Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

AGR-2 Data Qualification Interim Report

Projects for the very high temperature reactor (VHTR) Technology Development Office program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program established the NGNP Data Management and Analysis System (NDMAS) to manage and document VHTR data qualification, for storage of the data in a readily accessible electronic form, and to assist in the analysis and presentation of the data. This document gives the status of NDMAS processing and qualification of data associated with the initial reactor cycle (147A) of the second Advanced Gas Reactor (AGR-2) experiment which began on June 21, 2010. Because it is early in the AGR-2 experiment, data from only two AGR-2 data streams are reported on: Fuel Fabrication and Fuel Irradiation data. As of August 1, 2010, approximately 311,000 irradiation data records have been stored in NDMAS, and qualification tests are in progress. Preliminary information indicates that TC 2 in Capsule 2 failed prior to start of the experiment, and NDMAS testing has thus far identified only two invalid data values from the METSO data collection system Data from the Fission Product Monitoring System (FPMS) are not currently processed until after reactor cycle shutdown and have not yet been received. A description of the ATR operating conditions data associated with the AGR-2 experiment (e.g., power levels) are summarized in the AGR-1 data qualification report (INL/EXT-09-16460). Since ATR data are collected under ATR program data quality requirements (i.e., outside the VHTR program), the NGNP program and NDMAS do not take additional actions to qualify these data other than NDMAS capture testing. Data qualification of graphite characterization data collected under the Graphite Technology Development Project is reported in a separate status report (Hull 2010).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Acceptance and qualification test results of the 20 km electromechanical tether for TSS-1

Acceptance and qualification tests have been performed on the TSS-1 flight tether and its associated qualification tether. Acceptance testing during production included periodic measurement of conductor resistance, off-line breakstrength tests on strength member samples, continuous measurement of the insulation layer voltage withstand capability, and a continuous mechanical proof-loading procedure during the tether jacketing operation. The qualification test sequence consisted of thermal vacuum, voltage withstand and breakstrength tests on samples taken from the production runs for both the qualification and flight tethers. This paper will analyze the acceptance and qualification test data, respectively. Results indicate that the completed flight tether exceeds the design requirements for the TSS-1 mission.

Marshall, L. S.↗

RL10A-3-3B high mixture ratio qualification program

The results of the high mixture ratio qualification testing of the RL10 engine for the Shuttle/Centaur program are presented. The objective of the engine qualification test was to demonstrate the suitability of the RL10A-3-3B engine for space vehicle flight by subjecting it to the testing specified in RL10A-3-3B Model Specification Number 2295 dated February 1986. The applicable section of the specification is presented. Due to payload volume advantages which can be achieved by increasing the operating mixture ratio of the RL10, a decision was made to qualify the engine to run at a higher mixture ratio. A program was created to qualify the RL10 engine for operation at 15,000 pounds thrust and a nominal 6.0 to 1 mixture ratio. This model of the engine was designated the RL10A-3-3B. The qualification program included three test series as follows: (1) hardware durability and limits test in which the engine completed 23 firings and 4605.7 seconds with 1588.7 seconds at less than 6.6 mixture ratio; (2) preliminary qualification test in which the engine completed 26 firings and 5750 seconds; and (3) qualification test in which the engine completed 26 hot firings and 5693.4 seconds with 905.9 seconds at 6.7 mixture ratio. Several changes in engine hardware were required for operation of the RL10A-3-3B engine in the Space Shuttle which include a duel pressure switch ignition, an oxidizer flow control, and helium plumbing changes.

Vogel, T.↗

Structural Qualification Testing of the WindSat Payload Using Sine Bursts Near Structural Resonance

Sine burst tests are often used for structural qualification of space flight hardware. In most instances, the driving frequency of the shaker is specified far below the structure's first resonant mode, such that the entire test article sees uniform acceleration. For large structures, this limits qualification testing to lower parts of the structure, or else it over-tests the lower structure to achieve qualification of the upper structure. The WindSat payload, a 10.5 foot tall graphite/epoxy, titanium, and aluminum radiometer, experiences accelerations at the six foot diameter reflector nearly four times that at the spacecraft interface. Due to size of the payload, the number of bonded joints, and the lightweight reflector support structure design and construction, using static pull testing to qualify all of the bonded joints in the upper structure would result in large, expensive, and extensive test fixturing. Sine burst testing near the first two structural resonant modes was performed on the WindSat payload to achieve the correct load factor distribution up the stack for structural qualification. In this presentation, how finite element method (FEM) sine burst predictions were used in conjunction with low level random and sine burst tests to achieve correct qualification test load factor distribution on the WindSat payload is discussed. Also presented is the risk mitigation approach for using the uncorrelated FEM in this procedure.

