Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk Analyses”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

The NASA JSC Hypervelocity Impact Technology (HVIT) Office

The Hypervelocity Impact Technology (HVIT) office at the National Aeronautical and Space Administration (NASA) Johnson Space Center (JSC) is dedicated to support NASA flight programs in meeting their meteoroid and orbital debris (MMOD) protection requirements both efficiently and effectively, with a minimum of shielding mass, volume, and cost. This paper provides an overview of HVIT capabilities in providing hypervelocity tests, analyses, MMOD risk assessments and shielding expertise. HVIT personnel work closely with NASA program and safety/mission assurance personnel to develop program-specific MMOD protection requirements which are both achievable based on initial risk assessments and will meet overall safety and mission success requirements. HVIT then proceeds with hypervelocity impact testing and hydrocode assessments to update and verify ballistic limit equations used in the MMOD risk assessment. Hypervelocity impact tests are primarily performed at the NASA WSTF Remote Hypervelocity Test Laboratory (RHTL). Other hypervelocity facilities that provide complementary test capabilities are called on when necessary to fill data gaps. The goal of the final pre-flight MMOD risk assessment is to show compliance with MMOD requirements prior to flight. This final assessment will also incorporate changes in the MMOD environment from meteoroid showers and orbital debris breakups. After the mission is flown, post-flight inspections are performed by HVIT to document and trend MMOD damage to returned spacecraft surfaces and hardware. HVIT accomplishments in NASA mission support are described. In addition, current HVIT activities to aid on-going NASA crewed missions and science missions are presented.

Meteoroid↗

Asteroid Redirect Crewed Mission Space Suit and EVA System Architecture Trade Study

This paper discusses the Asteroid Redirect Crewed Mission (ARCM) space suit and Extravehicular Activity (EVA) architecture trade study and the current state of the work to mature the requirements and products to the mission concept review level. The mission requirements and the resulting concept of operations will be discussed. A historical context will be presented as to present the similarities and differences from previous NASA missions. That will set the stage for the trade study where all options for both pressure garment and life support were considered. The rationale for the architecture decisions will then be presented. Since the trade study did identity risks, the subsequent tests and analyses that mitigated the risks will be discussed. Lastly, the current state of the effort will be provided.

Bowie, Jonathan T.↗

Fault Management Algorithm Risk Assessment for the NASA Space Launch System

This paper presents the false positive (FP) and false negative (FN) risk assessment process currently being conducted for the Space Launch System (SLS) Artemis II Fault Management (FM) detection functions. The analysis scope, general assumptions and guide rules, and key modeling concepts were discussed to establish the basis of the risk assessments conducted. Initial analyses indicated a dominance in the total risk by software and firmware failures. This paper presents efforts applied to refine the software risks and the overall impact of implementing those modifications. Current analyses conducted on the detection functions implemented for the SLS Artemis II mission indicate primary risk drivers for the individual FM detection functions are flight software failures, firmware design failures, and hardware Common Cause Failures (CCFs). There still remains issues of how to account for time and redundancy in the software risk estimations.

probability risk analysis↗

Fault Management Algorithm Risk Assessment for the NASA Space Launch System

This presentation describes the false positive (FP) and false negative (FN) risk assessment process currently being conducted for the Space Launch System (SLS) Artemis II Fault Management (FM) detection functions. The analysis scope, general assumptions and guide rules, and key modeling concepts were discussed to establish the basis of the risk assessments conducted. Initial analyses indicated a dominance in the total risk by software and firmware failures. This paper presents efforts applied to refine the software risks and the overall impact of implementing those modifications. Current analyses conducted on the detection functions implemented for the SLS Artemis II mission indicate primary risk drivers for the individual FM detection functions are flight software failures, firmware design failures, and hardware Common Cause Failures (CCFs). There still remains issues of how to account for time and redundancy in the software risk estimations.

