Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Y(CO2)3”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

56 records · Page 4

High-Temperature Ceramic-Carbonate Dual-Phase Membrane Reactor for Pre-combustion Carbon Dioxide Capture (Final Scientific/Technical Report)

Arizona State University, in collaboration with University of South Carolina, worked on a project aimed at development of a new high temperature, high pressure CO 2 perm-selective membrane reactor for water-gas-shift reaction (WGS) with simulated gasifier syngas to produce a high concentration H 2 stream with CO 2 capture. The membrane reactor is made of a CO 2 semi-permeable ceramic-carbonate dual-phase (CCDP) membrane with high CO 2 perm-selectivity/permeance and thermal/mechanical stability for application in WGS reaction. The objectives of this project were to (1) synthesize the chemically/thermally stable tubular CCDP membranes with CO 2 permeance and selectivity (with respect to H 2 , CO or H 2 O) larger than 6.5×10-7 mol/m2·s·Pa and 500, respectively; (2) establish CCDP membrane reactor setup and study high pressure CO 2 permeation and WGS reaction with CO 2 capture using the setup; and (3) identify conditions for WGS in the CCDP membrane reactor that produce CO 2 and H 2 streams with purity of >99% and >90% respectively at CO conversion >95% and overall carbon capture >90%. The work in this project included both membrane development and membrane reactor process study. The membrane development efforts were focused on investigating a H 2 S resistant and highly oxygen-ionic conducting metal oxide material and membrane for CO 2 separation, fabrication of tubular samaria-doped-ceria/molten-carbonate CCDP membrane with high mechanical strength, and experimental and modeling study of high-pressure CO 2 permeation of the CCDP membranes. Mathematical models were developed to describe WGS in the CCDP membrane reactor without a catalyst or packed with a commercial high temperature WGS catalyst. Experiments on WGS in the CCDP membrane reactor with the commercial WGS catalyst, guided by the model analysis, were performed to identify optimum conditions for achieving the CO conversion, carbon capture, and the purity of the H 2 and CO 2 streams mentioned above. At 30 atm feed pressure, 750°C operation temperature, space velocity of 250 h-1, and with steam sweep, a single-stage CCDP membrane reactor with average CO 2 permeation flux of 0.5 cm3(STP)/min.cm2 can achieve CO 2 conversion of 95% and overall carbon capture of 94%, and produce CO 2 and H 2 streams with dry-based purity of >99% and 92% respectively. The project also included process design and techno-economic analysis (TEA) for a CCDP membrane reactor process for WGS reaction with CO 2 capture for a 550 MW coal-fired IGCC power plant, and its comparison with the conventional fixed-bed reactor system for WGS with follow-up CO 2 capture by an amine absorption process. The target performance for the reactor for WGS with CO 2 capture includes CO conversion >95%, hydrogen stream purity >90%, CO 2 stream purity >95%, and total carbon capture >90%. The CCDP membrane developed in this project can achieve the performance target, without subsequent CO 2 capture process at the optimum conditions identified in this project. The outcome of the process design and TEA analysis shows that the membrane reactor for WGS with in-situ CO 2 capture has an operating cost about 40% lower than that for the conventional fixed-bed reactor with a separate amine absorption process for CO 2 capture. However, the capital cost of the membrane reactor process is about twice that of the conventional process because of the higher cost of the CCDP membrane. Modeling analysis shows that a membrane reactor using a CCDP membrane with higher CO 2 permeance (about three times the current value) can deliver the targeted performance for WGS reaction with CO 2 capture at a much higher space velocity and lower membrane surface area to catalyst volume ratio, leading to a smaller catalyst amount and/or membrane area and hence significantly reduced membrane reactor capital costs.

