Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Regulatory Compliance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Failure Analysis–Informed Risk Assessment Framework for Geological Carbon Storage Using Numerical Simulation and Machine Learning

Geological carbon storage (GCS) is recognized as a critical technology for achieving large-scale reductions in anthropogenic carbon dioxide (CO 2 ) emissions. Ensuring long-term containment and safety requires robust risk assessment frameworks that account for geological uncertainty and identify potential failure scenarios. Among various indicators, the area of review (AoR) serves as a key metric for evaluating storage performance, regulatory compliance, and monitoring design, as it delineates the spatial extent impacted by pressure buildup and plume migration. However, conventional AoR-based risk assessments typically perturb parameters within narrow uncertainty bounds, potentially overlooking rare but high-impact events arising from extreme geological conditions. In this study, we present a failure analysis–informed risk assessment framework for large-scale GCS projects to improve site prescreening and monitoring design. A suite of 300 numerical simulations was generated using stochastic geological models that vary five key parameters: net-to-gross ratio, anisotropy azimuth, porosity multiplier, permeability multiplier, and vertical-to-horizontal permeability ratio. Among these, 200 realizations represent normal geological uncertainty, while 100 additional cases explore extreme yet plausible conditions for failure-case analysis. The AoR was simulated and computed from pressure and CO 2 saturation fields, where the baseline AoR boundary, representing the extent predicted under typical geological uncertainty, was defined as the union of 200 normal-range simulations, and failure was identified when extreme-range cases exceeded this baseline. Results show that incorporating broader parameter uncertainty produces significantly larger AoR extents, underscoring the potential underestimation of risk under conventional uncertainty ranges. Furthermore, spatial probability maps derived from failure-induced AoR exceedance identify regions requiring enhanced monitoring attention. Various machine learning (ML)–based classifiers were developed to predict failure occurrence from geological parameters, with the random forest model achieving the highest performance (F1-score of 0.986). Consistent findings from correlation coefficient, feature importance, and Sobol sensitivity analyses reveal that low net-to-gross ratios and permeability multipliers are the dominant risk drivers, reflecting reduced reservoir connectivity and limited pressure dissipation. Altogether, these results provide a novel framework for risk-informed site prescreening and monitoring design that explicitly considers rare but high-impact geological scenarios in GCS projects.

25 ENERGY STORAGE↗

Winning Asset Management Improvement Team: Maintenance Planning and Scheduling in a Highly Regulated Environment

The Y-12 National Complex (Y-12) site has numerous aging facilities that are crucial to the Department of Energy and the national security strategy for the nation. Y-12’s commitment to safety and regulatory compliance is of the highest importance. The commitment to meet the national security mission also creates additional rigor and complexity to the everyday maintenance and planning process. Y-12 is a collection of many facilities, both old and new, nestled between two ridges in Oak Ridge, TN. Y-12 was made with the short-term focus of ending “The Great War” through the creation of the worlds’ first atomic bomb. Almost eighty (80) years have passed since the groundbreaking, with the mission of the site changing from decade to decade. While the mission has changed, the way Y-12 employees continuously meet the challenge has not. The site was created to react and overcome; Y-12 still takes pride in the ability to react and overcome. The difference is the site is no longer ignorant to the need for a better way to manage the aging facilities and infrastructure. Shear willpower and determination was once the way to reach the objectives, but as a wise man once said, “Work smarter, not harder.” The business case for change started within the senior leadership at Y-12. A team of managers sat down and dictated objectives to provide a clear scope for the maintenance planning and scheduling optimization team, to include our Eruditio integrated blended learning coaches. In addition to providing the direction, they also made themselves available for escalation of issues in the event the team ran in to road blocks.

99 GENERAL AND MISCELLANEOUS↗

Regulatory Treatment of Low Frequency External Events under a Risk-Informed Performance-Based Licensing Pathway

