Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Workload management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Human-Autonomy Teaming Research in Support of m:N Operations

Since 2019, the NASA and industry partners have been involved in research focused on a novel paradigm for operations of remotely piloted aircraft. This paradigm involves multiple people sharing a fleet of multiple vehicles between them. Referred to as m:N (pronounced “em-to-en”), this configuration describes a ratio where m is the number of operators and N is the number of vehicles. Through force and asset multiplication, the m:N concept seeks to enable a scalable and resilient operation of remotely crewed vehicles. The primary means of obtaining such a robust operation is through allowing a flexible crew of variable size to dynamically attend to the needs of assets in while performing real-time operator workload management. It is in that sense that assets are shared between operators: as needed (such as in events of elevated workload) an operator in an m:N context can “handoff” the responsibility for some amount of assets, nh < N, to be absorbed by the m – 1 crew members on staff. At some time later, these nh assets could be returned to their original owner or they may be further distributed to other crew if called for by the mission. During this panel, I will elaborate on the research activity undertaken by the Human-Autonomy Teaming (HAT) Laboratory at NASA Ames Research Center over the previous three years. The studies conducted by the HAT Lab range from interviews with subject matter experts, a cognitive walkthrough, a task analysis, and two simulation experiments to-date. During experimentation, pilots made use of an advanced Ground Control Station developed by the HAT Lab and industry partners to simulate m:N operations in two large, metropolitan areas of Southern California: Los Angeles and San Diego. Further experimentation planned over the next few years. Results from our research to-date indicates that pilots of a moderately sized fleet of about a dozen remotely crewed aircraft adequately maintained safety performance and situation awareness of their aircraft, even when presented with unexpected situations of heightened workload.

multi-vehicle control↗

SHAPA: An interactive software tool for protocol analysis applied to aircrew communications and workload

As modern transport environments become increasingly complex, issues such as crew communication, interaction with automation, and workload management have become crucial. Much research is being focused on holistic aspects of social and cognitive behavior, such as the strategies used to handle workload, the flow of information, the scheduling of tasks, the verbal and non-verbal interactions between crew members. Traditional laboratory performance measures no longer sufficiently meet the needs of researchers addressing these issues. However observational techniques are better equipped to capture the type of data needed and to build models of the requisite level of sophistication. Presented here is SHAPA, an interactive software tool for performing both verbal and non-verbal protocol analysis. It has been developed with the idea of affording the researchers the closest possible degree of engagement with protocol data. The researcher can configure SHAPA to encode protocols using any theoretical framework or encoding vocabulary that is desired. SHAPA allows protocol analysis to be performed at any level of analysis, and it supplies a wide variety of tools for data aggregation, manipulation. The output generated by SHAPA can be used alone or in combination with other performance variables to get a rich picture of the influences on sequences of verbal or nonverbal behavior.

James, Jeffrey M.↗

Constructing a Testing Application for GWMS

Many of Fermilab’s High Energy Physics experiments require High Throughput Computing to carry out simulations, data reconstruction, and data analysis. Glidein Workflow Management System (GWMS) is a tool that distributes High Throughput Computing. The purpose of GWMS is to provide convenient access to Grid resources and sites. GWMS is coupled to HTCondor. HTCondor is the workload management system that is used for scheduling and job control. Users submit jobs to a local HTCondor queue and GWMS will make sure the job will run on one of the many remote resources.

Neely-Brown, LeRayah↗

Secure Command Line Solution for Token-based Authentication

The WLCG is modernizing its security infrastructure, replacing X.509 client authentication with the newer industry standard of JSON Web Tokens (JWTs) obtained through the Open ID Connect (OIDC) protocol. There is a wide variety of software available using the standards, but most of it is for Web browser-based applications and doesn’t adapt well to the command line-based software used heavily in High Throughput Computing (HTC). OIDC command line client software did exist, but it did not meet our requirements for security and convenience. This paper discusses a command line solution we have made based on the popular existing secrets management software from Hashicorp called vault. We made a package called htvault-config to easily configure a vault service and another called htgettoken to be the vault client. In addition, we have integrated use of the tools into the HTCondor workload management system, although they also work well independent of HTCondor. All of the software is open source, under active development, and ready for use.

