Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “artemis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Artemis Internal Science Team Update: Hardware and Integrated Testing

The Artemis program will reestablish human presence on the Moon and lead to a new era of scientific discovery and exploration. Led by the National Aeronautics and Space Administration (NASA), the Artemis program is a collaboration of space agencies and companies from around the world. In support of the Artemis program a cross disciplinary effort integrating science, engineering, operations, and human factors is currently being developed to identify methods, facilities, and field locations to test hardware, train astronauts, and evaluate concepts of operations. NASA’s Science Mission Directorate (SMD) and Exploration Systems Development Mission Directorate (ESDMD) established a comprehensive Science Team structure to support the Artemis program. This structure includes 1) an Artemis Internal Science Team (AIST), 2) a Geology Team (GT) with additional Participating Scientists (PS) roles, and 3) Payload Teams (PT) for the inclusion of scientific instruments. The GT, PS and PT will be competitively selected for each mission as part of NASA’s Research Opportunities in Space and Earth Sciences (ROSES) solicitations. The AIST provides multi-mission continuity and has been working closely with Artemis program elements to best integrate science into all aspects of planning and development. This abstract serves to provide an AIST update on science relevant hardware developments and integrated testing efforts that occurred in 2022.

Trevor George Graff↗

Enterprise Mission Integration for Artemis Lunar Missions

Mission integration is an iterative process by which a specific mission is formulated, refined, planned, and executed within the established vehicle(s), architecture, and ground systems design. Mission integration includes the people, vehicle(s) and ground hardware/software, products, processes, analyses, schedules, facilities, Certification of Flight Readiness, etc. The Artemis Mission Integration Task Team (MITT) developed a series of products and processes to support the complex mission integration across various Programs within the Artemis Mission Campaign (Orion, Space Launch Systems, Exploration Ground Systems, Gateway, Human Landing System, and Extravehicular Activity and Human Surface Mobility). The Moon to Mars (M2M) Program is referred to as ‘the enterprise’ as it includes both the M2M organization and the Programs supporting the Artemis Mission Campaign. Artemis Mission Integration has five phases: mission capability, mission definition, mission preparation, mission execution, and post-mission assessment. This paper focuses on one of the enterprise-level mission checkpoints as a kick-off to the Mission Preparation phase, the Mission Integration Review (MIR), which occurs 18-24 months prior to launch. The MIR helps to confirm the defined mission technical baseline is within the existing analyzed design envelope. Details are provided on the identification of dependencies, issues, or gaps for mission-specific objectives and requirements, as well as the definition of the analysis, training, mission execution products, facilities, and detailed supporting operations requirements. The MIR was held for both Artemis I and II and this paper aims to share with the aerospace community its value as we prepare for upcoming Artemis Missions.

Mary Anne Plaza↗

NASA’s Space Launch System: Artemis I Results and the Path Forward

On Nov. 16, 2022, NASA launched the Artemis I mission on the agency’s new SLS (Space Launch System) rocket. The debut launch of the integrated vehicle sent an uncrewed Orion spacecraft into a distant retrograde (DRO) orbit about the Moon to accomplish multiple mission objectives, including evaluating Orion’s heatshield at lunar return velocities and collecting critical data from the first flight of the new superheavy lift launch vehicle. Post-flight data analyses show that the rocket performed with a high degree of precision and accuracy. In addition to completing testing and launch of the Artemis I SLS in 2022, notable progress was made on hardware for future launch vehicles that will support Artemis missions II, III, IV, and V. The Artemis II core stage is mostly complete, and its RS-25 engines were integrated in the fall of 2023. The Artemis II solid rocket booster motor segments were shipped to the launch site in September 2023. Propellant tanks are being manufactured for additional missions, solid booster segments are being cast and prepared, software is being developed, and production of new RS-25 engines is underway. A more capable upper stage is in development, as well as a large adapter to encapsulate a 10-metric ton (t) co-manifested payload. This paper will provide details on the Artemis I flight as well as cover hardware progress for the future flights as available.

