Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WECC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Concentrating Solar Power and Water Issues in the U.S. Southwest

Concentrating solar power (CSP) systems utilize the sun's energy to create heat that is used to generate electrical power. CSP systems in the United States are installed primarily in the Southwest, with 92% of plants that are operational, under construction, or under development located in three western states--Arizona, California, and Nevada. This report provides an overview of CSP development in these states, or the 'Southwest' for the purposes of this discussion, with a particular focus on the water supply issues associated with CSP. The Western Governors' Association (WGA) commissioned staff from the Western States Water Council (WSWC) to collaborate with staff from the National Renewable Energy Laboratory (NREL) to prepare this report. The WGA has long supported the effective management of the West's water resources, as well as the development of a clean, diverse, reliable, and affordable energy supply consisting of traditional and renewable energy resources. This report is specifically intended to help inform these goals, especially as WGA continues to underwrite a Regional Transmission Expansion Planning project, undertaken by the WSWC and the Western Electricity Coordinating Council (WECC), to better understand energy development within the existing and future water resource constraints of the West. This report builds upon earlier research conducted by NREL, the University of Colorado-Boulder, and Stanford University that was supported through the Joint Institute for Strategic Energy Analysis (JISEA) and presents information gathered through extensive research and literature reviews, as well as interviews and outreach with state water administrators and energy regulators, WECC and other experts familiar with CSP development in the Southwest.

14 SOLAR ENERGY↗

Operational Benefits of Meeting California’s Energy Storage Targets

In October 2013, the California Public Utilities Commission (CPUC) issued rules for its jurisdictional utilities to procure a minimum of 1,325 megawatts (MW) of energy storage systems by 2020. The goal of this study is to examine the operational value of this storage portfolio in California and the rest of the Western Electricity Coordinating Council (WECC) region. Modeled results show that the storage portfolio, when providing energy and operating reserves, reduces the total WECC-wide production costs by $78 million per year in the 33% scenario. This value increases to $144 million per year in the 40% scenario, primarily because of the increase in off-peak and peak price differences that are due to additional solar generation. These values are equivalent to $59/kW-year for the storage portfolio for the 33% scenario and $109/kW-year for the 40% scenario.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Load Composition Model Workflow (BPA TIP-371 Deliverable 1A)

This project is funded under Bonneville Power Administration (BPA) Strategic Partnership Project (SPP) 17-005 between BPA and SLAC National Accelerator Laboratory. The project in a BPA Technology Improvement Project (TIP) that builds on and validates the Composite Load Model developed by the Western Electric Coordinating Council's (WECC) Load Modeling Task Force (LMTF). The composite load model is used by the WECC Modeling and Validation Work Group to study the stability and security of the western electricity interconnection. The work includes development of load composition data sets, collection of load disturbance data, and model development and validation. This work supports reliable and economic operation of the power system. This report was produced for Deliverable 1A of the BPA TIP-371 Project entitled \TIP 371: Advancing the Load Composition Model". The deliverable documents the proposed work ow for the Composite Load Model, which provides the basis for the instrumentation, data acquisition, analysis and data dissemination activities addressed by later phases of the project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Loads as a Resource: Frequency Responsive Demand

Demand-side frequency control can complement traditional generator controls to maintain the stability of large electric systems in the face of rising uncertainty and variability associated with renewable energy resources. This report presents a hierarchical frequency-based load control strategy that uses a supervisor to flexibly adjust control gains that a population of end-use loads respond to in a decentralized manner to help meet the NERC BAL-003-1 frequency response standard at both the area level and interconnection level. The load model is calibrated and used to model populations of frequency-responsive water heaters in a PowerWorld simulation of the U.S. Western Interconnection (WECC). The proposed design is implemented and demonstrated on physical water heaters in a laboratory setting. A significant fraction of the required frequency response in the WECC could be supplied by electric water heaters alone at penetration levels of less than 15%, while contributing to NERC requirements at the interconnection and area levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Loads as a Resource: Frequency Responsive Demand

