Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “VOYAGER PROJECT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Ephemerides of the major Neptunian satellites determined from earth-based astrometric and Voyager imaging observations

The Voyager project used Neptunian satellite ephemerides to support both navigation and acquisition of scientific data. The development of postencounter ephemerides for the satellites Triton, Nereid, and 1989N1 is discussed. Primary results are the final set of model parameters which generate orbits that best fit both the earth-based satellite observations and data acquired by Voyager. The ephemerides are compared with those generated preencounter, and the accuracy of the final ephemerides is assessed. Mean orbital elements are also provided as a geometrical representation for the satellite orbits.

Jacobson, R. A.↗

Ephemerides of the Uranian satellites determined from earth-based astrometric and Voyager imaging observations

Uranian satellite ephemerides were needed by the Voyager project to support both navigation and acquisition of scientific data. This paper outlines the mathematical modeling approach taken to generate those ephemerides and discusses their pre-encounter development, real time updating, and post-encounter refinement. The results presented include the final set of model parameters which generate the ephemerides that best fit the Voyager optical data as well as the earth based observations of the satellites.

Jacobson, R. A.↗

Telecommunications and data acquisition systems support for Voyager missions to Jupiter and Saturn, 1972-1981, prelaunch through Saturn encounter

The Deep Space Network has supported the Voyager Project for approximately nine years, during which time implementation, testing, and operational support was provided. Four years of this time involved testing prior to launch; the final five years included network operations support and additional network implementation. Intensive and critical support intervals included launch and four planetary encounters. The telecommunications and data acquisition support for the Voyager Missions to Jupiter and Saturn are summarized.

Traxler, M. R.↗

U.S. planetary protection program - Implementation highlights

The implementation of the United States planetary protection program, intended to prevent the contamination of the celestial bodies in the solar system during their exploration, in recent interplanetary projects is reviewed. The shift in planetary protection policy from that of absolute sterilization to a probabilistic approach is noted. Attention is then given to the use of microbiological assay, organic materials inventory, microbial burden reduction, contamination control, trajectory biasing and the analysis and identification of contaminating processes for purposed of planetary protection for the Pioneer 10 and 11, Viking and Voyager projects. The success of these measures, as demonstrated by the prevention of accidental planetary impact and the failure to detect terrestrial organisms by the Viking life detection experiments, is pointed out.

Barengoltz, J.↗

Grant Proposal for the Continuation of the Voyager Interstellar Mission: LECP Investigation

This proposal documents the plans of the Low Energy Charged Particle (LECP) investigation team for participation in NASA's Voyager Interstellar Mission (VIM) as the Voyager 1 and 2 spacecraft explore the outer reaches of the heliosphere and search for the termination shock and the heliopause. The proposal covers the four year period from 1 January 1997 to 31 December 2000. The LECP instruments on Voyager 1 and 2 measure in situ intensities of charged particles with energies from about 30 keV to 100 MeV for ions, and about 20 keV to greater than 10 MeV for electrons. The instruments provide detailed spectral, angular, and compositional information about the particles. Composition is available for greater than 200 keV/nuc using multi-parameter measurements. Angular information is obtained by a mechanically scanned platform that rotates at various commanded rates. Measurements of low energy ion and electron intensities versus time and spatial location within the heliosphere contain an abundance of information regarding various transport and acceleration processes on both local (approx. 1 hr, approx. 0.01 AU) and global (approx. 11 yrs, approx. 100 AU) scales. The LECP instruments provide unique observations of such dynamical processes, and we anticipate that it will return critical information regarding the boundaries of the heliosphere. Several recent and exciting discoveries based on LECP measurements emphasize the important role that low energy charged particle distributions play in physical processes in the interplanetary medium. Yet, at the same time, these discoveries also underscore the fact that our understanding of processes in the outer heliosphere is, in most cases, incomplete, and in others, only rudimentary at best. Among the discoveries referred to above are the following: (1) Shocks: Examination of greater than 30 keV ion intensities have revealed: (a) a total absence of acceleration beyond only -100-200 keV at a strong transient shock in May 1991 at 35 AU, despite an enhanced level of seed particles; (b) a large transient shock in September 1991 of global scale, with intensities of shock-accelerated ions greater than or equal to 30 keV to approx. 30 MeV showing complex, highly energy-dependent spatial evolution, and small-scale (approx. few gyroradii), often anisotropic, micro-structures; (c) recurrent intensity increases in greater than or equal to 30 keV to -few MeV ions, with structures that, in some cases, show no correlation with the associated corotating shock. (2) Superthermal ion pressure: A global merged interaction region with a leading shock, downstream of which the superthermal ion (greater than or equal to 30 keV to approx. 4 MeV) pressure is comparable to that of the thermal plasma, and the total particle pressure yields a plasma beta of order unity. (3) Pickup ions: Measurements of the C/O ratio within transient structures at 35-45 AU showing the first clear evidence that transient shocks can pre-accelerate interstellar pickup ions from approx. 1 keV/nuc to at least 1 MeV/nuc. (4) Seed particles: Injection of ions for acceleration to high energies at the termination shock is unlikely to be a problem, since interplanetary transient and recurrent shocks are continually accelerating ions, of solar wind or interstellar origin, to highly superthermal energies. (5) Precursor electrons: Ambient solar electrons (greater than or equal to few tens of keV) that exist in the outer heliosphere ca form a broad precursor, several days wide, that is upstream of the termination shock and potentially observable a few months prior to the shock crossing. (6) Solar wind velocity at Voyager 1: We can use LECP ion data to obtain the solar wind velocity at Voyager 1, enabling us to provide critical measurement of the plasma flow as we approach and encounter the termination shock and other regions (necessary due to the partial failure of the Voyager 1 PLS experiment). The work of the LECP investigator team during the VIM will include: (1) Continuing operations with regard to the receipt, processing, verification, cataloging, display, and distribution of the data from the LECP instruments on Voyager 1 and 2, (2) Monitoring the health and performance of the LECP instruments, and evaluating and characterizing the response of the LECP instruments to various energetic particle and plasma environments, (3) Participating in, and supporting Voyager Project planning exercises and other coordinated activities relevant to exploration of the outer heliosphere, (4) Developing analysis techniques and operational procedures suitable for searching for and characterizing the boundaries and unique regions of the outher heliosphere, (5) Continuing the preparation of data sets appropriate for submission to the National Space Sciences Data Center (NSSDC) and, where appropriate, the Planetary Data System (PDS), (6) Maintaining direct Web access to online LECP data through the JHU/APL Voyager LECP home page, (7) Performing scientific evaluations of the Voyager 1 and 2 LECP data sets in conjunction with other data sets and other investigators, with particular focus on the outer regions of the heliosphere, and (8) Publishing the results of these evaluations in the scientific literature and presenting the results in scientific conferences.

