Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE DISPOSAL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Database for Radwaste Management in Germany-30 Years of Experience by TUV NORD - 20461

From the very beginning in the late 1980's TUV NORD EnSys is involved as an independent expert in quality assurance processes concerning interim storage facilities and the disposal for radioactive waste with negligible heat generation in Germany. A database has been developed since these times by TUV NORD EnSys. The development of this database over a long time will be discussed as well as the lessons learned within this process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Why Cleanup Acceptance Is Running into Conflicts - Off-site Disposal Versus On Site Disposal - 19068

For years the U.S. Department of Energy (DOE) identified several sites to receive shipments of various types of wastes. However, with the backlog at the Waste Isolation Pilot Plant (WIPP), the inability to license Yucca Mountain, and the agency's desire to expedite cleanup, DOE is trying to 'dispose of' or 'store' more waste belonging to the Federal government on-site. Some states and communities that were 'promised' disposal of DoE's waste in geologic repositories and licensed landfills in arid locations, are now being told that on-site disposal is the best path forward. Competition for resources is forcing more sites to focus on near term cost savings of on-site disposal, rather than develop comprehensive life-cycle estimates representing a more realistic picture of costs associated with isolating radioactive and other hazardous materials on-site in perpetuity. The paper explores the issues and possible solutions in a case study on proposed on-site disposal of DOE waste, and concludes that DOE needs community support and community acceptance to successfully implement the agency's cleanup mission. Ongoing dialogue with the community saves both time and money but more importantly, cooperation helps ensure that effective long-term cleanup occurs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 24B: Records, Knowledge, and Memory for Radioactive Waste Repositories: Generational Equity Focus

This panel focused on the latest thoughts, ideas, and methodologies being explored throughout the world on how to communicate with future generations regarding nuclear waste disposal. Scientists determined many years ago that geological disposal in a repository was the preferred solution for nuclear waste disposal given the longevity concerns of the waste(s). Future generations must be informed through records, memory keeping and permanent markers to ensure they are aware of, and knowledgeable of, the dangers associated with nuclear waste isolated from the biosphere. Panelists with presentations: You Want to Drill Where? Human Intrusion Messaging Considerations (Thomas Peake, Jonathan Major); Ethical Reflections on the Basic Reasons for RK and M Measures (Carl-Reinhold Brakenhielm); NEA Activities on Information, Data and Knowledge Management (Rebecca Tadesse); Records, Knowledge and Memory (RK and M) Across Generations: Recent Activities and Progress in Sweden (Claudio Pescatore)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact to Groundwater All-Pathways Dose Estimates for the Remote-Handled Low-Level Waste Disposal Facility Performance Assessment Using Updated Dose Coefficients from DOE-STD-1196-2022

The Performance Assessment (PA) for the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility at Idaho National Laboratory (INL) was completed in 2018 (DOE-ID 2018) using dose coefficients from U.S. Department of Energy (DOE) Standard DOE-STD-1196-2011 (DOE 2011). Internal and external dosimetry was updated in 2021 and a new technical standard was published in 2022 (DOE-STD-1196-2022) (DOE 2022). This technical memorandum provides a comparison of the ingestion dose coefficients between those published in DOE (2011) and those published in DOE (2022). The dose coefficients in DOE (2022) were then used to calculate the all-pathways dose for the groundwater pathway and the results between the doses published in the 2018 PA and those calculated using the updated dose coefficients in DOE (2022) were compared. Several other issues in the 2018 RHLLW Disposal Facility PA were also addressed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Baseline Monitoring Data for the Remote-Handled Low-Level Waste Disposal Facility at Idaho National Laboratory

The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Co-Disposal Waste Package Loading Options for DOE SNF and HLW - 20331

