Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Fuel Qualification for Molten Salt Reactors

This report supports the development and review of an efficient methodology or process for liquid salt fuel system qualification. The report describes the technical issues encountered when developing an adequate understanding of the fuel salt’s chemical and physical behavior under both normal and accident conditions. The concepts presented in this report align with the fundamental safety functions (FSFs) approach of the more general non-light water reactor (nonLWR) fuel qualification guidance provided in NUREG-2246. However, because liquid salt fuel has substantial technical differences from solid fuels, this report describes tailored approaches for achieving the common safety intents when using liquid salt. The purpose of this report is to illustrate how variations in fuel salt properties impact achievement of FSFs at liquid-salt fueled molten salt reactors (MSRs). The focus on FSFs supports methodology compatibility with both current and developing licensing processes. Customized fuel qualification guidance for liquid salt–fueled Nuclear Power Plants (NPPs) are also provided in this report to supplement the generic non-LWR guidance recently developed by the NRC. As with the broader non-LWR fuel qualification, this report focuses on identification and understanding of fuel life-limiting failure and fuel salt property degradation mechanisms that occur as a result of irradiation during reactor operation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing, determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rates along with the average and maximum qualified stack flow rates for each of the LAB facility stacks. For each stack, the operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10°, except for the LB-C2 Fan A results, which were an average of 13.7°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 4.1% COV, which were all within the range of the target percent coefficient of variation values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Irradiation and Qualification of Ceramic Nuclear Fuels

Accelerated neutron irradiation testing is an component of accelerated qualification of new nuclear fuels for light water reactor (LWRs), microreactors, and other special purpose reactors. The qualification and licensing of nuclear fuel is a lengthy process that can take 20-25 years to bring a new fuel into service. Accelerated fuel qualification combines both experimental and modeling work to expedite the total qualification time to 5-10 years timeframe. The experimental aspect of this is accelerated irradiation aims to reduce the total time needed for neutron irradiation to achieve targeted burnup, which can take years using conventional irradiation profiles. The data that results from this irradiation testing can then be entered into BISON models to develop robust and reliable performance simulations to ensure safe operation under normal and off normal conditions. This milestone focused on the fabrication of test articles for accelerated irradiation testing at the Advance Test Reactor (ATR).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management Facility (EMF) stack monitor location was qualified using a combination of scale model stacks to mitigate the risk of identifying that the sampling location does not meet the qualification criteria on the full-scale stack. The LV-S1 scale model stack was used as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling locations were geometrically similar to the actual stack, and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. The LV-S1, LB-S1, and LV-S2 scale model stack tests have met the criteria of the ANSI/HPS N13.1-1999 standard to demonstrate the stack sampling locations are well mixed. Verification tests of the EMF stack were performed at normal operating conditions. The minimum 1/6 DV value and the maximum 6 DV value from the scale model testing determine the range of stack flow rates for which the full-scale stack may be operated while remaining in compliance with the stack verification criterion. A practical range for the full-scale stack qualification uses the average DV through 6 DV from the scale model tests to compute the corresponding flow rates. Table S1 lists the operating flow rate along with the average and maximum qualified stack flow rate based on the LV-S1 scale model DV values. The operating flow is below the maximum qualified stack flow, which means that the scale model test results are acceptable for stack qualification. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be ≤20°. Second, the velocity uniformity at the full-scale stack must be ≤20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were <5°; all flow angle results were within the ≤20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, all of which were within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all planned fan operating configurations. This includes each combination of ACV fans with DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Qualification Report: SRNL Glass Composition-Properties (ComPro) Database

The Savannah River National Laboratory Glass Composition-Properties (ComPro) database is an extensive database containing pertinent composition and durability data to support the accelerated clean-up mission at the Defense Waste Processing Facility. The activities described in this data qualification report were performed to support the information contained in the database. There were two objectives of the original data qualification process. The first objective was to review supporting documentation to determine if DOE/RW-0333P Quality Assurance Requirements and Description had been implemented during the original work. If the DOE/RW-0333P Quality Assurance Requirements and Description had not been directly implemented during the original work, the second objective was to determine if the controls that were used were adequate to meet the intent of the DOE/RW-0333P Quality Assurance Requirements and Description. The results of these two objectives and the activities performed to support these decisions are described in this document. An assessment of each dataset was made to determine if the data were RW-0333P Compliant, RW-0333P Equivalent or Non-RW-0333P Compliant. The original data qualification was performed in accordance with E7, Conduct of Engineering Manual, Procedure 3.70, Revision 4, Qualification of Data. The specific method that was used was Equivalent Controls as described in E7, 3.70. Revision 2 of this document adds supporting information for the RW-0333P Compliant datasets added to Revision 3 of the database.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Glass Property Database and Data Qualification Plan