Significant efforts are underway to develop and implement a risk-informed performance-based licensing framework for advanced reactors built on the establishment of an affirmative safety case. Such approaches offer the benefits of increased flexibility regarding key design and licensing decisions based on a detailed assessment and understanding of plant risk. These methods include the comprehensive analysis of scenarios that have historically been addressed through conservative and deterministic licensing analysis approaches, such as the evaluation of event sequences at frequencies of occurrence beyond the design basis. While the detailed analysis of low frequency events provides insights that can help justify alternative treatments to past conservatism, the findings are dependent on the quality and confidence associated with the analyses. The assessment of external hazards presents a unique challenge, as their potential frequency of occurrence, especially of large magnitude events, is inherently uncertain given the long return periods in question. The current project seeks to further explore the regulatory treatment of low frequency external events as part of a risk-informed performance-based framework. The goals are to identify the benefits and challenges of such approaches for advanced reactor vendors and to aid in the development of consistent and appropriate methodologies. As part of this effort, the current report summarizes initial project findings, with a focus on the evaluation of the seismic hazard. This includes an exploration of the implementation of a risk-informed performance-based approach through an example analysis. Based on the identified challenges associated with the probabilistic treatment of low frequency event sequences, additional performance-based methods were explored as complementary tools for demonstrating regulatory compliance. The report highlights key challenges and opportunities associated with the methods and outlines recommendations and future activities to assist with their implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Economic Impact of Permitting Timelines on Geothermal Power in California, Nevada, and Utah

The United States has great geothermal power potential; however, only a small fraction of this resource has been utilized for power generation. Various barriers, including technical, financial, and regulatory permit delays, are attributed to the lower penetration of geothermal energy into the national grid. Unpredictable environmental reviews and permitting timelines are some of the non-technical barriers that can cause delays in geothermal exploration and utilization plans. This document provides an assessment of the potential economic impact of permitting costs and timelines on geothermal power in California, Nevada, and Utah. Development of geothermal resources requires multi-layered regulatory permitting by local, state, and federal agencies. In this study, we collected and reviewed permit timelines and associated cost data for several existing geothermal power plants as well as for geothermal projects currently undergoing permitting processes for exploration and development activities in California, Nevada, and Utah. We interviewed several geothermal developers and staff from multiple permitting agencies to obtain insight from both sides (i.e., people applying for permits and people processing those applications for California Environmental Quality Act [CEQA] and National Environmental Policy Act [NEPA] reviews and other regulatory compliance). The intent of this project was also to identify informative pathways for the geothermal stakeholder community by which the permitting process could be streamlined.

15 GEOTHERMAL ENERGY↗

2021 Radionuclide Air Emissions Report for Los Alamos National Laboratory, Revised October 2022

Provided is a revision to the Calendar Year 2021 Radionuclide Air Emissions Report for the Los Alamos National Laboratory (LANL). This report is a regulatory compliance deliverable for LANL under the Radionuclide NESHAP, 40 CFR 61 Subpart H. The revised report is needed to correct an error identified regarding generation of wind data files. These wind data files are used for plume modeling as part of calculating off-sites doses from monitored radionuclide air emissions sources. The error resulted from a software update by LANL’s meteorology team after new towers were added to the tower network. As a result of this error, incorrect wind frequencies were assigned to the different stability classes. This slightly affected the plume model calculations and subsequent off-site dose determinations for analyses using these wind files.

2021 Radionuclide, Air Emissions↗

Alternative Technologies Adopters Outreach Survey Report

Brookhaven National Laboratory (BNL), in collaboration with Ioanna Iliopulos and Christopher Boyd (independent contractors), conducted quantitative and qualitative surveys to document views and opinions of scientists and researchers with firsthand experience operating x-ray devices for a wide range of research applications. The goal of the study was to fill critical information gaps and identify misconceptions widely held among the research community regarding the transition from Cesium-137 irradiators to x-ray devices. The survey instrument focused on three distinct yet interrelated areas that impact users' experience: operational impacts, including infrastructure needs, workflow, personnel management, and training, and regulatory compliance; research design and investigation impacts, including calibration, dosimetry, continuity of previous studies, development of new research agendas, and the outcomes for both; and funding impacts, specifically how grant sources and opportunities have responded to the transition.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integrating the Safety Evaluation for a Molten Salt Reactor Operation and Fuel Cycle Facility Application