Pontius, Jim↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Unintended Consequences: How Qualification Constrains Innovation

The development and implementation of new materials and manufacturing processes for aerospace application is often hindered by the high cost and long time span associated with current qualification procedures. The data requirements necessary for material and process qualification are extensive and often require millions of dollars and multiple years to complete. Furthermore, these qualification data can become obsolete for even minor changes to the processing route. This burden is a serious impediment to the pursuit of revolutionary new materials and more affordable processing methods for air vehicle structures. The application of integrated computational materials engineering methods to this problem can help to reduce the barriers to rapid insertion of new materials and processes. By establishing predictive capability for the development of microstructural features in relation to processing and relating this to critical property characteristics, a streamlined approach to qualification is possible. This paper critically examines the advantages and challenges to a modeling-assisted qualification approach for aerospace structural materials. An example of how this approach might apply towards the emerging field of additive manufacturing is discussed in detail.

Brice, Craig A.↗

Rover Low Gain Antenna Qualification for Deep Space Thermal Environments

A method to qualify the Rover Low Gain Antenna (RLGA) for use during the Mars Science Laboratory (MSL) mission has been devised. The RLGA antenna must survive all ground operations, plus the nominal 670 Martian sol mission that includes the summer and winter seasons of the Mars thermal environment. This qualification effort was performed to verify that the RLGA design, its bonding, and packaging processes are adequate. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed on the RLGA hardware before the start of the qualification test. Functional intermittent RF tests were performed during thermal chamber breaks over the course of the complete qualification test. For the return loss measurements, the RLGA antenna was moved to a test area. A vector network analyzer was calibrated over the operational frequency range of the antenna. For the RLGA, a simple return loss measurement was performed. A total of 2,010 (3 670 or 3 times mission thermal cycles) thermal cycles was performed. Visual inspection of the RLGA hardware did not show any anomalies due to the thermal cycling. The return loss measurement results of the RLGA antenna after the PQV (Package Qualification and Verification) test did not show any anomalies. The antenna pattern data taken before and after the PQV test at the uplink and downlink frequencies were unchanged. Therefore, the developed design of RLGA is qualified for a long-duration MSL mission.

Ramesham, Rajeshuni↗

Qualification of UHF Antenna for Extreme Martian Thermal Environments

The purpose of this development was to validate the use of the external Rover Ultra High Frequency (RUHF) antenna for space under extreme thermal environments to be encountered during the surface operations of the Mars Science Laboratory (MSL) mission. The antenna must survive all ground operations plus the nominal 670 Martian sol mission that includes summer and winter seasons of the Mars thermal environment.The qualification effort was to verify that the RUHF antenna design and its bonding and packaging processes are adequate to survive the harsh environmental conditions. The RUHF is a quadrifilar helix antenna mounted on the MSL Curiosity rover deck. The main components of the RUHF antenna are the helix structure, feed cables, and hybrid coupler, and the high-power termination load. In the case of MSL rover externally mounted hardware, not only are the expected thermal cycle depths severe, but there are temperature offsets between the Mars summer and winter seasons. The total number of temperature cycles needed to be split into two regimes of summer cycles and winter cycles. The qualification test was designed to demonstrate a survival life of three times more than all expected ground testing, plus a nominal 670 Martian sol missions. Baseline RF tests and a visual inspection were performed prior to the start of the qualification test. Functional RF tests were performed intermittently during chamber breaks over the course of the qualification test. For the RF return loss measurements, the antenna was tested in a controlled environment outside the thermal chamber with a vector network analyzer that was calibrated over the antenna s operational frequency range. A total of 2,010 thermal cycles were performed. Visual inspection showed a dulling of the solder material. This change will not affect the performance of the antenna. No other changes were observed. RF tests were performed on the RUHF helix antenna, hybrid, and load after the 2,010 qualification cycles test. The RF performance of the RUHF antenna, hybrid, and load were almost identical before and after the complete test. Therefore, the developed design of RUHF is qualified for a long-duration MSL mission. The RUHF antenna has not been used for long-duration missions such as MSL in the past. The state-of-the-art technology of the RUHF antenna is used to develop the antennas for MSL mission survivability. This developmental test data provides the confidence in using this RUHF antenna for future NASA missions to Mars.