John Honeycutt↗

Trends in Human Spaceflight: Analysis of Observed Propulsion Failure Modes Following NASA’s Artemis I Mission

In 2022, NASA’s Artemis program returned the agency to lunar space, propelled by the Orion European Service Module (ESM). Through rigorous ground test campaigns for Artemis I and II and the collection and transmission of operational data during the Artemis I flight, the Safety and Mission Assurance (S&MA) team created and maintained a robust database of component nonconformances. This study analyzes in-flight and ground processing findings on the Artemis ESM propulsion subsystem to track reliability and safety metrics, as well as comparing the data to that of previous human spaceflight programs, Apollo and Space Shuttle. In drawing a comparison to the Artemis I flight, recommendations can be made for the Artemis II crewed mission to ensure best practices for flight safety, including redundancy and failure tolerance in the system. The results reinforce a need for robust safety standards and caution against the complacency of a single successful test flight.

human spaceflight safety↗

Trends in Human Spaceflight: Analysis of Observed Propulsion Failure Modes Following NASA’s Artemis I Mission

In 2022, NASA’s Artemis program returned the agency to lunar space, propelled by the Orion European Service Module (ESM). Through rigorous ground test campaigns for Artemis I and II and the collection and transmission of operational data during the Artemis I flight, the Safety and Mission Assurance (S&MA) team created and maintained a robust database of component nonconformances. This study analyzes in-flight and ground processing findings on the Artemis ESM propulsion subsystem to track reliability and safety metrics, as well as comparing the data to that of previous human spaceflight programs, Apollo and Space Shuttle. In drawing a comparison to the Artemis I flight, recommendations can be made for the Artemis II crewed mission to ensure best practices for flight safety, including redundancy and failure tolerance in the system. The results reinforce a need for robust safety standards and caution against the complacency of a single successful test flight.

human spaceflight safety↗

The Relevance of the VIPER Mission to NASA’s Artemis Human Exploration of the Moon

NASA has ambitious plans to send astronaut crews to the south polar region of the Moon and explore this lunar terrain with humans for the first time through a series of Artemis missions. Artemis will provide economic benefits, drive technological advancement, and inspire the next generation of explorers. Simultaneously, Artemis presents a unique opportunity for humans to conduct high-priority planetary science in situ in the south polar region of the Moon. Prior to human exploration, landed robotic precursor investigations can provide valuable information to reduce risk and maximize discovery and productivity of subsequent crewed missions. NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) is a robotic mission designed to explore and characterize the lunar south polar region prior to crewed Artemis landed missions. VIPER is designed to explore multiple thermal regimes to characterize the lunar polar environment and regolith properties, and to explore for surface and subsurface ices. Each of these objectives are key for both scientific investigation and to detect and assess volatile deposits to support in situ resource utilization (ISRU) and a sustained human presence on the Moon. VIPER would also operate with a real-time mission operations architecture with relevance and feed-forward to Artemis crewed operations on the lunar surface. VIPER would provide key information regarding the lunar environment, scientific exploration, technologies, and real-time operations to optimize the valuable surface exploration time of Artemis crew members while simultaneously reducing risk to crew and increasing health and human safety on the lunar surface.

Jennifer L Heldmann↗

Adaptive Curation at NASA Johnson Space Center: Preparing for Artemis Samples by Leveraging Proven Practices and Innovative Solution

