Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Right Of Way”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines. Based on Platts electrical transmission line data, a total of 101 existing intersections with national trails on federal land were found, and 20 proposed intersections. Transmission lines and pipelines are proposed in Alaska; however there are no locations that intersect national trails. Source data did not indicate any planned transmission lines or pipelines in Hawaii. A map atlas provides more detailed mapping of the topics investigated in this study, and the accompanying GIS database provides the baseline information for further investigating locations of interest. In many cases the locations of proposed transmission lines are not accurately mapped (or a specific route may not yet be determined), and accordingly the specific crossing locations are speculative. However since both national trails and electrical transmission lines are long linear systems, the characteristics of the crossings reported in this study are expected to be similar to both observed characteristics of the existing infrastructure provided in this report, and of the new infrastructure if these proposed projects are built. More focused study of these siting challenges is expected to mitigate some of potential impacts by choosing routes that minimize or eliminate them. The current study primarily addresses a set of screening-level characterizations that provide insights into how the National Trail System may influence the siting of energy transport facilities in the states identified under Section 368(b) of the Energy Policy Act of 2005. As such, it initializes gathering and beginning analysis of the primary environmental and energy data, and maps the contextual relationships between an important national environmental asset and how this asset intersects with energy planning activities. Thus the current study sets the stage for more in-depth analyses and data development activities that begin to solve key transmission siting constraints. Our recommendations for future work incorporate two major areas: (1) database development and analytics and (2) modeling and scenario analysis for energy planning. These recommendations provide a path forward to address key issues originally developed under the Energy Policy Act of 2005 that are now being carried forward under the President’s Climate Action Plan.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2014 Annual Site Environmental Report: Southwestern Power Administration

Southwestern Power Administration’s Annual Site Environmental Report (ASER) serves as the chief reporting mechanism for site environmental performance information within the Department of Energy and as a valuable resource for shared and collaborative environmental protection and performance information to Agency stakeholders and members of the public living near Southwestern Power Administration’s (Southwestern) facilities and transmission line rights-of-ways. This ASER meets the requirements of Department of Energy (DOE) Order 231.B. Southwestern’s key environmental involvement includes an emphasis on the protection of ecological resources which is effectively accomplished through environmental program elements such as protecting water resources, generation of clean hydropower energy, oil spill prevention practices, elimination of green-house gas emissions, and comprehensive project reviews to ensure the protection of living organisms, migratory birds, Federally threatened or endangered species, and historic or cultural resources. Southwestern continues to actively minimize effects to natural resources and strive for continual improvement in the area of environmental compliance and sustainability while achieving the agency mission to market and deliver Federal hydroelectric power.

54 ENVIRONMENTAL SCIENCES↗

Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, Alaska, and Hawaii

As has been noted in many reports and publications, acquiring new or expanded rights-of-way for transmission is a challenging process, because numerous land use and land ownership constraints must be overcome to develop pathways suitable for energy transmission infrastructure. In the eastern U.S., more than twenty federally protected national trails (some of which are thousands of miles long, and cross many states) pose a potential obstacle to the development of new or expanded electricity transmission capacity. However, the scope of this potential problem is not well-documented, and there is no baseline information available that could allow all stakeholders to study routing scenarios that could mitigate impacts on national trails. This report, Electricity Transmission, Pipelines, and National Trails: An Analysis of Current and Potential Intersections on Federal Lands in the Eastern United States, was prepared by the Environmental Science Division of Argonne National Laboratory (Argonne). Argonne was tasked by DOE to analyze the “footprint” of the current network of National Historic and Scenic Trails and the electricity transmission system in the 37 eastern contiguous states, Alaska, and Hawaii; assess the extent to which national trails are affected by electrical transmission; and investigate the extent to which national trails and other sensitive land use types may be affected in the near future by planned transmission lines. Pipelines are secondary to transmission lines for analysis, but are also within the analysis scope in connection with the overall directives of Section 368 of the Energy Policy Act of 2005, and because of the potential for electrical transmission lines being collocated with pipelines.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Invasive Plant Management Plan for the Oak Ridge Reservation

