At least 73 records · Page 4

Multipole Effects Study for Project X Front End Cavities

Effects of RF field asymmetry along with multipoles have been studied in Project X front end cavities. One family of half wave resonators operating at 162.5 and two of spoke resonators operating at 325 MHz have been analysed. HWR and spoke res onators unlike elliptical cavities, do not have axial symmetry, hence a quadrupole perturbation to the beam is present. The purpose of this paper is to explain the approach and the calculation method used to understand and overcome the drawbacks due to th e RF field asymmetry.

43 PARTICLE ACCELERATORS↗

Main Couplers for Project X

Design of 325MHz and 650MHz multi-kilowatt CW main couplers for superconducting linac of Project X is described. Results of electrodynamics, thermal and mechanical simulations is presented.

43 PARTICLE ACCELERATORS↗

Testing Omega P’s 650 KW, 1.3 GHZ Low-Voltage Multi-Beam Klystron for the Project X Pulsed LINAC

Omega-P Inc. had developed a multi beam 1.3 GHz klystron (MBK) for the Project X pulsed linac application. Testing of the klystron require a special hardware such as a modulator, RF components, control system, power supplies, etc, as well as associated infrastructure( electricity, water, safety). This is an expensive part of klystron development for which Omega-P does not have the required equipment. Fermilab will test the MBK at Fermilab site providing contribution to the project all the necessary facilities, infrastructure and manpower for MBK test performance and analysis.

47 OTHER INSTRUMENTATION↗

Intense Muon Beams for Experiments at Project X

A coherent approach for providing muon beams to several experiments for the intensity-frontier program at Project X is described. Concepts developed for the front end of a muon collider/neutrino factory facility, such as phase rotation and ionization cooling, are applied, but with significant differences. High-intensity experiments typically require high-duty-factor beams pulsed at a time interval commensurate with the muon lifetime. It is challenging to provide large RF voltages at high duty factor, especially in the presence of intense radiation and strong magnetic fields, which may preclude the use of superconducting RF cavities. As an alternative, cavities made of materials such as ultra-pure Al and Be, which become very good –but not super– conductors at cryogenic temperatures, can be used.

43 PARTICLE ACCELERATORS↗

Project X with Superconducting Rapid Cycling Synchrotron

Investigation of neutrino oscillations and rare meson decays are main physics goals of Project X [1]. The successful physics outcome relies on the feasibility of high-intensity neutrino and meson (K + and µ) beams. In order to meet this goal we propose accelerator system dominated by the synchrotrons (Option A) as a technologically easier and significantly more cost-effective alternative to the accelerator system dominated by the linear accelerators (Option B, [2]). The synchrotron-based accelerator system and its main components are outlined and the expected proton beam power for the neutrino and meson beams production is presented and discussed.

43 PARTICLE ACCELERATORS↗

Analysis and Design of MEBT Beam Absorber for Project-X

A beam absorber is needed for a new high power accelerator to be built in Fermilab. It is called Project-X and should replace the existing linac and the 8 GeV Booster synchrotron. The beam absorber is part of the bunch-by-bunch chopper assigned to create an arbitrary bunch sequence required by experimental program. It will be located in the middle of the medium energy beam transport (MEBT) and has to remove the unnecessary bunches from the initially uniform bunch structure supplied by 2.1 MeV CW RFQ. At nominal RFQ beam current of 5 mA, the maximum power delivered to the beam absorber is about 10 kW. Beam optics requirements result in that the length allocated to the beam absorber is short ({approx}400 mm) and the beam size is small ({sigma}{approx}2mm). That yields high power density of the beam arriving to the absorber. The paper presents the thermal and mechanical analysis of one of proposed designs.

43 PARTICLE ACCELERATORS↗

Numerical Studies of High-Intensity Injection Painting for Project X

Injection phase space painting enables the mitigation of space charge and stability issues, and will be indispensable for the Project-X at Fermilab [1], delivering high-intensity proton beams to HEP experiments. Numerical simulations of multi-turn phase space painting have been performed for the FNAL Recycler Ring, including a self-consistent space charge model. The goal of our studies was to study the injection painting with inclusion of 3D space charge, using the ORBIT tracking code. In a current scenario the painting lasts for 110 turns, twice faster, than we considered in this paper. The optimal wave-forms for painting kickers, which ensure the flatter phase distributions, should be found. So far we used a simplified model for painting kicker strength (implemented as the 'ideal bump' in ORBIT). We will include a more realistic field map for the chicane magnets. Additional stripping simulations will be combined. We developed a block for longitudinal painting, which works with arbitrary notches in incoming micro-bunch buckets. The appropriate choice of the amplitude of the second harmonic of RF field will help to flatten the RF-bucket contours, as was demonstrated in 1D simulations. Non-linear lattice issue will be also addressed.

43 PARTICLE ACCELERATORS↗

Lattice Design for Project -X CW Superconducting Linac

In this paper, we discuss the beam dynamics optimization of a proposed continuous wave (CW) superconducting linac for Project-X. This 3.0 GeV linac has a peak current of 5-10 mA. The average current is 1 mA, yielding an average beam power of 3 MW. The linac consists of a low energy 325 MHz section (2.5 -470 MeV) containing three families of SC single-spoke resonators, an intermediate energy section (470 MeV-2.0 GeV) containing two families (βg = 0.61 and βg = 0.9) of 650 MHz squeezed SC elliptical cavities and finally, a high energy section (2.0-3.0 GeV) based on 1.3GHz ILC-type (βg = 1.0) cavities. Transverse and longitudinal dynamics in the CW linac are modeled assuming the maximum 1 mA peak current. Different options for transverse focusing are considered.