The proper curation of returned astromaterial samples is essential to ensure that high-quality scientific investigations can be conducted for decades, enabling future generations to address evolving research questions. The Astromaterials Acquisition and Curation Office at NASA Johnson Space Center (hereafter JSC Curation) is responsible for curating all of NASA’s extraterrestrial samples. Under the governing document, NASA Procedural Requirement (NPR) 7100.5 “Curation of Extraterrestrial Materials”, JSC Curation is charged with “The curation of all extraterrestrial material under NASA control, including future NASA missions.” The Directive goes on to define Curation as including “...documentation, preservation, preparation, and distribution of samples for research, education, and public outreach.” JSC Curation has a long-standing legacy of curating extraterrestrial materials, including but not limited to Apollo and Luna lunar samples, Genesis solar wind samples, Stardust comet samples, asteroid samples (Hayabusa1, Hayabusa2, and OSIRIS-REx), and Antarctic Meteorite samples from a variety of parent bodies. Building on this foundation, the Artemis program introduces new challenges and opportunities for sample curation, requiring both the application of proven practices and the development of innovative solutions. The Artemis Collection will be curated using established protocols refined through decades of experience with Apollo and subsequent sample collections, including but not limited to the utilization of cleanrooms, custom nitrogen gloveboxes, specialized storage containers and tools; all of which have strict material utilization and prohibition requirements. These practices provide a robust framework for contamination control, documentation, and long-term preservation. However, Artemis samples may present unique scientific and operational requirements, including enhanced contamination control measures (relative to Apollo) driven by evolving science objectives. To meet these needs, JSC Curation is actively developing new technologies and protocols that extend beyond traditional approaches, ensuring that the integrity of samples is maintained under increasingly stringent standards. One critical area of innovation is the development of cold sample curation capabilities. Certain Artemis samples, particularly those from Permanently Shadowed Regions (PSRs) and cold environments, are expected to contain ices and volatile components that require preservation and handling at sub-zero or even cryogenic temperatures. JSC Curation is leveraging best practices from the cold and cryogenic sample industries, as well as other government agencies and academic experts, to design facilities and handling procedures that maintain sample integrity while enabling scientific access. The goal is to develop capabilities to allow researchers to investigate volatiles and other temperature-sensitive materials while minimizing chemical and physical alterations from their returned state. In summary, adaptive curation at JSC combines the reliability of proven methodologies with forward-looking innovations to meet the scientific and operational demands of Artemis. Through enhanced contamination control, advanced cold curation capabilities, and an understanding of known and evolving future science priorities, NASA is preparing to maximize the scientific return from Artemis samples and preserve their value for generations of researchers.

Andrea D Harrington↗

Coordinateendonucleolytic 5' and 3' trimming of terminally blocked blunt DNA double-strand break ends by Artemis nuclease and DNA-dependent protein kinase

Previous work showed that, in the presence of DNA-PK, Artemis slowly trims 3'-phosphoglycolate-terminated blunt ends. To examine the trimming reaction in more detail, long internally labeled DNA substrates were treated with Artemis. In the absence of DNA-PK, Artemis catalyzed extensive 5' {yields} 3' exonucleolytic resection of double-stranded DNA. This resection required a 5'-phosphate but did not require ATP, and was accompanied by endonucleolytic cleavage of the resulting 3' overhang. In the presence of DNA-PK, Artemis-mediated trimming was more limited, was ATP-dependent, and did not require a 5'-phosphate. For a blunt end with either a 3'-phosphoglycolate or 3'-hydroxyl terminus, endonucleolytic trimming of 2-4 nucleotides from the 3'-terminal strand was accompanied by trimming of 6 nucleotides from the 5'-terminal strand. The results suggest that autophosphorylated DNA-PK suppresses the exonuclease activity of Artemis toward blunt-ended DNA, and promotes slow and limited endonucleolytic trimming of the 5'-terminal strand, resulting in short 3' overhangs that are trimmed endonucleolytically. Thus, Artemis and DNA-PK can convert terminally blocked DNA ends of diverse geometry and chemical structure to a form suitable for polymerase mediated patching and ligation, with minimal loss of terminal sequence. Such processing could account for the very small deletions often found at DNA double-strand break repair sites.

