Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TECHNOLOGY READINESS ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Development and Testing of a First-of-a-Kind Process to Support Commissioning a New Hazard Category 2 Nuclear Facility - 16573

The Department of Energy's Department of Environmental Management faces the complex task of cleaning up waste from nuclear weapons production. Often, the clean-up requires novel and untested technologies and approaches. In these cases, it is always necessary to provide some measure of assurance that the design engineers will be able to produce a design that will function in the means intended. Too many times we have seen first of a kind nuclear processing technologies put forth as commercially ready, only to be found insufficiently mature once attempted to be readied for operation. As now required by the DOE's Technology Readiness Assessment Process, it is necessary to demonstrate technologies in a similar environment to the current application and tested with a range of bounding simulants, or actual waste materials, if possible. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Technology Maturation Plan for Immobilization of High-Level Waste in Glass Ceramics

A technology maturation plan (TMP) was developed for immobilization of high-level waste (HLW) raffinate in a glass-ceramic waste form using a cold-crucible induction melter (CCIM). The TMP was prepared by the following process: 1) define the reference process and boundaries of the technology being matured, 2) evaluate the technology elements and identify the critical technology elements (CTE), 3) identify the technology readiness level (TRL) of each of the CTE’s using the DOE G 413.3-4, 4) describe the development and demonstration activities required to advance the TRLs to 4 and 6 in order, and 5) prepare a preliminary plan to conduct the development and demonstration. Results of the technology readiness assessment identified five CTE’s and found relatively low TRL’s for each of them: • Mixing, sampling, and analysis of waste slurry and melter feed: TRL-1; • Feeding, melting, and pouring: TRL-1; • Glass ceramic formulation: TRL-1; • Canister cooling and crystallization: TRL-1; and • Canister decontamination: TRL-4. Although the TRL’s are low for most of these CTE’s (TRL-1) primarily because the specific waste stream is not known or tested, the effort required to advance them to higher values is relatively low. A TRL of 2 would be obtained by completing an initial waste composition/property estimate, a preliminary engineering study, some additional laboratory scale tests of the glass-ceramic, and a mixing and sampling test. Relatively little additional effort is required to advance the technology to TRL-3.

Glass ceramics↗

Integrated Waste Treatment Unit (IWTU) Input Coal Analyses and Off-Gass Filter (OGF) Content Analyses

A full engineering scale Fluidized Bed Steam Reformer (FBSR) system is being used at the Idaho Nuclear Technology and Engineering Center (INTEC) to stabilize acidic Low Activity Waste (LAW) known as Sodium Bearing Waste (SBW). The INTEC facility, known as the Integrated Waste Treatment Unit (IWTU), underwent an Operational Readiness Review (ORR) and a Technology Readiness Assessment (TRA) in March 2014. The IWTU began non-radioactive simulant processing in late 2014 and by January, 2015 ; the IWTU had processed 62,000 gallons of simulant. The facility is currently in a planned outage for inspection of the equipment and will resume processing simulated waste feed before commencing to process 900,000 gallons of radioactive SBW. The SBW acidic waste will be made into a granular FBSR product (carbonate based) for disposal in the Waste Isolation Pilot Plant (WIPP). In the FBSR process calcined coal is used to create a CO2 fugacity to force the waste species to convert to carbonate species. The quality of the coal, which is a feed input, is important because the reactivity, moisture, and volatiles (C,H,N,O, and S) in the coal impact the reactions and control of the mineralizing process in the primary steam reforming vessel, the Denitration and Mineralizing Reformer (DMR). Too much moisture in the coal can require that additional coal be used. However since moisture in the coal is only a small fraction of the moisture from the fluidizing steam this can be self-correcting. If the coal reactivity or heating value is too low then the coal feed-rate needs to be adjusted to achieve the desired heat generation. Too little coal and autothermal heat generation in the DMR cannot be sustained and/or the carbon dioxide fugacity will be too low to create the desired carbonate mineral species. Too much coal and excess S and hydroxide species can form. Excess sulfur from coal that (1) is too rich in sulfur or (2) from overfeeding coal can promote wall scale and contribute to corrosion in process piping and materials, in excessive off-gas absorbent loading, and in undesired process emissions. The ash content of the coal is important as the ash adds to the DMR and other vessel products which affect the final waste product mass and composition. The amount and composition of the ash also affects the reaction kinetics. Thus ash content and composition contributes to the mass balance. In addition, sodium, potassium, calcium, sulfur, and maybe silica and alumina in the ash may contribute to wall-scale formation. Sodium, potassium, and alumina in the ash will be overwhelmed by the sodium, potassium, and alumina from the feed but the impact from the other ash components needs to be quantified. A maximum coal particle size is specified so the feed system does not plug and a minimum particle size is specified to prevent excess elutriation from the DMR to the Process Gas Filter (PGF). A vendor specification was used to procure the calcined coal for IWTU processing. While the vendor supplied a composite analysis for the 22 tons of coal (Appendix A), this study compares independent analyses of the coal performed at the Savannah River National Laboratory (SRNL) and at the National Energy Technology Laboratory (NETL). Three supersacks a were sampled at three different heights within the sack in order to determine within bag variability and between bag variability of the coal. These analyses were also compared to the vendor’s composite analyses and to the coal specification. These analyses were also compared to historic data on Bestac coal analyses that had been performed at Hazen Research Inc. (HRI) between 2004-2011.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Project Report: School Retrofit Demonstration of Lighting and Outlet Controls with LED Upgrades