Dykstra, Dave↗

Air Traffic Management Research at NASA Ames Research Center

Since the late 1980's, NASA Ames researchers have been investigating ways to improve the air transportation system through the development of decision support automation. These software advances, such as the Center-TRACON Automation System (eTAS) have been developed with teams of engineers, software developers, human factors experts, and air traffic controllers; some ASA Ames decision support tools are currently operational in Federal Aviation Administration (FAA) facilities and some are in use by the airlines. These tools have provided air traffic controllers and traffic managers the capabilities to help reduce overall delays and holding, and provide significant cost savings to the airlines as well as more manageable workload levels for air traffic service providers. NASA is continuing to collaborate with the FAA, as well as other government agencies, to plan and develop the next generation of decision support tools that will support anticipated changes in the air transportation system, including a projected increase to three times today's air-traffic levels by 2025. The presentation will review some of NASA Ames' recent achievements in air traffic management research, and discuss future tool developments and concepts currently under consideration.

Lee, Katharine↗

ReSS: A Resource Selection Service for the Open Science Grid

The Open Science Grid offers access to hundreds of computing and storage resources via standard Grid interfaces. Before the deployment of an automated resource selection system, users had to submit jobs directly to these resources. They would manually select a resource and specify all relevant attributes in the job description prior to submitting the job. The necessity of a human intervention in resource selection and attribute specification hinders automated job management components from accessing OSG resources and it is inconvenient for the users. The Resource Selection Service (ReSS) project addresses these shortcomings. The system integrates condor technology, for the core match making service, with the gLite CEMon component, for gathering and publishing resource information in the Glue Schema format. Each one of these components communicates over secure protocols via web services interfaces. The system is currently used in production on OSG by the DZero Experiment, the Engagement Virtual Organization, and the Dark Energy. It is also the resource selection service for the Fermilab Campus Grid, FermiGrid. ReSS is considered a lightweight solution to push-based workload management. This paper describes the architecture, performance, and typical usage of the system.

99 GENERAL AND MISCELLANEOUS↗

Certification of Completion of ASC FY08 Level-2 Milestone ID #2933

This report documents the satisfaction of the completion criteria associated with ASC FY08 Milestone ID No.2933: 'Deploy Moab resource management services on BlueGene/L'. Specifically, this milestone represents LLNL efforts to enhance both SLURM and Moab to extend Moab's capabilities to schedule and manage BlueGene/L, and increases portability of user scripts between ASC systems. The completion criteria for the milestone are the following: (1) Batch jobs can be specified, submitted to Moab, scheduled and run on the BlueGene/L system; (2) Moab will be able to support the markedly increased scale in node count as well as the wiring geometry that is unique to BlueGene/L; and (3) Moab will also prepare and report statistics of job CPU usage just as it does for the current systems it supports. This document presents the completion evidence for both of the stated milestone certification methods: Completion evidence for this milestone will be in the form of (1) documentation--a report that certifies that the completion criteria have been met; and (2) user hand-off. As the selected Tri-Lab workload manager, Moab was chosen to replace LCRM as the enterprise-wide scheduler across Livermore Computing (LC) systems. While LCRM/SLURM successfully scheduled jobs on BG/L, the effort to replace LCRM with Moab on BG/L represented a significant challenge. Moab is a commercial product developed and sold by Cluster Resources, Inc. (CRI). Moab receives the users batch job requests and dispatches these jobs to run on a specific cluster. SLURM is an open-source resource manager whose development is managed by members of the Integrated Computational Resource Management Group (ICRMG) within the Services and Development Division at LLNL. SLURM is responsible for launching and running jobs on an individual cluster. Replacing LCRM with Moab on BG/L required substantial changes to both Moab and SLURM. While the ICRMG could directly manage the SLURM development effort, the work to enhance Moab had to be done by Moab's vendor. Members of the ICRMG held many meetings with CRI developers to develop the design and specify the requirements for what Moab needed to do. Extensions to SLURM are used to run jobs on the BlueGene/L architecture. These extensions support the three dimensional network topology unique to BG/L. While BG/L geometry support was already in SLURM, enhancements were needed to provide backfill capability and answer 'will-run' queries from Moab. For its part, the Moab architecture needed to be modified to interact with SLURM in a more coordinated way. It needed enhancements to support SLURM's shorthand notation for representing thousands of compute nodes and report this information using Moab's existing status commands. The LCRM wrapper scripts that emulated LCRM commands also needed to be enhanced to support BG/L usage. The effort was successful as Moab 5.2.2 and SLURM 1.3 was installed on the 106496 node BG/L machine on May 21, 2008, and turned over to the users to run production.