59 BASIC BIOLOGICAL SCIENCES↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Artemis: An Overview of NASA’s Activities to Return Humans to the Moon

NASA is well underway in its plans to return humans to the Moon and build long-term infrastructure both in orbit and on the surface. Following the Artemis I and Artemis II flight tests, NASA will begin crewed landings and regular missions to the Moon. Artemis will return value to the American public and the global community, enable groundbreaking scientific discovery, and prepare NASA and its partners for exploration of the solar system. Work on the initial Human Landing System (HLS), procurement activities for future HLS, and work on the initial modules of the lunar-orbiting Gateway are underway. International partnerships are playing a critical role in the planning, development, and execution of these missions. As of December 2021, three international partners have entered agreements to contribute to the Gateway and 14 nations have signed the Artemis accords. A new spacesuit acquisition strategy will stimulate economic growth and meet the growing needs of NASA and emerging customers. Requirements development is underway for an unpressurized lunar surface rover and plans for a pressurized rover, foundation surface habitat, and the Artemis Base Camp are in work. This paper will provide an update on the HLS demonstration missions and the procurement status for HLS services; a comprehensive look at the Gateway’s components and related statuses; a summary of planned surface systems; and an outline of the strategies NASA will use to successfully implement these plans, preparing for humanity's next giant leap: Mars.

Artemis↗

A Notional Artemis Lunar Surface Exploration Package (ArLSEP) based on the Gandalf Staff Platform