A technology demonstration project funded by the U.S. Department of Energy (DOE) was hosted by Boston Public Schools (BPS). This project evaluated wireless controls technology for lighting systems and plug loads (energy consumed by devices plugged into electrical outlets), implemented along with LED lighting retrofits in two classrooms. This study assesses technology readiness and effectiveness to determine the deployment potential of the technology in schools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated Waste Treatment Unit (IWTU) Input Coal Analyses and Off-Gass Filter (OGF) Content Analyses

A full engineering scale Fluidized Bed Steam Reformer (FBSR) system is being used at the Idaho Nuclear Technology and Engineering Center (INTEC) to stabilize acidic Low Activity Waste (LAW) known as Sodium Bearing Waste (SBW). The INTEC facility, known as the Integrated Waste Treatment Unit (IWTU), underwent an Operational Readiness Review (ORR) and a Technology Readiness Assessment (TRA) in March 2014. The IWTU began non-radioactive simulant processing in late 2014 and by January, 2015 ; the IWTU had processed 62,000 gallons of simulant. The facility is currently in a planned outage for inspection of the equipment and will resume processing simulated waste feed before commencing to process 900,000 gallons of radioactive SBW. The SBW acidic waste will be made into a granular FBSR product (carbonate based) for disposal in the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microwave Cast Material Examination

Microwave-cast material dating from the latest prototype development period and subsequent TRL 7 advancement testing was sent to LANL for additional characterization. The initial characterization described here is considered a supplement to and verification of that performed by Y-12 during the Technology Readiness Assessment process. The carbon chemistry results from Y-12 and LANL regarding early prototype microwave cast test object (CTO) and cylinder castings match within expectations. Only one fully intact as-cast CTO was available for examination in which carbon chemistry does not appear to vary spatially, at least at relatively low carbon levels (hypoeutectic). The large as-cast grain size leads to relatively poor grain size statistics and similar difficulties were encountered during the TRA. Small, isolated gas pores were observed in four of the five metallographic samples in prototype CTO casting PT-01. Finally, the next phase of characterization work, which focuses on corrosion behavior, has started and is described briefly.

36 MATERIALS SCIENCE↗

Coal liquefaction processes and development requirements analysis for synthetic fuels production

Focus of the study is on: (1) developing a technical and programmatic data base on direct and indirect liquefaction processes which have potential for commercialization during the 1980's and beyond, and (2) performing analyses to assess technology readiness and development trends, development requirements, commercial plant costs, and projected synthetic fuel costs. Numerous data sources and references were used as the basis for the analysis results and information presented.

Source record↗

X-57 Systems Engineering Lessons Learned

The X-57 Maxwell is an electric aircraft based on a 4-passenger, twin engine Tecnam P2006T General Aviation aircraft. The X-57 project originally envisioned a straightforward integration of commercial-off-the-shelf hardware components and software into a novel configuration to demonstrate the aerodynamic and performance benefits of Distributed Electric Propulsion (DEP). The project was initially started with a high-risk venture capitalist approach under NASA’s Convergent Aeronautics Solutions (CAS) project, which led to an initial philosophy of Project Management “light” (which was then interpreted as Systems Engineering (SE) “light”). As the project matured, it was forced to transition to one with increasing SE-rigor as the project scope changed, hardware and software deficiencies were found, and the team realized the magnitude of the technical and integration challenges. In hindsight, these technical challenges came in part from an overly optimistic technology readiness assessment (TRA) at the beginning of the project, which resulted in the project assuming that little to no subsystem development would be required. The project’s approach to systems engineering evolved throughout three separate informal phases of the project as it underwent two key transitions as a result of the team wrestling with the technical challenges and resultant changing project scope. This paper discusses the assumptions, approaches, and challenges encountered from a Systems Engineering standpoint in each of the three informal phases of the X-57 project. This paper also provides recommendations on how future projects can apply Systems Engineering best practices upfront along with a realistic TRA to aid projects that find themselves with similar challenges.

