Program Managers Questions for LL13-MatModelRadDetect-2Jf
The major project goals are three-fold: 1) to determine the mechanisms of polarization of TlBr detectors related to electrical contact materials, and enable the rational design of optimal contact stacks for maximum detector longevity; 2) to elucidate the carrier trapping propensity of dislocations in CdTe/CZT and determine whether this depends on type and decoration of the dislocations; evaluate whether dislocation engineering (out of scope of this project) can optimize CZT detector performance; 3) to discover if (and how) a glass material can make a high-performance host for a scintillator, by understanding how atomic structure differences associated with composition and forming conditions affect carrier transport.