probability risk analysis↗

Model Based Mission Assurance: NASA's Assurance Future

Model Based Systems Engineering (MBSE) is seeing increased application in planning and design of NASA’s missions. This suggests the question: what will be the corresponding practice of Model Based Mission Assurance (MBMA)? Contemporaneously, NASA’s Office of Safety and Mission Assurance (OSMA) is evaluating a new objectives based approach to standards to ensure that the Safety and Mission Assurance disciplines and programs are addressing the challenges of NASA’s changing missions, acquisition and engineering practices, and technology. MBSE is a prominent example of a changing engineering practice. We use NASA’s objectives-based strategy for Reliability and Maintainability as a means to examine how MBSE will affect assurance. We surveyed MBSE literature to look specifically for these affects, and find a variety of them discussed (some are anticipated, some are reported from applications to date). Predominantly these apply to the early stages of design, although there are also extrapolations of how MBSE practices will have benefits for testing phases. As the effort to develop MBMA continues, it will need to clearly and unambiguously establish the roles of uncertainty and risk in the system model. This will enable a variety of uncertainty-based analyses to be performed much more rapidly than ever before and has the promise to increase the integration of CRM (Continuous Risk Management) and PRA (Probabilistic Risk Analyses) even more fully into the project development life cycle. Various views and viewpoints will be required for assurance disciplines, and an over-arching viewpoint will then be able to more completely characterize the state of the project/program as well as (possibly) enabling the safety case approach for overall risk awareness and communication.

Evans, John↗

Mosquito Larval Habitats, Land Use, and Potential Malaria Risk in Northern Belize from Satellite Image Analyses

The distribution of Anopheles mosquito habitats and land use in northern Belize is examined with satellite data. -A land cover classification based on multispectral SPOT and multitemporal Radarsat images identified eleven land cover classes, including agricultural, forest, and marsh types. Two of the land cover types, Typha domingensis marsh and flooded forest, are Anopheles vestitipennis larval habitats. Eleocharis spp. marsh is the larval habitat for Anopheles albimanus. Geographic Information Systems (GIS) analyses of land cover demonstrate that the amount of T-ha domingensis in a marsh is positively correlated with the amount of agricultural land in the adjacent upland, and negatively correlated with the amount of adjacent forest. This finding is consistent with the hypothesis that nutrient (phosphorus) runoff from agricultural lands is causing an expansion of Typha domingensis in northern Belize. This expansion of Anopheles vestitipennis larval habitat may in turn cause an increase in malaria risk in the region.

Pope, Kevin↗

Heritage and Advanced Technology Systems Engineering Lessons Learned from NASA Space Missions

Use of heritage and new technology is necessary/enabling to implementing small, low cost missions, yet overruns decrease the ability to sustain future mission flight rates The majority of the cost growth drivers seen in the D&NF study were embedded early during formulation phase and later realized during the development and I&T phases Cost drivers can be avoided or significantly decreased by project management and SE emphasis on early identification of risks and realistic analyses SE processes that emphasize an assessment of technology within the mission system to identify technical issues in the design or operational use of the technology. Realistic assessment of new and heritage spacecraft technology assumptions , identification of risks and mitigation strategies. Realistic estimates of effort required to inherit existing or qualify new technology, identification of risks to estimates and develop mitigation strategies. Allocation of project reserves for risk-based mitigation strategies of each individual area of heritage or new technology. Careful tailoring of inheritance processes to ensure due diligence.

Barley, Bryan↗

Probabilistic Risk Assessment (PRA): A Practical and Cost Effective Approach

The Lunar Reconnaissance Orbiter (LRO) is the first mission of the Robotic Lunar Exploration Program (RLEP), a space exploration venture to the Moon, Mars and beyond. The LRO mission includes spacecraft developed by NASA Goddard Space Flight Center (GSFC) and seven instruments built by GSFC, Russia, and contractors across the nation. LRO is defined as a measurement mission, not a science mission. It emphasizes the overall objectives of obtaining data to facilitate returning mankind safely to the Moon in preparation for an eventual manned mission to Mars. As the first mission in response to the President's commitment of the journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond, LRO has high-visibility to the public but limited resources and a tight schedule. This paper demonstrates how NASA's Lunar Reconnaissance Orbiter Mission project office incorporated reliability analyses in assessing risks and performing design tradeoffs to ensure mission success. Risk assessment is performed using NASA Procedural Requirements (NPR) 8705.5 - Probabilistic Risk Assessment (PRA) Procedures for NASA Programs and Projects to formulate probabilistic risk assessment (PRA). As required, a limited scope PRA is being performed for the LRO project. The PRA is used to optimize the mission design within mandated budget, manpower, and schedule constraints. The technique that LRO project office uses to perform PRA relies on the application of a component failure database to quantify the potential mission success risks. To ensure mission success in an efficient manner, low cost and tight schedule, the traditional reliability analyses, such as reliability predictions, Failure Modes and Effects Analysis (FMEA), and Fault Tree Analysis (FTA), are used to perform PRA for the large system of LRO with more than 14,000 piece parts and over 120 purchased or contractor built components.

