Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improved Management of the Technical Interfaces Between the Hanford Tank Farm Operator and the Hanford Waste Treatment Plant - 13383

The Department of Energy (DOE) is constructing the Waste Treatment and Immobilization Plant (WTP) at the Hanford site in Washington to treat and immobilize approximately 114 million gallons of high level radioactive waste (after all retrievals are accomplished). In order for the WTP to be designed and operated successfully, close coordination between the WTP engineering, procurement, and construction contractor, Bechtel National, Inc. and the tank farms operating contractor (TOC), Washington River Protection Solutions, LLC, is necessary. To develop optimal solutions for DOE and for the treatment of the waste, it is important to deal with the fact that two different prime contractors, with somewhat differing contracts, are tasked with retrieving and delivering the waste and for treating and immobilizing that waste. The WTP and the TOC have over the years cooperated to manage the technical interface. To manage what is becoming a much more complicated interface as the WTP design progresses and new technical issues have been identified, an organizational change was made by WTP and TOC in November of 2011. This organizational change created a co-located integrated project team (IPT) to deal with mutual and interface issues. The Technical Organization within the One System IPT includes employees from both TOC and WTP. This team has worked on a variety of technical issues of mutual interest and concern. Technical issues currently being addressed include: - The waste acceptance criteria; - Waste feed delivery and the associated data quality objectives (DQO); - Evaluation of the effects of performing a riser cut on a single shell tank on WTP operations; - The disposition of secondary waste from both TOC and WTP; - The close coordination of the TOC double shell tank mixing and sampling program and the Large Scale Integrated Test (LSIT) program for pulse jet mixers at WTP along with the associated responses to the Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 2010-2; - Development of a set of alternatives to the current baseline that involve aspects of direct feed, feed conditioning, and design changes. The One System Technical Organization has served WTP, TOC, and DOE well in managing and resolving issues at the interface. This paper describes the organizational structure used to improve the interface and several examples of technical interface issues that have been successfully addressed by the new organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 17275

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 211 983 m{sup 3} (56 million gallons) of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB), collectively known as LBL; - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the PT Facility; - Completing the design and construction of the HLW Facility; - Resolving the technical issues associated with the PT Facility; - Completing all WTP facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree, establishing revised milestone dates for the Hanford WTP that generally align with DOE's plans for completing the WTP facilities in sequence. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to accommodate direct feed of low-activity waste to the LAW Facility. The contract modification and revised performance baseline support completion of hot commissioning of the WTP facilities needed for DFLAW operations no later than December 31, 2023. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementing a Low Activity Waste Direct Feed Capability in the Hanford Waste Treatment Plant - 17277

The original design of the Waste Treatment and Immobilization Plant (WTP) requires that all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE) has developed a sequenced approach to completing the WTP Project, beginning with feeding some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. Sending low-activity waste from the tank farms to the LAW Facility is referred to as direct-feed LAW (DFLAW). Using this approach, low-activity waste will be pretreated in a Low-Activity Waste Pretreatment System (LAWPS) for cesium and solids separation to meet LAW Facility safety basis requirements and produce an acceptable low-activity waste product. The waste feed will then be transferred to the LAW Facility where it will be immobilized in glass, poured into stainless steel containers, and then transported by truck to the Integrated Disposal Facility, a mixed waste burial ground located in the Hanford 200-East Area. The primary driver for the DFLAW approach is to enable commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste (HLW) facilities. As such, the functions intended to be provided to the LAW Facility by the PT Facility and the common functionality with the HLW Facility must be refined and modified to enable DFLAW operations. The DFLAW approach will provide necessary systems and facilities to replace these enabling PT Facility functions until the PT Facility is completed and commissioned. For example, liquid effluents from the LAW Facility, primarily melter offgas condensate, will be processed in a new effluent management facility (EMF) within the WTP footprint rather than sending the effluent back to the PT Facility for processing. During DFLAW operations approximately 3 785 m{sup 3} (1 million gallons) of double-shell tank (DST) waste will be delivered to WTP