Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Stochastic Economic Dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Development of Multiresolution Capabilities for the Holistic Energy Resource Optimization Network (HERON) tool A progress update

INL researchers work on technoeconomic analyses for integrated energy systems (IES) using the Framework for Optimization of ResourCes and Economics (FORCE). Within FORCE, researchers use the Holistic Energy Resource Optimization Network (HERON) tool to conduct optimization of grid portfolios under uncertain market conditions. These optimizations determine optimal capacities for all IES components and strategies for resource dispatch which maximize some economic metric (e.g., net present value). Resource dispatch occurs on finer timescales (typically hours) and thus are asked to respond to a given time series (e.g. hourly load demand profiles for a grid, or pre-determined electricity prices). Volatile and complex bidding dynamics as well as poorly forecasted weather events within deregulated markets add uncertainty to the time series; FORCE can address this uncertainty by training a reduced order model on historical time series and generate unique synthetic time series which represent individual scenarios or realizations of the market. The IES configuration can be simulated under these different sampled realizations and a stochastic optimization is conducted which optimizes the expected value of the desired economic metric. The training of a synthetic time series generator is limited by the chosen time resolution; dynamics can occur on different time scales. Seasonal demand trends can dominate faster dynamical events (such as power outages from certain sectors or severe weather events) which might not get captured correctly by the trained model. In this report, we investigate different ways of addressing the training and generation of time series on multiple time scales using three main algorithms: wavelet decomposition, dynamic mode decomposition, and generative adversarial networks for time series. We demonstrate a time series analysis that yields information on not just the frequency space but also temporal space: where a fast Fourier transform can provide what frequencies dominate, the new algorithms can provide when the frequencies dominate as well. These analyses can help improve IES optimization by allowing researchers to couple simulations at different timescales when it is most needed - seasonal, day-ahead, and real time optimization - with greater computational efficiency. Future work will include implementation of a subset of the proposed algorithms into the FORCE toolset and application of these analyses into multiple timescale optimization.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

EVALUATING THE COMPETITIVENESS OF ENERGY STORAGE FOR MITIGATING THE STOCHASTIC, VARIABLE ATTRIBUTES OF RENEWABLES ON THE GRID

Energy storage has recently attracted significant interest as an enabling technology for integrating stochastic, variable renewable power into the electric grid. To meet the renewable portfolio standards targets imposed by 29 U.S. states and the District of Columbia, electricity production from wind technology has increased significantly. At the same time, wind turbines, like many renewables, produce power in a manner that is stochastic, variable, and non-dispatchable. These attributes introduce challenges to generation scheduling and the provision of ancillary services. To study the impacts of the stochastic variability of wind on regional grid operation and the role that energy storage could play to mitigate these impacts, Pacific Northwest National Laboratory (PNNL) has developed a series of linked, complex techno-economic-environmental models to address these key questions: a. What are the future expanded balancing requirements necessary to accommodate enhanced wind turbine capacity, so as to meet the renewable portfolio standards in 2020? Specific analyses are conducted for the four North American Electric Reliability Corporation (NERC) western sub-regions. b. What are the most cost-effective technological solutions for providing either fast ramping generation or energy storage to serve these balancing requirements? PNNL applied a stochastic approach to assess the future, expanded balancing requirements for the four western sub-regions with high wind penetration in 2020. The estimated balancing requirements are quantified for four sub-regions: Arizona-New Mexico-Nevada (AZNMNV), California-Mexico (CAMC), Northwest Power Pool (NWPP), and Rocky Mountain Power Pool (RMPP). Model results indicate that the new balancing requirements will span a spectrum of frequencies, from minute-to-minute variability (intra-hour balancing) to those indicating cycles over several hours (inter-hour balancing). The sharp ramp rates in the intra-hour balancing are of significant concern to grid operators. Consequently, this study focuses on analyzing the intra-hour balancing needs. A detailed, life-cycle cost (LCC) modeling effort was used to assess the cost competitiveness of different technologies to address the future, intra-hour balancing requirements. Technological solutions considered include combustion turbines, sodium sulfur (NaS) batteries, lithium ion (Li-ion) batteries, pumped-hydro energy storage (PHES), compressed air energy storage (CAES), flywheels, redox flow batteries, and demand response (DR). Hybrid concepts are also evaluated. For each technology, distinct power and energy capacity requirements are estimated. LCC results indicate that the most cost competitive technologies include electrochemical energy storage and Na-S and Li-Ion. This finding is consistent among the four sub-regions and is generally applicable to other regions.