Lee, Lydia L.↗

High Performance EVA Glove Collaboration: Glove Injury Data Mining Effort

Human hands play a significant role during Extravehicular Activity (EVA) missions and Neutral Buoyancy Lab (NBL) training events, as they are needed for translating and performing tasks in the weightless environment. Because of this high frequency usage, hand and arm related injuries are known to occur during EVA and EVA training in the NBL. The primary objectives of this investigation were to: 1) document all known EVA glove related injuries and circumstances of these incidents, 2) determine likely risk factors, and 3) recommend interventions where possible that could be implemented in the current and future glove designs. METHODS: The investigation focused on the discomforts and injuries of U.S. crewmembers who had worn the pressurized Extravehicular Mobility Unit (EMU) spacesuit and experienced 4000 Series or Phase VI glove related incidents during 1981 to 2010 for either EVA ground training or in-orbit flight. We conducted an observational retrospective case-control investigation using 1) a literature review of known injuries, 2) data mining of crew injury, glove sizing, and hand anthropometry databases, 3) descriptive statistical analyses, and finally 4) statistical risk correlation and predictor analyses to better understand injury prevalence and potential causation. Specific predictor statistical analyses included use of principal component analyses (PCA), multiple logistic regression, and survival analyses (Cox proportional hazards regression). Results of these analyses were computed risk variables in the forms of odds ratios (likelihood of an injury occurring given the magnitude of a risk variable) and hazard ratios (likelihood of time to injury occurrence). Due to the exploratory nature of this investigation, we selected predictor variables significant at p≤0.15. RESULTS: Through 2010, there have been a total of 330 NASA crewmembers, from which 96 crewmembers performed 322 EVAs during 1981-2010, resulting in 50 crewmembers being injured inflight and 44 injured during 11,704 ground EVA training events. Of the 196 glove related injury incidents, 106 related to EVA and 90 to EVA training. Over these 196 incidents, 277 total injuries (126 flight; 151 training) were reported and were then grouped into 23 types of injuries. Of EVA flight injuries, 65% were commonly reported to the hand (in general), metacarpophalangeal (MCP) joint, and finger (not including thumb) with fatigue, abrasion, and paresthesia being the most common injury types (44% of total flight injuries). Training injuries totaled to more than 70% being distributed to the fingernail, MCP joint, and finger crotch with 88% of the specific injuries listed as pain, erythema, and onycholysis. Of these training injuries, when reporting pain or erythema, the most common location was the index finger, but when reporting onycholysis, it was the middle finger. Predictor variables specific to increased risk of onycholysis included: female sex (OR=2.622), older age (OR=1.065), increased duration in hours of the flight or training event (OR=1.570), middle finger length differences in inches between the finger and the EVA glove (OR=7.709), and use of the Phase VI glove (OR=8.535). Differentiation between training and flight and injury reporting during 2002-2004 were significant control variables. For likelihood of time to first onycholysis injury, there was a 24% reduction in rate of reporting for each year increase in age. Also, more experienced crewmembers, based on number of EVA flight or training events completed, were less likely to report an onycholysis injury (3% less for every event). Longer duration events also found reporting rates to occur 2.37 times faster for every hour of length. Crewmembers with larger hand size reported onycholysis 23% faster than those with smaller hand size. Finally, for every 1/10th of an inch increase in difference between the middle finger length and the glove, the rate of reporting increased by 60%. DISCUSSION: One key finding was that the Series 4000 glove had a lower injury risk than the Phase VI, which provides a platform for further evaluation. General interventions that reduce hand overexertion and repetitive use exposure through tool development, procedural changes and shorter exposures may be one mitigation path, but due to the way the training event times were reported, we cannot provide a guideline for a specific event duration change. When the finger length was different from the glove length, the risk of injury increased indicating that the use of larger finger take-ups could be contributing to injury and therefore may not be recommended. Prior to this investigation, there was one previous investigation indicating hand anthropometry may be related to onycholysis. We found different hand anthropometry variables indicated by this investigation as compared to the prior, specifically differences in middle finger length compared to glove finger length, which point more towards a sizing issue than a specific anthropometry issue. Additionally, although this investigation has identified sizing as an issue, the force and environmental-related variables of the EVA glove that could also cause injury were not accounted for.

