Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workplace Charging”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Promoting the Market for Plug-in Hybrid and Battery Electric Vehicles: Role of Recharge Availability

Much recent attention has been drawn to providing adequate recharge availability as a means to promote the battery electric vehicle (BEV) and plug-in hybrid electric vehicle (PHEV) market. The possible role of improved recharge availability in developing the BEV-PHEV market and the priorities that different charging options should receive from the government require better understanding. This study reviews the charging issue and conceptualizes it into three interactions between the charge network and the travel network. With travel data from 3,755 drivers in the National Household Travel Survey, this paper estimates the distribution among U.S. consumers of (a) PHEV fuel-saving benefits by different recharge availability improvements, (b) range anxiety by different BEV ranges, and (c) willingness to pay for workplace and public charging in addition to home recharging. With the Oak Ridge National Laboratory MA3T model, the impact of three recharge improvements is quantified by the resulting increase in BEV-PHEV sales. Compared with workplace and public recharging improvements, home recharging improvement appears to have a greater impact on BEV-PHEV sales. The impact of improved recharging availability is shown to be amplified by a faster reduction in battery cost.

25 ENERGY STORAGE↗

Plug-in hybrid electric vehicles : How does one determine their potential for reducing U.S. oil dependence?

Estimation of the potential of plug-in hybrid electric vehicles (PHEV's) ability to reduce U.S. gasoline use is difficult and complex. Although techniques have been proposed to estimate the vehicle kilometers of travel (VKT) that can be electrified, these methods may be inadequate and/or inappropriate for early market introduction circumstances. Factors that must be considered with respect to the PHEV itself include (1) kWh battery storage capability; (2) kWh/km depletion rate of the vehicle (3) liters/km use of gasoline (4) average daily kilometers driven (5) annual share of trips exceeding the battery depletion distance (6) driving cycle(s) (7) charger location [i.e. on-board or off-board] (8) charging rate. Each of these factors is actually a variable, and many interact. Off the vehicle, considerations include (a) primary overnight charging spot [garage, carport, parking garage or lot, on street], (b) availability of primary and secondary charging locations [i.e. dwellings, workplaces, stores, etc] (c) time of day electric rates (d) seasonal electric rates (e) types of streets and highways typically traversed during most probable trips depleting battery charge [i.e. city, suburban, rural and high vs. low density]; (f) cumulative trips per day from charger origin (g) top speeds and peak acceleration rates required to make usual trips. Taking into account PHEV design trade-off possibilities (kW vs. kWh of battery, in particular), this paper attempts to extract useful information relating to these topics from the 2001 National Household Travel Survey (NHTS), and the 2005 American Housing Survey (AHS). Costs per kWh of PHEVs capable of charge depleting (CD) all-electric range (CDE, or AER) vs. those CD in 'blended' mode (CDB) are examined. Lifetime fuel savings of alternative PHEV operating/utilization strategies are compared to battery cost estimates.

02 PETROLEUM↗

Impact of Fast Charging on Life of EV Batteries; NREL (National Renewable Energy Laboratory)

Installation of fast charging infrastructure is considered by many as one of potential solutions to increase the utility and range of electric vehicles (EVs). This is expected to reduce the range anxiety of drivers of EVs and thus increase their market penetration. Level 1 and 2 charging in homes and workplaces is expected to contribute to the majority of miles driven by EVs. However, a small percentage of urban driving and most of inter-city driving could be only achieved by a fast-charging network. DC fast charging at 50 kW, 100 kW, 120 kW compared to level 1 (3.3 kW) and level 2 (6.6 kW) results in high-current charging that can adversely impact the life of the battery. In the last couple of years, we have investigated the impact of higher current rates in batteries and potential of higher temperatures and thus lower service life. Using mathematical models, we investigated the temperature increase of batteries due to higher heat generation during fast charge and have found that this could lead to higher temperatures. We compared our models with data from other national laboratories both for fine-tuning and calibration. We found that the incremental temperature rise of batteries during 1C to 3C fast charging may reduce the practical life of the batteries by less than 10% over 10 to 15 years of vehicle ownership. We also found that thermal management of batteries is needed for fast charging to prevent high temperature excursions leading to unsafe conditions.

