Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Upgrade”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Tolerance analyses of a quadrupole magnet for advanced photon source upgrade

Given physics requirements, the mechanical fabrication and assembly tolerances for storage ring magnets can be calculated using analytical methods [1, 2]. However, this method is not easy for complicated magnet designs [1]. In this paper, a novel method is proposed to determine fabrication and assembly tolerances consistent with physics requirements, through a combination of magnetic and mechanical tolerance analyses. In this study, finite element analysis using OPERA is conducted to estimate the effect of fabrication and assembly errors on the magnetic field of a quadrupole magnet and to determine the allowable tolerances to achieve the specified magnetic performances. Based on the study, allowable fabrication and assembly tolerances for the quadrupole assembly are specified for the mechanical design of the quadrupole magnet. Next, to achieve the required assembly level tolerances, mechanical tolerance stackup analyses using a 3D tolerance analysis package are carried out to determine the part and subassembly level fabrication tolerances. This method can be used to determine the tolerances for design of other individual magnets and of magnet strings.

43 PARTICLE ACCELERATORS↗

Design and Manufacture of the Conduction Cooled Torus Coils for the Jefferson Lab 12GeV Upgrade

The design of the 12-GeV torus required the construction of six superconducting coils with a unique geometry required for the experimental needs of Jefferson Laboratory Hall B. Each of these coils consists of 234 turns of copper-stabilized superconducting cable conduction cooled by 4.6 K helium gas. The finished coils are each roughly 2 × 4 × 0.05 m and supported in an aluminum coil case. Because of its geometry, new tooling and manufacturing methods had to be developed for each stage of construction. The tooling was designed and developed while producing a practice coil at Fermi National Laboratory. This paper describes the tooling and manufacturing techniques required to produce the six production coils and two spare coils required by the project. Project status and future plans are also presented.

43 PARTICLE ACCELERATORS↗

Mechanical Design Analysis of MQXFB, the 7.2-m-Long Low- $\beta$ Quadrupole for the High-Luminosity LHC Upgrade

As part of the High-Luminosity Large Hadron Collider (LHC) Project, a set of Nb 3 Sn quadrupoles are being developed, aiming to enhance the performance of the inner triplets. The new magnets, identified as MQXFA and MQXFB, will share the same cross section with two different lengths, 4.2 and 7.2 m, respectively. During the magnet development, three short models were tested, along with a number of mechanical models, demonstrating the capability of the magnet cross section to achieve the specified performances. The same performances are now required for the full-length magnets. To ensure this, the authors studied the impact of the magnet length on the capability of the structure to provide an adequate support to the coils. Finite element and simplified analytical models were used to evaluate the impact of the magnet length on the stresses in the magnet ends and coil elongation during powering. Lastly, the models were calibrated using the results from the short model tests, and used to provide an indication on the required prestress and its foreseen impact on the magnet performance.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Test Result of the Short Models MQXFS3 and MQXFS5 for the HL-LHC Upgrade

© 2002-2011 IEEE. In the framework of the High-Luminosity Large Hadron Collider, the installation of a new generation of quadrupole magnets is foreseen on each side of ATLAS and CMS experiments. The new magnets are based on Nb 3 Sn technology and shall be able to reach an ultimate current of 17.9 kA with a peak field of 12.3 T in the coil. In 2016 and 2017, the first two short models, called MQXFS3 and MQXFS5, have been tested at 4.2 and 1.9 K in the two new test benches at the European Organization for Nuclear Research. This paper presents the result of the quench performance of the two models; the first magnet reached nominal but failed to reach ultimate, showing detraining in one coil. MQXFS5 reached ultimate performance without any detraining phenomena, validating the PIT conductor used for the first time in this magnet program.

Bajas, Hugues↗

Phase Contrast Imaging Diagnostic on DIII-D (1994-2007); Phase Contrast Imaging Diagnostic on DIII-D and Alcator C-Mod (2007-2010); Experimental Study of Waves, Turbulence and Transport, and Model Validation with Phase Contrast Imaging on DIII-D and Alcator C-Mod (2010-2012); Phase Contrast Imaging Diagnostic Upgrade on DIII-D for Measuring High-k Turbulence and Alfven modes (2021-2016); Phase Contrast Imaging Diagnostic Upgrade on DIII-D for Full Multi-Scale Measurements (2016-2020) (Final Report)

This report describes the first twenty-five years of development and use of the Phase Contrast Imaging (PCI) diagnostic for measuring plasma fluctuations on the DIII–D tokamak. One of the key challenges in moving tokamak technology forward to the stage of a nuclear reactor remains understanding how energy and particles are transported across the magnetic field by the action of turbulence and waves, and PCI provides a highly flexible and capable measurement of these fluctuations. The PCI diagnostic uses a laser beam to probe the plasma and optical filtering to produce an amplitude variation on a linear detector array which provides an image of the density waves in the plasma. The PCI covers an exceptional range in frequency and wavelength of the measured fluctuations, allowing observation of plasma-sized magnetohydrodynamic (MHD) modes and ion- and electron-scale turbulence. Modulation of the beam amplitude allows measurement of radio frequency (RF) waves.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Home Energy Upgrade Data Standards: Home Upgrade Program Accelerator

This fact sheet explains how data standards like the Home Performance Extensible Markup Language (HPXML) can be used to establish a common way of defining, formatting, exchanging, and using data to describe residential buildings, energy conservation measures, and energy performance.