for treatment each year of operation, and nominally produce 21 metric tons of immobilized low-activity waste glass per day. The resultant freed space in the DSTs will support safe tank farm operation and staging of additional waste for treatment. In December 2016, DOE executed a contract modification and approved an incremental change to the project's performance baseline to complete the WTP facilities needed to allow direct feed of low-activity waste to the LAW Facility. The revised performance baseline supports completion and cold commissioning of the WTP facilities needed for DFLAW operations no later than August 2023. The design of modifications to WTP facilities needed to enable DFLAW operations is more that 60 percent complete. DOE approved the preliminary safety basis for DFLAW modifications to WTP based on the 30 percent design package in early 2016. Early construction work for DFLAW modifications to WTP began in mid-2015. Long-lead procurement actions for some of the more complex equipment needed for LAW Facility effluent treatment were initiated in early 2016. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transitioning from Construction to Startup for the Waste Treatment and Immobilization Plant's Low-Activity Waste Facility - 17284

The original design of the Waste Treatment and Immobilization Plant (WTP) required all waste be processed through the Pretreatment (PT) Facility in order to separate the low-activity waste and high-level waste streams. The U.S. Department of Energy (DOE), Office of River Protection (ORP) has developed a sequenced approach to completing the WTP Project, beginning with delivering some liquid waste directly to the Low-Activity Waste (LAW) Facility, bypassing the PT Facility. This operating configuration is referred to as direct-feed LAW (DFLAW). The primary driver for the DFLAW approach is to enable startup and commissioning of the LAW Facility for low-activity waste processing prior to the completion and availability of the PT and High-Level Waste facilities. In March 2016, a federal judge amended the Consent Decree between DOE and the State of Washington to require completion of hot commissioning for the LAW Facility no later than December 31, 2023. During the next few years ORP and the WTP contractor will transition the project from completion of construction to the startup and commissioning phase for the LAW Facility and the associated support facilities. The WTP contractor has developed an integrated management process to successfully conduct facility startup testing for the WTP facilities required to support DFLAW. The WTP contractor will also develop a commissioning plan and facility transition plan. These plans will describe the strategy; schedule; and requirements for safe, efficient, and sequential startup, commissioning, and transfer of the WTP facilities to an operations contractor. The WTP contractor has also established a strategy to achieve operational readiness for the facilities required to support DFLAW consistent with DOE O 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities and DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets. ORP has established a strategy for oversight of the WTP contractor's startup, commissioning, and readiness activities. The strategy also encompasses ORP's own activities to achieve readiness. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory Evaporation Testing Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream, LAW Off-Gas Condensate, from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of canistered glass waste forms. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to be within acceptable concentration ranges in the LAW glass. Diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the impact of potential future disposition of this stream in the Hanford tank farms, and investigates auxiliary evaporation to enable another disposition path. Unless an auxiliary evaporator is used, returning the stream to the tank farms would require evaporation in the 242-A evaporator. This stream is expected to be unusual because it will be very high in corrosive species that are volatile in the melter (chloride, fluoride, sulfur), will have high ammonia, and will contain carryover particulates of glass-former chemicals. These species have potential to cause corrosion of tanks and equipment, precipitation of solids, release of ammonia gas vapors, and scale in the tank farm evaporator. Routing this stream to the tank farms does not permanently divert it from recycling into the WTP, only temporarily stores it prior to reprocessing. Testing is normally performed to demonstrate acceptable conditions and limits for these compounds in wastes sent to the tank farms. The primary parameter of this phase of the test program was measuring the formation of solids during evaporation in order to assess the compatibility of the stream with the evaporator and transfer and storage equipment. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW facility melter offgas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet, and, thus, the composition will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. This report discusses results of evaporation testing of the simulant. Two conditions were tested, one with the simulant at near neutral pH, and a second at alkaline pH. The neutral pH test is comparable to the conditions in the Hanford Effluent Treatment Facility (ETF) evaporator, although that evaporator operates at near atmospheric pressure and tests were done under vacuum. For the alkaline test, the target pH was based on the tank farm corrosion control program requirements, and the test protocol and equipment was comparable to that used for routine evaluation of feed compatibility studies for the 242-A evaporator. One of the radionuclides that is volatile in the melter and expected to be in high concentration in this LAW Off-Gas Condensate stream is Technetium-99 (99Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are also expected to be in appreciable concentrations in the LAW Off-Gas Condensate are 129I, 90Sr, 137Cs, and 241Am. The concentrations of these radionuclides in this stream will be much lower than in the LAW, but they will still be higher than limits for some of the other disposition pathways currently available. At this time, these scoping tests did not evaluate the partitioning of the radionuclides to the evaporator condensate, since ample data are available separately from other experience in the DOE complex. Results from the evaporation testing show that the neutral SBS simulant first forms turbidity at ~7.5X concentration, while the alkaline-adjusted simulant became turbid at ~3X concentration. The major solid in both cases was Kogarkoite, Na3FSO4. Sodium and lithium fluorides were also detected. Minimal solids were formed in the evaporator bottoms until a substantial fraction of liquid was removed, indicating that evaporation could minimize storage volume issues. Achievable concentration factors without significant insoluble solids were 17X at alkaline pH, and 23X at neutral pH. In both runs, significant ammonia carried over and was captured in the condenser with the water condensate. Results also indicate that with low insoluble solids formation in the initial testing at neutral pH, the use of Reverse Osmosis is a potential alternate method for concentrating the solution, although an evaluation is needed to identify equipment that can tolerate insoluble solids. Most of the ammonia remains in the evaporator bottoms during the neutral pH evaporation, but partitions to the condensate during alkaline evaporation. Disposition of both streams needs to consider the management of ammonia vapor and its release. Since this is an initial phase of testing, additional tasks related to evaporation methods are expected to be identified for development. These tasks likely include evaluation and testing of composition variability testing and evaluations, corrosion and erosion testing, slurry storage and immobilization investigations, and evaporator condensate disposition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Crystallization In High Level Waste (HLW) Glass Melters: Operational Experience From The Savannah River Site

processing strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The basis of this alternative approach is an empirical model predicting the crystal accumulation in the WTP glass discharge riser and melter bottom as a function of glass composition, time, and temperature. When coupled with an associated operating limit (e.g., the maximum tolerable thickness of an accumulated layer of crystals), this model could then be integrated into the process control algorithms to formulate crystal tolerant high level waste (HLW) glasses targeting higher waste loadings while still meeting process related limits and melter lifetime expectancies. This report provides a review of the scaled melter testing that was completed in support of the Defense Waste Processing Facility (DWPF) melter. Testing with scaled melters provided the data to define the DWPF operating limits to avoid bulk (volume) crystallization in the un-agitated DWPF melter and provided the data to distinguish between spinels generated by K-3 refractory corrosion versus spinels that precipitated from the HLW glass melt pool. This report includes a review of the crystallization observed with the scaled melters and the full scale DWPF melters (DWPF Melter 1 and DWPF Melter 2). Examples of actual DWPF melter attainment with Melter 2 are given. The intent is to provide an overview of lessons learned, including some example data, that can be used to advance the development and implementation of an empirical model and operating limit for crystal accumulation for WTP. Operation of the first and second (current) DWPF melters has demonstrated that the strategy of using a liquidus temperature predictive model combined with a 100 °C offset from the normal melter operating temperature of 1150 °C (i.e., the predicted liquidus temperature (TL) of the glass must be 1050 °C or less) has been successful in preventing any detrimental accumulation of spinel in the DWPF melt pool, and spinel has not been observed in any of the pour stream glass samples. Spinel was observed at the bottom of DWPF Melter 1 as a result of K-3 refractory corrosion. Issues have occurred with accumulation of spinel in the pour spout during periods of operation at higher waste loadings. Given that both DWPF melters were or have been in operation for greater than 8 years, the service life of the melters has far exceeded design expectations. It is possible that the DWPF liquidus temperature approach is conservative, in that it may be possible to successfully operate the melter with a small degree of allowable crystallization in the glass. This could be a viable approach to increasing waste loading in the glass assuming that the crystals are suspended in the melt and swept out through the riser and pour spout. Additional study is needed, and