Ramesham, Rajeshuni↗

Findings from the Supersonic Qualification Program of the Mars Science Laboratory Parachute System

In 2012, the Mars Science Laboratory Mission (MSL) will deploy NASA's largest extra-terrestrial parachute, a technology integral to the safe landing of its advanced robotic explorer on the surface. The supersonic parachute system is a mortar deployed 21.5 m disk-gap-band (DGB) parachute, identical in geometric scaling to the Viking era DGB parachutes of the 1970's. The MSL parachute deployment conditions are Mach 2.3 at a dynamic pressure of 750 Pa. The Viking Balloon Launched Decelerator Test (BLDT) successfully demonstrated a maximum of 700 Pa at Mach 2.2 for a 16.1 m DGB parachute in its AV4 flight. All previous Mars deployments have derived their supersonic qualification from the Viking BLDT test series, preventing the need for full scale high altitude supersonic testing. The qualification programs for Mars Pathfinder, Mars Exploration Rover, and Phoenix Scout Missions were all limited to subsonic structural qualification, with supersonic performance and survivability bounded by the BLDT qualification. The MSL parachute, at the edge of the supersonic heritage deployment space and 33% larger than the Viking parachute, accepts a certain degree of risk without addressing the supersonic environment in which it will deploy. In addition, MSL will spend up to 10 seconds above Mach 1.5, an aerodynamic regime that is associated with a known parachute instability characterized by significant canopy projected area fluctuation and dynamic drag variation. This aerodynamic instability, referred to as "area oscillations" by the parachute community has drag performance, inflation stability, and structural implications, introducing risk to mission success if not quantified for the MSL parachute system. To minimize this risk and as an alternative to a prohibitively expensive high altitude test program, a multi-phase qualification program using computation simulation validated by subscale test was developed and implemented for MSL. The first phase consisted of 2% of fullscale supersonic wind tunnel testing of a rigid DGB parachute with entry-vehicle to validate two high fidelity computational fluid dynamics (CFD) tools. The computer codes utilized Large Eddy Simulation and Detached Eddy Simulation numerical approaches to accurately capture the turbulent wake of the entry vehicle and its coupling to the parachute bow-shock. The second phase was the development of fluid structure interaction (FSI) computational tools to predict parachute response to the supersonic flow field. The FSI development included the integration of the CFD from the first phase with a finite element structural model of the parachute membrane and cable elements. In this phase, a 4% of full-scale supersonic flexible parachute test program was conducted to provide validation data to the FSI code and an empirical dataset of the MSL parachute in a flight-like environment. The final phase is FSI simulations of the full-scale MSL parachute in a Mars type deployment. Findings from this program will be presented in terms of code development and validation, empirical findings from the supersonic testing, and drag performance during supersonic operation.

EDL↗

Personnel Qualification and Certification Program in Pressure Decay Leak Testing on the RT-100 Type (B) Cask - 17229

The requirements for qualifications and certification of leak test personnel on Type (B) shipping casks have been more clearly defined with the recent release of ANSI N14.5-2014, Leak Tests on Radioactive Packages for Shipment. The latest version creates a standardized approach for qualifying and certifying personnel to conduct pre-shipment leakage tests on Type (B) packages. The U.S Nuclear Regulatory Commission (NRC) is currently updating the Regulatory Guide R.G 7.4, Leakage Tests on Packages for shipment of Radioactive Material, to endorse ANSI N14.5-2014. According to ANSI N14.5-2014, leakage testing shall be performed in accordance with written procedures by qualified and certified personnel in accordance with the requirements of ASNT SNT-TC-1A-2006, Recommended Practice for Personnel Qualification and Certification in Nondestructive Testing. This is a significant modification to the old standard, ANSI N14.5-1997, which simply states that pressure leak testing shall be conducted by trained and certified personnel without reference to any specific certification standards or regulations. SNT-TC-1A published by the American Society for Nondestructive Testing (ASNT) has several advantages to employers; namely, it allows for a Limited NDT Level II certification program. Limited certifications are especially valuable for personnel who possess limited experience and wish to become a certified Limited NDT Level II in a specific technique on a specific cask using a specific procedure and equipment. Robatel Technologies recently developed a comprehensive qualification and training program based on the recommendations of SNT-TC-1A for Exelon Corporation to certify their employees to a Limited NDT Level II in Pressure Decay Leak Testing on the RT-100 Cask. The project scope included the development of a training and qualification program (Written practice), writing a pressure decay leak test procedure, the design of a pressure decay leak test manifold, and the delivery of classroom training. The written practice outlines the requirements to ensure that personnel participating in the program have the necessary qualification, experience, and training to become certified in the leak test method. The program will give Exelon the liberty to conduct their own leak testing on the RT- 100 without the need to rely on outside resources for leak testing. When fully implemented, the program is expected to improve productivity and eliminate schedule delays, along with substantial economic benefits. Following the appropriate standards and industry best practices, the project was successfully completed and scheduled to be fully implemented by Exelon's Nuclear Stations by the end of 2016. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

