Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

C-Band Airport Surface Communications System Engineering-Initial High-Level Safety Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed C-band (5091- to 5150-MHz) airport surface communication system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents an initial high-level safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the C-band communication system after the profile is finalized and system rollout timing is determined. A security risk assessment has been performed by NASA as a parallel activity. While safety analysis is concerned with a prevention of accidental errors and failures, the security threat analysis focuses on deliberate attacks. Both processes identify the events that affect operation of the system; and from a safety perspective the security threats may present safety risks.

Zelkin, Natalie↗

Space radiation health program plan

The Space Radiation Health Program intends to establish the scientific basis for the radiation protection of humans engaged in the exploration of space, with particular emphasis on the establishment of a firm knowledge base to support cancer risk assessment for future planetary exploration. This document sets forth the technical and management components involved in the implementation of the Space Radiation Health Program, which is a major part of the Life Sciences Division (LSD) effort in the Office of Space Science and Applications (OSSA) at the National Aeronautics and Space Administration (NASA). For the purpose of implementing this program, the Life Sciences Division supports scientific research into the fundamental mechanisms of radiation effects on living systems and the interaction of radiation with cells, tissues, and organs, and the development of instruments and processes for measuring radiation and its effects. The Life Sciences Division supports researchers at universities, NASA field centers, non-profit research institutes and national laboratories; establishes interagency agreements for cooperative use and development of facilities; and conducts a space-based research program using available and future spaceflight vehicles.

Source record↗

Knowledge-based decision support for Space Station assembly sequence planning

A complete Personal Analysis Assistant (PAA) for Space Station Freedom (SSF) assembly sequence planning consists of three software components: the system infrastructure, intra-flight value added, and inter-flight value added. The system infrastructure is the substrate on which software elements providing inter-flight and intra-flight value-added functionality are built. It provides the capability for building representations of assembly sequence plans and specification of constraints and analysis options. Intra-flight value-added provides functionality that will, given the manifest for each flight, define cargo elements, place them in the National Space Transportation System (NSTS) cargo bay, compute performance measure values, and identify violated constraints. Inter-flight value-added provides functionality that will, given major milestone dates and capability requirements, determine the number and dates of required flights and develop a manifest for each flight. The current project is Phase 1 of a projected two phase program and delivers the system infrastructure. Intra- and inter-flight value-added were to be developed in Phase 2, which has not been funded. Based on experience derived from hundreds of projects conducted over the past seven years, ISX developed an Intelligent Systems Engineering (ISE) methodology that combines the methods of systems engineering and knowledge engineering to meet the special systems development requirements posed by intelligent systems, systems that blend artificial intelligence and other advanced technologies with more conventional computing technologies. The ISE methodology defines a phased program process that begins with an application assessment designed to provide a preliminary determination of the relative technical risks and payoffs associated with a potential application, and then moves through requirements analysis, system design, and development.

Source record↗

L-Band Digital Aeronautical Communications System Engineering - Initial Safety and Security Risk Assessment and Mitigation

This document is being provided as part of ITT's NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: "New ATM Requirements--Future Communications, C-Band and L-Band Communications Standard Development." ITT has completed a safety hazard analysis providing a preliminary safety assessment for the proposed L-band (960 to 1164 MHz) terrestrial en route communications system. The assessment was performed following the guidelines outlined in the Federal Aviation Administration Safety Risk Management Guidance for System Acquisitions document. The safety analysis did not identify any hazards with an unacceptable risk, though a number of hazards with a medium risk were documented. This effort represents a preliminary safety hazard analysis and notes the triggers for risk reassessment. A detailed safety hazards analysis is recommended as a follow-on activity to assess particular components of the L-band communication system after the technology is chosen and system rollout timing is determined. The security risk analysis resulted in identifying main security threats to the proposed system as well as noting additional threats recommended for a future security analysis conducted at a later stage in the system development process. The document discusses various security controls, including those suggested in the COCR Version 2.0.

