Engineering Evaluation of International Low Impact Docking System Latch Hooks

The international Low Impact Docking System (iLIDS) provides a structural arrangement that allows for visiting vehicles to dock with the International Space Station (ISS) (Fig 1). The iLIDS docking units are mechanically joined together by a series of active and passive latch hooks. In order to preserve docking capability at the existing Russian docking interfaces, the iLIDS latch hooks are required to conform to the existing Russian design. The latch hooks are classified as being fail-safe. Since the latch hooks are fail-safe, the hooks are not fracture critical and a fatigue based service life assessment will satisfy the structural integrity requirements. Constant amplitude fatigue testing to failure on four sets of active/passive iLIDS latch hooks was performed at load magnitudes of 10, 11, and 12 kips. Failure analysis of the hook fatigue failures identified multi-site fatigue initiation that was effectively centered about the hook mid-plane (consistent with the 3D model results). The fatigue crack initiation distribution implies that the fatigue damage accumulation effectively results in a very low aspect ratio surface crack (which can be simulated as thru-thickness crack). Fatigue damage progression resulted in numerous close proximity fatigue crack initiation sites. It was not possible to determine if fatigue crack coalescence occurs during cyclic loading or as result of the fast fracture response. The presence of multiple fatigue crack initiation sites on different planes will result in the formation of ratchet marks as the cracks coalesce. Once the stable fatigue crack becomes unstable and the fast fracture advances across the remaining ligament and the plane stress condition at a free-surface will result in failure along a 45 deg. shear plane (slant fracture) and the resulting inclined edge is called a shear lip. The hook thickness on the plane of fatigue crack initiation is 0.787". The distance between the shear lips on this plane was on the order of 0.48" and it was effectively centered about the mid-plane of the section. The numerous ratchet marks between the shear lips on the fracture initiation plane are indicative of multiple fatigue initiation sites within this region. The distribution of the fatigue damage about the centerline of the hook is consistent with the analytical results that demonstrate peak stress/strain response at the mid-plane that decreases in the direction of the hook outer surfaces. Scanning electron microscope images of the failed sections detected fatigue crack striations in close proximity to the free surface of the hook radius. These findings were documented at three locations on the fracture surface : 1) adjacent to the left shear lip, 2) adjacent to the right shear lip, and 3) near the centerline of the section. The features of the titanium fracture surface did not allow for a determination of a critical crack size via identification of the region where the fatigue crack propagation became unstable. The fracture based service life projections where benchmarked with strain-life analyses. The strainrange response in the hook radius was defined via the correlated finite element models and the modified method of universal slopes was incorporated to define the strain-life equation for the titanium alloy. The strain-life assessment confirmed that the fracture based projections were reasonable for the loading range of interest. Based upon the analysis and component level fatigue test data a preliminary service life capability for the iLIDS active and passive hooks of 2 lifetimes is projected (includes a scatter factor of 4).

Martinez, J.↗

Owens-Illinois liquid solar collector materials assessment

From the beginning, it was noted that the baseline drawings for the liquid solar collector exhibited a distinct weakness concerning materials specification where elastomers, plastics, and foam insulation materials were utilized. A relatively small effort by a competent design organization would alleviate this deficiency. Based on results obtained from boilout and stagnation tests on the solar simulator, it was concluded that proof testing of the collector tubes prior to use helps to predict their performance for limited service life. Fracture mechanics data are desirable for predicting extended service life and establishing a minimum proof pressure level requirement. The temperature capability of this collector system was increased as the design matured and the coating efficiency improved. This higher temperature demands the use of higher temperature materials at critical locations in the collector.

Nichols, R. L.↗

Elastomer Compound Developed for High Wear Applications

The U.S. Army is currently spending 300 million dollars per year replacing rubber track pads. An experimental rubber compound has been developed which exhibits 2 to 3 times greater service life than standard production pad compounds. To improve the service life of the tank track pads various aspects of rubber chemistry were explored including polymer, curing and reinforcing systems. Compounds that exhibited superior physical properties based on laboratory data were then fabricated into tank pads and field tested. This paper will discuss the compounding studies, laboratory data and field testing that led to the high wear elastomer compound.

Crawford, D.↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 micrometers in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 micrometers or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in April 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This presentation presents relevant results of the post-test inspection for both discharge and neutralizer cathodes.

