wide variety of energy resources. These grid forming inverters are becoming critical assets for power systems to enable the replacement of existing rotational machines and provide grid services such as grid resiliency services and black-start. Hydrogen assets (fuel cells) have the potential to successfully replace rotating machines and act as voltage and frequency master by leveraging the long-duration and seasonal energy storage capabilities of hydrogen technologies. This poster presents the progress made in budget period 1 of the proposed work. We will leverage an existing ARIES platform experimental setup to run power-hardware-in-the-loop and controller-hardware-in-the-loop experiments with grid forming fuel cell inverters to develop and document the standardization requirements.

electrolyzer↗

Commercial Building Energy Asset Score Program Overview and Technical Protocol (Version 1.1)

The U.S. Department of Energy (DOE) is developing a voluntary national scoring system for commercial buildings to help building owners and managers assess a building’s energy-related systems independent of operations. The goal of the score is to facilitate cost-effective investment in energy efficiency improvements of commercial buildings. The system, known as the Commercial Building Energy Asset Score, will allow building owners and managers to compare their building infrastructure against peers and track building upgrades over time. The system will also help other building stakeholders (e.g., building investors, tenants, financiers, and appraisers) understand the relative efficiency of different buildings in a way that is independent from operations and occupancy. This report outlines the technical protocol used to generate the energy asset score, explains the scoring methodology, and provides additional details regarding the energy asset scoring tool. The alternative methods that were considered prior to developing the current approach are described in the Program Overview and Technical Protocol Version 1.0.

Building Energy Use↗

Energy Assets Transformation Web Mapping Application

This submission contains the link and geospatial materials used in the Energy Assets Transformation Web Mapping Application. The zip file contains 19 geospatial layers in a file geodatabase called EAT.gdb to be grouped in the following categories. 1. Industrial Assets: Coal Generation Units Retirements 2012-2040 (EIA); Examples of Repurposing Projects (32 projects in total); Abandoned Coal Mines (CORD, SkyTruth); Abandoned or Orphaned Wells (for ten states only). 2. Energy Transition Communities: 48C (e) Tax Credits - Designated Energy Communities (IRA); Index of Deep Disadvantage; Local Energy Action Program (LEAP); EJ Index for Proximity to Hazardous Waste (EPA). 3. Regional Landscape: State-Level Funding Programs (relevant to repurposing projects, for 2022 and 2023 only); Coal Flows from Mine to Plant 2021 (EIA), Variable Renewable Energy Shares (Wind and Solar, 2021, EIA). 4. Supporting Infrastructure: Railroads (HIFLD), Electric Power Transmission Lines (HIFLD), Major Highways (NHPN, DOT), Major Ports (National Atlas of the U.S.); Independent System Operators (HIFLD), NERC Regions and Subregions (HIFLD).

abandoned coal mines↗

Stranded asset implications of the Paris Agreement in Latin America and the Caribbean

Achieving the Paris Agreement's near-term goals (Nationally Determined Contributions, NDCs) and long-term temperature targets could result in pre-mature retirement, or stranding, of carbon-intensive assets before the end of their useful lifetime. We use an integrated assessment model to quantify the implications of the Paris Agreement for stranded assets in Latin America and the Caribbean (LAC), a developing region with the least carbon-intensive power sector in the world. We find that meeting the Paris goals results in stranding of 37-90 billion and investment of 1.9-2.6 trillion worth of power sector capital (2021-2050) across a range of future scenarios. Strengthening the NDCs could reduce stranding costs by 27-40%. Additionally, while politically shielding power plants from pre-mature retirement or increasing the role of other sectors (e.g. land-use) could also reduce power sector stranding, such actions could make mitigation more expensive and negatively impact society. For example, we find that avoiding stranded assets in the power sector increases food prices 13%, suggesting implications for food security in LAC. Our analysis demonstrates that climate goals are relevant for investment decisions even in developing countries with low emissions.

