Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WPA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Biofilm Management in a Microgravity Water Recovery System

Biofilm growth continues to be a significant concern for NASA’s current and future water systems. The International Space Station (ISS) Water Processor Assembly (WPA) produces potable water from a combination of humidity condensate and urine distillate. The WPA waste tank requires significant management to prevent biofilm growth from impacting downstream components. This issue is magnified for future NASA manned missions due to the need to place the vehicle’s life support system in a dormant state during uncrewed operations (e.g., when the vehicle is in Mars orbit during the surface mission). NASA personnel and the Center for Biofilm Engineering at Montana State University are evaluating various methods for mitigating biofilm growth, including reduced nutrient levels, thermal treatment, sonic waves treatment, and identifying effective biocides in this application. This paper provides an overview of the current status of this effort.

Yo-ann Velez Justiniano↗

Wind Powering America - Outreach in Priority States (Poster)

WPA works with 33 State Wind Working Groups to educate stakeholders on wind energy topics and to achieve the basics needed for effective wind development in a state. WPA has accelerated outreach and communication efforts with 13 priority states: Alaska, Arizona, Indiana, Maryland, Massachussetts, Michigan, Nebraska, Nevada, North Carolina, Ohio, South Dakota, Utah, and Virginia. These states have the potential to contribute substantially to the national portfolio of wind energy but do not yet have large amounts of wind energy applications on the ground. This is often due to barriers in in-state knowledge and understanding of wind energy issues and potential that impact the policy environment and the market environment. There are common regional issues among the states, and important learning opportunities can be gained by cross-training and sharing experiences. The Regional Wind Energy Institutes (RWEIs) are train-the-trainer organizations that work to develop a cadre of in-state outreach specialists who reach out to audiences of decisionmakers (e.g., the ag community, state and local officials, utilities, regulatory bodies) to build understanding, create public acceptance, take advantage of regional synergies, and eventually to impact polices and the market environment for effective wind implementation.

17 WIND ENERGY↗

Wind Energy Opportunities, Challenges, and Progress Within the Federal Government (Poster)

Wind Powering America (WPA) works with Federal agencies to increase their understanding of wind resources and assessment; facilitate project development activities through Met tower loans, wind data analysis, and technical assistance; and provide advice on RFP development and financing options. This poster provides an overview of WPA's activities with the federal sector.

17 WIND ENERGY↗

NREL's Wind Powering America Team Helps Indiana Develop Wind Resources (Fact Sheet)

How does a state advance, in just five years, from having no installed wind capacity to having more than 1000 megawatts (MW) of installed capacity? The Wind Powering America (WPA) initiative, based at the National Renewable Energy Laboratory (NREL), employs a state-focused approach that has helped accelerate wind energy deployment in many states. One such state is Indiana, which is now home tothe largest wind plant east of the Mississippi.

17 WIND ENERGY↗

20% Wind by 2030: Overcoming the Challenges (Final Technical Report)

The funds allocated through the Wind Powering America (WPA) grant were utilized by the State of Montana to support broad outreach activities communicating the benefits and opportunities of increased wind energy and transmission development. The challenges to increased wind development were also clearly communicated with the understanding that a clearer comprehension of the challenges would be beneficial in overcoming the obstacles to further development. The ultimate purpose of these activities was to foster the increased development of Montana's rich wind resources through increased public acceptance and wider dissemination of technical resources.

17 WIND ENERGY↗

Wind Powering America: The Next Steps in North Carolina

The goal of this project is to apply the WPA’s proactive outreach strategy to the problem of educating the public about the likely transmission infrastructure developments concomitant to the significant development of wind energy resources in North Carolina. Given the lead time to develop significant new transmission infrastructure (5-10 years), it is critical to begin this outreach work today, so that wind resources can be developed to adequately meet the 20% by 2030 goal in the mid- to long-term (10-20 years). The project team planned to develop a transmission infrastructure outreach campaign for North Carolina by: (1) convening a utility interest group (UIG) of the North Carolina Wind Working Group (NC WWG) consisting of electric utilities in the state and the Southeast; and (2) expanding outreach to local and state government officials in North Carolina.

17 WIND ENERGY↗

MultiPEM Toolbox: User Manual

This document explains use of the Multi-Phenomenology Explosion Monitoring (Multi PEM) Toolbox, a collection of R scripts for estimating the unknown device parameters of a new event with uncertainty quantification. The methodology and application used for il lustration in this user manual are published in Geophysical Journal International and fully documented in a Los Alamos National Laboratory technical report hereafter designated “WPA” for reference. Additional details on the application are found in a recent journal article. Two assessment types are available: rapid and complete.