development work for WTP might be leveraged to support a different operating limit for the DWPF. Several recommendations are made regarding considerations that need to be included as part of the WTP crystal tolerant strategy based on the DWPF development work and operational data reviewed here. These include: Identify and consider the impacts of potential heat sinks in the WTP melter and glass pouring system; Consider the contributions of refractory corrosion products, which may serve to nucleate additional crystals leading to further accumulation; Consider volatilization of components from the melt (e.g., boron, alkali, halides, etc.) and determine their impacts on glass crystallization behavior; Evaluate the impacts of glass REDuction/OXidation (REDOX) conditions and the distribution of temperature within the WTP melt pool and melter pour chamber on crystal accumulation rate; Consider the impact of precipitated crystals on glass viscosity; Consider the impact of an accumulated crystalline layer on thermal convection currents and bubbler effectiveness within the melt pool; Evaluate the impact of spinel accumulation on Joule heating of the WTP melt pool; and Include noble metals in glass melt experiments because of their potential to act as nucleation sites for spinel crystallization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LABORATORY OPTIMIZATION TESTS OF TECHNETIUM DECONTAMINATION OF HANFORD WASTE TREATMENT PLANT LOW ACTIVITY WASTE OFF-GAS CONDENSATE SIMULANT

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task examines the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in greatest abundance in this LAW Off-Gas Condensate stream is Technetium-99 ({sup 99}Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are low but are also expected to be in measurable concentration in the LAW Off-Gas Condensate are {sup 129}I, {sup 90}Sr, {sup 137}Cs, {sup 241}Pu, and {sup 241}Am. These are present due to their partial volatility and some entrainment in the off-gas system. This report discusses results of optimized {sup 99}Tc decontamination testing of the simulant. Testing examined use of inorganic reducing agents for {sup 99}Tc. Testing focused on minimizing the quantity of sorbents/reactants added, and minimizing mixing time to reach the decontamination targets in this simulant formulation. Stannous chloride and ferrous sulfate were tested as reducing agents to determine the minimum needed to convert soluble pertechnetate to the insoluble technetium dioxide. The reducing agents were tried with and without sorbents. The sorbents, hydroxyapatite and sodium oxalate, were expected to sorb the precipitated technetium dioxide and facilitate removal. The Phase 1 tests examined a broad range of conditions and used the initial baseline simulant. The Phase 2 tests narrowed the conditions based on Phase 1 results, and used a slightly modified simulant. Test results indicate that excellent removal of {sup 99}Tc was achieved using SnCl{sub 2} as a reductant, and was effective with or without sorption onto hydroxyapatite. This reaction worked even in the presence of air (which could oxidize the stannous ion) and at room temperature. This process was very effective at neutral pH, with a Decontamination Factor (DF) >199 in one hour with only 1 g/L of SnCl{sub 2}. Prior work had shown that it was much less effective at alkaline pH. The only deleterious effect observed was that the chromium co-precipitates with the {sup 99}c during the SnCl{sub 2} reduction. This effect was anticipated, and would have to be considered when managing disposition paths of this stream. Reduction using FeSO{sub 4} was not effective at removing {sup 99}Tc, but did remove the Cr. Chromium is present due to partial volatility and entrainment in the off-gas, and is highly oxidizing, so would be expected to react with reducing agents more quickly than pertechnetate. Testing showed that sufficient reducing agent must be added to completely reduce the chromium before the technetium is reduced and removed. Other radionuclides are also present in this off-gas condensate stream. To enable sending this stream to the Hanford ETF, and thereby divert it from the recycle where it impacts the LAW glass volume, several of these also need to be removed. Samples from optimized conditions were also measured for actinide removal in order to examine the effect of the Tc-removal process on the actinides. Plutonium was also removed by the SnCl{sub 2} precipitation process. Results of this separation testing indicate that sorption/precipitation is a viable concept and has the potential to decontaminate the {sup 99}Tc from the stream, allowing it to be diverted away from WTP and thus eliminating the impact of the recycled halides and sulfate on the LAW glass volume. Based on the results, a possible treatment scenario could involve the use of a reductive precipitation agent (SnCl{sub 2}) with or without sorbent at neutral pH to remove the Tc. Although hydroxyapatite was not necessary to effect the {sup 99}Tc removal, it may be beneficial in solid-liquid separations. Other testing will examine removal of the other radionuclides. This testing was the second phase of testing, which aimed at optimizing the process by examining the minimum amount of reductant needed and the minimum reaction time. Although results indicated that SnCl{sub 2} was effective, further work on a pH-adjusted Fe(SO{sub 4}) mixture are needed. Additional tasks are needed to examine removal of the other radionuclides, solid-liquid separation technologies, slurry rheology measurements, composition variability impacts, corrosion and erosion, and slurry storage and immobilization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Direct Feed Low Activity Waste Program Integration - 16638

