A Comprehensive Reliability Methodology for Assessing Risk of Reusing Failed Hardware Without Corrective Actions with and Without Redundancy

This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.

Putcha, Chandra S.↗

Reliability Analysis for AFTI-F16 SRFCS Using ASSIST and SURE

This paper reports the results of a study on reliability analysis of an AFTI-16 Self-Repairing Flight Control System (SRFCS) using software tools SURE (Semi-Markov Unreliability Range Evaluator and ASSIST (Abstract Semi-Markov Specification Interface to the SURE Tool). The purpose of the study is to investigate the potential utility of the software tools in the ongoing effort of the NASA Aviation Safety Program, where the class of systems must be extended beyond the originally intended serving class of electronic digital processors. The study concludes that SURE and ASSIST are applicable to reliability, analysis of flight control systems. They are especially efficient for sensitivity analysis that quantifies the dependence of system reliability on model parameters. The study also confirms an earlier finding on the dominant role of a parameter called a failure coverage. The paper will remark on issues related to the improvement of coverage and the optimization of redundancy level.

Wu, N. Eva↗

NASA trend analysis procedures

This publication is primarily intended for use by NASA personnel engaged in managing or implementing trend analysis programs. 'Trend analysis' refers to the observation of current activity in the context of the past in order to infer the expected level of future activity. NASA trend analysis was divided into 5 categories: problem, performance, supportability, programmatic, and reliability. Problem trend analysis uncovers multiple occurrences of historical hardware or software problems or failures in order to focus future corrective action. Performance trend analysis observes changing levels of real-time or historical flight vehicle performance parameters such as temperatures, pressures, and flow rates as compared to specification or 'safe' limits. Supportability trend analysis assesses the adequacy of the spaceflight logistics system; example indicators are repair-turn-around time and parts stockage levels. Programmatic trend analysis uses quantitative indicators to evaluate the 'health' of NASA programs of all types. Finally, reliability trend analysis attempts to evaluate the growth of system reliability based on a decreasing rate of occurrence of hardware problems over time. Procedures for conducting all five types of trend analysis are provided in this publication, prepared through the joint efforts of the NASA Trend Analysis Working Group.

Source record↗

Numerical aerodynamic simulation facility. Preliminary study extension. Executive summary

An optimized functional design of key elements of the Numerical Aerodynamic Simulation Facility was investigated. The following tasks were performed and are discussed: (1) develop, optimize, and describe the functional description of the custom hardware; (2) delineate trade-off areas between performance, reliability, availability, serviceability, and programmability; (3) develop metrics and models for validation of the candidate system's performance; (4) conduct a functional simulation of the system design; (5) perform a reliability analysis of the system design; and (6) develop the software specifications to include a user level high level programming language, a correspondence between the programming language and instruction set, and outline the operating system requirements.

Source record↗

Evaluation methodologies for an advanced information processing system

The system concept and requirements for an Advanced Information Processing System (AIPS) are briefly described, but the emphasis of this paper is on the evaluation methodologies being developed and utilized in the AIPS program. The evaluation tasks include hardware reliability, maintainability and availability, software reliability, performance, and performability. Hardware RMA and software reliability are addressed with Markov modeling techniques. The performance analysis for AIPS is based on queueing theory. Performability is a measure of merit which combines system reliability and performance measures. The probability laws of the performance measures are obtained from the Markov reliability models. Scalar functions of this law such as the mean and variance provide measures of merit in the AIPS performability evaluations.

Schabowsky, R. S., Jr.↗

Tutorial: Advanced fault tree applications using HARP

Reliability analysis of fault tolerant computer systems for critical applications is complicated by several factors. These modeling difficulties are discussed and dynamic fault tree modeling techniques for handling them are described and demonstrated. Several advanced fault tolerant computer systems are described, and fault tree models for their analysis are presented. HARP (Hybrid Automated Reliability Predictor) is a software package developed at Duke University and NASA Langley Research Center that is capable of solving the fault tree models presented.

Dugan, Joanne Bechta↗

Reliably Detectable Flaw Size for NDE Methods that Use Calibration

Probability of detection (POD) analysis is used in assessing reliably detectable flaw size in nondestructive evaluation (NDE). MIL-HDBK-1823 and associated mh1823 POD software gives most common methods of POD analysis. In this paper, POD analysis is applied to an NDE method, such as eddy current testing, where calibration is used. NDE calibration standards have known size artificial flaws such as electro-discharge machined (EDM) notches and flat bottom hole (FBH) reflectors which are used to set instrument sensitivity for detection of real flaws. Real flaws such as cracks and crack-like flaws are desired to be detected using these NDE methods. A reliably detectable crack size is required for safe life analysis of fracture critical parts. Therefore, it is important to correlate signal responses from real flaws with signal responses form artificial flaws used in calibration process to determine reliably detectable flaw size.