The U.S. Department of Energy vitrification facilities currently employ glass property-composition models to ensure processability of waste streams and acceptability of the final glass products. The efficiency (e.g., process flexibility, reduced down time, and reduced cost) of waste vitrification is directly tied to the size of the waste processing envelope. To increase the size of the processing envelope, a larger database was developed. The database will improve the prediction accuracy of glass properties, leading to higher waste loadings, higher waste throughput, broader process flexibility, and reduced mission life. Some of the data in this expanded database has insufficient quality assurance (QA) rigor for use in nuclear facility operation and glass qualification. A plan was developed to qualify high-value data under the appropriate QA rigor for use at the Hanford Waste Treatment and Immobilization Plant’s High-Level Waste (HLW) Facility. This qualification plan first compares the data coverage over the composition region of interest to Hanford HLW by property. Those studies that significantly improve the data coverage in the Hanford HLW glass composition region were prioritized for qualification activities. Qualification methods including QA equivalence, peer review, data corroboration, and confirmatory testing have been assigned to each high-priority study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

QUALIFICATION OF THE SECOND ICS-3000 ION CHROMATOGRAPH FOR USE AT THE DEFENSE WASTE PROCESSING FACILITY

The ICS-3000 Ion Chromatography (IC) system installed in 221-S M-14 has been qualified for use. The qualification testing was a head to head comparison of the second ICS-3000 with the initial ICS-3000 system that was installed in 221-S M-13. The crosscheck work included standards for instrument calibration and calibration verifications and standards for individual anion analysis, where the standards were traceable back to the National Institute of Standards and Technology (NIST). In addition the crosscheck work included the analysis of simulated Sludge Receipt and Adjustment Tank (SRAT) Receipt, SRAT Product, and Slurry Mix Evaporator (SME) samples, along with radioactive Sludge Batch 5 material from the SRAT and SME tanks. The Defense Waste Processing Facility (DWPF) requires the analysis of specific anions at various stages of its processing of high level waste (HLW). The anions of interest to the DWPF are fluoride, formate, chloride, nitrite, nitrate, sulfate, oxalate, and phosphate. The anion analysis is used to evaluate process chemistry including formic acid/nitric acid additions to establish optimum conditions for mercury stripping, reduction-oxidation (REDOX) chemistry for the melter, nitrite destruction, etc. The DWPF Laboratory (Lab) has recently replaced the Dionex DX-500 ion chromatography (IC) systems that had been used since 1998 by the first of two new ICS-3000 systems. The replacement effort was necessary due to the vendor of the DX-500 systems no longer supporting service contracts after 2008. DWPF purchased three new ICS-3000 systems in September of 2006. The ICS-3000 instruments are (a) designed to be more stable using an eluent generator to make eluent, (b) require virtually no daily chemical handling by the analysts, (c) require less line breaks in the hood, and (d) generally require less maintenance due to the pump configuration only using water versus the current system where the pump uses various hydroxide concentrations. The ICS-3000 instruments also allow the DWPF to maintain current service contracts, which support routine preventive maintenance and emergency support for larger problems such as component failure. One of the three new systems was set up in the DWPF Lab trailers in January of 2007 to be used for the development of methods and procedures. This system will continue to be used for training, new method development and potential improvements to current methods. The qualification of the other two ICS-3000 instruments was a phased effort. This effort was supported by the Applied Computational Engineering and Statistical (ACES) group of the Savannah River National Laboratory (SRNL) as authorized by the Technical Task Request (TTR) [1] and as directed by the corresponding Task Technical and Quality Assurance (TT&QA) plan [2]. The installation of the first 'rad' system into the M-13 Lab module required modifications to both the Lab module and to the radiohood. The installation was completed in July 2008. The testing of this system was conducted as directed by the TT&QA plan [2], and the instrument was qualified for use at the DWPF Lab as documented in [3]. As part of that evaluation, a recommendation was made that the second ICS-3000 be installed in the M-14 module and that qualification testing of that system be conducted. The purpose of this technical report is to provide a review of the data generated by these tests that will lead to the recommendation for the qualification of the M-14 ICS-3000 instrument.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High Temperature Materials Interim Data Qualification Report