The U.S. Department of Energy (DOE) is responsible for managing spent nuclear fuel (SNF) that is currently in, or will in the future come into, its possession. DOE must continue to safely store that SNF, transport it to an interim storage site or a repository, and dispose of it. These fuels come from a wide range of reactor types with various cladding materials and enrichments. Many of these reactors, now decommissioned, had unique design features, such as core configuration, fuel element and assembly geometry, moderator and coolant materials, operational characteristics, and neutron spatial and spectral properties, resulting in a large diversity of reactor and fuel designs. Because of the wide variety and conditions of SNF, a robust DOE Standard Canister was proposed that would confine radionuclides and preclude moderator. The DOE Standard Canister had four variations: 3.05-meter (10-foot) or 4.57-meter (15-foot) length, and 45.7-cm (18-inch) or 61.0-cm (24-inch) diameter. For ultimate disposal in the Yucca Mountain Repository, these canisters were to be grouped with 61.0-cm (24-inch) diameter high level waste (HLW) canisters in a 2.13-meter (84-inch) diameter co-disposal waste package. The smaller 45.7-cm (18-inch) diameter DOE Standard Canister could be placed in the middle of five HLW canisters. The larger 61.0-cm (24-inch) diameter DOE Standard Canister would take the place of one of the five HLW canisters on the outer ring in the co-disposal waste package. No DOE Standard Canisters have been loaded. A preliminary evaluation has estimated the number of elements of a fuel type that can fit into the different sizes of the DOE Standard Canister, but no definitive loading configuration has been selected. Changing the loading configuration could impact the number of loadable DOE Standard Canisters and the number of co-disposal waste packages needed for eventual disposition. This paper conveys the ranges of DOE Standard Canisters and HLW canisters that may be produced under certain conditions. It also examines the differences in the estimated number of co-disposal waste packages produced for eventual disposal when using different loading strategies in the DOE Standard Canister for Advanced Test Reactor (ATR), Peach Bottom, and High Flux Isotope Reactor (HFIR) SNF. Changing the loading configurations of ATR, Peach Bottom, and HFIR SNF slightly impacted the number of co-disposal waste packages that may be needed for ultimate disposal. The change in loading configuration was more impactful when a different canister was used, as opposed to varying the number of elements that could fit inside the same size canister. In one case, a reduction of co-disposal waste packages could be achieved by allowing mixing of short HLW canisters with long DOE Standard Canisters. The main conclusion from this analysis is that the ratio between HLW canisters and DOE Standard Canisters will drive the total number of co-disposal waste packages. If too many HLW canisters (i.e., more than five times the number of 18-inch DOE standard canisters) or DOE Standard Canisters are produced, some co-disposal waste packages may not have all positions filled. A co-disposal waste package may be filled with all HLW with no DOE Standard Canister, or a co-disposal waste package could be filled with a single DOE Standard Canister. A ratio that does not closely align to optimum could allow for the design of waste packages that hold just HLW canisters or just DOE SNF canisters. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

When Every Drum is a Win - Tackling a Thirty-Five Thousand Drum Legacy - 20064

Cameco Corporation's (Cameco) Port Hope Conversion Facility (PHCF) was previously owned by the federal Crown Corporation, Eldorado Nuclear, which held a significant inventory of legacy waste material at the time Cameco was formed in 1988. As a result, Cameco was granted an allocation of 150,000 cubic metres of space in the Long-Term Waste Management Facility (LTWMF) located in the Municipality of Port Hope (MPH), which opened to the receipt of Cameco material in June 2018. Cameco is currently undertaking a major site cleanup and renewal of its Port Hope Conversion Facility (PHCF) which is known as the Vision in Motion (VIM) project. Over its operating history, Eldorado accumulated an inventory of over 35,000 drums of accumulated waste that was primarily stored at two offside warehouse locations. In 2017 and 2018, the project focused on repackaging two well characterized legacy wastes (magnesium fluoride slag and depleted uranium titanium oxide) from one of the two offsite locations. At the conclusion of this work, approximately 15,000 drums of these wastes had been repackaged and disposed of at the LTWMF. There remained approximately 1000 drums from this location that either could not be repackaged safely or were different waste types and required further verification and/or processing. The buildings at this location were scheduled for demolition in early 2019, which triggered the development of a process for triaging legacy drums in August 2018, which allowed for preparation and shipment of approximately half of these drums to the LTWMF by March 2019, with the remainder moved to the second offsite warehouse location in February 2019 for further characterization which is ongoing. This paper will discuss key lessons learned as the drummed legacy waste disposal inventory has been reduced to approximately half of the initial inventory. This will include the development of an alternate packaging process; prioritization of characterization activities and selection of techniques where minimal inventory information is available; determination of next step(s) for each drum as it is assessed; key safety considerations; and how to make inroads into an overwhelming task while under public and regulatory scrutiny. In a relatively short period of time, significant progress has been made to organize and gather information about the legacy waste, update the inventory records and determine the most appropriate pathways (i.e. LTWMF disposal, disposal at another appropriate facility, site storage until future processing and/or disposal). Since 2017 the volume of the decades-old legacy waste inventory has decreased significantly. With the majority of the known materials safely disposed of at the LTWMF, every drum removed from the endless rows of 20,000 pyramidally-stacked waste drums with limited history that is safely characterized, prepared and shipped is considered a win. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Minimization of Nuclear Waste using AHWR Reactor Technology