33 ADVANCED PROPULSION SYSTEMS↗

Recovery - Strategy to Accelerate U.S. Transition to Electric Vehicles

The objective of this project was to develop Extended Range Electric Vehicle (EREV) advanced propulsion technology and demonstrate a fleet of 146 Volt EREVs to gather data on vehicle performance and infrastructure to understand the impacts on commercialization while also creating or retaining a significant number of jobs in the United States. This objective was achieved by developing and demonstrating EREVs in real world conditions with customers in several diverse locations across the United States and installing, demonstration and testing charging infrastructure while also continuing development on second generation EREV technology. The project completed the development of the Chevrolet Volt and placed the vehicle in the hands of consumers in diverse locations across the United States. This demonstration leveraged the unique telematics platform of OnStar, standard on all Chevrolet Volts, to capture the operating experience that lead to better understanding of customer usage. The project team included utility partners that installed, demonstrated and tested charging infrastructure located in home, workplace and public locations to understand installation issues, customer usage and interaction with the electric grid. Development and demonstration of advanced technologies such as smart charging, fast charging and battery to grid interface were completed. The recipient collected, analyzed and reported the data generated by the demonstration. The recipient also continued to advance the technology of the Chevrolet Volt technology by developing energy storage system enhancements for the next-generation vehicle. Information gathered from the first generation vehicle will be utilized to refine the technology to reduce cost and mass while also increasing energy storage capacity to enhance adoption of the second generation technology into the marketplace. The launch of the first generation Chevrolet Volt will provide additional opportunities to further enhance the RESS (Rechargeable Energy Storage System) with each additional generation. Lessons learned from the launch of the first generation RESS will be demonstrated in the second generation to enhance adoption into the marketplace.

33 ADVANCED PROPULSION SYSTEMS↗

Modeling charging infrastructure impact on the electric vehicle market in China

The plug-in electric vehicle (PEV) is deemed as a critical technological revolution, and the governments are imposing various vehicle policies to promote its development. Meanwhile, the market success of PEVs depends on many aspects. The study reported herein integrates one’s use of charging infrastructure at home, public place and workplace into the market dynamics analysis tool, New Energy and Oil Consumption Credits (NEOCC) model, to systematically assess the charging infrastructure (home parking ratio, public charging opportunity, and charging costs) impact on PEV ownership costs and analyze how the PEV market shares may be affected by the attributes of the charging infrastructure. Compared to the charging infrastructure, the impact of battery costs is incontrovertibly decisive on PEV market shares, the charging infrastructure is still non-negligible in the PEV market dynamics. The simulation results find that the public charging infrastructure has more effectiveness on promoting the PEV sales in the PEV emerging market than it does in the PEV mature market. However, the improvement of charging infrastructure does not necessarily lead to a larger PEV market if the charging infrastructure incentives do not coordinate well with other PEV policies. Besides, the increase of public charging opportunities has limited motivations on the growth of public PEV fleets, which are highly correlated to the number of public fast charging stations or outlets. It also finds that more home parking spaces can stimulate more sales of personal plug-in hybrid electric vehicles instead of personal battery electric vehicles.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Drive Electric Vermont Case Study

Currently in the United States, the heavy majority of plug-in electric vehicle (PEV) sales have been in highly conducive, selected, metropolitan areas; opposed to more broad distribution across the country. The U.S. Department of Energy’s EV Everywhere Grand Challenge is looking carefully at the barriers and opportunities that exist to enable small and midsize communities to partake in the PEV market and benefit from the economic and environmental advantages of PEVs. In order to gain insight into these challenges and barriers, DOE selected a success story (i.e., Drive Electric Vermont) as the subject of this case study, as the state of Vermont is tied with Detroit, Michigan in having the highest percentage of 2014 (most recent complete data) PEV registrations for cold weather U.S. cities and has seen more than a sixfold increase in charging stations over the last three years. The overall objective of this case study was to use the lessons learned from Drive Electric Vermont to determine what activities are most effective at encouraging acquisitions of PEVs and deployment of charging infrastructure in small to midsize communities, prioritizing and sequencing their implementation, identifying robust means for extrapolation, and applying this understanding to other small to midsize communities across the nation. The Drive Electric Vermont Program was formed in 2012 with a goal of increasing the use of electrified transportation in Vermont through policy development, education and outreach, and infrastructure development. The Drive Electric Vermont Program can be broadly broken into four components: (1) strategic planning/leadership, (2) stakeholder/partnership development, (3) education and outreach, and (4) incentives. The early phases of the program focused heavily on strategic planning, and stakeholder and partnership development, followed by a transition to education and outreach activities, charging infrastructure development, and grant and incentive programs that support charging infrastructure deployment and PEV purchases. Future plans include an additional round of consumer/dealer PEV incentives, continuation of the marketing campaign, and utilization of consumer surveys to develop new campaign themes and to optimize information distribution channels. In Vermont, the number of PEVs grew from 88 in July 2012 to 1,113 in January 2016, with a high percentage of the PEVs being plug-in hybrids (i.e., 865) versus all electric vehicles (i.e., 248). The most popular PEVs are Toyota’s Prius Plug-in and Ford’s C-Max Energi, which make up a combined 48% of the total PEV ownership in the state. The PEVs are predominantly clustered in four counties: Lamoille, Caledonia, Washington, and Chittenden. There is no evident correlation between community size and PEV penetration; however, over 70% of PEV owners are in communities of 1,000 to 10,000 people. On the other hand, there is a close correlation between where PEVs are registered and where they publically charge. The number of PEV charging stations in Vermont grew from 17 in January 2013 to 111 in January 2016, at a variety of charging venues, including retail, parking (short term and long term), workplace, dealerships, hotels, education, leisure, and hospitals. The vast majority of the charging venues contain Level 2 electric vehicle supply equipment (EVSE) solely or combined with Level 1 EVSE or direct current fast charging. The average power transferred per charging event for communities across Vermont ranged from 4.8 to 13.8 kWh for direct current fast charging and 1.0 to 11.9 kWh for and Level 2 EVSE. Over half the charging locations offer free charging. For those that do require payment, different pricing models are employed, including monthly memberships, hourly payment (where there is often a higher fee for the first hour followed by a lower hourly fee for the remaining hours), and energy use based on kWh drawn from the EVSE. There is no correlation between pricing models and community size and region, the strongest correlation is by network provider. Charging events across Vermont generally correlate with east-west bands of chargers (Figure ES-1) running from Burlington to Montpelier and in the area of Rutland.