ABSTRACT Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: 1. Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing – 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. 2. Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram – 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Computational Fluid Dynamics Modeling to Facilitate Qualification of Stack Sampling Probe Location

Computational fluid dynamics (CFD) modeling was used to help evaluate modifications to a radiological effluent stack and assist with establishing a stack sampling location that met the mixing criteria for qualification. Requirements for stack sampling location are listed in the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-2021 standard. Modeling was performed to help develop a suitable design for increasing building ventilation for the radiological effluent stack. The ANSI/HPS N13.1-2021 criteria for the air monitoring probe location are that the coefficient of variation of velocity uniformity, gaseous tracer uniformity, and particulate tracer uniformity must be less than or equal to 20%. Furthermore, no point in the sampling location may have a gaseous tracer concentration that varies from the mean concentration by more than 30%. Additionally, the flow angle at the sampling location must not be more than 20 degrees. The ANSI/HPS N13.1-2021 standard allows for models (physical or computational) to be employed to perform the full suite of qualification tests, followed by a more limited set of verification tests on the actual stack to qualify the stack sampling location. Here, a series of computational model simulations were employed to evaluate the stack qualification criteria. Significant time and re-source savings are achieved using CFD modeling. CFD modeling demonstrated that the stack meets the criteria at the sample probe location. Verification tests were performed on the modified stack to measure the velocity uniformity and flow angle at the stack sampling location, and results demonstrated that the CFD model results may be used to support the qualification of the stack sampling location.

Air Monitoring↗

AGR 5/6/7 Data Qualification Report for ATR Cycles 162B through 168A

This report provides the qualification status of experimental data for the Advanced Gas Reactor (AGR) 5/6/7 fuel irradiation. AGR-5/6/7 was conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of development and qualification of tri-structural isotropic (TRISO) low-enriched fuel for use in high temperature gas-cooled reactors. The objectives of the AGR-5/6/7 experiments are to: (i) irradiate reference-design fuel particles to support fuel qualification, (ii) establish operating margins for the fuel beyond normal operating conditions, and (iii) provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination (PIE) and safety testing. The test train contains five separate capsules that were independently controlled and monitored. Each capsule contains multiple 12.51-mm-long compacts filled with low enriched uranium carbide/oxide (UCO) TRISO fuel particles. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) is to verify successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data on fission-gas release from failed particles during irradiation. The AGR-5/6/7 capsules were irradiated in the ATR northeast flux trap location. The experiment began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of 360.9 effective full power days. The AGR 5/6/7 experiment was able to remain in the reactor core during all three Powered Axial Locator Mechanism (PALM) cycles (163A, 165A, and 167A) without overheating its fuel compacts. This report includes irradiation monitoring data from nine ATR Cycles: 162B, 163A, 164A, 164B, 165A, 166A, 166B, 167A, and 168A, as stored in the Nuclear Data Management and Analysis System (NDMAS). During irradiation, data records consisted of instantaneous measurements recorded every minute and provided by text files automatically every 2 hours. The AGR 5/6/7 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates [capsule inlet, outlet, and downstream at detector], pressure, and moisture content), and Fission Product Monitoring System (FPMS) data (release rates and release to birth rate ratios [R/Bs]) for each of the five capsules. A total of 94,989,908 TC temperature and sweep gas data records were received and processed by NDMAS for AGR 5/6/7 irradiation. Of these records, 41,593,387 (or 43.7% of the total) met data collection and accuracy requirements and are labeled as Qualified. A total of 57,746,693 TC temperature readings were captured from 54 installed TCs. Among them, 10,034,676 TC temperature records (only 17.4%) were Qualified and 47,701,371 TC temperatures (or 82.6%) are Failed due to 48 TC failures (63.5%) and due to missing values (19.1%). To assess performance of the operational TCs, analysis of daily correlations between TCs found no evidence of virtual junction failure for any TCs. Analyses on control charts of TC temperature differences revealed trending in TC readings for TC2, 4, 5, and 13 in Capsule 3, but there is no conclusive indication of TC drift failure that caused those trends. Therefore, TC control charts are not used to disqualify TC data, but only for users’ consideration. For sweep gas flow rates, a total of 31,519,747 gas flow records (84.4%) are Qualified for use for AGR-5/6/7 experiment; 5,723,468 gas flow records (15.4%) are Failed due mostly to missing values; and 74,641 high sweep gas flow rates (0.2 %) are Trend. A large number of Failed missing TC temperature and gas flow values were caused by an error in the data output script that outputted a ‘NULL’ value when values were unchanged. This problem was fixed during the outage of Cycle 166B, which led to a substantially decreased number of missing values during the last three cycles. Nonetheless, a large amount of non-missing data remained because of the high data acquisition frequency (1-minute) and still provided sufficient data to effectively monitor the experiment as designed. For FPMS data, NDMAS received and processed fission product release and R/B data for nine ATR cycles, when ATR core reached full power during AGR 5/6/7 irradiation. These data consist of 110,388 release rate records and 110,388 R/B records for the twelve radionuclides (Kr 85m, Kr 87, Kr 88, Kr 89, Kr 90, Xe 131m, Xe 133, Xe 135, Xe 135m, Xe 137, Xe 138, and Xe 139) for each of the five capsules. Equivalent numbers of uncertainty records associated the release rates and R/B values were provided. To date, qualification status of the FPMS data stored in the NDMAS dat