Koshti, Ajay M.↗

Software Released by LEWICE 2.0 Ice Accretion Software Development Project

Computational icing simulation methods are making the transition from the realm of research to commonplace use in design and certification. As such, standards of software management, design, validation, and documentation must be adjusted to accommodate the increased expectations of the user community with respect to accuracy, reliability, capability, and usability. With this in mind, in collaboration with Glenn's Engineering Design and Analysis Division, the Icing Branch of the NASA Glenn Research Center at Lewis Field began a software improvement project focused on the two-dimensional ice accretion simulation tool LEWICE. This project is serving as an introduction to the concepts of software management and is intended to serve as a pilot project for future icing simulation code development. The LEWICE 2.0 Software Development Project consisted of two major elements: software management and software validation. The software management element consisted of identifying features of well-designed and well-managed software that are appropriate for an analytical prediction tool such as LEWICE and applying them to a revised version of the code. This element included tasks such as identification of software requirements, development and implementation of coding standards, and implementation of software revision control practices. With the application of these techniques, the LEWICE ice accretion code became a more stable and reliable software product. In addition, the lessons learned about software development and maintenance can be factored into future software projects at the outset. The software validation activity was an integral part of our effort to make LEWICE a more accurate and reliable analysis tool. Because of the efforts taken to extensively validate this software, LEWICE 2.0 is more robust than previous releases and can reproduce results accurately across several computing platforms. It also differs from previous versions in the extensive quantitative comparisons of its results with a data base of ice shapes that were generated in Glenn's Icing Research Tunnel. The results of the shape comparisons were analyzed to determine the range of meteorological conditions under which LEWICE 2.0 is within the repeatability found for ice shapes obtained from experiments. These comparisons show that the average variation of LEWICE 2.0 from experimental data is 7.2 percent, whereas the overall variability of the experimental data is 2.5 percent. The LEWICE 2.0 Software Development Project resulted in the release, at the recent Icing Branch LEWICE Workshop, of a more useful and robust analysis tool than was previously available to the icing community. The lessons learned from this project will be applied to the Icing Branch s future software development efforts.

Potapczuk, Mark G.↗

Numerical aerodynamic simulation facility. Preliminary study extension

The production of an optimized design of key elements of the candidate facility was the primary objective of this report. This was accomplished by effort in the following tasks: (1) to further develop, optimize and describe the function description of the custom hardware; (2) to delineate trade off areas between performance, reliability, availability, serviceability, and programmability; (3) to develop metrics and models for validation of the candidate systems performance; (4) to conduct a functional simulation of the system design; (5) to perform a reliability analysis of the system design; and (6) to develop the software specifications to include a user level high level programming language, a correspondence between the programming language and instruction set and outline the operation system requirements.

Source record↗

Trends in computerized structural analysis and synthesis; Proceedings of the Symposium, Washington, D.C., October 30-November 1, 1978

The subjects considered are related to future directions of structural applications and potential of new computing systems, advances and trends in data management and engineering software development, advances in applied mathematics and symbolic computing, computer-aided instruction and interactive computer graphics, nonlinear analysis, dynamic analysis and transient response, structural synthesis, structural analysis and design systems, advanced structural applications, supercomputers, numerical analysis, and trends in software systems. Attention is given to the reliability and optimality of the finite element method, computerized symbolic manipulation in structural mechanics, a standard computer graphics subroutine package, and a drag method as a finite element mesh generation scheme.

Noor, A. K.↗

Semi-Markov Unreliability Range Evaluator

Semi-Markov Unreliability Range Evaluator, SURE, computer program is software tool for analysis of reconfigurable, fault-tolerant systems. Traditional reliability analyses based on aggregates of fault-handling and fault-occurrence models. SURE provides efficient means for calculating accurate upper and lower bounds for probabilities of death states for large class of semi-Markov mathematical models, and not merely those reduced to critical-pair architectures.