Lifetime↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 μm in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 μm or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Rohit Shastry↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 h of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for both discharge and neutralizer cathodes. Discharge keeper erosion was found to be significantly reduced from what was observed in the NEXT 2 kh wear test and NSTAR Extended Life Test, providing adequate protection of vital cathode components throughout the test with ample lifetime remaining. The area of the discharge cathode orifice plate that was exposed by the keeper orifice exhibited net erosion, leading to cathode plate material building up in the cathode-keeper gap and causing a thermally-induced electrical short observed during the test. Significant erosion of the neutralizer cathode orifice was also found and is believed to be the root cause of an observed loss in flow margin. Deposition within the neutralizer keeper orifice as well as on the downstream surface was thicker than expected, potentially resulting in a facility-induced impact on the measured flow margin from plume mode. Neutralizer keeper wall erosion on the beam side was found to be significantly lower compared to the NEXT 2 kh wear test, likely due to the reduction in beam extraction diameter of the ion optics that resulted in decreased ion impingement. Results from the post-test inspection have led to some minor thruster design improvements.

Ion engine↗

Airframe structural optimization for maximum fatigue life

A methodology is outlined for optimization of airframe structures under dynamic constraints to maximize service life of specified fatigue-critical components. For practical airframe structures, this methodology describes the development of sensitivity analysis and computational procedures for constraints on the steady-state dynamic response displacements and stresses. Strain energy consideration is used for selection of structural members for modification. Development of a design model and its relation to an analysis model, as well as ways to reduce the dimensionality of the problem via approximation concepts, are described. This methodology is demonstrated using an elastic stick model for the MH-53J helicopter to show service life improvements of the hinge fold region.

D. P. Schrage↗

Development of Test Protocols for International Space Station Particulate Filters

Air quality control on the International Space Station (ISS) is a vital requirement for maintaining a clean environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of gravitational settling. The ISS Environmental Control and Life Support System (ECLSS) uses a filtration system that has been in use for over 14 years and has proven to meet this challenge. The heart of this system is a traditional High- Efficiency Particulate Air (HEPA) filter configured to interface with the rest of the life support elements and provide effective cabin filtration. Over the years, the service life of these filters has been re-evaluated based on limited post-flight tests of returned filters and risk factors. On earth, a well designed and installed HEPA filter will last for several years, e.g. in industrial and research clean room applications. Test methods for evaluating these filters are being developed on the basis of established test protocols used by the industry and the military. This paper will discuss the test methods adopted and test results on prototypes of the ISS filters. The results will assist in establishing whether the service life can be extended for these filters. Results from unused filters that have been in storage will also be presented to ascertain the shelf life and performance deterioration, if any and determine if the shelf life may be extended.

Aerosol↗

Fatigue design procedure for the American SST prototype

For supersonic airline operations, significantly higher environmental temperature is the primary new factor affecting structural service life. Methods for incorporating the influence of temperature in detailed fatigue analyses are shown along with current test indications. Thermal effects investigated include real-time compared with short-time testing, long-time temperature exposure, and stress-temperature cycle phasing. A method is presented which allows designers and stress analyzers to check fatigue resistance of structural design details. A communicative rating system is presented which defines the relative fatigue quality of the detail so that the analyst can define cyclic-load capability of the design detail by entering constant-life charts for varying detail quality. If necessary then, this system allows the designer to determine ways to improve the fatigue quality for better life or to determine the operating stresses which will provide the required service life.

Doty, R. J.↗

The (RH+t) aging correlation. Electrical resistivity of PVB at various temperatures and relative humidities

Electrical products having organic materials functioning as pottants, encapsulants, and insulation coatings are commonly exposed to elevated conditions of temperature and humidity. In order to assess service life potential from this method of accelerated aging, it was empirically observed that service life seems proportional to an aging correlation which is the sum of temperature in degrees Celsius (t), and the relative humidity (RH) expressed in percent. Specifically, the correlation involves a plot of time-to-failure on a log scale versus the variable RH + T plotted on a linear scale. A theoretical foundation is provided for this empirically observed correlation by pointing out that the correlation actually involves a relationship between the electrical resistivity (or conductivity) of the organic material, and the variable RH + t. If time-to-failure is a result of total number of coulombs conducted through the organic material, then the correlation of resistivity versus RH + t is synonymous with the empirical correlation of time-to-failure versus RH + t.