Molten salt reactor (MSR) sites may include additional elements of the nuclear fuel cycle beyond those of the existing fleet. In the existing fleet, the individual elements of the fuel cycle typically have been located on different sites and licensed separately. Providing robust separation between hazards remains a useful safety practice for MSRs. Although the different elements of the fuel cycle at a nuclear site that includes MSRs may transfer material between processes more frequently than prior practices, providing adequate separation between distinct facilities avoids the potential for adverse interactions. Additionally, some elements of the MSR fuel cycle, such as fuel salt preparation or waste stabilization, may be more efficient to share among multiple nearby reactors, and nuclear sites that include MSRs may also include other reactor classes. Hence, discrete MSR fuel cycle facilities located at a common site could be physically separated with robust barriers—albeit potentially connected by piping—and licensed individually. This report describes the hazards of individual elements of representative MSR fuel cycle facilities, including their relationship to overall site level hazards. The report maps the regulatory compliance aspects of the individual MSR fuel cycle elements (e.g., fuel salt preparation, reactor, waste stabilization) to existing and developing regulations, as well as describes current and developing site-level regulations from an MSR perspective.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Integrated Issues and Risk Management: A Theoretical Framework Overview

The contractor requirements document for DOE O 226.1B, Implementation of Department of Energy Oversight Policy, requires DOE/NNSA contractors to establish an assurance system that includes, among other things, “Rigorous, risk-informed, and credible self-assessment and feedback and improvement activities. Assessment programs must be risk-informed, formally described and documented, and appropriately cover potentially high consequence activities” and “Contains an issues management process that is capable of categorizing the significance of findings based on risk and priority and other appropriate factors….” However, the term “risk-informed” is not defined in this or any other DOE order, and no formal guidance on how to integrate the two concepts currently exists. The Risk Management Guide for Defense Programs released by NA-18, Office of Systems Engineering and Integration (SE&I), states it is “a framework and general guidance to program office personnel on the effective management of program risks and issues”, however it then defines issues as “events with 100% likelihood of affecting program objectives” and states “unless specified otherwise, the term “risk” will also serve to represent issues for the remainder of this plan,” severally limiting its ability to provide adequate guidance on this topic. Outside of DOE scope, the U.S. Nuclear Regulatory Commission (U.S. NRC) imposes similar requirements. ASME NQA-1-2015 Requirement 16 states “Conditions adverse to quality shall be identified promptly and corrected as soon as practicable. In the case of a significant condition adverse to quality, the cause of the condition shall be determined, and corrective action taken to preclude recurrence. The identification, cause, and corrective action for significant conditions adverse to quality shall be documented and reported to appropriate levels of management. Completion of corrective actions shall be verified”. The purpose of this document is to provide a best-in-class framework for an integrated risk and issues management process. This process would provide a robust feedback loop between risk management and issues management to: Enhance risk identification and characterization, use risk handling principles to improve corrective action planning, and ensure regulatory compliance.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Cybersecurity for Energy Systems: Foundational Concepts for Bangladesh Electric Utilities [Slides]

This slide deck was developed for a training for the Northern Electricity Supply Company (NESCO) in Rajshahi, Bangladesh. The topics include: understanding the cybersecurity landscape in power utilities, fundamentals of cybersecurity for power utilities, regulatory compliance and standards, and best practices and strategies. The concepts in this slide deck are relevant for electric utilities throughout Bangladesh.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

43 PARTICLE ACCELERATORS↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Enhancing Site Screening for Underground Hydrogen Storage: Qualitative Site Quality Assessment - SHASTA: Subsurface Hydrogen Assessment, Storage, and Technology Acceleration Project

The global shift towards renewable energy sources to mitigate fossil fuel dependency and meet carbon emission targets by 2050 has underscored the importance of innovative solutions to address energy supply-demand imbalances. Underground Hydrogen Storage (UHS) has emerged as a promising strategy to store excess renewable energy in subsurface formations for future retrieval and utilization. This report focuses on enhancing the site screening process for UHS facilities. By drawing on insights from prior research to identify key criteria influencing site suitability, our objective is to present a comprehensive set of sixteen specific criteria essential for refining the selection of UHS sites. These criteria cover various aspects such as reservoir performance, legal access, regulatory compliance, economic viability, public acceptance, and safety and security considerations. Our proposed methodology allows users to evaluate potential sites using binary responses, transitioning from isolated factors to broader considerations that facilitate a qualitative assessment of site suitability. This method enables comparative analysis and informed decision-making, supporting stakeholders in the site selection process. Our approach is designed as a guiding framework rather than a rigid template for site screening, emphasizing the importance of customizing approaches to individual circumstances. As UHS site development project evolves, adopting a comprehensive selection methodology that integrates holistic evaluations will be essential for ensuring efficient and effective site screening processes tailored to specific project needs.