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Sub-sized specimen testing and its relationship with Gen IV Materials Qualification

Renewed interest in advanced reactor technologies which can produce inherently safe, reliable, low carbon, low cost energy requires the development of new materials which can operate in the extreme environments proposed by Gen IV reactor designs. The primary focus of the Nuclear Materials Discovery and Qualification Initiative (NMDQi) is to accelerate the process by which new materials can make their way into commercial use, enabling new technologies and innovations within the nuclear sector. Due to limitations in the production of neutron irradiated material for testing and qualification, the use of specimens far smaller than those traditionally called for in regulatory codes becomes a necessity. While the use of these sub-sized specimens is necessary to achieve materials qualification on a realistic timeline and budget, literature showing the efficacy of these samples as an appropriate surrogate for ASME/ASTM defined samples is limited. This poster will detail historical efforts to compare the mechanical behavior of small geometry samples with bulk material behavior and the potential of sub-sized specimen testing at INL for future materials qualification efforts.

36 MATERIALS SCIENCE↗

Accelerating Nuclear Fuels and Materials Qualification by Multi-Level Irradiation Experiment Campaign

The advanced reactor technologies feature fuels, coolants, and materials that promise safer operating conditions under normal and accident scenarios. However, the nuclear fuels and materials qualifications require several decades (for example, new reactor fuel qualification from conceptualization requires about 20 years). Therefore, accelerating nuclear fuels and materials qualification is essential, and it can be achieved by combining high through-put materials irradiation and testing, advanced post-irradiation examinations, and Multiphysics modeling. This paper addressed the associated challenges in accelerating nuclear fuels and material qualification for new and advanced reactor designs, which differ based on fuel, coolant, operating conditions, and structural materials. These challenges vary for radiation level, operating conditions (e.g., temperature and pressure), and coolant type (e.g., corrosion environment). In addition, the challenges and limitations in modeling tools, experimental facilities, and licensing guidelines are also discussed, and a general solution path forward is recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Presentation: Accelerating Nuclear Fuels and Materials Qualification by Multi-Level Irradiation Experiment Campaign