Cuddihy, E. F.↗

Satellite altimeters after Skylab and GEOS-C - should they utilize a single transmitter or an array of pulsed amplifiers?

An attempt was made to determine if future satellite altimeters, operating at K-band, should use a single transmitter or an array of pulsed amplifiers. The two systems were compared as a function of reliability, power, service life, system requirements, and weight. Preliminary results indicate the modular system to be superior in service life and reliability although it requires more power and is substantially heavier than the single system. No concrete conclusions were reached as to which system should be used.

Greene, A. H.↗

Risk Analysis

A National Academies panel says the Hubble Space Telescope is too valuable ;or gamblingon a long-shot robotic mission to extend its service life, and urges Directly contradicting Administrator Sean O'Keefe, who killed a planned fifth shuttle servicing mission to the telescope on grounds it was too dangerous for a human crew in the post-Challenger environment, the expert committee found that upgrades to shuttle safety actually should make it less hazardous to fly to the telescope than it was before Columbia was lost. Risks of a telescope-servicing mission are only marginally greater than the planned missions to the International Space Station (ISS) O'Keefe has authorized, the panel found. After comparing those risks to the dangers inherent in trying to develop a complex space robot in the 39 months remaining in the Hubble s estimated service life, the panel opted for the human mission to save one of the major achievements of the American space program, in the words of Louis J. Lanzerotti, its chairman.

Morring, Frank, Jr.↗

Feasibility study of a discrete bearing/roller drive rotary joint for the space station

The most critical mechanism on board the proposed space station is the continously rotating joint which must accurately align the solar power units with the sun during earth orbit. The feasibility of a multiple, discrete bearing supported joint driven by a self-loading, pinch drive actuator was investigated for this application. This concept appears to offer greater protection against catastrophic jamming, less sensitivity to adverse thermal gradients, greater accessibility to inorbit servicing or replacement and greater adaptability to very large (5 m) truss members than to more conventional continuous support bearing/gear reducer joints. Analytical trade studies performed herein establish that a discrete cam roller bearing support system having eight hangers around a continuous ring would provide sufficient radial and bending stiffness to prevent any degradation in the fundamental frequencies of the solar wing structure. Furthermore, it appears that the pinch roller drive mechanism can be readily sized to meet or exceed system performance and service life requirements. Wear life estimates based on experimental data for a steel roller coated with an advanced polyimide film show a continuous service life more than two orders of magnitude greater than required for this application.

Loewenthal, S. H.↗

Encapsulant selection and durability testing experience

The Flat Plate Solar Array Project (FSA) has established technically challenging cost and service life goals for photovoltaic modules. These goals are a cost of $70 sq m and an expected 30 years of service life in an outdoor weathering environment. out of the cost goal, $14 sq m is allocated for encapsulation materials, which includes the cost of a structural panel. At FSA's inception in 1975, the cumulative cost of encapsulation materials in popular use, such as room temperature vulcanized (RTV) silicones, aluminum panels, etc., greatly exceeded $14/sq m. Accordingly, it became necessary to identify and/or develop new materials and new material technologies to achieve the goals. Many of these new materials are low cost polymers that satisfy module engineering and encapsulation processing requirements but unfortunately are not intrinsically weather stable. This necessitates identifying lifetime and/or weathering deficiencies inherent in these low cost materials and developing specific approaches to enhancing weather stability.

Cuddihy, E. F.↗

The case for the evolution of the Shuttle system

Examining the expendable and reusable space transportation systems currently in use, it appears that the service life of a launch system, with periodic upgrades, can be 30 to 40 years. It is also evident that both reliability and performance increase with flight experience. With a life expectancy of at least 30 years, the Shuttle system is today only in the first third of its potential service life. This paper addresses the issues of why Shuttle evolution is warranted, how the evolutionary process is managed, and how that process can improve system performance and reduce costs. Specific examples of enhancements currently under consideration are presented and discussed in terms of their relationship to the achievement of greater inherent reliability in the Shuttle system.

Cohen, Aaron↗

Laser Peening Effects on Friction Stir Welding

The laser peening process can result in considerable improvement to crack initiation, propagation, and mechanical properties in FSW which equates to longer hardware service life Processed hardware safety is improved by producing higher failure tolerant hardware, and reducing risk. Lowering hardware maintenance cost produces longer hardware service life, and lower hardware down time. Application of this proposed technology will result in substantial benefits and savings throughout the life of the treated components

Hatameleh, Omar↗