Introduction: The Artemis program is planning to deliver crew and cargo to the lunar surface, but there is no current package for supporting lunar in-struments and experiments similar to the Apollo Lunar Surface Exploration Package (ALSEP). This abstract provides a possible concept for such a package using the Gandalf Staff Platform as a common core. Gandalf Staff: The Gandalf Staff is an early prototype system developed over FY’21/FY’22 using NASA Science Technology Mission Directorate (STMD) Center Information Fund (CIF) grants to de-sign, build and test “proof-of-concept” components. These components include a 24v battery powered monopole that powers a suite of subsystems, including a Graphical User Interface (GUI) for crew, surface voice and data communications, Lunar Search and Rescue (LunaSAR) navigation and communications, LiDAR, field site external lighting, 360-degree camera, and a geothermal instrument for measuring sub-surface temperature gradient. The staff can be carried independently by an Extra-Vehicular Activity (EVA) astronaut, or can be mounted into a tripod for “hands free” support at a surface site being investigated. The staff can be attached to an external solar array and power storage system for long-duration operations. [1,2] ALSEP: An ASLEP flew on each mission Apollo 12 to Apollo 17. For Apollo 11, a simplified packaged called the Early Apollo Scientific Experiments Pack-age (EASEP) was flown. Each package included a “Central Station” that provided the power and communications connected to a variety of instruments and sensors. The power was provided by a Radioisotope Thermoelectric Generator (RTG) fueled by Plutoni-um-238 generating 70 watts of power (initially, decayed over time) [3]. The communications system provide for direct to Earth data transfer from the lunar surface. Each pack-age was stowed externally in the Lunar Module (LM) Scientific Equipment (SEQ) bay with a mass up to 163 kg (Apollo 17). The crew unloaded the ALSEP from the LM and deployed the instruments on the lunar surface. Although designed to operate for only 1 year, many sites operated for up to 8 years successfully [4]. The Active Seismic Experiment (ASE) included 3 geophones for detecting seismic waves created by mortars and thumpers deployed by the crew. Other active experiments measured the lunar atmosphere, the heat flow in the subsurface, the lunar gravity and potential gravity waves, the lunar magnetic field, the solar wind and plasma interactions in cislunar space. Passive experiments included collectors for dust and cosmic rays, and retroreflectors for precise measurements of distance using a laser from Earth. The ALSEP program continues to generate insights into lunar formation and evolution. ArLSEP Concepts: The lunar surface science package for the Artemis program will hopefully exceed the capability of the ALSEP. There are multiple issues for discussion leading to the design of a new ArLSEP, needing requirements definition from the science community, NASA mission architecture, and NASA budget planners. 1. Delivery Mechanism Two possible projects currently provide capability to deliver scientific cargo to the lunar surface: 1) the Commercial Lunar Payload Services (CLPS) [5] and the Human Landing System (HLS) [6, 7]. Each project is controlled by a different organization within NASA and budgeted with different criteria although both support lunar exploration. The HLS system delivers crew (and potentially cargo) to human landing sites. If an ArLSEP is “predeployed” to such a site, the design must include power (either from the vehicle or independently) to keep the electronics functioning until deployed by the crew. If an ArLSEP is delivered on a vehicle after the crew is present on the lunar surface, safety protocols require adequate distance from the humans for impact from descent propelled sur-face regolith ejecta. This distance can not exceed the capability of the crew to walk (if no rover) to the vehicle for ArLSEP deployment. 2. Overall Guidelines The general design of ArLSEP will likely follow the ALSEP with a common system for communications and power; however, significant architecture differences between Apollo and Artemis exist. Power: The RTG will not be available for early Artemis missions nor likely follow-on Lunar Exploration Transportation Services (LETS) missions [8]. Thus, ArLSEP power must be supplied by solar arrays with sufficient battery capability to “keep alive” necessary electronics during any lunar surface eclipse period. Communication: The Artemis program is developing a series of communications satellites for lunar orbit to provide surface transmission of data and voice to Earth. Called “LunaNET”, this network is component useful for ArLSEP since south polar locations may not always have direct “line-of-sight” to Earth [9]. 3. Concept of Operations (ConOps) The general ConOps for ArLSEP is to deliver the package to lunar surface before the crew arrives, and then have the crew deploy the package after some period of time. This requires coordinated design (for power systems) and launch window (for schedule) on both the cargo and crew missions. Once the ArLSEP is deployed, it will operate autonomously for a number of years. It should be designed to be EVA compatible for crew maintenance and upgrade. 4. Notional Design (for discussion purpose only) The landing site near the South Pole is expected to have no eclipse cycle exceeding 5 days, so the “keep alive” power is 144 hours (6 days to include margin). A 12v ArLSEP will use rechargeable LiFePO4 cells, which are common in the Electric Vehicle (EV) industry. With a current of 5 amps and a 125 watt system, the mass is about 90kg. The comm. system and structure adds another 10kg, thus the “Central Station” is approximately 100kg. The solar power is collected on four arrays (each 2m above the surface), and the entire ArLSEP is designed to stow in a 2m x 1m x 1m volume. The experiment and instrument design will vary for each installation and add mass to the total (although they are expected to fit within the 2m3 volume). Seismic wave generation will likely not be provided with mortars, thus an electric “thumper” will be required. Active instruments such as imaging systems and sensing instruments will benefit from the additional power and communication capability provided by ArLSEP. Passive systems such as retroreflectors, witness plates, and cosmic dust collectors can be added to either the landing vehicle and/or the ArLSEP. With repeated HLS missions to the same human site, the ArLSEP can be expanded and easily maintained for long duration science collection on the lunar surface.

ALSEP↗

Artemis and Ethics Workshop Lessons Learned

As NASA lays out its Artemis activities, it expects to set precedents in spaceflight for decades to come. Including ethical and social considerations in Artemis planning will improve the likelihood that the future we create is one where humanity collectively wants to live. NASA’s Office of Technology, Policy, and Strategy (OTPS) hosted an Artemis and Ethics Workshop. This workshop was held at NASA’s Mary Jackson Headquarters in Washington, DC from April 12th -14th 2023 and brought together invited experts in social science, humanities, and technical fields to discuss ethical, legal, and social implications (ELSI) of Artemis and human exploration in general. The two key study questions that the workshop aimed to address were: 1) How should NASA consider the ELSI of the Artemis and Moon to Mars efforts?; and 2) What are the key ethical and societal implications that need consideration? After briefly summarizing the formal workshop report, this paper addresses the lessons learned from implementing an interdisciplinary workshop of this nature, and from reflecting on the complexities of societal implications long-term. Issues of breadth vs depth, preparing people to engage across cultures, and allowing for structured brainstorming of specific issues are of particular importance. We also reflect on the limits of a workshop full of experts for addressing these issues and note ways in which other participatory processes or adjustments to policy practices may be worthwhile.