arbitrage↗

Computational Math Problems for a Clean Energy Future

Cutting edge computational mathematics are ubiquitous in renewable energy research. Problems in resilient and reliable electric grid operations, infrastructure planning, wind farm yaw control, and more demand sophisticated and scalable computational tools that enable the transition of renewable energy technologies from proof of concept to deployment into our energy system. The mission of the Computational Science Center at NREL is to lead the lab's efforts to solve energy challenges using high-performance computing (HPC), computational science, applied mathematics, scientific data management, visualization, and informatics. In this poster, we provide a short overview of three areas of computational mathematics research at NREL: wind power scenario generation for stochastic grid operations and infrastructure planning, improved rational function approximations for electromagnetic transients codes, and wind farm yaw control using a combination of the Alternating Direction Method of Multipliers (ADMM) and reinforcement learning (RL). Increasing penetrations of renewable energy into power grids motivate the investigation of new approaches to characterizing uncertainty for five-minute economic dispatch problems. Similarly, as the penetration of distributed energy resources on power grids increases, it becomes important to revisit our methods of modelling transient phenomena, i.e. electromagnetic transients programs. Finally, the combination of ADMM and RL for wind farm yaw control presented here can potentially increase the efficiency of the deployed distributed controllers by orders of magnitude.

ADMM↗

STOCHASTIC OPTIMAL POWER FLOW FOR REAL-TIME MANAGEMENT OF DISTRIBUTED RENEWABLE GENERATION AND DEMAND RESPONSE (Final Report)

To meet the grand challenge of a sustainable energy future, there has been a surge of interest in renewable energy. Today, the uncertainty associated with renewable resources is handled by using operating reserves. The high penetration of renewable resources, however, introduces difficult-to-control dynamics and challenges for power system operation. Decision support tools are necessary at the bulk system operational level to recognize and efficiently utilize renewable resources and distributed demand response products in concert with traditional grid resources. It is envisaged that responsive load can potentially have very significant cost advantages over either spinning or non-spinning ramping reserve. Critical decisions are made during hour(s)-ahead and real-time power system operation regarding the commitment and dispatch of generators to ensure power delivery is both reliable and economic. These decisions are typically made by a security constrained optimal flow, which determines future generator commitments, dispatches, and ensures adequate reserves are available in the event of a contingency (unexpected outage) or if future system conditions deviate from forecasts. However, security has been always based on a pre-specified subset of contingency constraints whose enforcement does not guarantee security under all possible future possibilities while also giving little or no weight to the likelihood of each contingent event or the severity of its consequences. Existing tools, which are based exclusively on deterministic optimization models, do not yield optimal operational decisions to address these new challenges, in terms of both reliability and cost-effectiveness. This project has focused on developing a stochastic optimal power flow (SOPF) framework, which integrates renewable resource uncertainty, load uncertainty, distributed storage (DS), demand response (DR) products, in a holistic manner to address the uncertainty associated with ever-increasing renewable resources, along with the inclusion of distributed demand response products in future power systems. A proof-of-concept problem was created using the Pennsylvania-Jersey-Maryland (PJM) power system network. Synthetic wind generation was added to the system to simulate 50% wind penetration. A 1-hour test of SOPF operation indicated more than 6% operational cost savings. The project continued by adding the Midwestern Independent System Operator (MISO) as a partner, with focus shifting from SOPF to Stochastic Look-Ahead Unit Commitment (SLAC). Unlike PJM, MISO is faced with significant renewable energy resources within its footprint and is challenged with substantial uncertainty in its operations. The SLAC distinguishes itself from existing tools that operators use. At best, today’s tools solve two to three cases independently, where one or two system parameters, such as forecasted load level (e.g., a low, base, and high forecast), are varied and the resulting scenarios are analyzed independently. The stochastic-based optimization of SLAC leverages statistical information from an ensemble of potential operational scenarios and their respective likelihood. The SLAC output can be translated into valuable information to the operator such as suggested commitments, optimal scheduling and dispatch of resources, reserve requirements at both locational and zonal resolutions, ramping availability and requirements, availability of demand response including operational guidance concerning the near-term and real-time coordination between distributed energy resources, and utilization of distributed storage resources. The developed SOPF/SLAC tool, a stand-alone tool compatible with existing EMSs, will provide system operators with unprecedented visibility, flexibility and predictability to these resources and operational guidance concerning the real-time coordination between DERs and DR/DS products. The game changing and practical impact of this disruptive technology will be dramatic and will usher in a new era in the electric power industry, wherein green energy concepts are fully embraced, and electric power costs are lowered throughout the nation.