The advanced reactor technologies feature fuels, coolants, and materials that promise safer operating conditions under normal and accident scenarios. However, the nuclear fuels and materials qualifications require several decades (for example, new reactor fuel qualification from conceptualization requires about 20 years). Therefore, accelerating nuclear fuels and materials qualification is essential, and it can be achieved by combining high through-put materials irradiation and testing, advanced post-irradiation examinations, and Multiphysics modeling. This paper addressed the associated challenges in accelerating nuclear fuels and material qualification for new and advanced reactor designs, which differ based on fuel, coolant, operating conditions, and structural materials. These challenges vary for radiation level, operating conditions (e.g., temperature and pressure), and coolant type (e.g., corrosion environment). In addition, the challenges and limitations in modeling tools, experimental facilities, and licensing guidelines are also discussed, and a general solution path forward is recommended.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Methodology of Qualification of CCIM Vitrification Process Applied to the High- Level Liquid Waste from Reprocessed Oxide Fuels - 12438

The vitrification of high-level liquid waste from reprocessed oxide fuels (UOX fuels) by Cold Crucible Induction Melter is planed by AREVA in 2013 in a production line of the R7 facility at La Hague plant. Therefore, the switch of the vitrification technology from the Joule Heated Metal Melter required a complete process qualification study. It involves three specialties, namely the matrix formulation, the glass long-term behavior and the vitrification process development on full-scale pilot. A new glass frit has been elaborated in order to adapt the redox properties and the thermal conductivity of the glass suitable for being vitrified with the Cold Crucible Induction Melter. The role of cobalt oxide on the long term behavior of the glass has been described in the range of the tested concentrations. Concerning the process qualification, the nominal tests, the sensitivity tests and the study of the transient modes allowed to define the nominal operating conditions. Degraded operating conditions tests allowed to identify means of detecting incidents leading to these conditions and allowed to define the procedures to preserve the process equipments protection and the material quality. Finally, the endurance test validated the nominal operating conditions over an extended time period. This global study allowed to draft the package qualification file. The qualification file of the UOX package is currently under approval by the French Nuclear Safety Authority. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The CNSC's Inspector Training and Qualification Program and its Importance to the Nuclear Industry - 19370

Trained, qualified, and designated staff at the Canadian Nuclear Safety Commission (CNSC) conduct inspections of licensed nuclear sites as a method of compliance verification. This paper will describe the unique and comprehensive qualification process for CNSC inspectors, known as the Inspector Training and Qualification Program (ITQP). The ITQP includes service-line-specific training that is unique to each inspection group within the CNSC, dependent on the facility/industry type. The training requirements specific to staff in the Wastes and Decommissioning Division and its impact on safety at waste management sites across Canada will be discussed. This paper will specifically identify the importance of CNSC inspector training and detail how the unique training program requirements enable the CNSC to better identify and encourage compliance among nuclear waste and decommissioning sites in Canada. CNSC inspectors are designated under section 29 of the Nuclear Safety and Control Act (NSCA), and the powers of inspectors are outlined in section 32 of the NSCA. Having trained, qualified, and designated inspectors is paramount for both the CNSC and the nuclear industry. For the CNSC, this ensures that staff in the field are aware of potential hazards and how to mitigate such hazards (if applicable), that staff understand the regulatory framework and how to measure compliance against it, and that staff consistently apply CNSC values across the nuclear industry. For the industry, this ensures that staff present at nuclear facilities are knowledgeable and professional, that inspections are conducted in a consistent manner, and that any compliance actions issued are measurable and defendable against the regulatory framework. The CNSC's ITQP incorporates both theoretical (in-class and online) and practical training, and is broken down into six categories: mandatory training for all new employees; core training; service-line-specific training; on-the-job training; CNSC regulations training; and, recommended additional training. This paper will discuss in detail the specific aspects of each of these categories, the importance of each category including the difference between knowledge and skills acquired in theoretical versus hands-on training, and how CNSC staff in designated inspector positions (inspectors-in-training) progress through the program. The complete list of core training and service-line-specific training for inspectors in the Wastes and Decommissioning Division, including re-qualification requirements, will be explored throughout the paper. It is further important that CNSC designated inspectors undergo continuous learning to ensure that their skills remain up to date, as well as to ensure that inspectors requalify at defined intervals to enable the maintenance of the core knowledge and skills with which the determination of the person's qualification was based. The steps involved in this requalification process, as well as the importance of continuous learning and the maintenance of skills and knowledge will be further discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sludge Washing And Demonstration Of The DWPF Flowsheet In The SRNL Shielded Cells For Sludge Batch 8 Qualification