33 ADVANCED PROPULSION SYSTEMS↗

National Fire Protection Association Spurs the Safe Adoption of EVs Through Education and Outreach

As electric vehicles (EV) and their charging infrastructure steadily increase in popularity across the U.S., growing pains still exist, impeding their true potential for growth. The barriers include a general lack of knowledge around EV systems, range anxiety, electrical workplace safety practices, code compliance and inspection for charging stations, maintenance garages and workers, insurance concerns, and the potential risks associated with damaged lithium-ion batteries (fires, re-ignition, water immersion, and stranded energy).NFPA partnered with SMEs, training development organizations, and Clean City Coalitions to create a series of common online trainings for each EV ecosystem sector, educating communities on the realities of EV proliferation, myths, facts, statistics, codes, and basic information for each sector to become versed in EV knowledge. We also constructed a workshop program for the many EV stakeholders who should be involved in setting up a strategic, cohesive outlook for the participating towns and cities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Meeting 2025 Zero Emission Vehicle Goals: An Assessment of Electric Vehicle Charging Infrastructure in Maryland

The National Renewable Energy Laboratory (NREL) has been enlisted to conduct a statewide assessment of the electric vehicle charging infrastructure requirements for Maryland to meet its goal of supporting 300,000 zero emission vehicles by 2025. NREL's Electric Vehicle Infrastructure Projection Tool (EVI-Pro) was used to generate scenarios of statewide charging infrastructure to support consumer plug-in electric vehicle (PEV) adoption based on travel patterns provided by INRIX (a commercial mapping/traffic company) that are used to characterize regional travel in Maryland and to anticipate future demand for PEV charging. Results indicate that significant expansion of Maryland's electric vehicle charging infrastructure will be required to support the state's PEV goal for 2025. Analysis shows that a fleet of 300,000 PEVs will require 17,400 workplace Level 2 plugs, 9,300 public Level 2 plugs, and 1,000 fast charge plugs. These estimates assume that future PEVs will be driven in a manner consistent with present day gasoline vehicles and that most charging will happen at residential locations. A sensitivity study explores edge cases pertaining to several assumptions, highlighting factors that heavily influence the projected infrastructure requirements. Variations in the makeup of the PEV fleet, evolving consumer charging preferences, and availability of residential charging are all shown to influence 2025 infrastructure requirements.

33 ADVANCED PROPULSION SYSTEMS↗

New EVSE Analytical Tools/Models: Electric Vehicle Infrastructure Projection Tool (EVI-Pro)

This presentation addresses the fundamental question of how much charging infrastructure is needed in the United States to support PEVs. It complements ongoing EVSE initiatives by providing a comprehensive analysis of national PEV charging infrastructure requirements. The result is a quantitative estimate for a U.S. network of non-residential (public and workplace) EVSE that would be needed to support broader PEV adoption. The analysis provides guidance to public and private stakeholders who are seeking to provide nationwide charging coverage, improve the EVSE business case by maximizing station utilization, and promote effective use of private/public infrastructure investments.