Invasive non-native plant species have become one of the greatest ecological threats across the country and around the world. Actively managing incursions of invasive plants is crucial to maintaining ecosystems, protecting natural resources, and ensuring proper function of facilities and their support infrastructures, power lines and other utility rights-of-way (ROWs), communications structures, roadways, and waterways. Invasive plants can threaten cultural resources, public and private properties, forests, wetlands, and other natural areas through increased risks of fire and storm damage, as well as decrease native plant diversity, particularly disrupting vital habitats of threatened and endangered species, both plant and animal. In 2000, the Federal Plant Protection Act came into effect. Under this Act, federal agencies are required to develop and coordinate an undesirable plants management program for control of invasive plants on federal lands under each agency’s respective jurisdiction. The agency must adequately fund the undesirable plants management program using an Integrated Pest Management Plan. Additionally, each agency is required to implement cooperative agreements with local and state agencies, as well as other federal agencies, to manage undesirable plants on federal lands under the agency’s jurisdiction. The US Department of Energy (DOE) takes its responsibility for addressing invasive and undesirable plant issues very seriously. Many DOE sites have programs to control invasive pest plant species. DOE has taken a proactive stance toward invasive plant control, and the Invasive Plant Management Plan— created to meet regulatory requirements of federal laws, executive orders, presidential memos, contracts, and agreements on DOE’s Oak Ridge Reservation (ORR)—has been in effect since 2004. This document represents the second revision of this plan.

59 BASIC BIOLOGICAL SCIENCES↗

Corrective Action Study for the Former CCC/USDA Facility in Powhattan, Kansas (TR-18-01)

Low concentrations of carbon tetrachloride and chloroform have been identified in soil and groundwater in Powhattan, Kansas, at and near areas where grain handling operations have occurred for more than a century. Since about 1890, grain has been stored at several locations on the Chicago Rock Island and Pacific Railroad right-of-way by multiple parties, including the Brown County Cooperative Association (now Ag Partners Cooperative, Inc.), and — from 1949 to approximately1966 — the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA).

54 ENVIRONMENTAL SCIENCES↗

Ramona Risk Assessment Report (TR-17-01)

Ramona, Kansas, is a small rural town with187 residents (2010 Census). Located in the north-central portion of Marion County, Ramona is 104 mi southwest of Topeka, Kansas, in the SE 1/4 of Section 2, Township 17 South, Range 3 East. Grain storage has occurred over the years at multiple locations in Ramona, including a facility that was formerly operated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) and a facility operated by the Agri Trails Coop, of Tampa, Kansas (the Co-op; Figure 1.1). The Co-op operates on the opposite side of the railroad right-of-way from the former CCC/USDA facility.

54 ENVIRONMENTAL SCIENCES↗

CarbonSAFE Rocky Mountain Phase I: Ensuring Safe Subsurface Storage of Carbon Dioxide in the Intermountain West