Krimigis, Stamatios M.↗

Shared mission operations concept

Historically, new JPL flight projects have developed a Mission Operations System (MOS) as unique as their spacecraft, and have utilized a mission-dedicated staff to monitor and control the spacecraft through the MOS. NASA budgetary pressures to reduce mission operations costs have led to the development and reliance on multimission ground system capabilities. The use of these multimission capabilities has not eliminated an ongoing requirement for a nucleus of personnel familiar with a given spacecraft and its mission to perform mission-dedicated operations. The high cost of skilled personnel required to support projects with diverse mission objectives has the potential for significant reduction through shared mission operations among mission-compatible projects. Shared mission operations are feasible if: (1) the missions do not conflict with one another in terms of peak activity periods, (2) a unique MOS is not required, and (3) there is sufficient similarity in the mission profiles so that greatly different skills would not be required to support each mission. This paper will further develop this shared mission operations concept. We will illustrate how a Discovery-class mission would enter a 'partner' relationship with the Voyager Project, and can minimize MOS development and operations costs by early and careful consideration of mission operations requirements.

Spradlin, Gary L.↗

Tests and evaluation of multihundred watt thermoelectric generators at JPL

The multihundred watt (MHW) thermoelectric generator, based on silicon-germanium thermoelectric technology, delivers a nominal power output of 150 watts with an efficiency of about 6%. The two Voyager space probes each use three such generators assembled in tandem on a boom. A total of seven MHW type thermoelectric generators were tested at JPL in support of the Voyager project. The tests consisted of: (1) parametric evaluation of the electrical characteristics of the devices over a wide range of output voltage for different values of input power, different operating ambients (air, vacuum), and different internal environments (argon, helium, xenon, mixture of these gases, and vacuum) at different pressures to allow evaluation of the influences of both gas and pressure on the performance of the generator; (2) tests to determine the transient behavior of the generators; and (3) operation of the generator in conjunction with the Voyager spacecraft.

Rouklove, P.↗

Voyager flight engineering - Preparing for Uranus

Two Voyager spacecraft are currently engaged in exploration of the outer solar system with Voyager 2 scheduled to conduct the first close-up investigation of the planet Uranus during the period November 4, 1985 through March 3, 1986. Flight engineering for the Voyager project has the objectives of delivering a functioning spacecraft containing observing sequences to the right places at the right times. Due to the changing environment as the mission has progressed outward from Jupiter to Saturn to Uranus (and on to Neptune), this engineering task has included the development of significant new capabilities. The paper utilizes the case-study method to examine some new spacecraft capabilities in three subsystems: data, attitude and articulation control, and power. The implementation of a new navigational data-type, delta DOR, is also reviewed. An overview is given of the Voyager sequencing process for the cruise and encounter phases with a case study focusing on late updating of part of the near encounter sequence. The prospective mission to Neptune is previewed.

Mclaughlin, W. I.↗

Summary, volume 1 Final report

Voyager project study summaries on spacecraft powered by radioisotope thermoelectric generators, planetary quarantine, redundancy, and data management and control

Oleary, K. C.↗

The Viking decelerator system - An overview.

The Viking mission to place an instrumented lander on Mars in 1976 includes an aerodynamic decelerator as part of the landing sequence. Development of the decelerator, a single-stage mortared disk-gap-band parachute, began in 1965 for the Voyager project and culminated in the flight qualification of the decelerator system for the Viking mission in 1972. This paper summarizes the research, development, and qualification effort. The special operating conditions and the constraints imposed by the Viking mission and the Mars atmosphere, their effects on the decelerator system, and the solution of the resulting technical problems are briefly described.

Gillis, C. L.↗

Voyager mission description

The Voyager project, which involves the 1977 launch of two advanced three-axis attitude stabilized spacecraft for the exploration of the Jovian and Saturnian systems, as well as interplanetary space, is discussed. The missions include investigation of the gravitational fields, atmospheric dynamics and magnetospheres of Jupiter and Saturn, the atmospheres, surface composition and features of Titan, the Io flux tube, the Great Red Spot of Jupiter, and earth occultation by Saturn's rings. To reduce energy required to reach Saturn, gravity-assist swingbys of Jupiter will be employed; a continuation to Uranus by the second satellite may be implemented by reliance on gravity-assist at Saturn.

Kohlhase, C. E.↗