Systems Engineering↗

Successful Deployment of System for the Storage and Retrieval of Spent/Used Nuclear Fuel from Hanford K-West Fuel Storage Basin-13051

In 2012, a system was deployed to remove, transport, and interim store chemically reactive and highly radioactive sludge material from the Hanford Site's 105-K West Fuel Storage Basin that will be managed as spent/used nuclear fuel. The Knockout Pot (KOP) sludge in the 105-K West Basin was a legacy issue resulting from the spent nuclear fuel (SNF) washing process applied to 2200 metric tons of highly degraded fuel elements following long-term underwater storage. The washing process removed uranium metal and other non-uranium constituents that could pass through a screen with 0.25-inch openings; larger pieces are, by definition, SNF or fuel scrap. When originally retrieved, KOP sludge contained pieces of degraded uranium fuel ranging from 600 microns (μm) to 6350 μm mixed with inert material such as aluminum hydroxide, aluminum wire, and graphite in the same size range. In 2011, a system was developed, tested, successfully deployed and operated to pre-treat KOP sludge as part of 105-K West Basin cleanup. The pretreatment process successfully removed the vast majority of inert material from the KOP sludge stream and reduced the remaining volume of material by approximately 65 percent, down to approximately 50 liters of material requiring management as used fuel. The removal of inert material resulted in significant waste minimization and project cost savings because of the reduced number of transportation/storage containers and improvement in worker safety. The improvement in worker safety is a result of shorter operating times and reduced number of remote handled shipments to the site fuel storage facility. Additionally in 2011, technology development, final design, and cold testing was completed on the system to be used in processing and packaging the remaining KOP material for removal from the basin in much the same manner spent fuel was removed. This system was deployed and successfully operated from June through September 2012, to remove and package the last of the SNF fragments from the 105-K West Basin, ending the long and complex history of the KOP sludge materials. The planning and execution of this project demonstrated how the graded application of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets[1], DOE-STD-1189-2008, Integration of Safety into the Design Process[2], and DOE G 413.3-4, U.S. Department of Energy Technology Readiness Assessment Guide[3], can positively affect the outcome of project implementation in the DOE Complex. Provided herein are relevant information, ideas, and tools for use by other projects facing similar issues in managing high risk waste streams in a complex regulatory environment. Positive aspects are also provided of appropriate time spent in detailed planning, design, and testing in non-hazardous environments to reduce project risks in both cost and safety performance, as well as improving confidence in meeting project goals through predictable and reliable performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology and Manufacturing Readiness of Early Market Motive and Non-Motive Hydrogen Storage Technologies for Fuel Cell Applications

PNNL’s objective in this report is to provide DOE with a technology and manufacturing readiness assessment to identify hydrogen storage technologies’ maturity levels for early market motive and non-motive applications and to provide a path forward toward commercialization. PNNL’s Technology Readiness Assessment (TRA) is based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies in varying levels of development. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. The TRA report documents the process used to conduct the TRA, reports the TRL and MRL for each assessed technology and provides recommendations based on the findings.

08 HYDROGEN↗

Definition of Technology Readiness Levels for Transmutation Fuel Development

To quantitatively assess the maturity of a given technology, the Technology Readiness Level (TRL) process is used. The TRL process has been developed and successfully used by the Department of Defense (DOD) for development and deployment of new technology and systems for defense applications. In addition, NASA has also successfully used the TRL process to develop and deploy new systems for space applications. Transmutation fuel development is a critical technology needed for closing the nuclear fuel cycle. Because the deployment of a new nuclear fuel forms requires a lengthy and expensive research, development, and demonstration program, applying the TRL concept to the transmutation fuel development program is very useful as a management and tracking tool. This report provides definition of the technology readiness level assessment process as defined for use in assessing nuclear fuel technology development for the Transuranic Fuel Development Campaign.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization and assessment of novel bulk storage technologies : a study for the DOE Energy Storage Systems program.