An integrated CCS pre-feasibility study, CarbonSAF E Rocky Mountain Phase I, was conducted by the U niversity of Utah and its partners as part of the US D epartment of Energy’s Carbon Storage Assurance a nd Facility Enterprise (CarbonSAFE) program. The a ssembled project team consisted of academic, indus try and governmental agencies covering the technic al and non- technical challenges of a commercial-sc ale CO 2 storage facility capable of storing 50 million tonnes of anthropogenically-sourced CO 2 . The Rock y Mountain CarbonSAFE team identified the Hunter Power Plant in central Utah as the primary source of CO 2 on which this study would be focused. The nea rby Huntington power plant, also operated by Rocky Mountain Power, was evaluated as a secondary sou rce of CO 2 . The Hunter plant was chosen because o f an interest in CO 2 capture technology by the plant operator, Rocky Mountain Power, and also because i t is a representative example of a typical coal-fired g enerating station in the Rocky Mountain west. Amine -based and cryogenic-based capture assessments w ere performed for approximately 3 million tonnes per year for one of the boiler units at the Hunter plant, yi elding cost of capture estimates of $\$56$/tonne and $\$4 1.50$/tonne. Transportation and intermediate compre ssion would increase the per tonne costs, but will be highly dependent on specific injection locations and available rights-of-way. A high-level technical sub-ba sinal evaluation was performed on the area surround ing the Hunter and Huntington power plants to verify CO 2 storage capacity and integrity. Initial geologic c haracterization efforts focused on sites immediately adjacent to the Hunter plant, including the deep eolia n Permian White Rim Sandstone, which in outcrop a nd core from other locations indicates high permeabi lity and high porosity. However, petrophysical logs fr om wells near Hunter indicate porosity of only 2-4%. As a result, potential injection sites were moved stru cturally down-dip (to the west), into the high permea bility (~200 mD) and high porosity (20%) Navajo san dstone. A comprehensive analysis of the reservoir a nd seals was conducted, providing data to the model , simulation and risk assessment groups on the proje ct. CO 2 capacity estimates for the Navajo Sandston e approximately 18 kilometers from the Hunter plant are well in excess of the 50 million tonnes goal of the project. Area of Review Delineation and Risk Asse ssment on the Navajo, associated seals and shallow groundwater aquifers identified the most significant risks and mitigation options. A non-technical assessment to a commercial-scale CO 2 storage facility in central Utah was conducted. EPA Underground Injection Control Class VI and National Environmental Policy Act permitting present particularly challenging issues related to the development of any saline aquifer for CO 2 storage, including the area around the Hunter plant. While surface and subsurface ownership and ri ghts are not straightforward, especially on any privat e land, many of the stakeholders in central Utah are accustomed and open to oil/gas/mineral-related activities similar to what would be required for CO 2 storage sites.

01 COAL, LIGNITE, AND PEAT↗

Three-Dimensional Flow Analysis Methodology for Assessing Stream Stability and Channel Migration

Increases in the frequency and magnitude of weather events that deviate significantly from average are being observed both globally and in the U.S. Adaptation strategies need to account for and mitigate increased risks to transportation infrastructure that result from more extreme weather. The present study is a part of a project that covers a sensitivity study of the potential impacts of increases in stream flows due to rain events and floods on an active section of the Maple River near Iowa Highway 175 and Danbury, Iowa, which is shown. This study focuses on the use of advanced three-dimensional (3D) computational fluid dynamics (CFD) techniques to enhance the assessment of increased risks to stream stability of a section of the Maple River that may erode into Iowa Highway 175. The methodology developed and presented can be applied to a wide variety of streams and rivers that may face increased risk of migration due to changes in weather patterns and severity of weather events. The Maple River is a laterally active channel flowing through agricultural land that has migrated several hundred feet in recent decades and is currently within approximately 100 feet of the Highway 175 Right-of-Way. In addition to the near-term threat to the highway from the closest river meander, there is also a concern that other river meanders could develop into longer-term threats, especially if increasing intensity or frequency of rain events increase the rate of meander development and channel migration by changing the long-term hydrology of the Maple River.

54 ENVIRONMENTAL SCIENCES↗

Long-Term Surveillance Plan for the Naturita, Colorado, Disposal Site

This Long-Term Surveillance Plan (LTSP) explains how the U.S. Department of Energy (DOE) will fulfill general license requirements of Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27) as the licensee at the Naturita, CO, Disposal Site (site) and revises the original LTSP (DOE 1999). This revision incorporates changes that reflect the U.S. Nuclear Regulatory Commission (NRC) concurrence on April 15, 2014, with a request from the DOE Office of Legacy Management (LM) to terminate groundwater monitoring at the site (Appendix D). In addition, the title of the LTSP has been changed from Long-Term Surveillance Plan for the Upper Burbank Disposal Cell, Uravan, Colorado , because the town of Uravan no longer exists and the Upper Burbank disposal cell is now referred to as the Naturita disposal cell. Appendix B has been revised to include documentation of a 2003 agreement in which the Bureau of Land Management provides a right-of-way to DOE for the east and west toe drains (identified in the agreement as two storm water drainage structures) and a 2011 agreement in which Umetco Minerals Corporation (Umetco) allows DOE access to the west toe drain outlet (identified in the agreement as a diversion channel). These agreements were put in place after acceptance of the original LTSP, and they are included in this revised LTSP as a best management practice to maintain protectiveness and to inform all stewards of site conditions and controls.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Natural Resources Assessment for the SNS Second Target Station, Oak Ridge, Tennessee