99 GENERAL AND MISCELLANEOUS↗

BigPanDA monitoring system evolution in the ATLAS Experiment

Monitoring services play a crucial role in the day-to-day operation of distributed computing systems. The ATLAS Experiment at LHC uses the Production and Distributed Analysis workload management system (PanDA WMS), which allows a million computational jobs to run daily at over 170 computing centers of the WLCG and opportunistic resources, utilizing 600k cores simultaneously on average. The BigPanDA monitor is an essential part of the monitoring infrastructure for the ATLAS Experiment that provides a wide range of views, from top-level summaries to a single computational job and its logs. Over the past few years of the PanDA WMS advancement in the ATLAS Experiment, several new components were developed, such as Harvester, iDDS, Data Carousel, and Global Shares. Due to its modular architecture, the BigPanDA monitor naturally grew into a platform where the relevant data from all PanDA WMS components and accompanying services are accumulated and displayed in the form of interactive charts and tables. Moreover the system has been adopted by other experiments beyond HEP. In this paper we describe the evolution of the BigPanDA monitor system, the development of new modules, and the integration process into other experiments.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Accelerating science: The usage of commercial clouds in ATLAS Distributed Computing

The ATLAS experiment at CERN is one of the largest scientific machines built to date and will have ever growing computing needs as the Large Hadron Collider collects an increasingly larger volume of data over the next 20 years. ATLAS is conducting R&D projects on Amazon Web Services and Google Cloud as complementary resources for distributed computing, focusing on some of the key features of commercial clouds: lightweight operation, elasticity and availability of multiple chip architectures. The proof of concept phases have concluded with the cloud-native, vendoragnostic integration with the experiment’s data and workload management frameworks. Google Cloud has been used to evaluate elastic batch computing, ramping up ephemeral clusters of up to O(100k) cores to process tasks requiring quick turnaround. Amazon Web Services has been exploited for the successful physics validation of the Athena simulation software on ARM processors. We have also set up an interactive facility for physics analysis allowing endusers to spin up private, on-demand clusters for parallel computing with up to 4 000 cores, or run GPU enabled notebooks and jobs for machine learning applications. The success of the proof of concept phases has led to the extension of the Google Cloud project, where ATLAS will study the total cost of ownership of a production cloud site during 15 months with 10k cores on average, fully integrated with distributed grid computing resources and continue the R&D projects.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Optimization of distributed compute resources utilization in the CMS Global Pool

The CMS Submission Infrastructure is the primary system for managing computing resources for CMS workflows, including data processing, simulation, and analysis. It integrates geographically distributed resources from Grid, HPC, and cloud providers into federated pools managed by HTCondor and Glidein- WMS, for a total of around 500k CPU cores. This system dynamically manages workloads based on priorities defined by the collaboration. Additionally, CMS scheduling strategies must be flexible to handle multiple concurrent workloads while considering changing processing demands and resource availability from various providers.Efficient utilization of vast amounts of distributed compute resources is a key element for the success of the scientific programs of the LHC experiments. Optimizing the system is essential to maximize resource efficiency and fully utilize the distributed computing power. The CMS Submission Infrastructure team thus systematically investigates sources of inefficiency in workload scheduling to reduce their impact. In addition, a strategy of pilot overloading has been introduced to compensate for other inefficiency sources, thereby optimizing resource utilization and enhancing computational throughput.