Harnessing expert knowledge: Defining a Bayesian network decision model with limited data-Model structure for the vibration qualification problem

As systems become more complex, systems engineers rely on experts to inform decisions. There are few experts and limited data in many complex new technologies. This challenges systems engineers as they strive to plan activities such as qualification in an environment where technical constraints are coupled with the traditional cost, risk, and schedule constraints. Bayesian network (BN) models provide a framework to aid systems engineers in planning qualification efforts with complex constraints by harnessing expert knowledge and incorporating technical factors. By quantifying causal factors, a BN model can provide data about the risk of implementing a decision supplemented with information on driving factors. This allows a systems engineer to make informed decisions and examine “what-if” scenarios. This paper discusses a novel process developed to define a BN model structure based primarily on expert knowledge supplemented with extremely limited data (25 data sets or less). The model was developed to aid qualification decisions—specifically to predict the suitability of six degrees of freedom (6DOF) vibration testing for qualification. The process defined the model structure with expert knowledge in an unbiased manner. Finally, validation during the process execution and of the model provided evidence the process may be an effective tool in harnessing expert knowledge for a BN model.

97 MATHEMATICS AND COMPUTING↗

Mechanistic Multiscale Uncertainty Propagation in Support of Accelerated Fuel Qualification

Taking a nuclear fuel concept through the research, development, and qualification stages has historically taken on the order of 20 to 25 years because of extensive irradiation tests required for a variety of conditions. The concept of accelerated fuel qualification (AFQ) has been proposed to increase the innovation pace for nuclear fuels. The goal of AFQ is not to replace the traditional qualification approach but rather to reduce the total number of experiments required to ensure approval from the regulatory authority. Of the many AFQ approaches being explored, advanced modeling—and, in particular, mechanistic modeling—is in a uniquely cross-cutting position to reduce the number of required integral tests through the inclusion of separate-effects testing, while helping to extrapolate reactor performance during rare events. We make the case that propagation of uncertainty through various computational length scales helps contextualize mechanistic modeling. We will utilize UO 2 fission gas diffusion predictions from the atomistically informed cluster dynamics code Centipede to inform fuel performance rodlet simulations using the BISON finite element code as the metric for showing how multiscale mechanistic uncertainty quantification can help reduce uncertainty in fuel performance. In conclusion, by quantifying uncertainty and its reduction through multiscale modeling, the qualification process may be accelerated through the reduction of costly irradiation experiments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NMDQi Nuclear Materials Discovery and Qualification Initiative Conference Overview

The Nuclear Materials Discovery and Qualification Initiative (NMDQi) is designed to accelerate nuclear materials qualification to fulfill the promises of early and advanced reactor technologies as a safe, clean, and low-cost baseload energy. Materials development and qualification in the nuclear industry is by definition challenging due to stringent safety requirements, limited availability of specialized facilities for materials irradiation and testing, and the challenging high-temperature, high-radiation environment. NMDQi will establish tools and capabilities that will greatly accelerate the nuclear fuels and materials development process. These tools will provide both computationally informed insights and high-throughput infrastructure with the goal of completing qualification in a single pass. In this approach, materials must be fabricated with a range of properties of interest so that materials performance can be examined in parallel, rather than with multiple discrete specimens. Advanced manufacturing (AM) techniques, which can produce complex component geometries, microstructures, and compositions, are ideal. The improved process monitoring and control that AM can provide are ideal for ensuring and reducing material variability, which will be particularly important as standards committees pursue regulations for AM components. However, gaining these benefits requires overcoming the substantial barrier of qualifying AM processes and the resulting materials and components for supporting research campaigns and eventually nuclear service.