The mission of Program Integration is to champion and steer the development and implementation of common and consistent programs between the Tank Operating Contract (TOC) contractor and the Waste Treatment Plant (WTP) contractor. TOC is managed by Washington River Protection Solutions LLC (WRPS) and WTP is managed by Bechtel National, Inc. (BNI). The DOE Office of River Protection (DOE ORP) is the Program Owner. WRPS has been actively managing the TOC at the Hanford Site Tank Farms (TF) since 2008. Programs are already developed, verified, and in use for the TOC, whereas WTP is still in the construction phase. WTP Programs are established for construction only, but not developed for commissioning and future operations. An extensive effort is underway at WTP to develop commissioning programs. In order to drive consistency and minimize differences in program requirements between TF, which will feed the tank waste, and WTP, which will receive and treat the tank waste, DOE-ORP requires the two contractors to integrate and collaborate in program development. Advantages of integration are: - Achieves cost and time savings as WTP is able to review existing TOC programs as starting points in development of its programs. - Promotes interfaces with industry counterparts to share experiences, issues, and lessons learned. ? Minimizes difference in program requirements between the companies. - Helps prepare for and ultimately succeed in Operational Readiness Reviews (ORR). Program Integration is a priority for TOC and WTP, and in order to maintain the focus and drive to this effort, a unified One System Program Integration Council (OSPIC) was created in 2012. Membership of the OSPIC consists of senior managers from both companies and the OSPIC chair's report directly to their respective President. Thirty (30) programs are subject to integration, including but not limited to Conduct of Operations, Worker Safety and Health, Quality Assurance, Contractor Assurance, and Environmental Management. Progress of program development and integration efforts are tracked and monitored, and barriers to integration are resolved in a collaborative fashion within both companies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Macro-Batch Qualification Strategy for the Hanford Tank Waste Treatment and Immobilization Plant

The Savannah River National Laboratory (SRNL) has evaluated the existing waste feed qualification strategy for the Hanford Tank Waste Treatment and Immobilization Plant (WTP) based on experience from the Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) waste qualification program. The current waste qualification programs for each of the sites are discussed in the report to provide a baseline for comparison. Recommendations on strategies are then provided that could be implemented at Hanford based on the successful Macrobatch qualification strategy utilized at SRS to reduce the risk of processing upsets or the production of a staged waste campaign that does not meet the processing requirements of the WTP. Considerations included the baseline WTP process, as well as options involving Direct High Level Waste (HLW) and Low Activity Waste (LAW) processing, and the potential use of a Tank Waste Characterization and Staging Facility (TWCSF). The main objectives of the Hanford waste feed qualification program are to demonstrate compliance with the Waste Acceptance Criteria (WAC), determine waste processability, and demonstrate unit operations at a laboratory scale. Risks to acceptability and successful implementation of this program, as compared to the DWPF Macro-Batch qualification strategy, include: Limitations of mixing/blending capability of the Hanford Tank Farm; The complexity of unit operations (i.e., multiple chemical and mechanical separations processes) involved in the WTP pretreatment qualification process; The need to account for effects of blending of LAW and HLW streams, as well as a recycle stream, within the PT unit operations; and The reliance on only a single set of unit operations demonstrations with the radioactive qualification sample. This later limitation is further complicated because of the 180-day completion requirement for all of the necessary waste feed qualification steps. The primary recommendations/changes include the following: Collection and characterization of samples for relevant process analytes from the tanks to be blended during the staging process; Initiation of qualification activities earlier in the staging process to optimize the campaign composition through evaluation from both a processing and glass composition perspective; Definition of the parameters that are important for processing in the WTP facilities (unit operations) across the anticipated range of wastes and as they relate to qualification-scale equipment; Performance of limited testing with simulants ahead of the waste feed qualification sample demonstration as needed to determine the available processing window for that campaign; and Demonstration of sufficient mixing in the staging tank to show that the waste qualification sample chemical and physical properties are representative of the transfers to be made to WTP. Potential flowcharts for derivatives of the Hanford waste feed qualification process are also provided in this report. While these recommendations are an extension of the existing WTP waste qualification program, they are more in line with the processes currently performed for SRS. The implementation of these processes at SRS has been shown to offer flexibility for processing, having identified potential processing issues ahead of the qualification or facility processing, and having provided opportunity to optimize waste loading and throughput in the DWPF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Laboratory Scoping Tests Of Decontamination Of Hanford Waste Treatment Plant Low Activity Waste Off-Gas Condensate Simulant