The US Department of Energy’s Oak Ridge National Laboratory (ORNL) is a leading institution in advanced materials, supercomputing, neutrons, and nuclear science. As a research laboratory managed by UT-Battelle, LLC for DOE, ORNL has national priorities in energy, security, and scientific discovery that necessitate facility improvements and expansions. DOE is also committed to environmental stewardship. The laboratory is located on the ~32,000-acre Oak Ridge Reservation (ORR), much of which is categorized as a National Environmental Research Park and a state Wildlife Management Area. DOE works with the Tennessee Wildlife Resources Agency (TWRA), Tennessee Department of Environment and Conservation (TDEC), US Fish and Wildlife Service (USFWS), US Department of Agriculture, and other agencies to serve as an effective steward of the ORR. Accordingly, project managers must conform to environmental regulations, agreements, and policies at the federal, state, and institutional levels. Per 40 CFR (Code of Federal Regulations) 1508.14, potential effects on research and science education on the National Environmental Research Park represent potential impacts of federal actions. Moreover, federal actions that affect the quantity and quality of hunting opportunities and deer reduction harvest on the Oak Ridge Wildlife Management Area must be considered whenever other aspects of the human environment (as defined by NEPA) are affected. The Spallation Neutron Source (SNS) is a premiere facility at ORNL that provides advanced capabilities in neutron scattering to promote new discoveries and research opportunities in material sciences, physics, chemistry, biological sciences, and others. A conceptual design for a Second Target Station (STS) has been in consideration for several years. The STS is intended to complement and enhance existing ORNL capabilities, notably research and exploration of complex materials. The proposed STS will involve development of existing natural areas on the ORR, which might contain sensitive resources that require mitigation or avoidance in accordance with existing policies and regulation. This report summarizes current knowledge of natural and cultural resources within the STS project area. At the time of this report, the proposed STS project consisted of an operations area comprising 55.4 acres (22.4 ha) and a total review area for potential construction comprising ~224 acres (90.6 ha). The review area is located primarily within forested natural areas of the ORR with minor development in the form of power-line rights-of-way and secondary/graveled roads (Figure 1). The primary goal was to evaluate potential effects on sensitive resources that might result from development of the STS. In addition to onthe-ground surveys during summer 2009 and fall 2019 to summer 2020 by ORNL Natural Resources Management Program and Aquatic Ecology Group staff, this report makes use of historical (pre-1995) and contemporary (1995 to present) data from additional confirmed sources (e.g., TDEC). Likewise, forest conditions were compiled primarily from a 2013 forest inventory effort for Forest Management Compartment 17 and supplemented with limited ground observations in 2019. The individuals who obtained and compiled the data that are presented here are familiar with and routinely assess sensitive resources on the ORR.

54 ENVIRONMENTAL SCIENCES↗

Invasive Plant Species Management Plan for Los Alamos National Laboratory (Rev.3)