42 ENGINEERING↗

2022 FORCE Development Status Update

Integrated energy systems (IESs) are essential for decarbonizing electricity and industrial sectors and fully exploiting these systems requires sophisticated planning, scheduling, and dispatching tools to maximize their socio-economic benefits. The Framework for Optimization of Resources and Economics (FORCE) is a tool suite developed at Idaho National Laboratory and is dedicated to making robust analyses of IESs easier for analysts and researchers. The report summarizes the improvements and updates to FORCE during the most recent development cycle. Particularly, we demonstrate improvements to user accessibility, stochastic time-series analysis, and vertical integration with the software tools provided in FORCE.

97 MATHEMATICS AND COMPUTING↗

Acquire and Test IDAES Framework Components

The cooperation under the Grid Modernization Initiative and the Applied Energy Tri-Laboratory umbrellas requires mutual understanding of capabilities and a common effort to identify gaps existing in the available computational modeling and analysis tools. In this work, we report acquisition and testing of the National Energy Technology Laboratory’s Institute for the Design of Advanced Energy Systems (IDAES) framework, particularly including both electric power systems production cost model simulator Prescient as well as system optimization IDAES itself. Further, we consider the methods in which developments in Prescient and IDAES for grid-energy simulation and optimization may be included in the Framework for Optimization of ResourCes and Economics (FORCE) ecosystem that has been under collaborative development by Idaho National Laboratory, Argonne National Laboratory, and Oak Ridge National Laboratory. We propose two integration methods to introduce Prescient and IDAES into existing FORCE automated workflows. One integration involves using Prescient as a market reduced-order model and IDAES models similar to how existing Modelica models are used. The other integration involves wrapping the Prescient-IDAES dispatch optimization process with the stochastic capacity optimization workflow in FORCE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Thermal Energy Storage Model Development within the Integrated Energy Systems Hybrid Repository

This publication details newly created energy storage models developed within the HYBRID Modelica repository as part of the Department of Energy Office of Nuclear Energy (DOE-NE) Integrated Energy Systems (IES) program, led by Idaho National Laboratory (INL). Model development to-date includes creation of dynamic systems-level models of concrete, latent heat, and packed-bed thermocline energy storage technologies for deployment in the IES-based HYBRID repository. Models are developed using the latest publicly available data and incorporate the possibility of control strategy inclusion for use with the existing IES modeling, analysis, and optimization toolset. Simulations showcase the abilities of each technology to cyclically charge and discharge when exposed to time-varying boundary conditions. In addition, low-level surrogate models for some of the thermal energy storage technologies were created using Python. These lower order Python files are much cheaper to run (i.e., computationally faster) and thus operate well when incorporated within the stochastic optimization problems run for the IES program. Moreover, economic data was collected for use within the INL-developed Framework for Optimization of ResourCes and Economics (FORCE). This information is incorporated within the FORCE platform. This work has resulted in creation of systems-level models for concrete, latent heat, and thermocline thermal energy storage systems with associated control systems. Now that these models are available, they can be utilized within different integrated energy park concepts to understand optimal system operation, control, and dispatching. Moreover, given the generic nature of the models, industrial partner technologies (e.g., Storworks Power, EnergyNest) can be quickly added to the repository using the existing models as a basis. Additional dynamic models for thermal energy storage concepts can be developed and added to the HYBRID repository as needed.