08 HYDROGEN↗

Overview and Commentary on Applying the Coordinated Vulnerability Disclosure Process to Photovoltaic System Devices

The rapid expansion of photovoltaic (PV) systems, particularly inverters, has introduced new cybersecurity challenges that threaten both local operations as well as the broader electrical grid’s stability. PV inverters, integrated into critical energy infrastructure are potential targets for cyber attacks due to vulnerabilities in firmware, remote access systems, and communication protocols. The Coordinated Vulnerability Disclosure (CVD) process, as defined by the Cybersecurity and Infrastructure Security Agency (CISA), provides a framework for identifying, reporting, and addressing these vulnerabilities in a transparent and collaborative manner. This report outlines the CVD process as it applies to PV systems, detailing the roles of key stakeholders, such as manufacturers, grid operators, and security researchers. The report also highlights specific challenges in managing vulnerabilities for new and legacy PV systems, which includes those introduced by insecure communications and third-party supply chain components. By adhering to the CVD process, the PV industry can mitigate cybersecurity risks, ensure regulatory compliance, and maintain consumer trust, while safeguarding the operational resilience of the energy grid. Ultimately, the effective coordination of vulnerability management is crucial for securing the future of PV systems within the critical electric grid infrastructure landscape.

14 SOLAR ENERGY↗

Economic Evaluation of Modernization Expenditures for Electric Utility Distribution Systems: A Guide for Utility Regulators

Cost-effectiveness evaluation of potential grid modernization solutions is integral to integrated distribution system planning (IDSP). This report synthesizes and updates prior cost-effectiveness approaches identified by the U.S. Department of Energy for grid modernization investments, incorporating multi-objective decision-making. The structure of the report follows the IDSP process, from identifying objectives and priorities to prioritizing grid solutions. The report details two methods for conducting initial cost-effectiveness screening of individual and interdependent grid components: (1) Lowest Reasonable Cost and (2) Benefit-Cost Analysis. Drawing on solutions that passed the initial cost-effectiveness screen, the utility prioritizes grid solutions based on policy objectives and priorities, regulatory compliance, operational efficiencies, and other factors to develop a portfolio of distribution solutions. The utility uses multi-objective decision-making to assess each proposed expenditure against each objective and respective metric. The utility applies a weighting factor, reflecting the priority ranking of the objective, to the total numerical “score” based on the contribution of the proposed solution to addressing each objective. Ultimately, the utility ranks each expenditure from highest to lowest priority using the final score for each solution as well as its cost. The report includes examples of emerging best practices for states and utilities and a cost-effectiveness process checklist.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Southwest Regional Partnership on Carbon Sequestration: Phase III (Final Scientific/Technical Report)

