Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Project management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

296 records · Page 4

Powering the Lunar Surface: Managing Dust, Extreme Environments, and Power Needs

Power availability remains one of the primary constraints for lunar surface science. This talk reviews power requirements from previously flown instruments to help prepare future payloads for upcoming CLPS opportunities and highlights the testing and environmental simulation capabilities at NASA JSC that enable reliable lunar payload development. It also outlines the power needs, environmental challenges, and emerging technologies required to support sustained human and robotic operations on the lunar surface as part of NASA’s Moon to Mars strategy. Key challenges include variable solar illumination at polar and equatorial regions, extreme thermal environments, and dust driven degradation that limit current surface power systems. The science data needed for resource identification and landing site planning will allow for the successful preparation of crewed Artemis activities and long-term presence. Building on recent missions, current test infrastructure, and emerging power technology pathways, this presentation equips industry, academia, and government teams with the information needed to design robust lunar payloads, reduce development risk, and fully leverage the increasing cadence of CLPS missions. These developments will form a critical technical foundation for long duration lunar presence and future Mars exploration.

lunar power

Spacecraft Water Impurity Monitor, a System for Water Quality Analysis on Exploration Missions Beyond Low Earth Orbit

Exploration missions beyond low-earth-orbit (LEO) will require advanced instrumentation to monitor water quality. Traveling beyond LEO means the transfer of water samples to an Earth-based laboratory for detailed analysis is not feasible. Detailed analysis of water composition during exploration is still necessary, because having the capability to determine the specific organic chemical causing a change in total organic carbon (TOC) or the specific metal or ionic species causing a change in conductivity has the potential to inform the crew health and system management decisions. On a new vehicle such as a lunar or Mars surface habitat or a Mars transit vehicle, finding “new” impurities not seen on ISS should be expected. The key is to identify the impurity so the correct action can be taken. On ISS we can measure TOC, conductivity, and other physical properties but do not have the capability for detailed analysis using vehicle instrumentation. This is acceptable because ISS can send samples down to Earth for further analysis and obtain the detailed composition. The Spacecraft Water Impurity Monitor (SWIM) will provide detailed water quality analysis for missions in which sample down mass is not available. SWIM is a system comprising organic and inorganic analysis modules. For organic chemicals, a gas chromatograph mass spectrometer (GCMS) detects and identifies organic impurities. For inorganic species, a capillary electrophoresis capacitively coupled contactless conductivity detection (CE-C4D) system as well as ion specific electrodes detect and identify metal ions and other inorganic salts / acids. The SWIM technology demonstration project has completed a System Requirements Review (SRR) to finalize detection requirements and is currently working to refine vehicle interface requirements for a future technology demonstration. The project also has begun preliminary flight design activities for the core analyzers in the instrument suite.

Water Monitoring

A Simplified Model of VIPER Thermal Management System. Part II: Integrated Vehicle

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) thermal management system (TMS) relies on four loop heat pipes (LHPs) to transport electronic waste heat to the vehicle cooling radiative surface and avoid overheating. The TMS has also ten constant conductance heat pipes (CCHPs) dedicated to balance the thermal load within the internal environment where the avionics boxes are mounted, also called warm electronic box (WEB), and to transport the heat from two of the science payload instruments. The TMS also uses two thermal straps to thermally link the batteries to the WEB. These thermal components, in addition to heaters, thermostat, multi-layer insulation (MLIs), and isolators forms the core of the VIPER TMS. The complex heat transport balance managed by the TMS is challenging to characterize and model. The more fidelity and granularity of a model, the more costly the computational resources needed and the longer the simulation and modeling time. When the priority is to provide quick but reliable assessments of the thermal performance or real time thermal feedback for training of console operators, simplified modeling tools are needed. To satisfy that need, this paper describes the effort to develop and correlate a model of VIPER TMS based on control volume approach. The correlation effort in particular focuses on hibernation, cold thermal balance, and hot thermal balance data from the integrated vehicle thermal vacuum (TVAC) test. Thus, the correlated model captures the heat leaks during hibernations and the performance at two extremes, bounding, operating scenarios.

Loop Heat Pipe

A Simplified Model of VIPER Thermal Management System. Part II: Integrated Vehicle

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) thermal management system (TMS) relies on four loop heat pipes (LHPs) to transport electronic waste heat to the vehicle cooling radiative surface and avoid overheating. The TMS has also ten constant conductance heat pipes (CCHPs) dedicated to balance the thermal load within the internal environment where the avionics boxes are mounted, also called warm electronic box (WEB), and to transport the heat from two of the science payload instruments. The TMS also uses two thermal straps to thermally link the batteries to the WEB. These thermal components, in addition to heaters, thermostat, multi-layer insulation (MLIs), and isolators forms the core of the VIPER TMS. The complex heat transport balance managed by the TMS is challenging to characterize and model. The more fidelity and granularity of a model, the more costly the computational resources needed and the longer the simulation and modeling time. When the priority is to provide quick but reliable assessments of the thermal performance or real time thermal feedback for training of console operators, simplified modeling tools are needed. To satisfy that need, this paper describes the effort to develop and correlate a model of VIPER TMS based on control volume approach. The correlation effort in particular focuses on hibernation, cold thermal balance, and hot thermal balance data from the integrated vehicle thermal vacuum (TVAC) test. Thus, the correlated model captures the heat leaks during hibernations and the performance at two extremes, bounding, operating scenarios.