Butler, Ricky W.↗

Validation of highly reliable, real-time knowledge-based systems

Knowledge-based systems have the potential to greatly increase the capabilities of future aircraft and spacecraft and to significantly reduce support manpower needed for the space station and other space missions. However, a credible validation methodology must be developed before knowledge-based systems can be used for life- or mission-critical applications. Experience with conventional software has shown that the use of good software engineering techniques and static analysis tools can greatly reduce the time needed for testing and simulation of a system. Since exhaustive testing is infeasible, reliability must be built into the software during the design and implementation phases. Unfortunately, many of the software engineering techniques and tools used for conventional software are of little use in the development of knowledge-based systems. Therefore, research at Langley is focused on developing a set of guidelines, methods, and prototype validation tools for building highly reliable, knowledge-based systems. The use of a comprehensive methodology for building highly reliable, knowledge-based systems should significantly decrease the time needed for testing and simulation. A proven record of delivering reliable systems at the beginning of the highly visible testing and simulation phases is crucial to the acceptance of knowledge-based systems in critical applications.

Johnson, Sally C.↗

Software models: A Bayesian approach to parameter estimation in the Jelenski-Moranda software reliability model

Maximum likelihood estimation procedures for the Jelinski-Moranda software reliability model often give misleading answers. A reparameterization and a Bayesian analysis eliminate some of the problems incurred by MLE methods and often give better predictions on sets of real and simulated data. Practical difficulties in estimating the initial number of errors N and the failure rate of each error phi by the method of maximum likelihood are: N, the MLE of N, is occasionally infinite (i.e., the routines for calculating N and phi do not converge). It is shown that N is finite sub i only if the regression line of the interevent times t sub i vs. i has positive slope. A serious problem is that often N approximates n, the sample size, and sometimes N = n. Thus the MLE predicts that the program is perfect even when it is far from being so. Only when almost all failures have been removed can N and phi be trusted near the end of debugging.

Littlewood, B.↗

An attitude reorientation algorithm for the Galileo spacecraft

This paper presents an onboard closed loop attitude reorientation algorithm for a dual-spin spacecraft, Galileo. The basic concept for the design uses the despun stator as a reference and fires a sequence of fixed duration thruster pulses to precess the angular momentum vector to its commanded orientation. The error signals used to despin the stator and to perform the turn are derived from the stator error quaternion which is computed using gyro outputs. Constraints considered in the design include gyro rate saturation, plume impingement effects, system parameter variations, as well as software reliability and flexibility. The performance of the algorithm was predicted by analysis and confirmed by computer simulation results. It was concluded that a reorientation accuracy of better than 1 milliradian with a nutation angle of less than 1 degree during the turn can be achieved.

Lin, H.-S.↗

Spinoff 2005

Topics covered include: Lighting the Way for Quicker, Safer Healing; Discovering New Drugs on the Cellular Level; Hydrogen Sensors Boost Hybrids; Today s Models Losing Gas?; 3-D Highway in the Sky; Popping a Hole in High-Speed Pursuits; Monitoring Wake Vortices for More Efficient Airports; From Rockets to Racecars; All-Terrain Intelligent Robot Braves Battlefront to Save Lives; Keeping the Air Clean and Safe--An Anthrax Smoke Detector; Lightning Often Strikes Twice; Technology That's Ready and Able to Inspect Those Cables; Secure Networks for First Responders and Special Forces; Space Suit Spins; Cooking Dinner at Home--From the Office; Nanoscale Materials Make for Large-Scale Applications; NASA s Growing Commitment: The Space Garden; Bringing Thunder and Lightning Indoors; Forty-Year-Old Foam Springs Back With New Benefits; Experiments With Small Animals Rarely Go This Well; NASA, the Fisherman's Friend; Crystal-Clear Communication a Sweet-Sounding Success; Inertial Motion-Tracking Technology for Virtual 3-D; Then Why Do They Call Earth the Blue Planet?; Valiant 'Zero-Valent' Effort Restores Contaminated Grounds; Harnessing the Power of the Sun; Water and Air Measures That Make 'PureSense'; Remote Sensing for Farmers and Flood Watching; Pesticide-Free Device a Fatal Attraction for Mosquitoes Making the Most of Waste Energy Washing Away the Worries About Germs Celestial Software Scratches More Than the Surface A Search Engine That's Aware of Your Needs Fault-Detection Tool Has Companies 'Mining' Own Business; Software to Manage the Unmanageable; Tracking Electromagnetic Energy With SQUIDs; Taking the Risk Out of Risk Assessment; Satellite and Ground System Solutions at Your Fingertips; Structural Analysis Made 'NESSUSary'; Software of Seismic Proportions Promotes Enjoyable Learning; Making a Reliable Actuator Faster and More Affordable; Cost-Cutting Powdered Lubricant NASA s Radio Frequency Bolt Monitor: A Lifetime of Spinoffs Going End to End to Deliver High-Speed Data; Advanced Joining Technology: Simple, Strong, and Secure; Big Results From a Smaller Gearbox; Low-Pressure Generator Makes Cleanrooms Cleaner; and The Space Laser Business Model.