The Hanford Waste Treatment and Immobilization Plant (WTP) Low Activity Waste (LAW) vitrification facility will generate an aqueous condensate recycle stream (LAW Off-Gas Condensate) from the off-gas system. The baseline plan for disposition of this stream is to send it to the WTP Pretreatment Facility, where it will be blended with LAW, concentrated by evaporation and recycled to the LAW vitrification facility again. Alternate disposition of this stream would eliminate recycling of problematic components, and would enable de-coupled operation of the LAW melter and the Pretreatment Facilities. Eliminating this stream from recycling within WTP would also decrease the LAW vitrification mission duration and quantity of glass waste. This LAW Off-Gas Condensate stream contains components that are volatile at melter temperatures and are problematic for the glass waste form. Because this stream recycles within WTP, these components accumulate in the Condensate stream, exacerbating their impact on the number of LAW glass containers that must be produced. Approximately 32% of the sodium in Supplemental LAW comes from glass formers used to make the extra glass to dilute the halides to acceptable concentrations in the LAW glass, and diverting the stream reduces the halides in the recycled Condensate and is a key outcome of this work. Additionally, under possible scenarios where the LAW vitrification facility commences operation prior to the WTP Pretreatment facility, identifying a disposition path becomes vitally important. This task seeks to examine the potential treatment of this stream to remove radionuclides and subsequently disposition the decontaminated stream elsewhere, such as the Effluent Treatment Facility (ETF), for example. The treatment process envisioned is very similar to that used for the Actinide Removal Process (ARP) that has been operating for years at the Savannah River Site (SRS), and focuses on using mature radionuclide removal technologies that are also compatible with longterm tank storage and immobilization methods. For this new application, testing is needed to demonstrate acceptable treatment sorbents and precipitating agents and measure decontamination factors for additional radionuclides in this unique waste stream. The origin of this LAW Off-Gas Condensate stream will be the liquids from the Submerged Bed Scrubber (SBS) and the Wet Electrostatic Precipitator (WESP) from the LAW melter off-gas system. The stream is expected to be a dilute salt solution with near neutral pH, and will likely contain some insoluble solids from melter carryover. The soluble components are expected to be mostly sodium and ammonium salts of nitrate, chloride, and fluoride. This stream has not been generated yet and will not be available until the WTP begins operation, but a simulant has been produced based on models, calculations, and comparison with pilot-scale tests. One of the radionuclides that is volatile and expected to be in high concentration in this LAW Off-Gas Condensate stream is Technetium-99 ( 99 Tc). Technetium will not be removed from the aqueous waste in the Hanford WTP, and will primarily end up immobilized in the LAW glass by repeated recycle of the off-gas condensate into the LAW melter. Other radionuclides that are also expected to be in appreciable concentration in the LAW Off-Gas Condensate are 129 I, 90 Sr, 137 Cs, and {sup 241}Am. This report discusses results of preliminary radionuclide decontamination testing of the simulant. Testing examined use of Monosodium Titanate (MST) to remove 90 Sr and actinides, inorganic reducing agents for 99 Tc, and zeolites for 137 Cs. Test results indicate that excellent removal of 99 Tc was achieved using Sn(II)Cl 2 as a reductant, coupled with sorption onto hydroxyapatite, even in the presence of air and at room temperature. This process was very effective at neutral pH, with a Decontamination Factor (DF) >577 in two hours. It was less effective at alkaline pH. Conversely, removal of the cesium was more effective at alkaline pH, with a DF of 17.9. As anticipated, ammonium ion probably interfered with the Ionsiv®a IE-95 zeolite uptake of 137 Cs. Although this DF of 137 Cs was moderate, additional testing is expected to identify more effective conditions. Similarly, Monosodium Titanate (MST) was more effective at alkaline pH at removing Sr, Pu, and U, with a DF of 319, 11.6, and 10.5, respectively, within 24 hours. Actually, the Ionsiv® IE-95, which was targeting removal of Cs, was also moderately effective for Sr, and highly effective for Pu and U at alkaline pH. The only deleterious effect observed was that the chromium co-precipitates with the {sup 99}Tc during the SnCl 2 reduction. This effect was anticipated, and would have to be considered when managing disposition paths of this stream. Results of this separation testing indicate