The current Waste Solidification Engineering (WSE) practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks to Tank 51. Tank 51 sludge is washed and transferred to Tank 40, the current Defense Waste Processing Facility (DWPF) feed tank. Prior to transfer of Tank 51 to Tank 40, the Savannah River National Laboratory (SRNL) typically simulates the Tank Farm and DWPF processes using a Tank 51 sample (referred to as the qualification sample). WSE requested the SRNL to perform characterization on a Sludge Batch 8 (SB8) sample and demonstrate the DWPF flowsheet in the SRNL shielded cells for SB8 as the final qualification process required prior to SB8 transfer from Tank 51 to Tank 40. A 3-L sample from Tank 51 (the SB8 qualification sample; Tank Farm sample HTF-51-12-80) was received by SRNL on September 20, 2012. The as-received sample was characterized prior to being washed. The washed material was further characterized and used as the material for the DWPF process simulation including a Sludge Receipt and Adjustment Tank (SRAT) cycle, a Slurry Mix Evaporator (SME) cycle, and glass fabrication and chemical durability measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AGR-2 Data Qualification Report for ATR Cycle 154B

This report provides the data qualification status of Advanced Gas Reactor-2 (AGR-2) fuel irradiation experimental data from Advanced Test Reactor (ATR) Cycle 154B as recorded in the Nuclear Data Management and Analysis System (NDMAS). This is the last cycle of AGR-2 irradiation, as the test train was pulled from the ATR core during the outage portion of ATR Cycle 155A. The AGR-2 data streams addressed in this report include thermocouple (TC) temperatures, sweep gas data (flow rates including new Fission Product Monitoring (FPM) downstream flows from Fission Product Monitoring System (FPMS) detectors, pressure, and moisture content), and FPMS data (release rates and release-to-birth rate ratios [R/Bs]) for each of the six capsules in the AGR-2 experiment. The final data qualification status for these data streams is determined by a Data Review Committee (DRC) comprised of AGR technical leads, Sitewide Quality Assurance (QA), and NDMAS analysts. The Data Review Committee reviewed the data acquisition process, considered whether the data met the requirements for data collection as specified in QA-approved Very High Temperature Reactor (VHTR) data collection plans, examined the results of NDMAS data testing and statistical analyses, and confirmed the qualification status of the data as given in this report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

WTP Waste Feed Qualification: Hydrogen Generation Rate Measurement Apparatus Testing Report

The generation rate of hydrogen gas in the Hanford tank waste will be measured during the qualification of the staged tank waste for processing in the Hanford Tank Waste Treatment and Immobilization Plant. Based on a review of past practices in measurement of the hydrogen generation, an apparatus to perform this measurement has been designed and tested for use during waste feed qualification. The hydrogen generation rate measurement apparatus (HGRMA) described in this document utilized a 100 milliliter sample in a continuously-purged, continuously-stirred vessel, with measurement of hydrogen concentration in the vent gas. The vessel and lid had a combined 220 milliliters of headspace. The vent gas system included a small condenser to prevent excessive evaporative losses from the sample during the test, as well as a demister and filter to prevent particle migration from the sample to the gas chromatography system. The gas chromatograph was an on line automated instrument with a large-volume sample-injection system to allow measurement of very low hydrogen concentrations. This instrument automatically sampled the vent gas from the hydrogen generation rate measurement apparatus every five minutes and performed data regression in real time. The fabrication of the hydrogen generation rate measurement apparatus was in accordance with twenty three (23) design requirements documented in the conceptual design package, as well as seven (7) required developmental activities documented in the task plan associated with this work scope. The HGRMA was initially tested for proof of concept with physical simulants, and a remote demonstration of the system was performed in the Savannah River National Laboratory Shielded Cells Mockup Facility. Final verification testing was performed using non-radioactive simulants of the Hanford tank waste. Three different simulants were tested to bound the expected rheological properties expected during waste feed qualification testing. These simulants were tested at different temperatures using purge gas spiked with varying amounts of hydrogen to provide verification that the system could accurately measure the hydrogen in the vent gas at steady state.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