Artemis↗

Artemis and Ethics Workshop Lessons Learned

As NASA lays out its Artemis activities, it expects to set precedents in spaceflight for decades to come. Including ethical and social considerations in Artemis planning will improve the likelihood that the future we create is one where humanity collectively wants to live. NASA’s Office of Technology, Policy, and Strategy (OTPS) hosted an Artemis and Ethics Workshop. This workshop was held at NASA’s Mary Jackson Headquarters in Washington, DC from April 12th-14th 2023 and brought together invited experts in social science, humanities, and technical fields to discuss ethical, legal, and social implications (ELSI) of Artemis and human exploration in general. The two key study questions that the workshop aimed to address were: 1) How should NASA consider the ELSI of the Artemis and Moon to Mars efforts?; and 2) What are the key ethical and societal implications that need consideration? After briefly summarizing the formal workshop report, this paper addresses the lessons learned from implementing an interdisciplinary workshop of this nature, and from reflecting on the complexities of societal implications long-term. Issues of breadth vs depth, preparing people to engage across cultures, and allowing for structured brainstorming of specific issues are of particular importance. We also reflect on the limits of a workshop full of experts for addressing these issues and note ways in which other participatory processes or adjustments to policy practices may be worthwhile.

Artemis↗

ARTEMIS: Ares Real Time Environments for Modeling, Integration, and Simulation

This slide presentation reviews the use of ARTEMIS in the development and testing of the ARES launch vehicles. Ares Real Time Environment for Modeling, Simulation and Integration (ARTEMIS) is the real time simulation supporting Ares I hardware-in-the-loop (HWIL) testing. ARTEMIS accurately models all Ares/Orion/Ground subsystems which interact with Ares avionics components from pre-launch through orbit insertion The ARTEMIS System integration Lab, and the STIF architecture is reviewed. The functional components of ARTEMIS are outlined. An overview of the models and a block diagram is presented.

Hughes, Ryan↗

ARTEMIS Orbit Determination Accuracy in the Earth-Moon Lissajous Region

The ARTEMIS mission, part of the THEMIS extended mission, is the first to fly spacecraft in the Earth-Moon Lissajous regions. In 2009, two of the five THEMIS spacecraft were redeployed from Earth-centered orbits to arrive in Earth-Moon Lissajous orbits in late 2010. Starting in August 2010, the ARTEMIS Pl spacecraft executed numerous station-keeping maneuvers, initially maintaining a lunar L2 Lissajous orbit before transitioning into a lunar LI orbit. The ARTEMIS P2 spacecraft entered a LI Lissajous orbit in October 2010. In April 2011, both ARTEMIS spacecraft will suspend Lissajous station-keeping and will be maneuvered into lunar orbits. The success of the ARTEMIS mission has allowed the science team to gather unprecedented magnetospheric measurements in the lunar Lissajous regions.

Woodard, Mark↗

Artemis Innovative Assembly and Integration Operations of the Launch Abort Systemat KSC

This paper describes the Artemis program assembly and integration approach that enables affordable and low risk processing operations for the Launch Abort System at KSC. NASA is currently developing the Artemis 1 spacecraft to meet the test objectives of an uncrewed orbital mission to the moon and return to earth in 2021. The Artemis Orion spacecraft consists of a Crew Module (CM), a Service Module (SM), and a Launch Abort System (LAS) to safely transport a crew of 4 to the moon and return to earth. The LAS enables the CM to have an abort capability for the crew during the launch phase of the mission from the launch pad throughout the ascent phase. The LAS includes motor elements for abort, attitude control, and stage separation is assembled at the Launch Abort System Facility (LASF) adjacent to the CM/SM (CSM) assembly operations in the Neil Armstrong Operations and Checkout Building (O&C) at KSC. The LAS integration to the CSM is completed in the LASF and the completed Artemis spacecraft is integrated to the Space Launch System (SLS) in the Vehicle Assembly Building (VAB) at KSC. A significant LAS development flight test milestone was recently completed in 2019 for the Ascent Abort (AA-2) flight test at Cape Canaveral Air Force Station where a high-altitude abort test was successfully achieved using a Peacekeeper booster stage exercising all of the LAS systems including propulsion, avionics, and pyrotechnics demonstrating he LAS readiness for crewed flight. The first operational flight of the LAS will be for the Artemis 2 mission which is the first crewed mission for the Orion program planned in 2023.