Zelkin, Natalie↗

A Risk Assessment Model for Reduced Aircraft Separation: A Quantitative Method to Evaluate the Safety of Free Flight

As new technologies and procedures are introduced into the National Airspace System, whether they are intended to improve efficiency, capacity, or safety level, the quantification of potential changes in safety levels is of vital concern. Applications of technology can improve safety levels and allow the reduction of separation standards. An excellent example is the Precision Runway Monitor (PRM). By taking advantage of the surveillance and display advances of PRM, airports can run instrument parallel approaches to runways separated by 3400 feet with the same level of safety as parallel approaches to runways separated by 4300 feet using the standard technology. Despite a wealth of information from flight operations and testing programs, there is no readily quantifiable relationship between numerical safety levels and the separation standards that apply to aircraft on final approach. This paper presents a modeling approach to quantify the risk associated with reducing separation on final approach. Reducing aircraft separation, both laterally and longitudinally, has been the goal of several aviation R&D programs over the past several years. Many of these programs have focused on technological solutions to improve navigation accuracy, surveillance accuracy, aircraft situational awareness, controller situational awareness, and other technical and operational factors that are vital to maintaining flight safety. The risk assessment model relates different types of potential aircraft accidents and incidents and their contribution to overall accident risk. The framework links accident risks to a hierarchy of failsafe mechanisms characterized by procedures and interventions. The model will be used to assess the overall level of safety associated with reducing separation standards and the introduction of new technology and procedures, as envisaged under the Free Flight concept. The model framework can be applied to various aircraft scenarios, including parallel and in-trail approaches. This research was performed under contract to NASA and in cooperation with the FAA's Safety Division (ASY).

Cassell, Rick↗

Millimeter wave satellite concepts. Volume 2: Technical report

Identification of technologies for millimeter satellite communication systems, and assessment of the relative risks of these technologies, were accomplished through subsystem modeling and link optimization for both point-to-point and broadcast applications. The results, in terms of annual cost per channel to the user from a commercial view point, are described.

Hilsen, N. B.↗

How NASA decided Webb was ready: Inside the risk assessment

Every do-it-yourselfer knows how hard it can be to declare a project complete. Will another turn of the bolt or brushstroke make things better or worse? That was roughly the choice NASA faced a year before the Dec. 25 launch of the James Webb Space Telescope. Would more testing close more technical risks in the nearly $10 billion project or create new ones? In the end, NASA decided against more testing. NASA’s Jesse Leitner and Tupper Hyde describe the assessment they performed.

JWST↗

Government Personnel Participation in Suborbital Space Flight

In 2020, NASA issued a Request for Information (RFI) from potential sources for Suborbital Crew (SubC) space transportation services. NASA recognizes the advancement of the commercial suborbital space flight industry and is currently working to develop suborbital transportation for Government personnel that could fly on commercially available suborbital vehicles and determine a systems qualification approach for flight risk acceptance. Prior examples of risk assessment such as the purchase of Soyuz missions serve as a foundation for how the US Government’s best technical experts can partner with a successfully flying industry provider to understand risks. More recently, NASA, the FAA, and industry have successfully demonstrated that a company-owned operation with government oversight can successfully launch Government Astronauts safely. This paper explores the challenges and opportunities presented with the use of suborbital vehicles by Government personnel and how industry might leverage the Government’s efforts to maximize the success of the suborbital space industry.