Nuclear sciences have grown from creating reactors to a greater understanding of how to dispose off the waste exhibited by the nuclear activities. Various methodologies have been proposed and are being used in order to do the same. This poster poses great attention to 'Using a fuel cycle dedicated to the production of the lower quantity of minor actinides, is one of the key targets in reducing nuclear waste in india'. A significant fraction of thorium is utilized as a fertile host in the Advanced Heavy Water Reactor (AHWR300-LEU) fuel. Being lower in the periodic table, it leads to a reduction of minor actinides. It produces only half of the minor actinides as a waste as compared to modern LWRs. As thorium oxide has inert nature, it benefits in its prolonged storage. Therefore, safe disposal of spent fuel is achieved due to the inert matrix, on completion of one fuel cycle mode. AHWR is a 300 MWe, vertical, pressure-tube type, boiling light water-cooled, and heavy water-moderated reactor. Employs natural circulation for removal of heat from the reactor core. In-situ conversion of {sup 232}Th into {sup 233}U. The reactor design permits flexible fuel cycle options. There are two types of AHWR depending upon the fuel cycle options. Uses thorium-based oxide fuels: two fuel cycle options. With the adoption of thorium fuel cycle, AHWR300-LEU produces less minor actinides. As compared to modern LWRSs, it produces almost 37% less amount of actinides for the same amount of energy production, which in turn minimizes the burden on waste disposal requirements. But, it is associated with radionuclides such as {sup 231}Pa (produced through absorption of one neutron and emission of two neutrons). Since, the reaction rate of (n,2n) reactions is very low in thermal neutron reactors, thus making the fuel cycle the favorable one. Thorium oxide (ThO{sub 2}) is chemically stable and is the highest oxidation state of thorium, therefore the inert nature of the matrix is advantageous for safe disposal of spent fuel in case of adoption of open fuel cycle mode and offers prolonged storage of spent fuel. The AHWR is thorium fueled Indian nuclear reactor that assimilates several new features with diminished environmental concern due to reduced waste generation. Since thorium fuel cycle produces less long lived nuclear waste, thus it can possibly bring the world cleaner and more sustainable nuclear energy. Currently, India being the only country with large scale research program of thorium nuclear power serves a platform for the development and demonstration of all technologies and advanced safety systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unlocking the Vault - Accelerated Delivery Through the Application of Innovation and Collaboration - 19011

The Pile Fuel Cladding Silo (PFCS) at Sellafield was built in 1949/50 to receive and store fuel cladding from reprocessing of Windscale Pile fuel; it has been used to store this material and other waste from the UK nuclear programme ever since. The Silo is unsuitable for indefinite storage; this along with uncertainty in the make-up and condition of the inventory combine to rank the facility alongside the most hazardous in Western Europe. Sellafield Ltd, began working with its supply chain partners Bechtel Cavendish Nuclear Solutions (BCNS - a joint venture between Bechtel Inc and Cavendish Nuclear Ltd) in 2012, to execute a suite of projects to create an access route to the waste and a capability to retrieve waste from the silo for the first time ever. However, the challenge of providing this capability, while maintaining ongoing safe storage of the waste, and underpinning future performance of both the silo and the waste packages for many hundreds of years, proved to be too much for traditional Sellafield Ltd delivery models. With both cost and schedule forecasts doubling from initial estimates, a new approach was clearly required. The team recognised that success would require all of the experience and expertise of each organisation working together to a common goal. Therefore, significant effort was expended to build a collaborative team environment into which an innovative approach to both the engineering of what was provided and the delivery methods for doing it could be launched. Focussing on collaborative culture in which innovation and fit for purpose thinking were encouraged has completely rebuilt stakeholder confidence. The project is now almost complete; 17 months ahead of schedule and British Pounds 100 m less than the approved cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applicability Evaluation of the In-can Vitrification to Fukushima Waste - 19016