Thermal Modeling

A Simplified Model of VIPER Thermal Management System. Part I: Loop Heat Pipe

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) uses a combination of loop heat pipes (LHPs) and heaters as the primary hardware to modulate the temperature of the electronic boxes and payloads instruments. LHPs have been designed and instrumented to be capable of passive and active shutdown. The goal of the passive shutdown, using a thermal control valve (TCV) to limit the flow of the working fluid, is to preserve thermal energy and avoid unnecessary heat leaks during lunar night. The goal of the active shutdown on the other hand, is to forcefully increase the vehicle internal temperature to bakeout the payload instruments. Several numerical modeling tools are available to analyze LHP performance under the complex set of operational requirements and environments levied on the VIPER Thermal Management System (TMS). Yet, while those numerical modeling tools are capable of detailed performance analysis, they tend to take large computational resources and long computational time. In this paper, a model of a single LHP developed based on control volume approach is presented. By using the control volume approach, the complex geometry of the LHP, and the components attached to it, are reduced to thermal lump capacitances, thus reducing the computation effort. This paper also describes the effort to correlate the proposed LHP model using thermal vacuum (TVAC) test data.

Loop Heat Pipe

A Simplified Model of VIPER Thermal Management System. Part I: Loop Heat Pipe

NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) uses a combination of loop heat pipes (LHPs) and heaters as the primary hardware to modulate the temperature of the electronic boxes and payloads instruments. LHPs have been designed and instrumented to be capable of passive and active shutdown. The goal of the passive shutdown, using a thermal control valve (TCV) to limit the flow of the working fluid, is to preserve thermal energy and avoid unnecessary heat leaks during lunar night. The goal of the active shutdown on the other hand, is to forcefully increase the vehicle internal temperature to bakeout the payload instruments. Several numerical modeling tools are available to analyze LHP performance under the complex set of operational requirements and environments levied on the VIPER Thermal Management System (TMS). Yet, while those numerical modeling tools are capable of detailed performance analysis, they tend to take large computational resources and long computational time. In this paper, a model of a single LHP developed based on control volume approach is presented. By using the control volume approach, the complex geometry of the LHP, and the components attached to it, are reduced to thermal lump capacitances, thus reducing the computation effort. This paper also describes the effort to correlate the proposed LHP model using thermal vacuum (TVAC) test data.

Loop Heat Pipe

A Transient Hydrodynamic Model of Screen Channel Liquid Acquisition Devices for In-Space Cryogenic Propellant Management

Screen channel liquid acquisition devices (LADs) will play a crucial role in future deep space travel. It is essential that vapor-free delivery of propellants during tank-to-tank transfer is ensured to maximize yield from storage tanks and prevent potential combustion instabilities. The screen channel LAD utilizes a fine screen wire mesh that can separate phases in a low Bond number (i.e. microgravity) environment using surface tension forces. This study presents the development and verification of a new model for transient screen compliance, one of the influential factors for screen channel LAD design. Screen compliance is crucial during LAD channel outflow transients because the slight deflection of the screen can provide needed mass to satisfy rapid outflow demands and reduce the pressure difference across the screen. The model is successfully verified against CFD simulations. In addition, the characteristic speed for the governing screen compliance equations is derived which allows for numerical stability criteria to be established. As shown in this study, the transient maximum pressure difference across the screen can greatly exceed the steady state maximum pressure difference across the screen in many cases.

Hydrodynamics Simulations

Surveyor Project Final Report: Part 2 - Science Results

This two-part document constitutes the Project Final Report on the Surveyor spacecraft. Part I of this Technical Report consists of a technical description and an evaluation of engineering results of the systems used on Surveyor. Part II presents the science data derived from the lunar soft-landing missions, and the scientific analyses conducted by the Surveyor Scientific Evaluation Advisory Team, the Surveyor Investigator Teams, and the associated Working Croups. Results given in this part of this Technical Report are based on data evaluation before June 15, 1968. It is expected that future evaluations and analyses will provide additional science results.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Apollo-Soyuz Test Project: Preliminary Science Report

This document summarizes the experimental concepts and preliminary analyses (as of December 1975) for each of the 28 scientific experiments conducted during the Apollo-Soyuz Test Project from July 15 to 24, 1975. The scientific topics are X- ray and extreme ultraviolet astronomy, solar astronomy, gamma- ray detectors, Earth studies (including the upper atmosphere, meteorological phenomena, hydrology, oceanography, geology, desert studies, and gravity field studies), microbiology, heavy cosmic particle interaction with live cells, vestibular system studies, and materials processing (including high-temperature and ambient-temperature processing of industrial materials and electrophoretic processing of biological materials) .