54 ENVIRONMENTAL SCIENCES↗

Voltage positioning using co-optimization of controllable grid assets in radial networks

With increasing penetration of solar PV, some distribution feeders are experiencing highly variable net-load flows and even reverse flows. To optimize distribution systems under such conditions, the scheduling of mechanical devices, such as OLTCs and capacitor banks, needs to take into account forecasted solar PV and actual grid conditions. However, these legacy switching assets are operated on a daily or hourly timescale, due to the wear and tear associated with mechanical switching, which makes them unsuitable for real-time control. Therefore, there is a natural timescale- separation between these slower mechanical assets and the responsive nature of inverter-based resources. In this paper, we present a network admissible convex formulation for holistically scheduling controllable grid assets to position voltage optimally against solar PV. An optimal hourly schedule is presented that utilizes mechanical resources to position the predicted voltages close to nominal values, while minimizing the use of inverter-based resources (i.e., DERs), making them available for control at a faster time-scale (after the uncertainty reveals itself). A convex, inner approximation of the OPF problem is adapted to a mixed-integer linear program that minimizes voltage deviations from nominal (i.e., maximizes voltage margins). Here, the resulting OPF solution respects all the network constraints and is, hence, robust against modeling simplifications. Simulation based analysis on IEEE distribution feeders validates the approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Commercial Building Energy Asset Score

This software (Asset Scoring Tool) is designed to help building owners and managers to gain insight into the as-built efficiency of their buildings. It is a web tool where users can enter their building information and obtain an asset score report. The asset score report consists of modeled building energy use (by end use and by fuel type), building systems (envelope, lighting, heating, cooling, service hot water) evaluations, and recommended energy efficiency measures. The intended users are building owners and operators who have limited knowledge of building energy efficiency. The scoring tool collects minimum building data (~20 data entries) from users and build a full-scale energy model using the inference functionalities from Facility Energy Decision System (FEDS). The scoring tool runs real-time building energy simulation using EnergyPlus and performs life-cycle cost analysis using FEDS. An API is also under development to allow the third-party applications to exchange data with the web service of the scoring tool.

Source record↗

Substation Secondary Asset Health Monitoring and Management System (SSHM)

Electric Power Group, LLC (EPG) was awarded DOE OE0000850 to design, develop, and demonstrate a real-time software application for substation secondary equipment health monitoring and management at host utility American Electric Power (AEP), a cost share partner. This project addresses the need for monitoring substation equipment health and providing operators with tools to identify and take pre-emptive action to avoid catastrophic equipment failure. By monitoring synchrophasor data in real time, data anomalies that indicate potential asset failure can be detected and alerts can be sent to operators in time to take corrective actions. EPG developed two data driven algorithms to identify abnormal equipment signature patterns as well as a method using substation linear state estimation (SLSE). The software has been deployed on hardened PC’s and tested and validated for cost share partner AEP’s substations - 138kV and 765 kV. The SSHM software has been accepted by AEP and final demonstration of DOE - OE0000850 for AEP and DOE was successfully completed on March 17th, 2020. EPG developed the Substation Secondary Asset Health Monitoring (SSHM) Platform to analyze equipment failure signatures in PMU data and alert substation personnel when pre-emptive inspection, repairs and other actions are warranted to prevent potential catastrophic failures. This is the first system that automatically monitors the health of substation secondary assets and alerts users to emerging failures using synchrophasor measurements. SSHM uses high resolution PMU data from PTs, CTs, and CCVTs to analyze equipment signatures and identify anomalies that are precursor indicators of potential equipment failure. When an anomaly is detected, there is a likelihood of potential failure of monitored equipment, the system alerts the user with visual alarms including alarm trend charts and indicator lights on a oneline diagram of the substation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber Secure Sensor Network for Fossil Fuel Power Generation Assets Monitoring

The energy sector is undergoing digital transformation which is to say more and more power generation assets have become automated and connected to the internet. The connected sensors can tap into plants to monitor the health of assets and manage fleets remotely. These are just some of the benefits digitalization is bringing to the power industry. Within a power plant, control systems are no longer concerned with one system or one piece of equipment, but rather whole fleet of assets inter-connected with smart sensors which have the function of continuously monitoring and transmitting real-time operational data to operators. These connected systems will form a part of the industrial internet of things (IIoT). The big data scenarios provide benefits of performing system prognostics and optimization which is a key selling point of power plant digitalization.