Source record↗

Development of Probabilistic Life Prediction Methodologies and Testing Strategies for MEMS and CMC's

This effort is to investigate probabilistic life prediction methodologies for ceramic matrix composites and MicroElectroMechanical Systems (MEMS) and to analyze designs that determine stochastic properties of MEMS. For CMC's this includes a brief literature survey regarding lifing methodologies. Also of interest for MEMS is the design of a proper test for the Weibull size effect in thin film (bulge test) specimens. The Weibull size effect is a consequence of a stochastic strength response predicted from the Weibull distribution. Confirming that MEMS strength is controlled by the Weibull distribution will enable the development of a probabilistic design methodology for MEMS - similar to the GRC developed CARES/Life program for bulk ceramics. A main objective of this effort is to further develop and verify the ability of the Ceramics Analysis and Reliability Evaluation of Structures/Life (CARES/Life) code to predict the time-dependent reliability of MEMS structures subjected to multiple transient loads. A second set of objectives is to determine the applicability/suitability of the CARES/Life methodology for CMC analysis, what changes would be needed to the methodology and software, and if feasible, run a demonstration problem. Also important is an evaluation of CARES/Life coupled to the ANSYS Probabilistic Design System (PDS) and the potential of coupling transient reliability analysis to the ANSYS PDS.

Jadaan, Osama↗

An Efficient Approach for the Reliability Analysis of Phased-Mission Systems with Dependent Failures

We consider the reliability analysis of phased-mission systems with common-cause failures in this paper. Phased-mission systems (PMS) are systems supporting missions characterized by multiple, consecutive, and nonoverlapping phases of operation. System components may be subject to different stresses as well as different reliability requirements throughout the course of the mission. As a result, component behavior and relationships may need to be modeled differently from phase to phase when performing a system-level reliability analysis. This consideration poses unique challenges to existing analysis methods. The challenges increase when common-cause failures (CCF) are incorporated in the model. CCF are multiple dependent component failures within a system that are a direct result of a shared root cause, such as sabotage, flood, earthquake, power outage, or human errors. It has been shown by many reliability studies that CCF tend to increase a system's joint failure probabilities and thus contribute significantly to the overall unreliability of systems subject to CCF.We propose a separable phase-modular approach to the reliability analysis of phased-mission systems with dependent common-cause failures as one way to meet the above challenges in an efficient and elegant manner. Our methodology is twofold: first, we separate the effects of CCF from the PMS analysis using the total probability theorem and the common-cause event space developed based on the elementary common-causes; next, we apply an efficient phase-modular approach to analyze the reliability of the PMS. The phase-modular approach employs both combinatorial binary decision diagram and Markov-chain solution methods as appropriate. We provide an example of a reliability analysis of a PMS with both static and dynamic phases as well as CCF as an illustration of our proposed approach. The example is based on information extracted from a Mars orbiter project. The reliability model for this orbiter considers the various phases of Launch, Cruise, Mars Orbit Insertion, and Orbit. Some of the CCF for the orbiter in this mission include environmental effects, such as micrometeoroids, human operator errors, and software errors.

reliability analysis↗

Commercialization of NESSUS: Status

A plan was initiated in 1988 to commercialize the Numerical Evaluation of Stochastic Structures Under Stress (NESSUS) probabilistic structural analysis software. The goal of the on-going commercialization effort is to begin the transfer of Probabilistic Structural Analysis Method (PSAM) developed technology into industry and to develop additional funding resources in the general area of structural reliability. The commercialization effort is summarized. The SwRI NESSUS Software System is a general purpose probabilistic finite element computer program using state of the art methods for predicting stochastic structural response due to random loads, material properties, part geometry, and boundary conditions. NESSUS can be used to assess structural reliability, to compute probability of failure, to rank the input random variables by importance, and to provide a more cost effective design than traditional methods. The goal is to develop a general probabilistic structural analysis methodology to assist in the certification of critical components in the next generation Space Shuttle Main Engine.

Thacker, Ben H.↗