William J Koenig↗

Using Open Standards and NASA Open Source Simulation Tools to Model Artemis Base Camp Mission Timelines

The United States’ National Aeronautics and Space Administration (NASA) has announced that the Artemis Program will return humans to the Moon, establishing a persistent presence with the Artemis Base Camp (ABC), and extend human exploration to Mars. The NASA Exploration Systems Simulations (NExSyS) team at NASA’s Johnson Space Center is using internationally developed simulation interoperability standards and NASA open source simulation tools to support Artemis concept, analysis, designs, development, training, and ultimately operations. The NExSyS team has been tasked to support early ABC architecture and mission analysis using mission time lines developed by the crew operations mission planning team. The NExSyS team is developing a distributed simulation framework with initial Artemis element implementations to model the ABC mission timelines using the international simulation interoperability standard High Level Architecture (HLA), the Simulation Interoperability Standards Organization’s Space Reference Federation Object Model (SpaceFOM), the NASA open source Trick Simulation Environment, and another NASA open source interface package called TrickHLA. The ABC architecture is composed of a number of key surface elements and resources. Some examples of modeled elements (also known as entities) are landers, habitats, rovers, logistics carriers, and astronauts. Some examples of modeled transferable and consumable resources are power, water, oxygen, nitrogen, scientific samples, and food. These entities and resources are modeled in a collection of individual simulations called Federates. A coordinated collection of interoperable federates is called a Federation and when these federates are tied together in a coordinated simulation run, it is referred to as a Federation Execution. The federates communicate through HLA using data exchange formats defined by a collection of machine readable files called Federation Object Models (FOMs). These FOM files are based on extensions to the SpaceFOM. This enables the instantiation and sharing of objects and interactions between federates in the federation. These provide for entity and resource tracking, object transfer, and data collection. Federate interactions are used to trigger events and notify federates of entity or resource transfers. For the initial implementation, the constituent federates are Trick-based simulations that use TrickHLA to provide the required HLA-base interoperability. These Trick-based simulations provide the required modeling for the individual Artemis elements along with the associated element resources. These federates provide a means to explore traverses between surface elements and exploration sites as scheduled in a mission timeline and explore the affects traverse times have on the overall mission timeline. The mission time lines are modeled using a Trick input file event handling capabilities. Each timeline operation is handled as individual simulation events, and triggered based on previous event status, time of operation, and simulated task completions. In addition, the ABC Federation can be used to perform Monte Carlo analysis. The Monte Carlo tool can vary the inputs, timings, and malfunctions to show how various contingencies in the mission can affect the mission timeline.

Keaton Craig Dodd↗

Performance of the Two-Level Targeting Algorithm on Artemis I

Artemis is NASA’s campaign to explore the Moon and beyond. Artemis I, the un-crewed exoLEO test flight, was completed in 2022. This paper will summarize the performance of the onboard targeting algorithm, the two-level targeter (TLT), during the flight. The function of the TLT is to autonomously recompute the burn targets for the upcoming burn (or multiple burns) in response to navigation and vehicle dispersions, providing a solution that meets all of the trajectory constraints. Although the TLT has been utilized previously as a ground-based planning tool, the Artemis I mission is the first time it has been flown onboard. The lessons learned from TLT performance during Artemis I will help to inform the further development of the algorithm for future Artemis missions.

Sara S Scarritt↗