20 FOSSIL-FUELED POWER PLANTS↗

Evolution of Programmatic Asset Lifecycle Planning at MESA

Early on in 2018 Sandia recognized the Microsystems Engineering, Science and Applications (MESA) Programmatic Asset Lifecycle Planning capability to be unpredictable, inconsistent, reactive, and unable to provide strong linkage to the sponsor's needs. The impetus for this report is to share learnings from MESA's journey towards maturing this capability. This report describes re-building the foundational elements of MESA's Programmatic Asset Lifecycle Planning capability using a risk-based, Multi-Criteria Decision Analysis (MCDA) approach. To begin, MESA's decades-old Piano Chart + Ad Hoc Hybrid Methodology is described with a narrative of its strengths and weaknesses. Then its replacement, the MCDA /Analytical Hierarchy Process, is introduced with a discussion of its strengths and weaknesses. To generate a realistic Programmatic Asset Lifecycle Planning budget outlook, MESA used its rolling 20-year Extended Life Program Plan (MELPP) as a baseline. The new MCDA risk-based prioritization methodology implements DOE/NNSA guidelines for prioritization of DOE activities and provides a reliable, structured framework for combining expert judgement and stakeholder preferences according to an established scientific technique. An in-house Hybrid Decision Support System (HDSS) software application was developed to facilitate production of several key deliverables. The application enables analysis of the prioritization decisions with charts to display and provide linkage of MESA's funding requests to the stakeholders' priorities, strategic objectives, nuclear deterrence programs, MESA priorities, and much more.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

High Explosives and Energetics Asset Analysis Tool

The High Explosives and Energetics (HE&E) Asset Analysis Tool is a database and reference for LANL facilities, equipment, staffing and financial information pertinent to the HE&E program. The tool is used for the communication of the current state and investment planning for the program assets. Additional analyses can offer more insights into the dependencies and impacts of the assets within the HE&E portfolio. This tool is developed under collaboration with the HE&E Program Office.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Identification of Balance of Plant Asset and Wireless Instrumentation to Enable Predictive Maintenance

One of the major contributors to the total operating costs of domestic nuclear fleet of reactors today is the operation and maintenance (O&M) costs. These include labor-intense preventive maintenance programs involving manually-performed inspection, calibration, testing, and maintenance of plant assets at periodic frequency and time-based replacement of assets at periodic frequency, irrespective of its condition. This has resulted in a labor-centric business model to achieve high capacity factors. To achieve optimal maintenance program, it’s time to transition from this labor-centric business model to a technology-centric business model. Fortunately, there are technologies (advanced sensor, data analytics, and risk assessment methodologies) that will support transition from a labor-centric business model to a technology-centric business model. The technology-centric business model will result in significant plant life extension and reduction of time-based maintenance activities. This will drive down O&M costs as labor is a rising cost and technology is a declining cost. This approach will lay the foundation for real-time condition assessment of plant assets, allowing condition-based maintenance to enhance plant safety, reliability, and economics of operation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

SuperLab 2.0 Showcase: Connecting Five Labs to Tackle Grid Complexity and Unlock Unique Grid Asset Potential

SuperLab 2.0 (a five-lab demonstration) is a collaborative, national-scale experiment showcasing the coordination of geographically distributed energy assets in real time. The demonstration integrates 25 physical and digital assets, spanning wind, photovoltaics, batteries, electrolyzers, DC fast chargers, microgrid controllers, building automation systems, small modular reactors, control centers, and gas turbines, across five U.S. Department of Energy (DOE) national laboratories: National Laboratory of the Rockies (NLR), Idaho National Laboratory, National Energy Technology Laboratory, Lawrence Berkeley National Laboratory, and Sandia National Laboratories. These assets are unified using Energy Sciences Network (ESnet), a low-latency, high-performance DOE network, and are controlled via a centralized energy controller hosted at NLR's Advanced Research on Integrated Energy Systems facility. The demonstration validates the ability to stress-test hybrid energy systems under dynamic scenarios to de-risk advanced control strategies for greater resilience and flexibility.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Coordination of Mars Orbiting Assets to Support Entry, Descent, and Landing (EDL) Activities

NASA policy requires continuous telecommunications with missions during the execution of their critical events, which implies constraints on where missions to other planets may land or inject into orbit. JPL is working to establish a telecommunications network at Mars to provide contact with inbound missions to Mars and assets that have landed on the Martian surface, thus reducing the constraints on where critical events may be performed. Coordination of network assets is required to cover an inbound mission's critical event, such as EDL. This paper describes the development of a tool to evaluate EDL coverage capability of Mars network assets over a specified launch date/arrival date space.

Mars Network↗

The Future of Asset Management for Human Space Exploration: Supply Classification and an Integrated Database

One of the major logistical challenges in human space exploration is asset management. This paper presents observations on the practice of asset management in support of human space flight to date and discusses a functional-based supply classification and a framework for an integrated database that could be used to improve asset management and logistics for human missions to the Moon, Mars and beyond.

interplanetary supply chain management↗