36 MATERIALS SCIENCE↗

U-10Mo Monolithic Fuel Qualification Plan

The Material Management and Minimization (M3) Program’s primary objective within the U.S. Department of Energy/National Nuclear Security Administration is to achieve permanent threat reduction by minimizing and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project, is pursuing a fuel qualification and licensing effort focused on converting high-performance research reactors in the United States from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. The body of this document is focused on defining the activities required for generic qualification of high density, LEU fuel that then allows reactor conversions to proceed for the four high-performance research reactors and the critical assembly that will operate using the U-10Mo monolithic fuel design (see Subsection 1.3): MITR, MURR, NBSR, ATR, and ATRC. Fuel qualification in this report means generic fuel acceptance of the U-10Mo monolithic fuel form by the NRC for use in reactor conversions in the United States, which allows the fuel to be used in subsequent reactor specific licensing requests. The U 10Mo Monolithic Fuel Research, Development, and Qualification Plan utilizes the functions and requirements of the USHPRR Project that was established in the Functions and Requirements Document (F&RD) [1] and expands on these requirements to ensure that planned tests have traceable results that will ensure the requirement has been met. The methods by which data will be collected to show that these requirements have been met are described in this document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DOE Advanced Gas Reactor Fuel Development and Qualification Program

Breakdown of the DOE Advanced Gas Reactor Fuel Development and Qualification Program. Including discussion topics on TRISO technology Status Circa 2000, New Production Reactor (NPR) Fuel Experience, Fuel Qualification, US DOE Advanced Gas Reactor (AGR) Fuel Development and Qualification Program, Initial AGR Program Reference HTGR Design, Fuel Qualification Approach, Fuel Performance Modeling, Fuel Fabrication, Selected AGR-1, AGR-2, and AGR-5/6/7 Fuel Property Means, AGR Program TRISO Fuel Key Performance Data, Irradiation Performance: Fission Gas R/B, Irradiation Testing Results, Kernel and Coating Behavior During Irradiation, Locating and Studying Failed Particles Greatly Improves Understanding of Fuel Performance, Fission Product Release from UCO Fuel Compacts: AGR-1 and AGR-2 Examples, HTGR Accident Safety Testing of TRISO Fuel, Evaluating Behavior During D-LOFC Accidents, Safety Test Results for US UCO Fuel, Particle Failure Evaluation, Fuel Performance Summary, Ongoing Work and Outstanding Data Needs, Core Oxidation, Industry Engagement, and Coated-Particle-Fueled Reactor Concepts and Fuel Designs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Integrating Advanced Modeling and Accelerated Testing for a Modernized Fuel Qualification Paradigm

With the increasing interest in sodium fast reactor technology, as seen by applications to the U.S. Nuclear Regulatory Commission for the OKLO Aurora plant, fuel testing for the TerraPower Traveling Wave Reactor, and the impending construction and startup of the versatile test reactor (VTR), a modernized, accelerated approach to fuel qualification is needed. To guide this effort, a Phenomena Identification Ranking Table–styled analysis was performed for a U-Pu-Zr sodium-free annular fuel system. This analysis evaluated a series of fuel design properties and parameters against their contributions to key fuel performance phenomena. The resulting priority parameters were then reviewed against existing modeling and experimental capabilities to support investigation of the highest-priority parameters. A pathway for qualification was then established using highthroughput, high-volume experiments from MiniFuel and FAST in parallel with advanced physics-based model development. This effort outlines how the first stages of qualification can be reduced from the typical 20+-year development cycle to 5 to 7 years by deploying accelerated irradiation testing platforms. As with any accelerated test, these methods are prototypic in some aspects and less so in others; however, by coupling with advanced fuel performance modeling and simulation capabilities, the larger space of irradiation parameters and material response provided offers advantages for the validation of physics-based models supporting the deployment of novel fuel designs. As a test case, this paper utilizes a proposed Mark II fuel system for the upcoming VTR. Thus, an accelerated qualification method can be tested for the development of MARK II driver fuel so that by the time of VTR startup, lead test assemblies for a Mark II fuel can be initiated.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