Current power grid operation predominantly relies on scheduling and regulating generation resources to supply loads and balance load changes. Due to the inherent intermittency of renewable energy, more flexible and fast ramping capacity is required to compensate for the uncertainty and variability introduced by renewable energy resources. With the advancement of information technologies, power system end-use loads are becoming more agile and can participate in provision of balancing energy and other grid services. The use of demand response can greatly reduce the required generation reserve in a clean and environmentally friendly way. In this report, a new frequency responsive load (FRL) controller was proposed based on the GFA controller, which can respond to both over and under-frequency events. A supervisory control was introduced to coordinate the autonomous response from FRLs in order to overcome the issues of excessive system response due to high penetration of FRLs. The effectiveness of the proposed FRL controller was demonstrated by large-scale simulation studies on the WECC system. Specifically, the FRLs were deployed in the WECC system at different penetration levels to analyze the performance of the proposed strategy both with and without supervisory level control. While both methods have their own advantages, the case without supervisory control could lead to system-wide instability depending on the size of the contingency and the number of FRLs deployed in the system. In addition, the voltage impacts of this controller on distribution system were also carefully investigated. Finally, a preliminary measurement and verification approach was also developed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A method for assessing economic, environmental, and reliability tradeoffs of interregional transmission connecting ERCOT (the Texas grid) to the eastern and western grids

Reliable development of the power grid is an evolving concern for humanity due to extreme weather that frequently threatens power sector infrastructure. The state of Texas is a uniquely structured testbed for grid planners to study when looking for solutions to development, innovation, and overcoming such challenges. Because of its size and islanded structure, Texas is small enough to model, but big enough to matter. Texas is a global leader in energy production, energy consumption, and maintains an unusually diverse fuel mix. In addition, the state has experienced winter freezes, heat waves, wind storms, droughts and floods that have threatened power sector infrastructure or caused recent blackouts and calls for demand side conservation. One of the most devastating of these events was the North American winter storm, dubbed “Winter Storm Uri” by the Weather Channel, that froze the region in February 2021 and led to an extended power outage event that put the majority of Texan residents in darkness for days. While preparing to avoid such outage events in the future, various tools have been proposed to improve grid reliability, including energy efficiency, demand response, and distributed energy resources. An additional option would be to develop interregional transmission that connects the Texas grid to other national grids. To assess the merits of this idea, we developed a novel, universally-applicable and internationally-relevant framework to study how the Texas grid would evolve alongside access to various interregional ties. This method allows us to stress the synthetic grid structure and analyze how it would respond to the shock of a simulated winter storm event. Our method leverages open-source modeling tools, such as PowerGenome, pyGRETA, and GenX to synthesize unique zonal grid data, construct a consolidated network of model regions, and simulate different developmental pathways of capacity expansion and operational dispatch. We demonstrate our method with an analysis connecting the Electric Reliability Council of Texas (ERCOT), the grid that serves most of Texas, the Western Electricity Coordinating Council (WECC), the grid that serves the western half of the contiguous U.S., and the Eastern Interconnect, the grid that serves the eastern half of the contiguous U.S. Our results indicate that the cost-optimal capacity of interregional transmission connecting the ERCOT grid to other grids lies between 9–13 GW assuming baseline conditions. Building this amount of connecting capacity in one or multiple directions lowers the costs and emissions of development and operation by up to $16 billion and 257 million metric tonnes (MMT) respectively. Additionally, our results show that the interregional connections between ERCOT and other national grids reduce the amount of total load shed required through mild winter storm events. However, our results also show that there is a threshold of very extreme winter storm conditions, spanning multiple service areas, above which the connections exacerbate resource adequacy problems. Therefore, the results indicate that the connections need to be carefully planned alongside the rest of the grid infrastructure to avoid over-reliance on specific resources or technology options.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Probabilistic N - k failure-identification for power systems

This work considers a probabilistic generalization of the N - k failure-identification problem in power transmission networks, where the probability of failure of each component in the network is known a priori and the goal of the problem is to find a set of k components that maximizes disruption to the system loads weighted by the probability of simultaneous failure of the k components. The resulting problem is formulated as a bilevel mixed-integer nonlinear program. Convex relaxations, linear approximations, and heuristics are developed to obtain feasible solutions that are close to the optimum. A general cutting-plane algorithm is proposed to solve the convex relaxation and linear approximations of the N - k problem. Extensive numerical results corroborate the effectiveness of the proposed algorithms on small-, medium-, and large-scale test instances; the test instances include the IEEE 14-bus system, the IEEE single-area and three-area RTS96 systems, the IEEE 118-bus system, the WECC 240-bus test system, the 1354-bus PEGASE system, and the 2383-bus Polish winter-peak test system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Chance-constrained economic dispatch with renewable energy and storage