Risk Management↗

Chemical Hygiene Program

The Chemical Management Team is responsible for ensuring compliance with the OSHA Laboratory Standard. The program at Lewis Research Center (LeRC) evolved over many years to include training, developing Standard Operating Procedures (SOPS) for each laboratory process, coordinating with other safety and health organizations and teams at the Center, and issuing an SOP binder. The Chemical Hygiene Policy was first established for the Center. The Chemical Hygiene Plan was established and reviewed by technical, laboratory and management for viability and applicability to the Center. A risk assessment was conducted for each laboratory. The laboratories were prioritized by order of risk, higher risk taking priority. A Chemical Management Team staff member interviewed the lead researcher for each laboratory process to gather the information needed to develop the SOP for the process. A binder containing the Chemical Hygiene Plan, the SOP, a map of the laboratory identifying the personal protective equipment and best egress, and glove guides, as well as other guides for safety and health. Each laboratory process has been captured in the form of an SOP. The chemicals used in the procedure have been identified and the information is used to reduce the number of chemicals in the lab. The Chemical Hygiene Plan binder is used as a training tool for new employees. LeRC is in compliance with the OSHA Standard. The program was designed to comply with the OSHA standard. In the process, we have been able to assess the usage of chemicals in the laboratories, as well as reduce or relocate the chemicals being stored in the laboratory. Our researchers are trained on the hazards of the materials they work with and have a better understanding of the hazards of the process and what is needed to prevent any incident. From the SOP process, we have been able to reduce our chemical inventory, determine and implement better hygiene procedures and equipment in the laboratories, and provide specific training to our employees. As a result of this program, we are adding labeling to the laboratories for emergency responders and initiating a certified chemical user program.

Mayor, Antoinette C.↗

The X-43 Fin Actuation System Problem - Reliability in Shades of Gray

Following the loss of the first X-43 during launch, the mishap investigation board indicated the Fin Actuator System (FAS) needed to have a larger torque margin. To supply this added torque, a second actuator was added. The consequences of what seemed to be a simple modification would trouble the X-43 program. Because of the second actuator, a new computer board was required. This proved to be subject to electronic noise. This resulted in the actuator latch up in ground tests of the FAS for the second launch. Such a latch up would cause the Pegasus booster to fail, as the FAS was a single string system. The problem was corrected and the second flight was successful. The same modifications were added to the FAS for flight three. When the FAS underwent ground tests, it also latched up. The failure indicated that each computer board had a different tolerance to electronic noise. The problem with the FAS was corrected. Subsequently, another failure occurred, raising questions about the design, and the probability of failure for the X-43 Mach 10 flight. This was not simply a technical issue, but illuminated the difficulties facing both managers and engineers in assessing risk, design requirements, and probabilities in cutting edge aerospace projects.

Peebles, Curtis↗

Uncertainty Estimation Cheat Sheet for Probabilistic Risk Assessment

Quantitative results for aerospace engineering problems are influenced by many sources of uncertainty. Uncertainty analysis aims to make a technical contribution to decision-making through the quantification of uncertainties in the relevant variables as well as through the propagation of these uncertainties up to the result. Uncertainty can be thought of as a measure of the 'goodness' of a result and is typically represented as statistical dispersion. This paper will explain common measures of centrality and dispersion; and-with examples-will provide guidelines for how they may be estimated to ensure effective technical contributions to decision-making.