Native species are plants and animals that continually occupy a natural range without direct or indirect introduction and/or care by humans. They are adapted to the environmental conditions and processes of the ecosystem in which they reside. A species introduced into a novel ecosystem can either exploit that ecosystem and thrive or be unable to survive in that ecosystem (Hobbs et al. 2006). Alien or non-native species are species that are intentionally or accidentally introduced into a novel ecosystem and are capable of living and propagating within the physical parameters of that ecosystem. Invasive species is a species that is non-native (or alien) to the ecosystem under consideration and a noxious species are those whose introduction causes or is likely to cause economic or environmental harm. The term invasive species is applicable to plants and animals alike; however, this invasive species management plan currently focuses on invasive vegetation. Invasive plant species are usually capable of rapid colonization of disturbed ground, such as after a change in wildfire regime intensity and frequency (Reilly et al. 2020) or anthropogenic ground disturbance (Burke and Grime 1996; Hobbs and Huenneke 1992). Climate change facilitates the spread and establishment of many alien species and creates new opportunities for them to become invasive (Turbelin and Catford 2021). As climate change impacts increase in the coming decades, we may see in an increase in invasive species establishment. See a list of definitions of terms pertinent to this document in Appendix A: Definitions. Los Alamos National Laboratory (LANL) hosts populations of non-native and invasive species all typical of the northern New Mexico region (Martin 2004; NMDA 2020). By implementing an invasive species management plan, LANL will have readily accessible management strategies for invasive species that are found on-site. The benefits of managing invasive species include a decrease in wildland fire risks, an increase in soil productivity, an increase in (productive or beneficial) wildlife habitat, an increase in water quantity and quality, and the restoration of impacted areas (Burke and Grime 1996; Hobbs and Huenneke 1992; D’Antonio and Hobbie 2005; MacDougall et al. 2013; Reilly et al. 2020). The aforementioned benefits from invasive species management directly enable the LANL mission by ensuring compliance requirements are met and site-wide programs, such as the Vulnerability Assessment and Resilience Plan, are supported for a mutually beneficial outcome. An example for the LANL site specifically, controlling non-native annual plant species, for example, could reduce the costs associated with stabilizing soils during the stormwater pollution prevention compliance process. Roadway and utility right-of-way areas are another place where an integrated vegetation management strategy would promote low growing perennial plants in a way that is mutually beneficial to habitat and the institution through lowered maintenance costs. There is also an economic benefit to managing invasive species. In one nationwide study, invasive plants had an estimated impact cost of $190.45 billion (Fantel-Lepczyk et al. 2022). Investing in preventative measures and surveillance could help to offset future control and management costs of invasive species that have the potential to become established. The State of New Mexico has developed plant species lists and recommendations through the New Mexico Department of Agriculture’s Noxious Weeds Management Act, Article 7D (NM Statute § 76-7D-4 2021); however, effective invasive species management must rely on local knowledge of the site and region. Los Alamos County (LAC) has already compiled a target invasive plant species list and species-specific management objectives (Martin 2004). Therefore, the New Mexico Noxious Weed List and the LAC invasive plant species list, as well as management objectives from those documents, are integrated into LANL’s invasive plant species management plan.

54 ENVIRONMENTAL SCIENCES↗

Assessing the Solar Photovoltaic Potential in Puerto Rican Brownfields and Reservoirs: Analysis and Modeling [Slides]

This study by the National Renewable Energy Laboratory (NREL) evaluates the potential for solar photovoltaic (PV) development on brownfields and reservoirs in Puerto Rico. Redeveloping these sites offers significant benefits, such as expanding energy infrastructure, supporting environmental remediation, and enhancing community revitalization. The study identifies up to 3.3 gigawatts (GW) of solar PV capacity, including 213 megawatts (MW) on closed landfills, 1-2.5 GW on contaminated sites, 78 MW on decommissioned plants, 21-50 MW on transmission line rights-of-way, and 636 MW on waterbodies for floating PV. This research highlights the strategic importance of investments and regulatory support to achieve Puerto Rico's goal of 100% clean energy by 2050.

14 SOLAR ENERGY↗

Assessing the Solar Photovoltaic (PV) Potential in Puerto Rican Brownfields and Reservoirs: Detailed Results and Methodology Annex [Slides]

This is the technical annex for "Assessing the Solar Photovoltaic (PV) Potential in Puerto Rican Brownfields and Reservoirs." This study by the National Renewable Energy Laboratory (NREL) evaluates the potential for solar photovoltaic (PV) development on brownfields and reservoirs in Puerto Rico. Redeveloping these sites offers significant benefits, such as expanding energy infrastructure, supporting environmental remediation, and enhancing community revitalization. The study identifies up to 3.3 gigawatts (GW) of solar PV capacity, including 213 megawatts (MW) on closed landfills, 1-2.5 GW on contaminated sites, 78 MW on decommissioned plants, 21-50 MW on transmission line rights-of-way, and 636 MW on waterbodies for floating PV. This research highlights the strategic importance of investments and regulatory support to achieve Puerto Rico's goal of 100% clean energy by 2050.