58 GEOSCIENCES↗

NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Fall 2008, Wind & Hydropower Technologies Program (Brochure)

As part of its Native American outreach, DOE?s Wind Powering America program produces a newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events. This issue features an interview with Dave Danz, a tribal planner for the Grand Portage Band of Chippewa in northeastern Minnesota, and a feature on the new turbine that powers the KILI radio station on the Pine Ridge Reservation.

17 WIND ENERGY↗

Wind for Schools Project Power System Brief, Wind Powering America Fact Sheet Series

Wind Powering America's (WPA's) Wind for Schools project uses a basic system configuration for each school project. The system incorporates a single SkyStream wind turbine, a 70-ft guyed tower, disconnect boxes at the base of the turbine and at the school, and an interconnection to the school's electrical system. This document provides a detailed description of each system component.

17 WIND ENERGY↗

NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Spring 2009

As part of its Native American outreach, DOE's Wind Powering America program has initiated a NAWIG newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events. It is our hope that this newsletter will both inform and elicit comments and input on wind development in Indian Country. This issue profiles the Banner Wind Project in Nome, Alaska, and a new Native project in Kansas.

17 WIND ENERGY↗

NAWIG News: The Quarterly Newsletter of the Native American Wind Interest Group, Fall 2009

As part of its Native American outreach, DOE's Wind Powering America program has initiated a NAWIG newsletter to present Native American wind information, including projects, interviews with pioneers, issues, WPA activities, and related events. It is our hope that this newsletter will both inform and elicit comments and input on wind development in Indian Country. This issue profiles the Campo Band Wind Project in California and a feature on the Cheyenne River Sioux Tribe's plans for a 100- to 125-MW project.

17 WIND ENERGY↗

Monsoon-Enso Relationships: A New Paradigm

This article is partly a review and partly a new research paper on monsoon-ENSO relationship. The paper begins with a discussion of the basic relationship between the Indian monsoon and ENSO dating back to the work of Sir Gilbert Walker up to research results in more recent years. Various factors that may affect the monsoon-ENSO, relationship, including regional coupled ocean-atmosphere processes, Eurasian snow cover, land-atmosphere hydrologic feedback, intraseasonal oscillation, biennial variability and inter-decadal variations, are discussed. The extreme complex and highly nonlinear nature of the monsoon-ENSO relationship is stressed. We find that for regional impacts on the monsoon, El Nino and La Nina are far from simply mirror images of each other. These two polarities of ENSO can have strong or no impacts on monsoon anomalies depending on the strength of the intraseasonal oscillations and the phases of the inter-decadal variations. For the Asian-Australian monsoon (AAM) as a whole, the ENSO impact is effected through a east-west shift in the Walker Circulation. For rainfall anomalies over specific monsoon areas, regional processes play important roles in addition to the shift in the Walker Circulation. One of the key regional processes identified for the boreal summer monsoon is the anomalous West Pacific Anticyclone (WPA). This regional feature has similar signatures in interannual and intraseasonal time scales and appears to determine whether the monsoon-ENSO relationship is strong or weak in a given year. Another important regional feature includes a rainfall and SST dipole across the Indian Ocean, which may have strong impact on the austral summer monsoon. Results are shown indicating that monsoon surface wind forcings may induce a strong biennial signal in ENSO and that strong monsoon-ENSO coupling may translate into pronounced biennial variability in ENSO. Finally, a new paradigm is proposed for the study of monsoon variability. This paradigm provides a unified framework in which monsoon predictability, the role of regional vs. basin-scale processes, its relationship with different climate subsystems, and causes of secular changes in monsoon-ENSO relationship can be investigated.

Lau, K. M.↗

Evolution of the Large Scale Circulation, Cloud Structure and Regional Water Cycle Associated with the South China Sea Monsoon During May-June, 1998