Mascheroni, Marco [UC, San Diego (main)]↗

Supercomputers, Clouds and Grids powered by BigPanDA for Brain studies

The PanDA WMS - Production and Distributed Analysis Workload Management System - has been developed and used by the ATLAS experiment at the LHC (Large Hadron Collider) for all data processing and analysis challenges. BigPanDA is an extension of the PanDA WMS to run ATLAS and non-ATLAS applications on Leadership Class Facilities and supercomputers, as well as traditional grid and cloud resources. The success of the BigPanDA project has drawn attention from other compute intensive sciences such as biology. In 2017, a pilot project was started between BigPanDA and the Blue Brain Project (BBP) of the Ecole Polytechnique Federal de Lausanne (EPFL) located in Lausanne, Switzerland. This proof of concept project is aimed at demonstrating the efficient application of the BigPanDA system to support the complex scientific workflow of the BBP, which relies on using a mix of desktop, cluster and supercomputers to reconstruct and simulate accurate models of brain tissue.

Computer Science↗

CDF GlideinWMS usage in grid computing of high energy physics

Many members of large science collaborations already have specialized grids available to advance their research in the need of getting more computing resources for data analysis. This has forced the Collider Detector at Fermilab (CDF) collaboration to move beyond the usage of dedicated resources and start exploiting Grid resources. Nowadays, CDF experiment is increasingly relying on glidein-based computing pools for data reconstruction. Especially, Monte Carlo production and user data analysis, serving over 400 users by central analysis farm middleware (CAF) on the top of Condor batch system and CDF Grid infrastructure. Condor is designed as distributed architecture and its glidein mechanism of pilot jobs is ideal for abstracting the Grid computing by making a virtual private computing pool. We would like to present the first production use of the generic pilot-based Workload Management System (glideinWMS), which is an implementation of the pilot mechanism based on the Condor distributed infrastructure. CDF Grid computing uses glideinWMS for its data reconstruction on the FNAL campus Grid, user analysis and Monte Carlo production across Open Science Grid (OSG). We review this computing model and setup used including CDF specific configuration within the glideinWMS system which provides powerful scalability and makes Grid computing working like in a local batch environment with ability to handle more than 10000 running jobs at a time.

99 GENERAL AND MISCELLANEOUS↗

Use of glide-ins in CMS for production and analysis

With the evolution of various grid federations, the Condor glide-ins represent a key feature in providing a homogeneous pool of resources using late-binding technology. The CMS collaboration uses the glide-in based Workload Management System, glideinWMS, for production (ProdAgent) and distributed analysis (CRAB) of the data. The Condor glide-in daemons traverse to the worker nodes, submitted via Condor-G. Once activated, they preserve the Master-Worker relationships, with the worker first validating the execution environment on the worker node before pulling the jobs sequentially until the expiry of their lifetimes. The combination of late-binding and validation significantly reduces the overall failure rate visible to CMS physicists. We discuss the extensive use of the glideinWMS since the computing challenge, CCRC-08, in order to prepare for the forthcoming LHC data-taking period. The key features essential to the success of large-scale production and analysis on CMS resources across major grid federations, including EGEE, OSG and NorduGrid are outlined. Use of glide-ins via the CRAB server mechanism and ProdAgent, as well as first hand experience of using the next generation CREAM computing element within the CMS framework is discussed.

99 GENERAL AND MISCELLANEOUS↗

Early experience on using glidein WMS in the cloud

Cloud computing is steadily gaining traction both in commercial and research worlds, and there seems to be significant potential to the HEP community as well. However, most of the tools used in the HEP community are tailored to the current computing model, which is based on grid computing. One such tool is glideinWMS, a pilot-based workload management system. In this paper we present both what code changes were needed to make it work in the cloud world, as well as what architectural problems we encountered and how we solved them. Benchmarks comparing grid, Magellan, and Amazon EC2 resources are also included.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PanDA Pilot Submission using Condor-G: Experience and Improvements