14 SOLAR ENERGY↗

Market Analysis of Solar Photovoltaic Development Potential on Bureau of Land Management Land in Arizona

This report explores the magnitude of the potential buildout of new solar development on Bureau of Land Management (BLM) land in Arizona based on market conditions in 2023. The BLM currently has 18 solar energy zones (SEZs), including three in Arizona, where land has undergone preliminary reviews and is suitable for expedited environmental review and permitting for solar energy projects. The BLM also administers variance areas that are outside SEZs and may consider right-of-way (ROW) applications for utility-scale solar development on such variance lands. Within variance areas in Arizona, the BLM has further identified Renewable Energy Development Area (REDA) lands that are likely well suited to solar or wind development. The purpose of the analysis reported here is to explore the anticipated extent of new solar development on BLM land in the state by 2035.

14 SOLAR ENERGY↗

Roughrider Carbon Storage Hub (Final Report)

The Roughrider Carbon Storage Hub was a 2-year project (October 2023 – September 2025) conducted by the Energy & Environmental Research Center (EERC) focused on advancing the feasibility of a commercial-scale carbon dioxide (CO 2 ) geologic storage hub in McKenzie County, North Dakota. The project’s objective was to investigate the potential that stacked storage complexes (multiple deep saline formations) can safely and economically store at least 50 million tonnes of CO 2 within 30 years. The captured CO 2 would be sourced from industrial emitters including project partner ONEOK, Inc.’s gas-processing plants and a planned gas-to-liquids facility. Drilling of the Roughrider 1 stratigraphic test well (14,979-ft total depth) was completed in November 2024. The wellbore intersected four candidate storage formations: Inyan Kara, Broom Creek, Mission Canyon, and Black Island–Deadwood. Operational challenges, including a stuck drill string, were resolved without long-term impact. A comprehensive logging and coring program was conducted, followed by successful well abandonment and site reclamation. Over 660 ft of 4-in. whole core was retrieved. Core plug samples were processed and analyzed for petrophysical and geochemical properties. Results confirmed promising porosity and permeability in the Inyan Kara and Broom Creek Formations and removal of the Mission Canyon and Black Island–Deadwood horizons from further investigation. Data derived from the logging and coring program were used to improve initial geologic models built from legacy data. CO 2 injection simulations showed that the Inyan Kara alone can feasibly store the target mass of CO 2 . Because of subtle differences in geologic structure and porosity trends between the formations, a stacked storage scenario using the Broom Creek and Inyan Kara Formations resulted in a larger overall plume area than using the Inyan Kara alone. Preliminary CO 2 pipeline routes from the industrial sources were mapped utilizing existing rights of way and evaluated for capacity and cost using U.S. Department of Energy Office of Fossil Energy and Carbon Management/National Energy Technology Laboratory models and U.S. Environmental Protection Agency emissions data. Integrating capture, transport, and storage cost estimates with policy incentives (e.g., 45Q credits) provided a total cost-per-ton analysis. Results indicate that the small scale of the volumes to be transported over the cumulative large distances does not support the project’s financial viability. However, the groundwork laid during this project from geological, regulatory, and social perspectives positions the Roughrider hub site as a promising candidate for commercial carbon storage in North Dakota, especially if the economy of scale is introduced for CO 2 transportation to the hub site.

01 COAL, LIGNITE, AND PEAT↗

Satellite-based Investigation of Power-Line Vegetation Encroachment in the US (SILVANUS)

Rapid wide-area assessments of vegetation encroachment on transmission and distribution line rights-of-way (ROW) is a highly desirable capability for understanding risks to the power grid during severe weather and wildfire events. Conventional assessments are time-consuming and expensive due to the need for in-situ inspections and the use of aerial assets. Performing conventional assessments on a wide area would require immense resources and time that might not be available within the horizon of an expected adverse event. Developing a capability to accurately assess vegetation encroachment into ROWs will enable faster analysis of potential grid vulnerabilities in NAERM. This project sought to develop a prototype capability for rapid ROW vegetation encroachment assessments by using Puerto Rico as a test case. Puerto Rico is a heavily forested island territory frequently impacted by tropical cyclones that threaten the electric grid by downing trees across transmission and distribution lines. Multispectral satellite imagery (MSI) enable very high resolution (i.e., 0.5 - 2 meter) assessment of vegetation conditions at scale and with revisit times appropriate for regular monitoring (e.g., weekly to quarterly, depending on cloud cover) of the entire island. Synthetic aperture radar (SAR) data from satellites was also investigated as solution to the cloud-cover issue as they are active sensors that emit and receive a microwave signal rather than relying on solar illumination, and are therefore unaffected by cloud cover and can collect data during day or night. Finally, MSI-derived digital surface models (DSMs) map the height of objects relative to sea level, and were assessed for their ability to estimate the height of forest canopies relative to coincident transmission lines. The results of the mapping investigation are described in this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS

In 2020, Patua Acquisition Company LLC, submitted the proposal “Increasing Power Generation at the Patua Nevada Geothermal Field through Targeted and Adaptive EGS”, in response to the DOE’s Geothermal Wells of Opportunity Funding Opportunity Announcement. The primary goal of the project was to convert an idle well, Patua 16-29, to an active producer and generate at least an additional 5 MWe at the Patua plant. The project was intended to provide an example of a reproducible methodology for well stimulation in Enhanced Geothermal Systems The project was proposed to be performed in three phases over a period of performance of four years. A first project go/no-go decision was made at the end of Phase 1 based on feasibility of the wellbore, site, and ability to realize a 5 MWe benefit from the project. Several factors were recognized that led to a no-go decision at this phase: • Electrical needs for placing the stimulated well on production were not considered in the initial scoping. Costs of pipeline costs were also underestimated in the original cost share. Easements and rights-of-way to establish a geothermal pipeline underneath or across an interstate highway were also found to be intractable on the time scale of the project. • The plant is injection limited, and no design or cost estimate was in place to handle the additional production needed to realize a 5 Mwe benefit. A new injection well would need to be drilled in addition to the other facility improvements to bring in the stimulated well. Patau Acquisition Company attempted to locate additional wells of opportunity that could realize the SOPOs goals, but was unsuccessful. As a result, this project is being terminated at the end of Phase 1.

15 GEOTHERMAL ENERGY↗

Corral Summit Pumped Storage Hydropower Hybrid: Site Suitability Assessment

In 2024, Idaho National Laboratory (INL) and Pacific Northwest National Laboratory (PNNL) initiated a technical-assistance project to support Cat Creek Energy, LLC, (CCE) in evaluating site suitability for the proposed Corral Summit Pumped Storage Hydropower (PSH) project in south-central Idaho near Mackay Reservoir. The Corral Summit facility incorporates battery storage and photovoltaic (PV) solar arrays in a Trybrid configuration to deliver large-volume long-duration (LVLD) storage solutions for rural electric cooperatives in eastern Idaho. The evaluation process focused on determining the most-suitable location for the upper reservoir of the PSH system, guided by a comprehensive assessment framework spanning multiple categories, including physical characteristics, environmental constraints, building infrastructure, regulatory constraints, cultural resources and sensitivity, social factors, and power market and grid integration. Each site was analyzed based on a ranking scale (0–1), which scores ranging from “severely disfavored” to “highly favored,” allowing detailed comparisons of site-specific conditions. Categories such as hydraulic head, utilities corridor, land ownership, and transmission-grid limitations emerged as key contributors to the overall assessment. Site 2 (Idaho Trust) demonstrated a slight advantage over Site 1 (Bureau of Land Management) primarily due to favorable outcomes in regulatory constraints, building infrastructure, and power-market integration. However, Site 1 outperformed Site 2 in factors related to physical characteristics and social factors. The report emphasizes the need for further evaluation of both sites before clear determination of which site is preferred, due to the limited information available on either site at the time of this report. Key areas of evaluation to clearly define the preferred site are ecological impacts, cultural-resource surveys, and economic-feasibility assessments. For successful project execution, recommended follow-up actions include seismic and geotechnical surveys, groundwater and habitat monitoring, regulatory reviews of water rights and right-of-way agreements, cultural engagement with local tribal governments, and enhanced stakeholder strategies. These efforts will ensure the Corral Summit Trybrid facility meets local energy needs while balancing environmental, social, and regulatory responsibilities.

13 - HYDRO ENERGY↗