The in-can vitrification process has been developed by the CEA for an internal application (alpha waste treatment) since 2005 and can be rated TRL 7. On these basis the DEM'n'MELT consortium which gathers Orano, CEA and ECM technologies is currently developing and qualifying a robust, simple and versatile in situ vitrification process dedicated to D and D waste. The DEM'n'MELT vitrification process is developed with a modular design, the main characteristics are presented hereafter: - Suitable for high or medium level waste. - Heated by a simple and robust resistance furnace. - Offering homogeneity to the melted mixture. - Suitable for solid or liquid wastes, including zeolites and sludge. - Flexible enough to accommodate uncertainties on waste composition. - Designed in order to produce a small amount of secondary waste. - Implementing proven technological solutions from French high level vitrification shops. - Requiring low investment and operation costs. Regarding this features, the in-can process has been deemed as an appropriate tool for the vitrification of the Fukushima water treatment secondary waste (mineral adsorbants, sludge). The evaluation of the In-can process for Fukushima waste is a project led by Orano, CEA and ANADEC. The main phases are: - Scenarios and glass formulation studies to optimize waste loading and matrix homogeneity. - Bench scale tests on several scenarios of blended waste. - Pilot scale test on one selected scenario (reference scenario). - Feasibility evaluation to Fukushima Daiichi Nuclear Power Station implementation. This paper presents the first results of this project with a highlighting on glass waste loading, glass properties, bench tests and pilot test results, process parameters, and material balance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Can Melter for Vitrification of Waste Coming from Decommissioning and Dismantling Operations - 19020

Some waste streams from decommissioning and dismantling operations are identified as an issue in terms of handling, transportation, adapted conditioning matrix or evacuation outlet within the existing regulations. In this context, the consortium of the DEM and MELT project which gathers Orano, the CEA and ECM technologies are currently developing and qualifying a specific vitrification tool designed to match the requirements and constraints of D and D projects. The main characteristics of this In-Can vitrification process are presented hereafter: - Suitable for high or medium level waste; - Flexible enough to accommodate uncertainties on waste composition; - Adequately dimensioned and compact to be implemented and operated inside an existing cell or close to the waste to be treated; - Designed for a short duration of use, as a decommissioning tool, aimed to be dismantled just after the treatment operation; - Designed in order to produce a small amount of secondary waste; - Requiring low investment and operation costs. The In-Can melting process has already been developed by the CEA for an internal application (defense waste vitrification) and can be rated TRL 7. That means it has been tested at full scale at a prototypical demonstration level with a range of simulants in an operational environment. This paper presents the In-Can vitrification process and its performances for a typical D and D waste highly loaded with Cs. The vitrification tests results will be in particular discussed in terms of process parameters, glass properties and cesium volatility. This paper also highlights the methodology and the organization (material, process, technological and long term behavior teams) deployed in order to adapt and qualify the In-Can process for all kind of wastes (liquid, solid, highly loaded with Tc and Cs, waste with no route, ...) from the matrix design definition to the full qualification. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mechanical Waste Gathering System (MWGS), Alternate Retrieval of Hanford Tank Waste - 19188

Hanford has 149 underground single shell tanks; of which several have known or suspected leak sites. Sluicing with large volumes of solution in compromised leaking tanks is not desirable due to the risk of environmental release. To address the complex retrieval of hardpan nuclear waste in Hanford's single shell tanks, a Mechanical Waste Gathering System is being developed and tested, which breaks up the waste and moves it to the surfaces without the introduction of liquid to the tank bottom. To improve the removal of hardpan tank waste, WRPS has leveraged industry knowledge and previous experience to identify a solution. This technology will provide another option for the technology toolbox at Hanford. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simulation of Spent Nuclear Fuel loading into a Final Waste Repository

