Facility construction and equipment installation
Facility construction, and installation of S-band systems and ground support equipment for Deep Space Network
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Facility construction, and installation of S-band systems and ground support equipment for Deep Space Network
Apollo project support for systems analysis and test of S-band and planning for navigation aspects of lunar landing mission
Spacecraft radio studies on multipacting between coaxial electrodes, S-band ranging, radar beam guidance, and rectangular cup radiator for high impact antenna
Noise characteristics of unified S-band tracking system high speed range rate and X-Y ANGULAR data obtained during aircraft flyby tests
A first-principles study of a carbon-nitrogen (CN) impurity complex in silicon is presented as an isoelectronic alternative to the T center [(CCH) Si ]. The latter has been pursued for applications in quantum information science, yet its sensitivity to the presence of hydrogen is still problematic. Our proposed complex has no hydrogen, thereby eliminating this issue. First, we show that the CN complex is stable against decomposition into substitutional and interstitial defects. Next, we show that due to being isoelectronic to the T center, the CN complex has a similar electronic structure, and therefore could be used in similar applications. We assess several low-energy configurations of the CN complex, finding (CN) Si to be stable and have the largest Debye-Waller factor. We predict a zero-phonon line (ZPL) of 828 meV (in the telecom S-band) and a radiative lifetime of 4.2 μs, comparable to the T center. Due to the presence of a bound exciton, choice of the exchange-correlation functional and also supercell-size scaling of the ZPL and transition dipole moment require special scrutiny; we rigorously justify our extrapolation schemes that allow computing values in the dilute limit.
Aboveground biomass (AGB) is a critical parameter to better understand the global carbon cycle and to develop sustainable forest management. However, a large uncertainty prevails. L-band SAR data have demonstrated strong potential to accurately retrieve AGB over low-biomass regions (<100 Mg ha-1). The upcoming NASA-ISRO Synthetic Aperture Radar mission will collect data at L- and S-band over earth’s landmass with a repeat period of 12 days, allowing us to have ample data for monitoring biomass and its dynamics. One of the key science requirements of the mission is to produce annual AGB maps at 1-ha resolution with RMS accuracy of 20 Mg/ha for 80 percentage of area over low-biomass regions in Calibration/Validation sites. The NISAR biomass algorithm will generate AGB maps based on the parameterization of semi-empirical model along with NISAR time-series dual pol data (HH and HV). To calibrate and validate the model for mission requirements, the mission will use reference estimates of AGB produced from ground inventory plots and airborne LiDAR data collected over selected sites distributed across different global ecoregions. This paper presents the initial results of the calibration/validation of the NISAR AGB retrieval algorithm over the Lenoir Landing (LENO), Alabama, USA site using NISAR simulated ALOS-2 time series data. Five multi-temporal dual-pol HH and HV NISAR Simulated ALOS 2 data collections were used as input to assess the performance of the model. The model AGB retrieval results shows that the NISAR model was able to achieve RMS accuracy within 20 Mg/ha.
The potential of millimeter-wavelength radar-based ice water content (IWC) estimation is demonstrated using a Ka-band Scanning Polarimetric Radar (KASPR) for the U.S. northeast coast winter storms. Two IWC relations for Ka-band polarimetric radar measurements are proposed: one that uses a combination of the radar reflectivity Z and the estimated total number concentration of snow particles N t and the other based on the joint use of Z, specific differential phase K DP , and the degree of riming f rim . A key element of the algorithms is to obtain the “Rayleigh-equivalent” value of Z measured at the Ka band, i.e., the corresponding Z at a longer radar wavelength for which Rayleigh scattering takes place. This is achieved via polarimetric retrieval of the mean volume diameter D m and incorporating the relationship between the dual-wavelength ratio DWR S/Ka and D m . Those techniques allow for retrievals from single millimeter-wavelength radar measurements and do not necessarily require the dual-wavelength ratio (DWR) measurements, if the DWR–D m relation and Rayleigh assumption for Ka-band K DP are valid. Comparison between the quasivertical profile product obtained from KASPR and the columnar vertical profile product generated from the nearby WSR-88D S-band radar measurements demonstrates that the DWR S/Ka can be estimated from the two close radars without the need for collocated radar beams and synchronized antenna scanning and can be used for determining the Rayleigh-equivalent value of Z. As a result, the performance of the suggested techniques is evaluated for seven winter storms using surface disdrometer and snow accumulation measurements.
Design consideration of unified S-band antenna on land and shipboard for Apollo project
Communications subsystem providing S-band link between LEM and Earth and VHF link between LEM AND Command Module
Erectable antenna for S-band communication between LEM and Earth
Planetary probe conical scanning system, signal processing, S-band power amplifier survey, modulation and bit synchronization, antenna temperature, and trajectory perturbations
Parametric amplifiers and tunnel diodes as L-band and S-band down-converters - frequency division multiplexing
Tuning range extension of klystrons used for pumping S-band traveling wave masers
High power testing of S-band Cassegrain monopulse cone antenna
Although the design of the Apollo network followed closely behind the Manned Space Flight Network (MSFN) modification for the Gemini program, many site modifications were necessary to provide Apollo support due to the greater scope of the Apollo program. The Apollo program requires instrumentation for support of the S-I, S-11, S IV-B/IU, Command Service Module (CSM) and Lunar Excursion Module (LEM) stages. Command Service Module (CSM) and Lunar Excursion Module (LEM) stages. Support must also be provided at both orbital and lunar distances. Increased data processing capability is required for processing and displaying significantly larger amounts of information. The ground network requires the capability of processing both Pulse Code Modulation (PCM) telemetry and command data for the CSM, LEM, and S IV-B/IU. In various stages of the Apollo program, both tone (on UHF) and digital [on Unified S-Band (USB) and UHF] command capabilities are required. Also at various stages both USB and VHF telemetry links are required.
Gas ionization and plasma heating by high power microwaves using X-band and S-band frequency magnetrons
Techniques for improving Apollo spacecraft acquisition using S-band equipment
Parametric amplifier for tracking antenna - Apollo project