30 DIRECT ENERGY CONVERSION↗

U.S. EV Infrastructure: Analysis and Projections

This presentation addresses the fundamental question of how much charging infrastructure is needed in the United States to support PEVs. It complements ongoing EVSE initiatives by providing a comprehensive analysis of national PEV charging infrastructure requirements. The result is a quantitative estimate for a U.S. network of non-residential (public and workplace) EVSE that would be needed to support broader PEV adoption. The analysis provides guidance to public and private stakeholders who are seeking to provide nationwide charging coverage, improve the EVSE business case by maximizing station utilization, and promote effective use of private/public infrastructure investments.

30 DIRECT ENERGY CONVERSION↗

Value to the Grid From Managed Charging Based on California's High Renewables Study

Managed charging of electric vehicle (EV) loads has the potential to use renewable energy more effectively, shave peak demand, and fill demand valleys while serving transportation needs. However, the potential value to the grid from managed charging has not been fully quantified. This paper adopts the tools used in the National Renewable Energy Laboratory's California Low Carbon Grid Study to quantify value to the grid from managed charging by using three levels of managed loads for 13 terawatt-hours of annual load from three million EVs in a 2030 California grid scenario. Simulation results show that management of the EV fleet's aggregate load from unmanaged to 100% managed results in savings between 210 million and 660 million annually in generation system costs, depending on grid conditions. The simulation results also suggest that targeted EV supply equipment (EVSE) deployments at workplaces and other mid-day parking locations will be needed to support managed charging in a high-renewables California and enable the identified value to the grid. Although the value of generation to the grid from managed EV load paired with high renewables seems substantial, we estimate that the installed cost of an EVSE must be between 1,000 and 3,000 for a 10-year life to be cost neutral, depending on grid conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EVs and PHEVs Charging Habits

Idaho National Laboratory has collected driving and charging profiles and preferences from 8,000 electric and plug-in hybrid electric vehicles, and 17,000 charging units in order to benchmark drivers’ vehicle operations and recharging preferences when using Level 2 and DC Fast Chargers in residential, public and workplace locations. In this presentation these preferences and use rates will be discussed.

33 ADVANCED PROPULSION SYSTEMS↗

What is the Impact of Utility Demand Charges on an Alternating Current Level 2 Elective Vehicle Supply Equipment Host?

The EVSE delivered by The EV Project included both residential and non-residential units. Approximately 4,000 non-residential ACL2 EVSE were installed in workplace environments, fleet applications and publicly accessible locations near retail centers, parking lots, and similar locations. The Blink ACL2 utilized in The EV Project is capable of charging at up to 7.2 kW power, although most vehicles in The EV Project charged at about 3.7 kW. This power can be a significant additional electrical load for the charging site host. This concern becomes greater when several EVSE are in operation on a site at the same time. Many electric utilities include maximum power demand as part of their commercial rate structure. The demand charge incurred by a commercial customer is related to the peak power used during a monthly billing cycle. This is in contrast to the total energy usage that is the more familiar utility charge seen for residential service. A demand charge is typically calculated based on the highest average power level over a 15 minute period during the monthly billing cycle and is not a cumulative-type charge. One objective of The EV Project was to elucidate the motivations and hindrances to potential site hosts of non-residential EVSE. The imposition of electric utility demand charges represents such a potential hindrance. This subject was introduced in the paper: DC Fast Charge - Demand Charge Reduction1, specifically dealing with DC Fast Chargers. The concept remains relevant to ACL2 EVSE, especially when several EVSE are deployed at the same site, which occurred frequently in the EV Project. In fact, the average number of ACL2 EVSE per site was 2.58 and varied by market from 1.79 to 3.45 per site. This paper identifies the impact of demand charges on non-residential ACL2 hosts in The EV Project

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

What is the Impact of Utility Demand Charges on a DCFC host

The PEV Electric Vehicle Supply Equipment (EVSE) delivered by The EV Project included both AC Level 2 and DCFC units. Over 100 of these dual-port Blink DC fast chargers were deployed by The EV Project. These DCFCs were installed in workplaces and in publicly accessible locations near traffic hubs, retail centers, parking lots, restaurants, and similar locations. The Blink DCFC is capable of charging at power up to 60 kW. Its dual-port design sequences the charge from one port to the other, delivering power to only one of two vehicles connected at a time. The actual power delivered through a port is determined by the PEV’s on-board battery management system (BMS). Both the power and the total energy used to recharge a PEV can represent a significant cost for the charging site host. Many electric utilities impose fees for power demand as part of their commercial rate structure. The demand charge incurred by a customer is related to the peak power used during a monthly billing cycle. This is in contrast to the cumulative total energy usage that is the more familiar utility charge seen for most residential services. A demand charge is typically assessed for the highest average power over any 15 minute interval during the monthly billing cycle. One objective of The EV Project was to identify and elucidate the motivations and barriers to potential DCFC site hosts. The application of electric utility demand charges is one such potential barrier. This subject was introduced in the paper: DC Fast Charge - Demand Charge Reduction1. It discussed demand charge impact in general terms in order to focus on potential mitigation actions. This paper identifies specific cases in order to quantify the impact of demand charges on EV Project DCFC hosts.