The Southwest Regional Partnership on Carbon Sequestration (SWP) is one of 7 regional partnerships formed in 2003 under the U.S. Department of Energy’s (DOE) Regional Carbon Sequestration Partnerships (RCSPs) initiative. The overall purpose of the initiative was to help determine and implement the technology, infrastructure, and regulations most appropriate to promote carbon storage in different regions of the country. Covering Arizona, Colorado, New Mexico, Oklahoma, Utah, and parts of Texas, Wyoming, and Kansas, the SWP evaluated regional carbon storage and utilization potential and focused on technologies and sites that could complement the region’s strong position in energy production. The project progressed through three phases: • Phase I (2003–2005): Characterized regional geologic formations and CO 2 sources, assessed sequestration potential, and identified pilot test sites. • Phase II (2005–2013): Conducted small-scale field tests to validate sequestration methods, including geologic and terrestrial projects. • Phase III (2008–2022): Demonstrated large-scale CO 2 injection at a commercial oil field to test monitoring, verification, and long-term storage strategies. This report covers Phase III. The final project site, the Farnsworth Unit (FWU) in Texas, provided real-world testing of reservoir characterization, monitoring, and risk evaluation tools and processes that could be used in any commercial scale carbon capture, utilization, and storage (CCUS) project. Extensive data collection and analysis helped refine best practices for reservoir characterization, injection monitoring, and storage verification. The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Key lessons learned include the importance of robust data management, strategic site selection, regulatory navigation, and effective industry collaboration. The project’s findings will inform ongoing and future carbon storage initiatives. Task 1 (Regional Characterization) • The SWP continued to participate in national outreach efforts and NATCARB. • The SWP evaluated multiple potential sites before selecting the FWU as the primary field test location. Task 2 (Public Outreach and Education) • The SWP contributed to national databases, DOE best practice manuals, and regional geological assessments to support future sequestration efforts. Task 3 (Permitting and Regulatory Compliance) • The SWP ensured compliance with federal and state regulations, including National Environmental Policy Act (NEPA) requirements. • The SWP obtained all necessary permits for drilling, injection, and monitoring activities. Task 4 (Site Characterization and Planning) • The SWP developed work plans for four key activities: characterization, simulation, monitoring and verification, and risk evaluation. • The SWP collected and synthesized legacy data from multiple sources to build initial static geological models and dynamic reservoir models demonstrating project feasibility. • The SWP conducted an initial risk evaluation and developed mitigation plans. Task 5 (Field Operations and Data Collection) • The SWP drilled, logged, and cored three characterization wells to gather critical subsurface data. • The SWP conducted multiple geophysical surveys, including 3D seismic, crosswell seismic, and vertical seismic profiling, to improve reservoir characterization. Task 6 (Monitoring and Verification) • The SWP performed extensive geological characterization using data from characterization wells and seismic surveys. • The SWP established a surface monitoring network to track CO 2 flux in soil gas, groundwater chemistry, and near-surface atmospheric CO 2 levels. • The SWP built and refined reservoir models to study the effects of relative permeability on simulation behavior and improve calibration with experimental data. Task 7 (Risk Assessment and Model Refinement) • The SWP conducted multiple studies to evaluate reservoir integrity, predict CO 2 plume behavior and improve predictive modeling capabilities. • The SWP refined geological models and used them to enhance the accuracy of simulation models. • The SWP continued quantitative risk assessment of top-ranked risks and strengthened the link between qualitative and quantitative risk methodologies.

02 PETROLEUM↗

Autonomous Fueling System for Heavy-Duty Fuel Cell Electric Trucks

The motivation for this project stemmed from the challenges associated with rapidly refueling heavy-duty hydrogen fuel cell electric trucks (FCETs). Current manual refueling processes for fast refueling involve large, heavy equipment (e.g., hoses three times heavier than standard) and pose ergonomic risks and potential for equipment damage. The goal was to develop and test an autonomous fueling system to improve ergonomics, enhance safety, increase equipment durability through design improvements, and potentially speed up the fueling process. This project aimed to add to the understanding of autonomous systems in the context of heavy-duty hydrogen refueling, evaluating the technical effectiveness of potential concepts. A successfully developed system would benefit the public by facilitating the adoption of zero-emission heavy-duty transport, reducing reliance on manual labor for a physically demanding task, and potentially improving the safety and efficiency of hydrogen refueling infrastructure. The major accomplishment during the project's active period was the completion of the system-level architecture task. This involved establishing a detailed list of system requirements covering interfaces, environmental conditions, regulatory compliance, industry standards, safety, security, performance capabilities, and optional features. Five key use cases for the autonomous system were also identified. However, due to internal restructuring at Nikola, the necessary resources could not be allocated to continue the project. Consequently, Nikola opted to discontinue the project. The award was mutually terminated by Nikola and the DOE.

08 HYDROGEN↗

Optimization Studies of Radiation Shielding for PIP-II Project at Fermilab

The Proton Improvement Plan-II (PIP-II) at Fermilab represents a significant advancement in the quest to answer some of the most profound questions about our universe using the world's most intense high-energy neutrino beam. The project requires the construction of a new addition to the Fermilab accelerator complex – an 800-MeV high-intensity superconducting linear accelerator. Ensuring the safety and regulatory compliance of this ambitious project is paramount, necessitating thorough dose rate assessments under both normal operational and accidental scenarios to align with the Fermilab Radiological Control Manual (FRCM) standards. Our approach included a shielding optimization used for the simulations with the Monte Carlo code MARS [1,2,3] to incorporate new magnet and collimator designs, essential for reflecting the current state of PIP-II infrastructure. The implementation of high-resolution detector planes, despite their computational demands, enabled us to gather detailed radiation field data crucial for optimizing shielding configurations. To overcome the significant computational demands, we developed a branching code that drastically reduced simulation runtimes while maintaining statistical integrity. This was achieved through geometry splitting and the application of Russian Roulette techniques, tailored to prioritize regions of interest based on predefined importances and weight limits.

Makovec, Alajos↗