Home Performance Extensible Markup Language, HPXML↗

Evaluation of Steam Cycle Upgrades to Improve the Competitiveness of U.S. Coal Power Plants (Final Scientific / Technical Report)

Increasing the competitiveness of the existing pulverized-coal utility fleet in the United States may be achieved by decreasing heat rate, via increases in steam cycle efficiency through upgraded steam temperatures and use of latest technology available in steam turbine and blading design. The average net plant efficiency of the US coal-fired fleet is approximately 33% (HHV). Plant efficiency increases to approximately 41.4% (HHV) at 1,350°F (732°C) steam temperature. However, achieving these Advanced Ultra-Super Critical (AUSC) steam conditions requires the use of advanced high-temperature materials. While there has been a significant amount of DOE-funded materials R&D, most of the related design work has focused on new (greenfield) units, rather than on opportunities to retrofit this advanced technology to the existing utility fleet. If technology, based upon the advanced materials required for AUSC steam conditions, may be applied to the existing fleet, using an economically viable retrofit, a higher capacity factor can be expected as a result of the increased plant competitiveness. The Electric Power Research Institute (EPRI) was awarded a project by the US Department of Energy to examine the technical and economic feasibility of a series of steam cycle upgrades to the two most prevalent types of U.S. coal power plants: 2,400 psig (16.6 MPa) subcritical and 3,500 psig (24.1 MPa) supercritical pulverized coal units. The nine upgrade options that were originally being considered included increasing the main and reheat steam temperatures from 1,000°F (538°C) to 1,100°, 1,200°, and 1,350°F (593°C, 649°C, and 732°C) while holding the steam pressures constant at their original design values, and cases where just the main steam or reheat steam temperatures were increased. The objective was to minimize the modifications required to the existing power plant while still providing a significant improvement in heat rate. The upgrade options assumed that the boiler enclosure envelope remained unchanged from each base case, and that all applicable OEM design guidelines for normal commercial units were imposed. For the highest temperature supercritical case, an option of using a low-pressure molten salt loop to transfer heat from the furnace to the steam was examined. The first major task of the work scope was designed to examine the technical feasibility of various upgrade options, while the subsequent work determined economic viability of the technically feasible upgrade options. Prior to evaluating the effect of these increased temperatures, a “base case” model of a subcritical and supercritical PC boiler was created, which was used for comparative purposes. Upgrade options were evaluated at full-load, part-load and dynamic transient conditions. Once the technical feasibility of each upgrade option was evaluated, the economic value of the heat rate improvement of each feasible option was determined by detailed modeling of unit dispatch in several regional power markets. The dispatch model was used to estimate the amount of revenue from power sales the upgraded unit would receive in comparison to a non-upgraded version of the same power plant. As a parallel task to the dispatch analysis, the capital cost of implementing the upgrades was estimated. The capital cost estimates were then compared to the increased revenue estimated by the dispatch modeling to determine the economic attractiveness of each upgrade option. Several upgrade options were determined to be technically feasible. The net present value (NPV) of the costs for steam cycle upgrades considered in this study ranged from approximately $\$$111 to $\$$130 million. The economic modeling results show that the unit dispatch changes resulting from steam cycle upgrades are relatively small, due largely to heat rate (and operating cost) changes being relatively small. Additionally, the cost of each upgrade exceeds the net revenue increases associated with the upgrade case. Note that the breakeven values are higher for subcritical retrofits, but the capital costs for the subcritical upgrades are also slightly higher. In typical new pulverized coal plants, fuel accounts for approximately 25% of the cost of electricity (COE), while capital costs represent around 50% of the COE. Therefore, in order to improve the heat rate by 4% one can only afford to increase the capital cost by 2%, at the same cost of electricity. The conclusion of this study is that without a cost for emitting CO 2 , it will be difficult to pay for significant efficiency improvements on plants firing low cost coals.

01 COAL, LIGNITE, AND PEAT↗

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation and New Windows

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Window Replacement, Exterior Wall Insulation, and Roof Insulation, which we will refer to collectively as the "High Efficiency Envelope" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

End-Use Savings Shapes Upgrade Package Documentation: LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Light Emitting Diode (LED) Lighting, Heat Pump Rooftop Unit (RTU) (HP-RTU), and Air-Source Heat Pump (ASHP) Boiler, which we will refer to collectively as the "Interior Lighting and Heat Pump" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