Reid, C. R.↗

Method for Tracking and Communicating Aggregate Risk Through the Use of Model-Based Systems Engineering (MBSE) Tools

Large, complex projects can identify a significant number and variety of risks, throughout the project life cycle. These risks are analyzed, mitigated, closed or accepted as independent uncertainties. Once closed or accepted, it is easy for projects to lose awareness of their impact. In reality, each of these risks contributes some amount to the overall risk posture of the project. The ability to track and effectively communicate this aggregate risk has represented a challenge to project management. There have been previous attempts to create a schema to communicate the aggregate effect of risks, without notable success. Most of these attempts have centered on some additive metric derived from the scoring of likelihood and consequence values. This, in and of itself, is a logical approach, but all too often the scores were then aggregated to a level where all context was lost. One weakness has been a lack of attempt to create linkages or logical groups of the risks upon which useful aggregation could then occur. The overall move to model-based (systems) engineering (MBSE) has opened up a vast frontier of opportunities to better integrate all project data. MBSE provides an underlying layer that links data items to each other. Objectives link to requirements, which then link to functions, functions to physical architecture items, and so on, as far down as projects want to model. While it started with a focus on modeling requirements based on things like use cases, efforts are now underway to integrate safety and mission assurance (S&MA) information and analyses, such as risks. This effort, called Model Based Mission Assurance (MBMA), is yielding models that are more useful and are a more accurate representations of the systems. MBSE models, with this ability to link related items, provide a new means of tracking and communicating aggregate risks. In the proposed method, risks are added into the models as distinct items, having attributes that communicate a scoring derived from the likelihood and consequence values as charted on the standard NASA 5x5 risk matrix. Like earlier efforts, each box in the 5x5 has an associated scoring, which may include both a current score and potential post-mitigation/control score. The risk items are then linked to elements of the model, such as system objectives/goals, requirements, functions, or physical architecture items, with "Risk to" relationships. These risks will then be communicated by use of reports generated from the model, detailing all risks and/or hazards linked to model elements. These reports can include aggregate impacts, including a current scoring and potential future state scoring based on the planned mitigations and/or controls. These reports will show all risks, open, accepted, and closed, linked to project objectives or requirements. When run as part of an upcoming risk acceptance discussion, these reports will serve to remind the team of all previous risks that relate to the effected portion of the system. When included as part of periodic program or project reviews, risk reviews, and safety reviews, this method can improve the overall understanding of the system's true risk posture. This proposed method takes full advantage of the advances that modern modeling techniques provide, with a minimal investment of additional time. Utilizing the model environment also enables a near constant access to current state of aggregate risks.

model based mission assurance↗

Expectation vs. Reality: The Sunrise Problem Applied to Probabilistic Risk Assessment

The Sunrise Problem is succinctly stated as a question: “what is the probability that the sun will rise tomorrow?” Attempts to answer this seemingly simple question reveal unexpected incongruities between statistical/probabilistic estimates and “real-world” expectations. Rather than being a purely philosophical problem, similar incongruities can be found in reliability and probabilistic risk assessment (PRA) analyses. These differences between statistical predictions and demonstrated reliability can result in analysis shortcomings that should be addressed and resolved. This presentation will begin by discussing the nature of the Sunrise Problem and how it applies to PRA and reliability. Examples of the Sunrise Problem in a PRA estimate will also be included, along with tips to identify and resolve the shortcomings that result from these anomalous situations.

Sunrise Problem↗

JPL Large Advanced Antenna Station Array Study

In accordance with study requirements, two antennas are described: a 30 meter standard antenna and a 34 meter modified antenna, along with a candidate array configuration for each. Modified antenna trade analyses are summarized, risks analyzed, costs presented, and a final antenna array configuration recommendation made.

Source record↗

Elements of computational engine-airframe integration

Computerized flow simulation methods are being developed to refine the traditional engine-airframe integration process. These analyses reduce design risk, minimize wind tunnel and flight test requirements, and provide detailed design information not available by any other means. This paper describes computational tools which have matured sufficiently to permit project applications. Several applications are combined with research studies to illustrate the prediction of high-speed nonlinear phenomena associated with engine inlet flow rate, nacelle shape and position, afterbody shape and integration, propeller slipstream interactions, airframe-induced inlet flow, and pylon integration. Both fighter and transport configurations are used to highlight current capabilities and future requirements.

Boppe, C. W.↗

Probabilistic load simulation: Code development status

The objective of the Composite Load Spectra (CLS) project is to develop generic load models to simulate the composite load spectra that are included in space propulsion system components. The probabilistic loads thus generated are part of the probabilistic design analysis (PDA) of a space propulsion system that also includes probabilistic structural analyses, reliability, and risk evaluations. Probabilistic load simulation for space propulsion systems demands sophisticated probabilistic methodology and requires large amounts of load information and engineering data. The CLS approach is to implement a knowledge based system coupled with a probabilistic load simulation module. The knowledge base manages and furnishes load information and expertise and sets up the simulation runs. The load simulation module performs the numerical computation to generate the probabilistic loads with load information supplied from the CLS knowledge base.