43 PARTICLE ACCELERATORS↗

Preliminary Test Results from 650 MHz Single Cell Medium Beta Cavities for Project X

We have fabricated two single cell 650 MHz {beta}=0.61 cavities of a JLab design, which possibly can be used for the proposed Project X proton linac application. Both cavities were manufactured at JLab from RRR>250 niobium sheet of 4 mm thickness using standard techniques such as deep drawing, electron beam welding, buffered chemical polishing, hydrogen degassing heat treatment, high pressure ultrapure water rinsing and clean room assembly. Initially cavity no. 1 was -- after final surface treatment by buffered chemical polishing (BCP) -- measured without any provisions for stiffening. As expected, the pressure sensitivity and the Lorentz Force detuning coefficients were relatively high; however, the RF performance was very encouraging: the cavity exhibited a Q-value > 10{sup 11} at 1.6K, corresponding to a residual resistance of < 1.5 n{Omega} The initial gradient was limited to E{sub acc} ~ 18 MV/m, limited by field emission. In a subsequent test, the cavity was re-rinsed and stiffened up, resulting in a somewhat improved mechanical behavior, but no improvement in rf performance. The second cavity was also tested twice, before and after low temperature baking. The results from all tests are reported in this contribution.

43 PARTICLE ACCELERATORS↗

Low-Beta Structure for High Energy Part of Project X

Long 11-cell, {beta} = 0.81 L-band structure is considered as an initial stage of the high-energy part of the Project-X in order to accommodate to a standard Type-4 cryomodule. The cavity shape is optimized for maximal energy gain providing the same time field flatness along the structure not worse than for ILC {beta} = 1 cavity, and the same ratio of surface magnetic field to electric field. The results of spectrum analysis for monopole and dipole HOMs is presented as well.

43 PARTICLE ACCELERATORS↗

Longitudinal and Transverse Effects of HOMs in the Project X Linac

Results of analysis are presented for the longitudinal and transverse effects of High-Order Mode (HOM) excitation in the acceleration RF system of the CW proton linac of the Project X facility. Necessity of HOM dampers in the SC cavities of the linac is discussed.

43 PARTICLE ACCELERATORS↗

Project X and a Muon Facility at Fermilab

An integrated program is described, starting with muon experiments in the Booster era, continuing with a 2 MW target station, a 4 GeV Neutrino Factory and a 3 TeV Muon Collider, all driven by Project X. This idea provides an integrated approach to the Intensity and Energy Frontiers at Fermilab.

43 PARTICLE ACCELERATORS↗

Design, Fabrication and Testing of Medium-Beta 650 MHz SRF Cavity Prototypes for Project-X

A new type of superconducting radio frequency (SRF) cavity shape with a shallow equator dome to reduce electron impact energies for suppressing multipacting barriers has been proposed. The shape is in consideration for the first time in the framework of Project-X to design a potential multi-cell cavity candidate for the medium-beta section of the SRF proton CW linac operating at 650 MHz. Rationales covering the design of the multi-cell cavity, the manufacture, post-processing and high power testing of two single-cell prototypes are presented.

43 PARTICLE ACCELERATORS↗

Optimization of End Cells of Low Beta Cavity of Higher Energy Part of Project X

11 cell elliptical cavity is designed for acceleration of particles travelling at 81 % of the speed of light. It will operate at 1.3 GHz & will be served to accelerate the particles from 0.450 GeV to 1.2 GeV in high energy section of Project-X. The cavity is studied for higher order mode (HOM) & trapped modes. The shapes of end cells of cavity is optimized to increase the field amplitude in end cells so that coupling of trapped modes may increase with HOM coupler & they can be extracted easily but keeping the field flatness & operating frequency undisturbed.

43 PARTICLE ACCELERATORS↗

Precision Neutrino Oscillation Measurements using Simultaneous High-Power, Low-Energy Project-X Beams

The first phase of the long-baseline neutrino experiment, LBNE10, will use a broadband, high-energy neutrino beam with a 10-kt liquid argon TPC at 1300 km to study neutrino oscillation. In this paper, we describe potential upgrades to LBNE10 that use Project X to produce high-intensity, low-energy neutrino beams. Simultaneous, high-power operation of 8- and 60-GeV beams with a 200-kt water Cerenkov detector would provide sensitivity to nu_mu to nu_e oscillations at the second oscillation maximum. We find that with ten years of data, it would be possible to measure sin2(2theta_13) with precision comparable to that expected from reactor antineutrino disappearance and to measure the value of the CP phase, delta_CP, with an uncertainty of (5-10) degrees. This document is submitted for inclusion in Snowmass 2013.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

RF thermal and new cold part design studies on TTF-III input coupler for Project-X

An RF power coupler is one of the key components in a superconducting (SC) linac. It provides RF power to the SC cavity and interconnects different temperature layers (1.8 K, 4.2 K, 70 K and 300 K). The TTF-III coupler is one of the most promising candidates for the High Energy (HE) linac of Project X, but it cannot meet the average power requirements because of the relatively high temperature rise on the warm inner conductor, so some design modifications will be required. In this paper, we describe our simulation studies on the copper coating thickness on the warm inner conductor with RRR values of 10 and 100. Our purpose is to rebalance the dynamic and static loads, and finally lower the temperature rise along the warm inner conductor. Additionally, to get stronger coupling, better power handling and less multipacting probability, one new cold part design was proposed using a 60 mm coaxial line; the corresponding multipacting simulation studies have also been investigated.