25 ENERGY STORAGE↗

Proactive Operations and Investment Planning via Stochastic Optimization to Enhance Power Systems Extreme Weather Resilience

We present novel stochastic optimization models to improve power systems resilience to extreme weather events. We consider proactive redispatch, transmission line hardening, and transmission line capacity increases as alternatives for mitigating expected load shed due to extreme weather. Our model is based on linearized or "DC" optimal power flow, similar to models in widespread use by independent system operators (ISOs) and regional transmission operators (RTOs). Our computational experiments indicate that proactive redispatch alone can reduce the expected load shed by as much as 25% relative to standard economic dispatch. This resiliency enhancement strategy requires no capital investments and is implementable by ISOs and RTOs solely through operational adjustments. We additionally demonstrate that transmission line hardening and increases in transmission capacity can, in limited quantities, be effective strategies to further enhance power grid resiliency, although at significant capital investment cost. We perform a cross validation analysis to demonstrate the robustness of proposed recommendations. Our proposed model can be augmented to incorporate a variety of other operational and investment resilience strategies, or combination of such strategies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Stochastic Optimization with Risk Aversion for Virtual Power Plant Operations: A Rolling Horizon Control

While the concept of aggregating and controlling renewable distributed energy resources (DERs) to provide grid services is not new, increasing policy support of DER market participation has driven research and development in algorithms to pool DERs for economically viable market participation. Sandia National Laboratories recently undertook a three-year research program to create the components of a real-world virtual power plant (VPP) that can simultaneously participate in multiple markets. Our research extends current state-of-the-art rolling horizon control through the application of stochastic programming with risk aversion at various time resolutions. Our rolling horizon control consists of (1) day-ahead optimization to produce an hourly aggregate schedule for the VPP operator and (2) sub-hourly optimization for real-time dispatch of each VPP subresource. Both optimization routines leverage a two-stage stochastic program (SP) with risk aversion, and integrate the most up-to-date forecasts to generate probabilistic scenarios in real operating time. Our results demonstrate the benefits to the VPP operator of constructing a stochastic solution regardless of the weather. In more extreme weather, applying risk optimization strategies can dramatically increase the financial viability of the VPP. As a result, the methodologies presented here can be further tailored for optimal control of any VPP asset fleet and its operational requirements.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Energy Storage Sizing and Operation of an Integrated Utility-Scale PV+ESS Power Plant

Integration of an energy storage system (ESS) into a large-scale grid-connected photovoltaic (PV) power plant is highly desirable to improve performance of the system and overcome the stochastic nature of PV power generation. Algorithms to size ESS within an integrated PV and ESS ( PV+ESS) power plant, conventionally, require a large number of high-resolution samples of PV generation. These algorithms are computationally expensive. In this paper, a two-day optimization algorithm that utilizes n-step constant power output dispatch every day from the PV+ESS power plant is proposed to size the ESS. Additionally, an n-step power dispatch every day through the one-year timeframe based optimization of the size of ESS is also performed. The proposed methods are computationally cheaper and provide acceptable accuracy with respect to the conventional sizing methods. The economics identified from the proposed methods are compared with the typical day-ahead hourly dispatch-based power production from the PV+ESS power plant. This comparison has shown similar economic performance showcasing the accuracy of the proposed methods in sizing the ESS. It also shows the potential for operating PV+ESS power plant in n-step constant power generation mode.