SLUDGE BATCH 7 ACCEPTANCE EVALUATION: RADIONUCLIDE CONCENTRATIONS IN TANK 51 SB7 QUALIFICATION SAMPLE PREPARED AT SRNL

Presented in this report are radionuclide concentrations required as part of the program of qualifying Sludge Batch Seven (SB7) for processing in the Defense Waste Processing Facility (DWPF). The SB7 material is currently in Tank 51 being washed and prepared for transfer to Tank 40. The acceptance evaluation needs to be completed prior to the transfer of the material in Tank 51 to Tank 40. The sludge slurry in Tank 40 has already been qualified for DWPF and is currently being processed as SB6. The radionuclide concentrations were measured or estimated in the Tank 51 SB7 Qualification Sample prepared at Savannah River National Laboratory (SRNL). This sample was prepared from the three liter qualification sample of Tank 51 sludge slurry (HTF-51-10-125) received on September 18, 2010. The sample was delivered to SRNL where it was initially characterized in the Shielded Cells. With consultation from the Liquid Waste Organization, the qualification sample was then modified by several washes and decants, which included addition of Pu from H Canyon and sodium nitrite per the Tank Farm corrosion control program. This final slurry now has a composition expected to be similar to that of the slurry in Tank 51 after final preparations have been made for transfer of that slurry to Tank 40. Determining the radionuclide concentrations in this Tank 51 SB7 Qualification Sample is part of the work requested in Technical Task Request (TTR) No. HLW-DWPF-TTR-2010-0031. The radionuclides included in this report are needed for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria (TSR/WAC) Evaluation, and the DWPF Solid Waste Characterization Program (TTR Task I.2). Radionuclides required to meet the Waste Acceptance Product Specifications (TTR Task III.2.) will be measured at a later date after the slurry from Tank 51 has been transferred to Tank 40. Then a sample of the as-processed SB7 will be taken and transferred to SRNL for measurement of these radionuclides. The results presented in this report are those necessary for DWPF to assess if the Tank 51 SB7 sample prepared at SRNL meets the requirements for the DWPF Radiological Program Evaluation, the DWPF Waste Acceptance Criteria evaluation, and the DWPF Solid Waste Characterization Program. Concentrations are given for thirty-four radionuclides along with total alpha and beta activity. Values for total gamma and total gamma plus beta activities are also calculated.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SLUDGE WASHING AND DEMONSTRATION OF THE DWPF FLOWSHEET IN THE SRNL SHIELDED CELLS FOR SLUDGE BATCH 7A QUALIFICATION

Waste Solidification Engineering (WSE) has requested that characterization and a radioactive demonstration of the next batch of sludge slurry (Sludge Batch 7a*) be completed in the Shielded Cells Facility of the Savannah River National Laboratory (SRNL) via a Technical Task Request (TTR). This characterization and demonstration, or sludge batch qualification process, is required prior to transfer of the sludge from Tank 51 to the Defense Waste Processing Facility (DWPF) feed tank (Tank 40). The current WSE practice is to prepare sludge batches in Tank 51 by transferring sludge from other tanks. Discharges of nuclear materials from H Canyon are often added to Tank 51 during sludge batch preparation. The sludge is washed and transferred to Tank 40, the current DWPF feed tank. Prior to transfer of Tank 51 to Tank 40, SRNL simulates the Tank Farm and DWPF processes with a Tank 51 sample (referred to as the qualification sample). Sludge Batch 7a (SB7a) is composed of portions of Tanks 4, 7, and 12; the Sludge Batch 6 heel in Tank 51; and a plutonium stream from H Canyon. SRNL received the Tank 51 qualification sample (sample ID HTF-51-10-125) following sludge additions to Tank 51. This report documents: (1) The washing (addition of water to dilute the sludge supernate) and concentration (decanting of supernate) of the SB7a - Tank 51 qualification sample to adjust sodium content and weight percent insoluble solids to Tank Farm projections. (2) The performance of a DWPF Chemical Process Cell (CPC) simulation using the washed Tank 51 sample. The simulation included a Sludge Receipt and Adjustment Tank (SRAT) cycle, where acid was added to the sludge to destroy nitrite and reduce mercury, and a Slurry Mix Evaporator (SME) cycle, where glass frit was added to the sludge in preparation for vitrification. The SME cycle also included replication of five canister decontamination additions and concentrations. Processing parameters were based on work with a non-radioactive simulant. (3) Vitrification of a portion of the SME product and characterization and durability testing (as measured by the Product Consistency Test (PCT)) of the resulting glass. (4) Rheology measurements of the initial slurry samples and samples after each phase of CPC processing. This program was controlled by a Task Technical and Quality Assurance Plan (TTQAP), and analyses were guided by an Analytical Study Plan. This work is Technical Baseline Research and Development (R&D) for the DWPF. It should be noted that much of the data in this document has been published in interoffice memoranda. The intent of this technical report is bring all of the SB7a related data together in a single permanent record and to discuss the overall aspects of SB7a processing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