Microbiology

Bipolar Nickel-Metal Hydride Battery Development Project

This paper reviews the development of the Electro Energy, Inc.'s bipolar nickel metal hydride battery. The advantages of the design are that each cell is individually sealed, and that there are no external cell terminals, no electrode current collectors, it is compatible with plastic bonded electrodes, adaptable to heat transfer fins, scalable to large area, capacity and high voltage. The design will allow for automated flexible manufacturing, improved energy and power density and lower cost. The development and testing of the battery's component are described. Graphic presentation of the results of many of the tests are included.

Cole, John H.

Turbofan Engine Power Extraction Demonstration Final Report

As GE Aerospace advances toward a revolutionary step change in propulsion efficiency, the integration and demonstration of new engine architectures and technology systems are essential. The NASA Turbofan Engine Power Extraction Demonstration (PEx), conducted through the Hybrid Thermally Efficient Core (HyTEC) project, aims to develop and demonstrate megawatt-class hybrid electric capability on a modern commercial turbofan engine. The hybrid electric system is critical to meeting the needs of the U.S. aviation industry for next-generational propulsion systems with greater efficiency, durability, and range. This supports energy independence and helps ensure the security and resilience of one of America's largest export industries. The PEx project specifically targets three key objectives: mechanically integrating hybrid electric capability into a commercial turbofan engine, integrating electric machine control with turbofan control for advanced power management, and de-risking performance modeling of future hybrid electric architectures. To mature these technologies to Technology Readiness Level (TRL) 6, a series of electric power system component tests and a baseline engine performance test campaign were conducted. These efforts culminated in an integrated hybrid electric turbofan test campaign demonstrating power extraction, power insertion, and power transfer between spools. Tests of the electric power system were completed at GE Aerospace’s Electrical Power Integrated Systems Center in Dayton, Ohio and engine tests were completed at Peebles Test Operation in Peebles, Ohio. Hybrid electric trade studies extended the demonstrated capability to altitude using the validated cycle model from the PEx test campaigns, allowing for comments on expanded mission benefits not demonstrated in the ground campaign. The knowledge gained from PEx also supports GE Aerospace’s Compact Core Demonstrator as part of HyTEC Phase 2 and ultimately informs the implementation of hybrid electric systems in the next generation of GE Aerospace commercial engine products. This report provides a summary of the program background, test campaigns, trade studies, and insights into the technical maturation required to support future commercial products.

Hybrid Electric

Extended Duration Orbiter Medical Project Microbial Air Sampler (STS-50/USML-1)

The Microbial Air Sampler was used on mission days 1, 7, and 13 in the Spacelab during STS-50/USML-1. Microbial air samples were collected using two types of media strips containing agar (Rose Bengal for yeast and molds, TSA for bacteria). The bacterial level found on day 1 was lower than experienced on previous Spacelab missions. A high level of fungi was present on day 1, however subsequent samples on days 7 and 13 did not indicate fungal growth. Bacterial growth was also minimized in this microgravity environment as the mission progressed. No pathogenic microorganisms were isolated, and the health risk from airborne microbes was minimal throughout the mission.

Duane L Pierson

Modular Assembled Radiators for Nuclear Electric Propulsion (NEP) VehicLes (MARVL) Project Thermal Technology Development

Nuclear Electric Propulsion (NEP) has been considered for crew and cargo class missions to Mars for more than six decades. The Primary Heat Rejection Subsystem (PHRS) of an NEP vehicle expels the megawatts of waste heat generated by the Power Conversion Subsystem (PCS). In previous studies, integrating the majority of the NEP vehicle within a single launch fairing required the use of complex deployable elements and resulted in reduced PCS efficiency. To achieve the necessary radiating area, past design studies have utilized massive multi-wing folding radiators resulting in conceptual PHRS designs that have been widely acknowledged as non-optimal. The Modular Assembled Radiators for NEP VehicLes (MARVL) project is incorporating in-Space Assembly (iSA) into the design process to realize lightweight, modular, and more capable PHRS radiators. Since the project’s Authority to Proceed (ATP) date of October 2024, the project team has been developing a modular design for the PHRS radiators that will be suitable for both the Mars mission environments and iSA commissioning operations. This document captures the current progress of the incremental technology development for the thermal components of the MARVL System of Interest (SOI).

Modular Radiator

Autonomous Detection and Classification of Lunar Minerals Using a Convolutional Neural Network Based Framework for the SUCR DALI Project

NASA’s long-term goal is to deploy humans to the Moon and, from there, advance human exploration to Mars, with Artemis missions as pivotal milestones. Raman spectroscopy can uniquely identify minerals, compounds, water states, and other materials, providing distinctive fingerprints for classification. A Raman instrument has been successfully deployed and utilized on the Mars surface via the Perseverance rover, but has not yet been utilized at the lunar surface The SUCR DALI project is working towards developing a Raman spectroscopy instrument to be applied in various lunar mission concepts, including within the Artemis program. The objective of my research is to assist in the maturation of the proposed SUCR DALI lunar Raman instrument through the development of an autonomous detection and classification model capable of identifying minerals and water states on the Moon’s surface.

Convolutional Neural Networks