Previous work towards studying repository loading have used: - spent nuclear fuel (SNF) with an average burnup composition; - a lumped capacitance thermal model for calculating temperature in a Cyclus repository model. The goal of this work is to improve on the repository models and use U.S. historical SNF inventory data in simulations to more accurately study the loading of a waste repository. These goals will be achieved by: - using UNF-ST-and-DARDS Unified Database (UDB) that has historic assembly-specific data (e.g, isotopic composition, heat) in Cyclus simulations; - implementing a more accurate thermal model within a Cyclus repository model. Objectives: - Create a Cyclus spent fuel conditioning model that packages spent fuel bundles into packages which have user-defined properties. - Create a Cyclus medium-fidelity repository model that gives accurate time and spatial dependent temperature values and loads the repository based on a user-selected loading strategy. Cyclus is an agent-based extensible framework for modeling flow of material through user-defined nuclear fuel cycles. In Cyclus, each facility in the fuel cycle is modeled individually and the facilities interact with one another as independent agents. The spent fuel conditioning model accepts spent fuel bundles and puts them into a cylindrical waste package. In the spent fuel conditioning model, the user can define variables: For each layer, radius, thermal conductivity, thermal diffusivity; For each package, Number of spent fuel bundles, Radius and height. The waste repository model accepts waste packages and emplaces them into available positions within the waste repository based on a thermal criteria. The thermal criteria is a temperature limit at the interface between the waste package surface and the host geology, that is set based on the repository's host geology. In the waste repository model, the user can define the variables: Capacity, Distance between waste packages, Distance between drifts, Repository host geology, Loading Strategy. After the addition of new waste packages at each time step, the waste repository model recalculates the temperature at each location in the repository. If the addition of this new package causes its temperature to exceed the thermal limit, it will be placed back into the buffer. A thermal model that relies on a transient 'outside' model and quasi-steady-state 'inside' model is used to accurately determine the temperature in the repository. The 'outside' model assumes a homogenous medium with the Engineered Barrier System (EBS) replaced by the geologic medium. Temperature solutions for the central waste package, adjacent point and line sources are superimposed to calculate the temperature at specific points in the repository. The central drift consists of one finite line source which represents the central waste package. The central drift also consists of point sources that represent neighboring waste packages in the central drift. The neighboring drifts are represented by infinite line sources. The 'inside' model is considered to be at a quasi-steady-state condition because EBS has a relatively low thermal mass compared to the infinite geologic medium. The steady state calculation is performed at each time step with the heat source and interface temperature as boundary conditions. Future Work: Run Cyclus simulations with U.S. historical SNF inventory data, the spent fuel conditioning and repository models to study how waste package acceptance strategies impact repository loading.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 109: US HLW Repository: Status and Next Steps

This panel focused on the technical, institutional and broader political issues associated with advancing a US HLW Repository program including programmatic, regulatory, legislative and funding challenges. Panelist with presentations: WM 2020 HLW Repository Status and Next Steps (Leo Blundo)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cigeo Design Options, Risks and Opportunities Management: A Continuous Project Management Goal - 20015

Andra is currently completing the detailed engineering phase of the stepwise design development of Cigeo, the French HLW and IL-LLW Deep Geological Repository. If licensed in the coming years, Cigeo's progressive construction, industrial operation and closure will last over more than a century. Such a duration, associated with the requirements in terms of reversibility, lead to the choice of an incremental design that allows, for next operator generations, to integrate improvements derived from scientific and technical progress as well as from experience feedback from its operation. This incremental design approach, associated with a permanent risks and opportunities management process, will continue after licensing of Cigeo as a tool for the governance of the reversibility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of the Safety Analyses of the Konrad Repository - 20530

The Bundesgesellschaft fuer Endlagerung (BGE) is the license holder of all geological repository sites in Germany since 2017. Besides the construction of the Konrad repository for the emplacement of low- and intermediate-level waste (LILW), the operation of the Asse II mine including the retrieval of the emplaced waste, and the preparation for the closure of the Morsleben repository, BGE is responsible to carry out the operative tasks of selecting a site for a high-level waste (HLW) repository. The Konrad repository is Germany's first repository for radioactive waste with negligible heat generation, which was fully licensed under atomic law within the scope of a plan approval procedure from the original application in 1982 until the license was granted in 2002 and finally confirmed by the Federal Administrative Court in 2007. The emplacement of LILW was licensed up to a volume of 303,000 m{sup 3} with a total β/γ-activity of 5 x 10{sup 18} Bq and a total α-activity of 1.5 x 10{sup 17} Bq. Currently, the former iron ore mine Konrad is being converted to a repository and is expected to come into operation in 2027. But what if there is no safety case in place nor a regulatory framework tailored for a change of documents in order to ensure the safety according to the state-of-the-art of science and technology during the evolution of a long-term project such as a geological repository? In this presentation, a review procedure of the safety analyses, that have been the basis of the plan approval decision for the Konrad repository at that time, will be described. Furthermore, the first results of this graduated review procedure for updating the safety analyses will be presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