33 ADVANCED PROPULSION SYSTEMS↗

Characterize Plug-In Electric Vehicle Driver Away-From-Home Parking Behavior in The EV Project

The EV Project deployed over 5,000 AC Level 2 charging stations and over 100 dual-port DC fast chargers for commercial use in 17 geographic regions across the united States. Approximately 8,300 Nissan LEAFs™ and Chevrolet Volts PEVs participated in The EV Project by allowing data to be collected characterizing operation of their PEV and their charging usage. In the San Diego region, final PEV enrollment included 681 Leafs and 272 Volt owners. The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included electric vehicle supply equipment (EVSE) installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where The EV Project residential participants resided and where significant PEV traffic was expected. Using this process, The EV Project installed 545 non-residential fleet, workplace, and publicly accessible EVSE at 164 locations in the San Diego region. Another report: “Do PEV Drivers Park near Publicly Accessible EVSE in San Diego but not use them?” 1 investigated the San Diego PEV drivers’ use of 139 of these publicly accessible EVSE locations. It examined how frequently drivers parked near publicly accessible EVSE locations, but did not use them for charging. It concluded that parking near EVSE installed by The EV Project accounted for 3% of vehicle away-from-home parking. This report looks in greater detail at the PEV parking locations in San Diego to determine if there are highly utilized parking locations that should have EVSE available.

33 ADVANCED PROPULSION SYSTEMS↗

California Plug-In Electric Vehicle Infrastructure Projections: 2017-2025 - Future Infrastructure Needs for Reaching the State's Zero Emission-Vehicle Deployment Goals

This report analyzes plug-in electric vehicle (PEV) infrastructure needs in California from 2017 to 2025 in a scenario where the State's zero-emission vehicle (ZEV) deployment goals are achieved by household vehicles. The statewide infrastructure needs are evaluated by using the Electric Vehicle Infrastructure Projection tool, which incorporates representative statewide travel data from the 2012 California Household Travel Survey. The infrastructure solution presented in this assessment addresses two primary objectives: (1) enabling travel for battery electric vehicles and (2) maximizing the electric vehicle-miles traveled for plug-in hybrid electric vehicles. The analysis is performed at the county-level for each year between 2017 and 2025 while considering potential technology improvements. The results from this study present an infrastructure solution that can facilitate market growth for PEVs to reach the State's ZEV goals by 2025. The overall results show a need for 99k-130k destination chargers, including workplaces and public locations, and 9k-25k fast chargers. The results also show a need for dedicated or shared residential charging solutions at multi-family dwellings, which are expected to host about 120k PEVs by 2025. An improvement to the scientific literature, this analysis presents the significance of infrastructure reliability and accessibility on the quantification of charger demand.

33 ADVANCED PROPULSION SYSTEMS↗

Characterize the Demand and Energy Characteristics of Direct Current Fast Chargers

The electric vehicle supply equipment (EVSE) deployed by The EV Project included both AC Level 2 (ACL2) and DCFC units. Over 100 of the Blink dual-port DCFCs were deployed by The EV Project. These DCFCs were all publicly accessible, located in workplaces, near traffic hubs, retail centers, parking lots, restaurants, and similar locations. The Blink DCFC dual-port design sequences the charge from one port to the other, delivering power to only one of two vehicles connected at a time. The actual power delivered through a port is determined by the PEV’s on-board battery management system (BMS).The Blink DCFC is capable of charging at power up to 60 kW. For the EV Project, the Nissan Leaf was the only participating PEV capable of accepting a DC charge. The Nissan Leaf BMS allows acceptance of up to 50 kW DC power. At this rate, the DCFC is capable of recharging a Leaf battery from a 30% state of charge (SOC) to an 80% SOC in about 25 minutes. The power required by the DCFC to recharge a plug-in electric vehicle (PEV) can be a significant additional electrical load for the charging site host and contributes to the overall power demand on the electric grid.

33 ADVANCED PROPULSION SYSTEMS↗

Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?

The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment plan for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.

33 ADVANCED PROPULSION SYSTEMS↗