Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Progress Report”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Space Shuttle Program Progress Report

A status report is presented on progress in the design, manufacturing and testing of components of the space transportation system (STS), and primarily the Space Shuttle vehicles. Project landmarks from 1969 to 1981 are indicated, fabrication of the Shuttle Orbiter and rollout of the first prototype are described, fabrication and assembly of some Orbiter parts are sketched, and some of the subsystems (thermal protection, avionics, maneuvering aids, reaction control, remote manipulator) are described. Also discussed are: Orbiter carrier aircraft, Shuttle main engine and tests, external fuel tank, solid rocket booster, launch and landing facilities. A separate section is devoted to ground tests (vibration, propulsion, electronics, avionics integration), trainers and simulators, and flight tests (captive flight, free flight, landing and approach, orbital flight).

Thompson, R. F.↗

X-ray emission from RS CVn systems - A progress report

A report is given on progress made in a search for soft X-ray emission from RS CVn systems, using the low-energy detectors aboard HEAO 1. To date, nine systems have been seen. The properties of these systems are discussed. The failure to detect certain systems is considered. The possibility is discussed of discovering hitherto unknown RS CVn systems with soft X-ray observations.

Walter, F.↗

Long Baseline Nulling Interferometry with the Keck Telescopes: A Progress Report

The Keck Interferometer Nuller (KIN) is one of the major scientific and technical precursors to the Terrestrial Planet Finder Interferometer (TPF-I) mission. KIN's primary objective is to measure the level of exo-zodiacal mid-infrared emission around nearby main sequence stars, which requires deep broad-band nulling of astronomical sources of a few Janskys at 10 microns. A number of new capabilities are needed in order to reach that goal with the Keck telescopes: mid-infrared coherent recombination, interferometric operation in 'split pupil' mode, N-band optical path stabilization using K-band fringe tracking and internal metrology, and eventually, active atmospheric dispersion correction. We report here on the progress made implementing these new functionalities, and discuss the initial levels of extinction achieved on the sky.

instrumentation↗

Adjustable impedance, force feedback and command language aids for telerobotics (parts 1-4 of an 8-part MIT progress report)

Projects recently completed or in progress at MIT Man-Machine Systems Laboratory are summarized. (1) A 2-part impedance network model of a single degree of freedom remote manipulation system is presented in which a human operator at the master port interacts with a task object at the slave port in a remote location is presented. (2) The extension of the predictor concept to include force feedback and dynamic modeling of the manipulator and the environment is addressed. (3) A system was constructed to infer intent from the operator's commands and the teleoperation context, and generalize this information to interpret future commands. (4) A command language system is being designed that is robust, easy to learn, and has more natural man-machine communication. A general telerobot problem selected as an important command language context is finding a collision-free path for a robot.

Sheridan, Thomas B.↗

Nimbus - A progress report.

Flight accomplishments of Nimbus satellites and progress in meteorological spacecraft observatory systems since program initiation

Huston, W. B.↗

A progress report - Induction plasma simulation of the GCNR.

Significant progress has been made in the design, construction and operation of induction coupled devices which simulate the open cycle Gas Core Nuclear Rocket. These devices incorporate solid feed of the plasma forming material (uranium and uranium simulating materials), permeable walls, seeding of the propellant, and transpiration cooled, choked flow nozzles. Operating parameters and performance data of devices employing these design features are discussed. A uranium plasma experiment is included. In addition, operating data of several devices which compare theoretical and actual performance at a variety of powers, pressures, frequencies, and sizes are discussed.

Vogel, C. E.↗

Use of graphics in decision aids for telerobotic control: (Parts 5-8 of an 8-part MIT progress report)

Four separate projects recently completed or in progress at the MIT Man-Machine Systems Laboratory are summarized. They are: a decision aid for retrieving a tumbling satellite in space; kinematic control and graphic display of redundant teleoperators; real time terrain/object generation: a quad-tree approach; and two dimensional control for three dimensional obstacle avoidance.

Sheridan, Thomas B.↗

The 1990 progress report and future plans

This document describes the progress and plans of the Artificial Intelligence Research Branch (RIA) at ARC in 1990. Activities span a range from basic scientific research to engineering development and to fielded NASA applications, particularly those applications that are enabled by basic research carried out at RIA. Work is conducted in-house and through collaborative partners in academia and industry. Our major focus is on a limited number of research themes with a dual commitment to technical excellence and proven applicability to NASA short, medium, and long-term problems. RIA acts as the Agency's lead organization for research aspects of artificial intelligence, working closely with a second research laboratory at JPL and AI applications groups at all NASA centers.

Friedland, Peter↗

A progress report on grazing incidence optics fabrication and evaluation

The progress being made on a mirror array telescope for high energies (MARTHE) project is reported. As a first step, small mirror flats and full-size Wolter I mirrors are produced that are lacquer coated (mandrels) and then coated with gold or palladium. The up-to-date results of fabricating and testing these mirrors are presented. Currently, results can be provided on the micro-roughness, marco-figure, X-ray scattering, and reflectivity up to 8 keV from flats and Wolter I mirrors as well as optical measurements of the flats.

Teague, Peter F.↗

NASA's Space Launch System: Progress Report

NASA and its commercial industry team achieved significant progress in 2016 in manufacturing and testing of the Block 1 vehicle for the first launch of the Space Launch System (SLS). Test and flight article hardware for the liquid hydrogen fuel tank as well as the engine section for the core stage were completed at Michoud Assembly Facility (MAF) in New Orleans. Test stands neared completion at Marshall Space Flight Center for the propellant tanks, engine section, intertank and payload section. Stennis Space Center completed major structural renovations on the B2 test stand, where the core stage "green run" test program will be conducted. The SLS team completed a hotfire test series at Stennis to successfully demonstrate the ability of the RS-25 engine to operate under SLS environments and performance conditions. The team also test fired the second qualification five-segment solid rocket motor and cast the first six motor segments for the first SLS mission. The Interim Cryogenic Propulsion Stage (ICPS) test article was delivered to Marshall for structural tests, and work is nearly finished on the flight stage. Flight software testing completed at Marshall included power quality and command and data handling. In 2017, that work continues. SLS completed Preliminary Design Review (PDR) on the Exploration Upper Stage (EUS), a powerful, human-rated spacecraft that will propel explorers to cis-lunar space. In 2017, hardware will continue to be integrated at MAF for core stage structural test articles and the first two operational flights. RS-25 hotfire testing will continue to explore engine performance, as well as test flight-like software and four new Engine Controller Units (ECUs) for the first mission. Production of development components for a more affordable RS-25 design is underway. Core stage structural test articles have begun arriving at Marshall. While engineering challenges typical of a new development are possible, SLS is working toward launch readiness in late 2018. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before first flight

Cook, Jerry↗