20 FOSSIL-FUELED POWER PLANTS↗

North Dakota Integrated Carbon Storage Complex Feasibility Study. Final report

In spring 2017, the Energy & Environmental Research Center (EERC) initiated an effort to determine the feasibility of developing a commercial-scale CO 2 geologic storage complex able to store 50+ million tonnes (Mt) of CO 2 in central North Dakota safely, permanently, and economically. The objective was to fulfill the goals of the U.S. Department of Energy (DOE) Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative and address technical and nontechnical challenges specific to commercial-scale deployment of a CO2 storage project. The findings clearly show that the concept of capturing CO 2 from a lignite-fired electrical generation facility in central North Dakota and safely and permanently storing the CO 2 in the deep subsurface is indeed technically, economically, and socially feasible. This project evaluated two study areas and their respective geologic storage complexes located adjacent to separate coal-fired facilities in North Dakota: the Basin Electric Power Cooperative (BEPC)-owned Great Plains Synfuels Plant (GPSP) and the Minnkota Power Cooperative (Minnkota)-owned Milton R. Young Station (MRYS). These locations, one with CO 2 capture in place and an existing CO 2 pipeline, are bolstered by progressive North Dakota pore space ownership and long-term liability laws. These elements and a motivated team created an ideal synergistic scenario for ensuring success of the CarbonSAFE Initiative and promoting North Dakota’s statewide vision for carbon management. The project included drilling two new geologic characterization wells, integrating an existing 3-D seismic survey, creating a geologic model subsequently used for injection simulation, a risk assessment, public outreach, and generating a site development plan based on results. In addition, the performance of select National Risk Assessment Partnership tools was evaluated. The geologic characterization wells were drilled ~5600 feet deep to the Broom Creek Formation; ~350 feet of core was retrieved from each well. The core included the Broom Creek (targeted injection zone) and a portion of the overlying Opeche Shale (seal). The Flemmer-1 well, west of Beulah, North Dakota, yielded 169 feet of sandstone. The BNI-1 well located south of Center, North Dakota, yielded 124 feet of sandstone. In each case, laboratory analysis of the sandstone showed permeability in the 300–1000-mD range, with porosity of 20%–30%. The Flemmer-1 well was sited within the boundaries of an existing 3-D seismic survey. Colocating the well with the seismic survey maximized the relationship between new and legacy data and developed a first-of-its-kind interpretation of the geologic fabric of the Broom Creek. Geologic characterization data were integrated into a 5544-mi 2 geocellular model that encompassed both new wells and stratigraphy from the surface to the Amsden Formation (underlying the Broom Creek). The model was later expanded vertically to include the deeper Black Island–Deadwood interval to examine its potential viability as a storage target. The geocellular model provided the foundation for dynamic simulation of CO 2 into the Broom Creek. Results of the simulation suggest that the Broom Creek could accept the DOE target rate of 2 Mt/yr of CO 2 into as few as two wells. To bracket the expected capture from MRYS, simulations were also investigated for a 4-Mt/yr rate near MRYS. Although more wells are needed (two additional), the Broom Creek still has the storage resource to accept the CO 2 at the increased rate. A risk assessment exercise was conducted to identify and assess technical and nontechnical risks that could prevent potential candidate storage complexes within the study area from serving as commercial storage sites. The assessment identified and evaluated six technical risk categories: 1) CO 2 injectivity, 2) storage capacity, 3) lateral migration of CO 2 , 4) lateral pressure propagation, 5) vertical migration of CO 2 or formation brine, and 6) induced seismicity. Following two rounds of analysis and scoring, no risks were determined to preclude continued efforts to develop carbon capture, utilization, and storage (CCUS) in central North Dakota. The risk assessment results will be used to guide future site characterization, modeling and simulation, and monitoring activities. A specific nontechnical strategic risk based on challenges that may be realized in amalgamation of pore space resulted in vertically expanding the geologic model to incorporate the potential for stacked storage in multiple saline reservoirs. By including the Black Island–Deadwood interval (the basal sedimentary reservoir in this region), the amalgamated areal extent could be reduced by as much as 45%. Working with a smaller geographic area reduces risks and costs associated with monitoring and pore space leasing. An economic evaluation incorporating capture; transport (<5 mi); Class VI wells; permitting; and monitoring, verification, and accounting suggests implementing commercial-scale CCUS is economically attractive if the federal tax benefits of 45Q are included. This is validated by Minnkota’s continued pursuit of CO 2 capture and geologic storage at MRYS through its Project Tundra initiative, indicating that there is a business case for CCUS in central North Dakota. Currently, North Dakota is the only state with underground injection control (UIC) Class VI primacy. Built into the North Dakota Century Code is a series of regulatory requirements that guide the process to obtain a Class VI CO 2 storage facility permit. As part of this project, a site development plan was compiled to assure compliance with North Dakota’s requirements to permit a commercial-scale CO 2 storage operation and includes a prospective time line encompassing a general breakdown of activities. In total, an estimated 30 months would be needed to execute the necessary steps to attain a North Dakota CO 2 storage facility permit. Outreach was an integral part of the project and encompassed any project-related activity that had contact or exposure beyond the project team. The goals of outreach were to foster an environment from which stakeholders could make informed decisions about the project and gauge community receptiveness to a CCUS project. A consistent set of messages and outreach products were developed in conjunction with an outreach advisory board that integrated project partners and team members. To gauge public acceptability of geologically storing CO 2 , 5611 households in the project area were invited to participate in an online survey. The survey results indicate that the public attitude regarding CCUS is neutral to positive, with strong sentiment that CO 2 capture and storage may be an approach to maintain the economic vitality of the region. To achieve project objectives, critical support in the form of financial backing, engineering evaluations, site access, outreach collaboration, operations data, risk assessment/evaluation, and software access was provided by BEPC, the North Dakota Industrial Commission Lignite Research Council, ALLETE Clean Energy, BNI Energy, North American Coal Corporation, Minnkota, Prairie Public Broadcasting, Computer Modelling Group Ltd., and Schlumberger.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