In this paper, changes in the large-scale circulation, cloud structures and regional water cycle associated with the evolution of the South China Sea (SCS) monsoon in May-June 1998 were investigated using data from the Tropical Rainfall Measuring Mission (TRMM) and field data from the South China Sea Monsoon Experiment (SCSMEX). Results showed that both tropical and extratropical processes strongly influenced the onset and evolution of the SCS monsoon. Prior to the onset of the SCS monsoon, enhanced convective activities associated with the Madden and Julian Oscillation were detected over the Indian Ocean, and the SCS was under the influence of the West Pacific Anticyclone (WPA) with prevailing low level easterlies and suppressed convection. Establishment of low-level westerlies across Indo-China, following the development of a Bay of Bengal depression played an important role in building up convective available potential energy over the SCS. The onset of SCS monsoon appeared to be triggered by the equatorward penetration of extratropical frontal system, which was established over the coastal region of southern China and Taiwan in early May. Convective activities over the SCS were found to vary inversely with those over the Yangtze River Valley (YRV). Analysis of TRMM microwave and precipitation radar data revealed that during the onset phase, convection over the northern SCS consisted of squall-type rain cell embedded in meso-scale complexes similar to extratropical systems. The radar Z-factor intensity indicated that SCS clouds possessed a bimodal distribution, with a pronounced signal (less than 30dBz) at a height of 2-3 km, and another one (less than 25 dBz) at the 8-10 km level, separated by a well-defined melting level indicated by a bright band at around 5-km level. The stratiform-to-convective cloud ratio was approximately 1:1 in the pre-onset phase, but increased to 5:1 in the active phase. Regional water budget calculations indicated that during the active phase, the SCS was a strong sink (E-P much less than 0) of atmospheric moisture, with the primary source of moisture coming from regions further west over Indo-China and the eastern Indian Ocean. Before onset and during the break, the SCS was a moisture source (E-P greater than ) to the overlying atmosphere. In particular, the SCS provided the bulk of moisture to the torrential rain over the YRV in mid-June 1998.

Lau, William K.-M.↗

Development Status of the International Space Station Urine Processor Assembly

NASA, Marshall Space Flight Center (MSFC) is developing a Urine Processor Assembly (UPA) for the International Space Station (ISS). The UPA uses Vapor Compression Distillation (VCD) technology to reclaim water from pre-treated urine. This water is further processed by the Water Processor Assembly (WPA) to potable quality standards for use on the ISS. NASA has developed this technology over the last 25-30 years. Over this history, many technical issues were solved with thousands of hours of ground testing that demonstrate the ability of the UPA technology to reclaim water from urine. In recent years, NASA MSFC has been responsible for taking the UPA technology to "flight design" maturity. This paper will give a brief overview of the UPA design and a status of the major design and development efforts completed recently to mature the UPA to a flight level.

Holder, Donald W.↗

Clean Water for Remote Locations

Marshall Space Flight Center engineers are working on creating the Regenerative Environmental Control and Life Support System, a complex system of devices intended to sustain the astronauts living on the ISS and, in the future, sustain those who are blasting off to the Moon or Mars. The devices make use of the available resources, by turning wastewater from respiration, sweat, and urine into drinkable water. One of the devices that Marshall has been working on is the Water Recovery System (WRS). Marshall has teamed with long-time NASA contractor, Hamilton Sundstrand Space Systems International, Inc., of Windsor Locks, Connecticut. Hamilton Sundstrand, the original designer of the life support devices for the space suits, developed the Water Processor Assembly (WPA). It, along with the Urine Processor Assembly (UPA) developed by Marshall, combines to make up the total system, which is about the size of two refrigerators, and will support up to a six-member crew. The system is currently undergoing final testing and verification. "The Water Processor Assembly can produce up to about 28 gallons of potable recycled water each day," said Bob Bagdigian, Marshall Regenerative Environmental Control and Life Support System project manager. After the new systems are installed, annual delivered water to the ISS should decrease by approximately 15,960 pounds, or about 1,600 gallons.

Source record↗

Environmental Control and Life Support Integration Strategy for 6-Crew Operations

The International Space Station (ISS) crew compliment will be increasing in size from 3 to 6 crew members in the summer of 2009. In order to support this increase in crew on ISS, the United States on-orbit Segment (USOS) has been outfitted with a suite of regenerative Environmental Control and Life Support (ECLS) hardware including an Oxygen Generation System(OGS), Waste and Hygiene Compartment (WHC), and a Water Recovery System (WRS). The WRS includes the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA). A critical step in advancing to a 6Crew support capability on ISS is a full checkedout and verification of the Regenerative ECLS hardware. With a successful checkout, the ISS will achieve full redundancy in its onorbit life support system between the USOS and Russian Segment (RS). The additional redundancy created by the Regenerative ECLS hardware creates the opportunity for independent support capabilities between segments, and for the first time since the start of ISS, the necessity to revise Life Support strategy agreements. Independent operating strategies coupled with the loss of the Space Shuttle supply and return capabilities in 2010 offers additional challenges. These challenges create the need for a higher level of onorbit consumables reserve to ensure crewmember life support during a system failure. This paper will discuss the evolution of the ISS Life Support hardware strategy in support of 6Crew on ISS, as well as the continued work which will be necessary to ensure the support of crew and ISS Program objectives through the life of station.

FROM↗