Britton, Paul↗

Surface Biology and Geology (SBG) Thermal Infrared (TIR) Free -Flyer Concept

Scientists and engineers from the United States and Italy are developing a thermal infrared (TIR) free-flyer concept that forms an essential element of the NASA Surface Biology & Geology (SBG) designated observable and the greater NASA Earth System Observatory (ESO), which also includes observations of aerosols, clouds, convection, and precipitation; mass change; and surface deformation & change.In response to the recommendations from the 2017 National Academies decadal survey for Earth science, NASA initiated the SBG designated observable with five key research and applications focus areas: ecosystems and natural resources, hydrology, weather, climate, and solid Earth. SBG includes spaceborne measurements of hyperspectral imagery in the visible to shortwave infrared (0.4-2.5 um) and multispectral imagery in the mid and thermal infrared (3-12 um) that provide the remote sensing data needed to inform each research and applications area. High-level TIR data products include Earth surface temperature & emissivity, evapotranspiration, substrate composition, volcanic plumes, and high-temperature features. While the science, applications, and technology build on prior mission studies conducted for more than a decade, it has only been recently that a joint team of scientists and engineers from the NASA Jet Propulsion Laboratory (JPL), Agenzia Spaziale Italiana (ASI), Istituto Nazionale Geofisica e Volcanologia (INGV), and the Istituto Nazionale Astrofisica (INAF) have developed a compelling concept for a TIR free-flyer. In this concept, the TIR instrument is an eight-band radiometer. Seven of the bands are between 3 and 12 um with an additional band at 1.65 um. The instrument’s 68.8 deg total viewing angle and the free-flyer’s 665 km operational altitude results in a ground sampling distance (GSD) of <60 m at nadir, produces a swath width of 935 km, and allows for a 2-3-day revisit time. A two-band visible and near infrared (VNIR) camera, with <30 m GSD at nadir and 935 km swath width, will complement the TIR instrument. VNIR high-level data products include top & bottom of atmosphere reflectance and normalized difference vegetation indices (NDVI). The TIR instrument and VNIR camera will be mounted on a PLATiNO+ spacecraft, a multi-application, reconfigurable, and scalable platform. The launcher selected for the TIR free-flyer is the VEGA-C. To maximize the science and applications benefits the SBG-TIR free-flyer team are collaborating with personnel from the ESA Land Surface Temperature Monitoring mission (LSTM) as well individuals from the Thermal Infrared Imaging Satellite for High-resolution Natural resource Assessment (TRISHNA), a joint mission by CNES and ISRO. Pre-Phase A concept studies for the SBG-TIR free-flyer commenced in the spring 2021. This allows for the concept to be refined; for technical risks to be identified and mitigated, as necessary; and strategies for reducing the development schedule to be defined and assessed before conducting a NASA-ASI Mission Concept Review (MCR) in the spring of 2022 and a NASA Key Decision Point-A (KDP-A) as early as the summer of 2022. These are key milestones in being able to launch and begin operating the SBG-TIR free-flyer in the second half of the decade, so that many of the questions posed by the National Academies in the 2017 decadal survey can be answered.

Fabrizia-Buongiorno, Maria↗

Low-Cost, Class D Testing of Spacecraft Photovoltaic Systems Can Reduce Risk

The end-to-end verification of a spacecraft photovoltaic power generation system requires light! A lowcost, portable, and end-to-end photovoltaic-system test appropriate for NASA's new generation of Class D missions is presented. High risk, low-cost, and quick-turn satellites rarely have the resources to execute the traditional approaches from higher-class (A-C) missions. The Class D approach, as demonstrated on the Lunar Atmospheric and Dust Environment Explorer (LADEE), utilizes a portable, metalhalide, theatre lamp for an end-to-end photovoltaic system test. While not as precise and comprehensive as the traditional Large Area Pulsed Solar Simulator (LAPSS) test, the LADEE method leverages minimal resources into an ongoing assessment program that can be applied through numerous stages of the mission. The project takes a true Class D approach in assessing the technical value of a costly, highfidelity performance test versus a simpler approach with less programmatic risk. The resources required are a fraction of that for a LAPSS test, and is easy to repeat due to its portability. Further, the test equipment can be handed down to future projects without building an on-site facility. At the vanguard of Class D missions, the LADEE team frequently wrestled with and challenged the status quo. The philosophy of risk avoidance at all cost, typical to Class A-C missions, simply could not be executed. This innovative and simple testing solution is contextualized to NASA Class D programs and a specific risk encountered during development of the LADEE Electrical Power System (EPS). Selection of the appropriate lamp and safety concerns are discussed, with examples of test results. Combined with the vendor's panellevel data and periodic inspection, the method ensures system integrity from Integration and Test (I&T) through launch. Following launch, mission operations tools are utilized to assess system performance based on a scant amount of available data.

power systems↗

Composite Crew Module (CCM) Permeability Characterization

In January 2007, the NASA Administrator chartered the NASA Engineering and Safety Center (NESC) to form an Agency team to design and build a composite crew module in 18 months in order to gain hands-on experience in anticipation that future exploration systems may be made of composite materials. One of the conclusions from this Composite Crew Module Primary Structure assessment was that there was a lack of understanding regarding the ability for composite pressure shells to contain consumable gases, which posed a technical risk relative to the use of a metallic design. After the completion of the Composite Crew Module test program, the test article was used in a new program to assess the overall leakage/permeability and identify specific features associated with high leak rates. This document contains the outcome of the leakage assessment.