This paper reports the results of a high-level study to assess the technological readiness and technical and economic feasibility of 17 novel bulk energy storage technologies. The novel technologies assessed were variations of either pumped storage hydropower (PSH) or compressed air energy storage (CAES). The report also identifies major technological gaps and barriers to the commercialization of each technology. Recommendations as to where future R&D efforts for the various technologies are also provided based on each technology's technological readiness and the expected time to commercialization (short, medium, or long term). The U.S. Department of Energy (DOE) commissioned this assessment of novel concepts in large-scale energy storage to aid in future program planning of its Energy Storage Program. The intent of the study is to determine if any new but still unproven bulk energy storage concepts merit government support to investigate their technical and economic feasibility or to speed their commercialization. The study focuses on compressed air energy storage (CAES) and pumped storage hydropower (PSH). It identifies relevant applications for bulk storage, defines the associated technical requirements, characterizes and assesses the feasibility of the proposed new concepts to address these requirements, identifies gaps and barriers, and recommends the type of government support and research and development (R&D) needed to accelerate the commercialization of these technologies.

13 HYDRO ENERGY↗

Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

Cannon, I.↗

Mach-Zehnder recording systems for pulsed power diagnostics

Fiber-optic transmission and recording systems, based on Mach-Zehnder modulators, have been developed and installed at the National Ignition Facility (NIF), and are being developed for other pulsed-power facilities such as the Z accelerator at Sandia, with different requirements. We present the design and performance characteristics for the mature analog links, based on the system developed for the Gamma Reaction History diagnostic at the OMEGA laser and at NIF. For a single detector channel, two Mach-Zehnders are used to provide high dynamic range at the full recording bandwidth with no gaps in the coverage. We present laboratory and shot data to estimate upper limits on the radiation effects as they impact recorded data quality. Finally, we will assess the technology readiness level for mature and developing implementations of Mach-Zehnder links for these environments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Life-Cycle and Techno-Economic Assessment of Early-Stage Carbon Capture and Utilization Technologies—A Discussion of Current Challenges and Best Practices

The mitigation of climate change requires research, development, and deployment of new technologies that are not only economically viable but also environmentally benign. Systematic and continuous technology assessment from early technology maturity onwards allows assessment practitioners to identify economic and environmental characteristics. With this information, decision-makers can focus time and resources on the most promising technologies. A broad toolset for technology assessment exists—stretching from the well-established life cycle assessment (LCA) methodology to more loosely defined techno-economic analysis (TEA) methods and the increasingly popular principles of technology maturity assessment such as the concept of technology readiness levels (TRL). However, current technology assessment practice faces various challenges at early stages, resulting in a potential mismatch of study results and stakeholders' needs and an escalation of assessment effort. In this practice review, we outline current challenges in the interplay of LCA, TEA, and TRL and present best practices for assessing early-stage climate change mitigation technologies in the field of carbon capture and utilization (CCU). The findings help practitioners systematically identify the TRL of a technology and adapt technology assessment methodologies accordingly. We highlight the methodological challenges for practitioners when adapting the goal and scope, identifying benchmark technologies, creating a comprehensive inventory, comparing early stage to commercial stage, ensuring clarity of recommendations for decision-making under high uncertainty, and streamlining conventional LCA and TEA assessment approaches and provide actionable recommendations. Overall, this work contributes to identifying promising technologies faster and more systematically, accelerating the development of new technologies for climate change mitigation and beyond.

54 ENVIRONMENTAL SCIENCES↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗

Developing Technology Performance Level Assessments for Early-Stage Wave Energy Converter Technologies: Preprint

The advantage of using Technology Performance Level (TPL) in conjunction with Technology Readiness Level (TRL) assessments in guiding technology development trajectories to successful outcomes in less time, at less overall cost, and with less encountered risk has been well articulated in the literature. In partnership with industry and international collaborators, a TPL assessment methodology for grid-connected applications has been developed through the application of the systems engineering approach. Metrics under seven different categories have been developed, weighted based on their relative relevance, and combined to yield a composite score. The methodology has been implemented in a spreadsheet tool plus a web application specifically aimed at assessing early stage (TRL 1-3) concepts. The target use cases are (a) technology developers improving their design, to find fatal flaws early, to get feedback on current design, to identify areas of improvement that will yield the highest return on investment, (b) reviewers assessing technologies in competitions or for making funding decisions, (c) investor or project developer doing due diligence, (d) policy makers landscaping the technology domain for formulating R&D strategy. The methodology and the tools are undergoing continuous improvement based on the experience and lessons learnt from applying it to internal and external marine energy technology development projects. The methodology is also being adapted for assessing WECs servicing markets outside the continental grid - broadly categorized as Powering the Blue Economy (PBE) applications. Such applications have vastly different functional requirements entailing a modification of the methodology to account for their higher risk tolerance, reduced price sensitivities, lower power needs, different permitting protocols, etc. This paper presents the latest status of the TPL assessment methodology and tools, describes its adaptation to select PBE markets, and explores its extension to other domains where it could provide a comprehensive and holistic measure of a nascent or disruptive technology's technoeconomic performance potential.

metrics↗