Newell, J. F.↗

Risk-Based Explosion Assessment Internal Explosion of Exploration Upper Stage in Vehicle Assembly Building

This paper presents risk-based explosion analyses used to determine if an explosion of NASA's Space Launch System (SLS) Exploration Upper Stage (EUS) during fueling in Vehicle Assembly Building (VAB) High Bay 4 can hazard the Space Launch System (SLS) being processed in Bay 3. This paper focuses on blast fragmentation as it was the controlling hazard. An estimate of the amount of Net Explosion Weight (NEW) was used to develop a fragment list (mass, shape, takeoff velocity/angle) given an explosion occurs at ground level in Bay 4. Intervening superstructure that exists between Bay 4 and Bay 3 (that could potentially block EUS fragments) was modeled based on detailed visual images (VISSIM) and AUTOCAD/structural drawings. The fragment list was input to a 3D trajectory application that performs multiple random explosion simulations; each simulation varying fragment ballistic coefficient and takeoff angle/velocity. Individual fragments are tracked until stopped by the intervening superstructure or reach Bay 3, potentially impacting the SLS. The probability of impacting the SLS is then determined from the random simulations; the results are used to help decision-makers determine the efficacy of co-processing within the VAB and decide what mitigations may be appropriate.

Explosion Assessment↗

Engineering Risk Assessment of Space Thruster Challenge Problem

The Engineering Risk Assessment (ERA) team at NASA Ames Research Center utilizes dynamic models with linked physics-of-failure analyses to produce quantitative risk assessments of space exploration missions. This paper applies the ERA approach to the baseline and extended versions of the PSAM Space Thruster Challenge Problem, which investigates mission risk for a deep space ion propulsion system with time-varying thruster requirements and operations schedules. The dynamic mission is modeled using a combination of discrete and continuous-time reliability elements within the commercially available GoldSim software. Loss-of-mission (LOM) probability results are generated via Monte Carlo sampling performed by the integrated model. Model convergence studies are presented to illustrate the sensitivity of integrated LOM results to the number of Monte Carlo trials. A deterministic risk model was also built for the three baseline and extended missions using the Ames Reliability Tool (ART), and results are compared to the simulation results to evaluate the relative importance of mission dynamics. The ART model did a reasonable job of matching the simulation models for the baseline case, while a hybrid approach using offline dynamic models was required for the extended missions. This study highlighted that state-of-the-art techniques can adequately adapt to a range of dynamic problems.

Assessment↗

Cross-Cutting Computational Modeling Project: Integrative Modeling Approach

A wide range of computational models and analyses have been applied to spaceflight risk assessment and countermeasure development. The benefits of using computational modeling to enhance Human Research Program (HRP) goals include the ability to mathematically represent physiological systems, integrate multiple, discrete experimental measures, span multiple temporal and spatial scales, determine important factors within the system and provide estimates of unmeasurable quantities. In the area of application, computational models provide a means of developing simulations to test hypotheses, determining key factors of the system to aid experimental design and bridging gaps in sparse data by mathematically simulating large populations. Specifically, computational models and their supporting analysis tools have the proven potential to integrate analyses of risk factors to enhance mission planning and preparation capabilities and to inform spacecraft design and countermeasure development. Appropriately applied, computational models may allow intelligent, unbiased physiological parameter assessment to enable hypothesis testing and model based design of experiments. HRP recently formed the Computational Modeling Project (CMP), managed out of Glenn Research Center, as a cross-cutting activity aimed at leveraging the growing power and acceptance of computational modeling in informing clinical, physiological, and biological studies. This presentation will provide an overview of the challenges and opportunities in implementing various forms of computational models in support of the HRPs path to risk reduction.

biomechanics↗

Database of Properties of Meteors

A database of properties of meteors, and software that provides access to the database, are being developed as a contribution to continuing efforts to model the characteristics of meteors with increasing accuracy. Such modeling is necessary for evaluation of the risk of penetration of spacecraft by meteors. For each meteor in the database, the record will include an identification, date and time, radiant properties, ballistic coefficient, radar cross section, size, density, and orbital elements. The property of primary interest in the present case is density, and one of the primary goals in this case is to derive densities of meteors from their atmospheric decelerations. The database and software are expected to be valid anywhere in the solar system. The database will incorporate new data plus results of meteoroid analyses that, heretofore, have not been readily available to the aerospace community. Taken together, the database and software constitute a model that is expected to provide improved estimates of densities and to result in improved risk analyses for interplanetary spacecraft. It is planned to distribute the database and software on a compact disk.

Suggs, Rob↗