Kirsch, Michael T.↗

Advanced Exploration Systems Atmosphere Resource Recovery and Environmental Monitoring

In September 2011, the Atmosphere Resource Recovery and Environmental Monitoring (ARREM) project was commissioned by NASA's Advanced Exploration Systems program to advance Atmosphere Revitalization Subsystem (ARS) and Environmental Monitoring Subsystem (EMS) technologies for enabling future crewed space exploration missions beyond low Earth orbit. The ARREM project's period of performance covered U.S. Government fiscal years 2012-2014. The ARREM project critically assessed the International Space Station (ISS) ARS and EMS architectures and process technologies as the foundation for an architecture suitable for deep space exploration vehicles. The project's technical content included technical tasks focused on improving the reliability and life cycle cost of ARS and EMS technologies as well as reducing future flight project developmental risk and design, development, test, and evaluation costs. Targeted technology development and maturation tasks, including key technical trade assessments, were accomplished and integrated ARS architectures were demonstrated. The ARREM project developed, demonstrated, and tested leading process technology candidates and subsystem architectures that met or exceeded key figures of merit, addressed capability gaps, and significantly improved the efficiency, safety, and reliability over the state-of-the-art ISS figures of merit. Promising EMS instruments were developed and functionally demonstrated in a simulated cabin environment. The project's technical approach and results are described and recommendations for continued development are provided.

Perry, J.↗

Synthesis Report of the IPCC Sixth Assessment Report (AR6)

This Synthesis Report (SYR) of the IPCC Sixth Assessment Report (AR6) summarises the state of knowledge of climate change, its widespread impacts and risks, and climate change mitigation and adaptation, based on the peer-reviewed scientific, technical and socio-economic literature since the publication of the IPCC’s Fifth Assessment Report (AR5) in 2014. he assessment is undertaken within the context of the evolving international landscape, in particular, developments in the UN Framework Convention on Climate Change (UNFCCC) process, including the outcomes of the Kyoto Protocol and the adoption of the Paris Agreement. It reflects the increasing diversity of those involved in climate action. This report integrates the main findings of the AR6 Working Group reports and the three AR6 Special Reports. It recognizes the interdependence of climate, ecosystems and biodiversity, and human societies; the value of diverse forms of knowledge; and the close linkages between climate change adaptation, mitigation, ecosystem health, human well-being and sustainable development. Building on multiple analytical frameworks, including those from the physical and social sciences, this report identifies opportunities for transformative action which are effective, feasible, just and equitable using concepts of systems transitions and resilient development pathways. Different regional classification schemes4 are used for physical, social and economic aspects, reflecting the underlying literature.

climate impacts↗

Integrated Application of Active Controls (IAAC) Technology to an Advanced Subsonic Transport: Project Plan

The state of the art of active controls technology (ACT) and a recommended ACT development program plan are reviewed. The performance benefits and cost of ownership of an integrated application of ACT to civil transport aircraft is to be assessed along with the risk and laboratory and/or flight experiments designed to reduce the technical risks to a commercially acceptable level.

Source record↗

A proposal for risk sharing in the development of a lunar oxygen plant

The production of lunar oxygen for use in a NASA lunar outpost program could provide a profitable investment for nongovernment development, savings for government, and an initiation of a new resource of capital financing for space industrialization. A joint endeavor to share development risks between government and nongovernment investment is proposed, based on some early assessments of technical and financial feasibility for the project. Successful initial negotiations between government and nongovernment investors can establish the requirements for financing the project with private funds.

Duke, Michael B.↗