Xia, Qian↗

Report on the Economic Optimization of a Demonstration Case for a Static N-R HES Configuration using RAVEN

The synthetic time history generation algorithm in RAVEN has been extensively tested and used to perform qualitative assessments of the statistical characteristics of the net demand vs. demand for different values of the penetration of wind generation. Reported results highlight the need to consider the impact of variable renewable on the electricity net demand profile, due to the increase in its volatility with increased wind penetration. This analysis provides a strong foundation for the modeling and simulation needs expressed under the "Nuclear-Renewable Hybrid Energy Systems" (NRHES) project. Following this confirmative analysis the entire stochastic optimization framework has been tested in a demo case. The case chosen is an optimization driven by profitability for a system composed by a nuclear plant and a hydrogen production industrial process. This type of economical analysis is aimed to assess the capability of a hybrid system to penetrate the current energy market. In this sense it differs from the approach suggested under NRHES, where a cost minimization approach is suggested. This analysis is instead aimed to show the flexibility of the developed framework, e.g. for the evaluation of retrofitting projects of already existing plants. The system considered is subject to variable prices of electricity, which are simulated using the algorithm for the production of synthetic time histories. The physical system is considered without inertia so that it can be replaced by dispatching rules based on the highest marginal profit. Two optimization problems have been considered, for the first the size of the nuclear power plant is fixed and the optimization variable is the capacity of the hydrogen production plant. For the second, both plant sizes are optimization parameters while the overall capital expenditure is caped. The economical figures of merits considered are the Internal Rate of Return (IRR) and/or Profitability Index (PI) for the first one (since no cap is placed on the investment size) and Net Present Value (NPV) and/or IRR for the second one where the capital expenditure is constrained. Economic input data concerning capital costs, size-scaling factors, and operational costs for both plants have been collected from literature in order to achieve a simulation as realistic as possible. More work will be needed to obtain even more realistic numbers, possibly from industrial partners, and considering market elasticity for the hydrogen market. In order to perform the optimization of the cases described above, the economical external RAVEN module (CashFlow) for financial analysis has been improved in flexibility and generality. Some improvements have also been made to the optimization algorithm for a more efficient treatment of the boundary constrains. In conclusion three major results have been obtained: a) collection of the economical parameters characterizing the nuclear power plants and hydrogen production plants, b) extension of the financial analysis module (CashFlow) to drive the calculation of all needed cash flow streams and c) the testing of the full framework in a nearly final configuration.

97 MATHEMATICS AND COMPUTING↗

Data centers as dispatchable loads to harness stranded power

Here, we analyze how traditional data center placement and optimal placement of dispatchable data centers affect power grid efficiency. We use detailed network models, stochastic optimization formulations, and diverse renewable generation scenarios to perform our analysis. Our results reveal that significant spillage and stranded power will persist in power grids as wind power levels are increased. A counter-intuitive finding is that collocating data centers with inflexible loads next to wind farms has limited impacts on renewable portfolio standard (RPS) goals because it provides limited system-level flexibility. Such an approach can, in fact, increase stranded power and fossil-fueled generation. In contrast, optimally placing data centers that are dispatchable provides system-wide flexibility, reduces stranded power, and improves efficiency. In short, optimally placed dispatchable computing loads can enable better scaling to high RPS. In our case study, we find that these dispatchable computing loads are powered to 60-80% of their requested capacity, indicating that there are significant economic incentives provided by stranded power.

97 MATHEMATICS AND COMPUTING↗

Novel stochastic methods to predict short-term solar radiation and photovoltaic power

Solar forecasting has evolved towards becoming a key component of economical realization of high penetration levels of photovoltaic (PV) systems. This paper presents two novel stochastic forecasting models for solar PV by utilizing historical measurement data to outline a short-term high-resolution probabilistic behavior of solar. First, an uncertain basis functions method is used to forecast both solar radiation and PV power. Three possible distributions are considered for the uncertain basis functions - Gaussian, Laplace, and Uniform distributions. Second, stochastic state-space models are applied to characterize the behaviors of solar radiation and PV power output. A filter-based expectation-maximization and Kalman filtering mechanism is employed to recursively estimate the system parameters and state variables. This enables the system to accurately forecast small as well as large fluctuations of the solar signals. The introduced forecasting models are suitable for real-time tertiary dispatch controllers and optimal power controllers. The PV forecasting models are tested using solar radiation and PV power measurement data collected from a 13.5 kW PV panel installed on the rooftop of our laboratory. Furthermore, the results are compared with standard time series forecasting mechanisms and show a substantial improvement in the forecasting accuracy of the total energy produced.