that sorption/precipitation was a viable concept and has the potential to decontaminate the stream. All radionuclides were at least partially removed by one or more of the materials tested. Based on the results, a possible treatment scenario could involve the use of a reductive precipitation agent (SnCl 2 ) and sorbent at neutral pH to remove the Tc, followed by pH adjustment and the addition of zeolite (Ionsiv® IE-95) to remove the Cs, Sr, and actinides. Addition of MST to remove Sr and actinides may not be needed. Since this was an initial phase of testing, additional tasks to improve separation methods were expected to be identified. Primarily, further testing is needed to identify the conditions for the decontamination process. Once these conditions are established, follow-on tasks likely include evaluation and testing of applicable solid-liquid separation technologies, slurry rheology measurements, composition variability testing and evaluations, corrosion and erosion testing, slurry storage and immobilization investigations, and decontaminated LAW Off-Gas Condensate evaporation and solidification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced High-Level Waste Glass Research and Development Plan

The U.S. Department of Energy Office of River Protection (ORP) has implemented an integrated program to increase the loading of Hanford tank wastes in glass while meeting melter lifetime expectancies and process, regulatory, and product quality requirements. The integrated ORP program is focused on providing a technical, science-based foundation from which key decisions can be made regarding the successful operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) facilities. The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and tactical processing strategies to ensure safe and successful operations for both the low-activity waste (LAW) and high-level waste (HLW) vitrification facilities with an appreciation toward reducing overall mission life. The purpose of this advanced HLW glass research and development plan is to identify the near-, mid-, and longer-term research and development activities required to develop and validate advanced HLW glasses and their associated models to support facility operations at WTP, including both direct feed and full pretreatment flowsheets. This plan also integrates technical support of facility operations and waste qualification activities to show the interdependence of these activities with the advanced waste glass (AWG) program to support the full WTP mission. Figure ES-1 shows these key ORP programmatic activities and their interfaces with both WTP facility operations and qualification needs. The plan is a living document that will be updated to reflect key advancements and mission strategy changes. The research outlined here is motivated by the potential for substantial economic benefits (e.g., significant increases in waste throughput and reductions in glass volumes) that will be realized when advancements in glass formulation continue and models supporting facility operations are implemented. Developing and applying advanced glass formulations will reduce the cost of Hanford tank waste management by reducing the schedule for tank waste treatment and reducing the amount of HLW glass for storage, transportation, and disposal. Additional benefits will be realized if advanced glasses are developed that demonstrate more tolerance for key components in the waste (such as Al 2 O 3 , Cr 2 O 3 , SO 3 and Na 2 O) above the currently defined WTP constraints. Tolerating these higher concentrations of key waste loading limiters may reduce the burden on (or even eliminate the need for) leaching to remove Cr and Al and washing to remove excess S and Na from the HLW fraction. Advanced glass formulations may also make direct vitrification of the HLW fraction without significant pretreatment more cost effective. Finally, the advanced glass formulation efforts seek not only to increase waste loading in glass, but also to increase glass production rate. When coupled with higher waste loading, ensuring that all of the advanced glass formulations are processable at or above the current contract processing rate leads to significant improvements in waste throughput (the amount of waste being processed per unit time),which could significantly reduce the overall WTP mission life. The integration of increased waste loading, reduced leaching/washing requirements, and improved melting rates provides a system-wide approach to improve the effectiveness of the WTP process.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification Tests with Potential Technetium Capture Streams

About 50 million gallons of high-level waste is currently stored in underground tanks at The United States Department of Energy’s (DOE’s) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE’s Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High Level Waste (IHLW) products. The ILAW product will be disposed in an engineered facility on the Hanford site while the IHLW product is designed for acceptance at a national deep geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment before they can be accepted for disposal. The Low Activity Waste (LAW) and High-Level Waste (HLW) at Hanford will be vitrified in Joule Heated Ceramic Melters (JHCMs) to produce stable products for disposal. Technetium is an important radioactive component in the Hanford tank waste and is typically one of the principal contributors to risk in performance