PanDA (Production and Distributed Analysis) is the workload management system of the ATLAS experiment, used to run managed production and user analysis jobs on the grid. As a late-binding, pilot-based system, the maintenance of a smooth and steady stream of pilot jobs to all grid sites is critical for PanDA operation. The ATLAS Computing Facility (ACF) at BNL, as the ATLAS Tier1 center in the US, operates the pilot submission systems for the US. This is done using the PanDA 'AutoPilot' scheduler component which submits pilot jobs via Condor-G, a grid job scheduling system developed at the University of Wisconsin-Madison. In this paper, we discuss the operation and performance of the Condor-G pilot submission at BNL, with emphasis on the challenges and issues encountered in the real grid production environment. With the close collaboration of Condor and PanDA teams, the scalability and stability of the overall system has been greatly improved over the last year. We review improvements made to Condor-G resulting from this collaboration, including isolation of site-based issues by running a separate Gridmanager for each remote site, introduction of the 'Nonessential' job attribute to allow Condor to optimize its behavior for the specific character of pilot jobs, better understanding and handling of the Gridmonitor process, as well as better scheduling in the PanDA pilot scheduler component. We will also cover the monitoring of the health of the system.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

CRAB3: Establishing a new generation of services for distributed analysis at CMS

In CMS Computing the highest priorities for analysis tools are the improvement of the end users ability to produce and publish reliable samples and analysis results as well as a transition to a sustainable development and operations model. To achieve these goals CMS decided to incorporate analysis processing into the same framework as data and simulation processing. This strategy foresees that all workload tools (TierO, Tier1, production, analysis) share a common core with long term maintainability as well as the standardization of the operator interfaces. The re-engineered analysis workload manager, called CRAB3, makes use of newer technologies, such as RESTFul based web services and NoSQL Databases, aiming to increase the scalability and reliability of the system. As opposed to CRAB2, in CRAB3 all work is centrally injected and managed in a global queue. A pool of agents, which can be geographically distributed, consumes work from the central services serving the user tasks. The new architecture of CRAB substantially changes the deployment model and operations activities. In this paper we present the implementation of CRAB3, emphasizing how the new architecture improves the workflow automation and simplifies maintainability. In particular, we will highlight the impact of the new design on daily operations.

Cinquilli, M.↗

PD2P: PanDA Dynamic Data Placement for ATLAS

The PanDA (Production and Distributed Analysis) system plays a key role in the ATLAS distributed computing infrastructure. PanDA is the ATLAS workload management system for processing all Monte-Carlo (MC) simulation and data reprocessing jobs in addition to user and group analysis jobs. The PanDA Dynamic Data Placement (PD2P) system has been developed to cope with difficulties of data placement for ATLAS. We will describe the design of the new system, its performance during the past year of data taking, dramatic improvements it has brought about in the efficient use of storage and processing resources, and plans for the future.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evolution of the ATLAS PanDA Production and Distributed Analysis System

Evolution of the ATLAS PanDA Production and Distributed Analysis System T Maeno1,5, K De2, T Wenaus1, P Nilsson2, R Walker3, A Stradling2, V Fine1, M Potekhin1, S Panitkin1 and G Compostella4 Published under licence by IOP Publishing Ltd Journal of Physics: Conference Series, Volume 396, Part 3 Article PDF References Citations Metrics 101 Total downloads Cited by 8 articles Turn on MathJax Share this article Article information Abstract The PanDA (Production and Distributed Analysis) system has been developed to meet ATLAS production and analysis requirements for a data-driven workload management system capable of operating at LHC data processing scale. PanDA has performed well with high reliability and robustness during the two years of LHC data-taking, while being actively evolved to meet the rapidly changing requirements for analysis use cases. We will present an overview of system evolution including automatic rebrokerage and reattempt for analysis jobs, adaptation for the CernVM File System, support for the multi-cloud model through which Tier-2 sites act as members of multiple clouds, pledged resource management and preferential brokerage, and monitoring improvements. We will also describe results from the analysis of two years of PanDA usage statistics, current issues, and plans for the future.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