Increased penetration of renewables, along with uncertainties associated with them, have transformed how power systems are operated. High levels of uncertainty means that it is not longer possible to guarantee operational feasibility with certainty, instead constraints are required to be satisfied with high probability. We present a chance-constrained economic dispatch model that efficiently integrates energy storage and high renewable penetration to satisfy renewable portfolio requirements. Specifically, it is required that wind energy contributes at least a prespecified ratio of the total demand and that the scheduled wind energy is dispatchable with high probability. We develop an approximated partial sample average approximation (PSAA) framework to enable efficient solution of large-scale chanceconstrained economic dispatch problems. Computational experiments on the IEEE-24 bus system show that the proposed PSAA approach is more accurate, closer to the prescribed tolerance, and about 100 times faster than sample average approximation. Improved efficiency of our PSAA approach enables solution of WECC-240 system in minutes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Sensitivity of Western U.S. power system dynamics to droughts compounded with fuel price variability

The energy sector is heavily dependent on surface water availability for reliable electricity generation. Power system operations are usually evaluated through system reliability and economic perspectives, with assumptions based on market prices and normal water availability. As natural gas technologies continue to dominate new thermal capacity, replacing retiring coal and nuclear generators, natural gas price stability becomes increasingly important and the impact of price volatility on grid operations must be understood. Here, we explore the range of Western Electricity Coordinating Council (WECC) regional power operations, which represents the electric interconnection over the western half of the continental United States, using a production cost model driven by different fuel prices and an integrated hydrology model to simulate historical water availability. Our results show system-wide operation costs increasing in drought years or when gas prices increase, as expected. In addition, we found those system-wide increases can be of the same magnitude. Regional analysis of the responses to compounded droughts and price volatility highlight differences in magnitude and direction depending on regional generation technology portfolios. The Pacific Northwest is most sensitive to drought conditions, Southern California is most sensitive to gas prices, and the Desert Southwest is sensitive to both with the same magnitude. This analysis motivates further research in combined hydrology and power system modeling to characterize regional dynamics and associated uncertainties across scales, which is an important underpinning for the development of more resilient energy and water systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Long duration battery sizing, siting, and operation under wildfire risk using progressive hedging

Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. Here we formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 min of wall-clock time.

25 ENERGY STORAGE↗

Contingency Analysis Post-Processing With Advanced Computing and Visualization

Contingency analysis is a critical function widely used in energy management systems to assess the impact of power system component failures. Its outputs are important for power system operation for improved situational awareness, power system planning studies, and power market operations. With the increased complexity of power system modeling and simulation caused by increased energy production and demand, the penetration of renewable energy and fast deployment of smart grid devices, and the trend of operating grids closer to their capacity for better efficiency, more and more contingencies must be executed and analyzed quickly in order to ensure grid reliability and accuracy for the power market. Currently, many researchers have proposed different techniques to accelerate the computational speed of contingency analysis, but not much work has been published on how to post-process the large amount of contingency outputs quickly. This paper proposes a parallel post-processing function that can analyze contingency analysis outputs faster and display them in a web-based visualization tool to help power engineers improve their work efficiency by fast information digestion. Case studies using an ESCA-60 bus system and a WECC planning system are presented to demonstrate the functionality of the parallel post-processing technique and the web-based visualization tool.

Chen, Yousu↗

Framework for Large-scale Implementation of Wholesale-Retail Transactive Control Mechanism

Transactive energy is a control technique that uses market mechanisms to achieve desired control objectives. Several simulation studies and field demonstrations were carried out in recent years, but all focused on small scale systems and purpose-built simplified models which are not always capable of pointing out all the advantages and shortcomings of transac- tive energy methods. This work describes a co-simulation framework built on a hierarchical control architecture that allows for conducting studies of the impacts of a very large-scale deployment of transactive energy. The hierarchical transactive control architecture adopted in this work helps with alleviating computation and communication burden to facilitate a more effective large scale real-time market operation among device level resources and the system level operators. The co-simulation framework is evaluated an integrated power sys- tem model of unprecedented scale composed of the Western Electricity Coordination Council (WECC) transmission system with tens of thousands of distribution systems deployed with flexible device-level distributed energy resources (DERs) using off-the-shelf simulators.