assessments for the ILAW disposal facility. Technetium is also one of the more volatile radionuclides and the retention of technetium in the glass under the high temperature conditions prevailing during vitrification can vary over a relatively wide range depending on the feed composition, feed chemistry, and melter operating parameters. In support of the WTP Project, the Vitreous State Laboratory (VSL) at The Catholic University of America (CUA) and EnergySolutions have developed and tested glass formulations for WTP waste envelopes to provide data to meet the WTP contract requirements and to support system design activities. That work is based upon small-scale batch melts (“crucible melts”) using waste simulants. Glass compositions suitable for processing the tank waste streams for the WTP have been identified and tested for processing and product quality requirements at various scales, ranging from crucible melts of a few grams, up to the LAW Pilot Melter at processing rates in excess of 6600 kg/day (2000 kg/m 2 /day). Recent testing performed at VSL for Washington River Protection Solutions, LLC (WRPS) has investigated the baseline “single-pass” retention of technetium over the range of WTP LAW feed compositions and glass formulations as well as the development of potential modifications to the baseline that could increase the single-pass retention. For the WTP melter systems, the liquid waste streams from the primary off-gas system components are recycled back to the pretreatment facility and, ultimately, to subsequent melter feed batches. Such a recycle loop can greatly increase the overall retention of volatile constituents in the glass product over the single-pass value. Accordingly, more recent testing at VSL has been conducted on a melter system that incorporates a recycle flow sheet. The results from that work have provided important performance data for the unit operations in the primary off-gas system with respect to technetium capture and recycle, which is crucial in assessing the amount of technetium that ultimately reports to non-glass waste forms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Treatment and Immobilization Plant U. S. Department of Energy Office of River Protection Submerged Bed Scrubber Condensate Disposition Project - 13460

The Hanford Waste Treatment and Immobilization Plant (WTP) will generate an off-gas treatment system secondary liquid waste stream [submerged bed scrubber (SBS) condensate], which is currently planned for recycle back to the WTP Low Activity Waste (LAW) melter. This SBS condensate waste stream is high in Tc-99, which is not efficiently captured in the vitrified glass matrix [1]. A pre-conceptual engineering study was prepared in fiscal year 2012 to evaluate alternate flow paths for melter off-gas secondary liquid waste generated by the WTP LAW facility [2]. This study evaluated alternatives for direct off-site disposal of this SBS without pre-treatment, which mitigates potential issues associated with recycling. This study [2] concluded that SBS direct disposal is a viable option to the WTP baseline. The results show: - Off-site transportation and disposal of the SBS condensate is achievable and cost effective. - Reduction of approximately 4,325 vitrified WTP Low Activity Waste canisters could be realized. - Positive WTP operational impacts; minimal WTP construction impacts are realized. - Reduction of mass flow from the LAW Facility to the Pretreatment Facility by 66%. - Improved Double Shell Tank (DST) space management is a benefit. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Improvements in Interface Management for Hanford's Waste Treatment and Immobilization Plant - 13263

The U.S. Department of Energy (DOE), Office of River Protection (ORP) is responsible for management and completion of the River Protection Project (RPP) mission, which includes the Hanford Site tank farms operations and the Waste Treatment and Immobilization Plant (WTP). The RPP mission is to store, retrieve and treat Hanford's tank waste; store and dispose of treated wastes; and close the tank farm waste management areas and treatment facilities by 2047. The WTP is currently being designed and constructed by Bechtel National Inc. (BNI) for DOE-ORP. BNI relies on a number of technical services from other Hanford contractors for WTP's construction and commissioning. These same services will be required of the future WTP operations contractor. Partly in response to a DNFSB recommendation, the WTP interface management process managing these technical services has recently been improved through changes in organization and issue management. The changes are documented in an Interface Management Plan. The organizational improvement is embodied in the One System Integrated Project Team that was formed by integrating WTP and tank farms staff representing interfacing functional areas into a single organization. A number of improvements were made to the issue management process but most notable was the formal appointment of technical, regulatory and safety subject matter experts to ensure accurate identification of issues and open items. Ten of the thirteen active WTP Interface Control Documents have been revised in 2012 using the improved process with the remaining three in progress. The value of the process improvements is reflected by the ability to issue these documents on schedule and accurately identify technical, regulatory and safety issues and open items. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