14 SOLAR ENERGY↗

Synthetic Electricity Market Data Generation and HERON Use Case Setup of Advanced Nuclear Reactors Coupled with Thermal Energy Storage Systems

This study evaluates and optimizes advanced nuclear reactors coupled with thermal energy storage (TES) systems in an Integrated Energy System (IES) architecture to enable advanced nuclear power plants (A NPP) to participate in multi-commodity markets, thus enhancing their economic competitiveness. Nuclear-TES coupling scenarios studied herein are designed attenuate the nuclear heat dynamics and defer energy delivery to a later time, enabling the nuclear reactor to continue operating at or near steady-state design conditions as usual while also enabling flexible generation. Three A-NPPs, namely, an advanced light-water reactor (A LWR), a high temperature gas-cooled reactor (HTGR) and a liquid-metal fast reactor (LMFR) were selected as the initial use cases for demonstrating the technoeconomic of thermally balanced energy storage coupling design for thermal power extraction. Each of the reactor technologies were evaluated in two different electricity markets. Stochastic optimization approach was adopted which included the evaluation of price signals from the Pennsylvania-New Jersey-Maryland (PJM) market, and Electric Reliability Council of Texas (ERCOT), using an autoregressive moving average (ARMA) model. Risk Analysis Virtual Environment (RAVEN) tool and its dispatch optimization plugin, the Holistic Energy Resource Optimization Network (HERON), were used to perform dispatch and capacity optimization, using the price data provided by the ARMA models. The results from the Nuclear-TES use cases will be used to design and characterize dynamic integrated system behavior and feedback.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.

17 WIND ENERGY↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Testing of Strategies for the Acceleration of the Cost Optimization

The general problem addressed in the Nuclear-Renewable Hybrid Energy System (N-R HES) project is finding the optimum economical dispatch (ED) and capacity planning solutions for the hybrid energy systems. In the present test-problem configuration, the N-R HES unit is composed of three electrical power-generating components, i.e. the Balance of Plant (BOP), the Secondary Energy Source (SES), and the Energy Storage (ES). In addition, there is an Industrial Process (IP), which is devoted to hydrogen generation. At this preliminary stage, the goal is to find the power outputs of each one of the N-R HES unit components (BOP, SES, ES) and the IP hydrogen production level that maximizes the unit profit by simultaneously satisfying individual component operational constraints. The optimization problem is meant to be solved in the Risk Analysis Virtual Environment (RAVEN) framework. The dynamic response of the N-R HES unit components is simulated by using dedicated object-oriented models written in the Modelica modeling language. Though this code coupling provides for very accurate predictions, the ensuing optimization problem is characterized by a very large number of solution variables. To ease the computational burden and to improve the path to a converged solution, a method to better estimate the initial guess for the optimization problem solution was developed. The proposed approach led to the definition of a suitable Monte Carlo-based optimization algorithm (called the preconditioner), which provides an initial guess for the optimal N-R HES power dispatch and the optimal installed capacity for each one of the unit components. The preconditioner samples a set of stochastic power scenarios for each one of the N-R HES unit components, and then for each of them the corresponding value of a suitably defined cost function is evaluated. After having simulated a sufficient number of power histories, the configuration which ensures the highest profit is selected as the optimal one. The component physical dynamics are represented through suitable ramp constraints, which considerably simplify the numerical solving. In order to test the capabilities of the proposed approach, in the present report, the dispatch problem only is tackled, i.e. a reference unit configuration is assumed, and each one of the N-R HES unit components is assumed to have a fixed installed capacity. As for the next steps, the main improvement will concern the operation strategy of the ES facility. In particular, in order to describe a more realistic battery commitment strategy, the ES operation will be regulated according to the electricity price forecasts.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