Transactive energy, market-based controls, DER int↗

Damping inter-area oscillation using reinforcement learning controlled TCSC

Appropriate damping control of the inter-area oscillation would ensure the grid stability and maintain the tie-line power transfer capability. In this paper, we proposed a novel reinforcement learning (RL) based power oscillation damping (POD) controller that uses Thyristor Controlled Series Compensators (TCSC) to damp inter-area oscillations. By leveraging the unbiased gradient direction estimation of the natural evolution strategy (NES), we successfully regulated the power flows on the tie-lines and damped inter-area oscillations through dynamically modulating the inserted reactance of the TCSC. The proposed RL-based POD controller has been tested on both two-area four-machine system and North American Minni-WECC system. Extensive studies have demonstrated the excellent performance of the proposed RL-based TCSC POD controller in damping inter-area oscillations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cyber‐physical system testbed for power system monitoring and wide‐area control verification

The electric power system is intrinsically a cyber‐physical system (CPS) with power flowing inthe physical system and information flowing in the cyber‐network. Testbeds arecrucial for understanding the cyber‐physical interactions and provideenvironments for prototyping novel applications. This study proposes afour‐layer architecture for CPS testbeds with emphases on communication networkemulation and networked physical components. A configurable software‐definednetwork is employed to bridge physical components with wide‐area applicationsfor closed‐loop control. In order to distribute physically coupled devices intomultiple software simulations, this study proposes a data broker setup based ona distributed messaging environment to achieve low‐latency data streaming. Thedecoupled design with data streaming allows for building testbed components asmodules and running them in a distributed manner. Case studies verify the databroker setup for low‐latency sensing and actuation, as well as the communicationemulation setup for the desired network latency. Also illustrated is a replayattack scenario using synchrophasors in the Western Electricity CoordinatingCouncil (WECC) 181‐bus system for demonstrating the closed‐loop cyber‐physicalsimulation capability of the testbed.

Cui, Hantao↗

Design and Stability Analysis of Control System in Multiport Autonomous Reconfigurable Solar Power Plants (MARS)

The Multiport Autonomous Reconfigurable Solar Power Plant (MARS) is an integrated photovoltaic (PV) power generation and energy storage system (ESS), that is designed to connect to both alternating current (AC) transmission grids and high-voltage direct current (HVDC) links. It is a three-phase plant consisting of numerous components with a complex hardware and hierarchical control architecture. This paper presents an approach to decouple the multivariable system of MARS using a recursive reduced-order and boundary layer system methodology. This approach enables efficient computation of the control parameters for the Ll, L2, and L3 controllers. To validate the effectiveness of the proposed control strategy, cyclic tests in accordance with pre-defined performance criteria using controller Hardware-in-the-Loop (cHIL) experiments are conducted. The results demonstrate that the MARS system operates consistently under steady-state conditions. Furthermore, the dynamic response of the MARS system to various grid events is analyzed, underlining the resilience of MARS in presence of faults or loss of generation within the connected WECC system.

Xia, Qian↗

Bulk Grid Frequency Support Using Electrolyzers

Increasing renewable penetration in the bulk power systems has resulted in declining inertial response of the generation during system disturbances. This results in larger frequency deviations and oscillations during such events. This paper proposes a strategy for controlled dispatch of electrolyzers as loads to improve the system’s frequency response. A droop based controller with constraints based on electrolyzer operating limits has been developed to regulate its load. Consecutively, a localized frequency based control strategy has been developed to support the bulk system during disturbances. The impact of the electrolyzer support has been demonstrated using the 23-bus SAVNW system, and the 240-bus WECC system for baseline, 25% and 50% renewable penetration. The impact of changing droop settings and the available controllable electrolyzer capacities on the system’s frequency response has also been presented. Overall, the dispatchable electrolyzers helps improve (reduce) both the maximum frequency deviation and the settling times during common disturbances like loss of load/generation, and line faults. Systems with lower inertia were seen to benefit more from the controlled electrolyzer dispatch.

39 EE - Hydrogen and Fuel Cell Technologies (EE-3F↗

A Participation Factor-Based Approach for Defining the EMT Model Boundary for Power System Simulations with Inverter-Based Resources

The increasing penetration of inverter-based resources (IBRs) introduces new challenges to power system simulations, particularly with the emergence of fast electromagnetic transient (EMT) dynamics and sub-synchronous oscillations (SSO) that require time-consuming EMT simulations. To reduce the time cost for simulating a large-scale power grid with IBRs, this paper proposes a novel participation factor-based approach for defining a critical zone for detailed EMT modeling and simulations, which includes the IBRs, synchronous generators, and the network components participating significantly in simulated contingencies. Both model-based and response-based methods are introduced for the estimation of participation factors (PFs). The case study on the 240-bus Western Electricity Coordinating Council (WECC) system demonstrates that the EMT zone determined by the proposed approach can effectively capture power system dynamics involving IBRs.

EMT simulation↗