Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Production planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Southern Rockies Western Slope Agriculture: Identifying Drivers of Rangeland Production for Drought Planning on the Western Slope of the Southern Rockies

Over the last decade, the southern Rocky Mountains of the United States have experienced increasingly severe and variable drought. Local ranchers and landowners have reported strain on their operations, citing decreasing forage production for their cattle and a need to adjust their business models, even considering abandoning their businesses altogether. The study identified Major Land Resource Area-48 (MLRA-48) and northwestern Colorado as the key region for analysis. NASA DEVELOP partnered with the BLM Colorado River Field Office, Colorado State University Extension, USDA Forest Service, and the National Drought Mitigation Center to address stakeholder concerns of the efficacy of existing remotely sensed rangeland production estimation platforms and explore possible early warning climatic indicators of drought. The study identified two key rangeland platforms, the Rangeland Production Monitoring Service (RPMS) and Rangeland Analysis Platform (RAP) and used in-situ data to statistically validate their efficacy. RAP outperformed RPMS in estimating in-situ biomass and was therefore used in our climate modeling. Our study performed a random forest analysis, sampling 1500 points across the study area, comparing monthly RAP biomass estimates to a variety of climatic variables, including mean precipitation, temperature, palmer drought severity index, snow water equivalent, wind speed and direction, and vapor pressure deficit. After analysis, our study determined that vapor pressure deficit is a key indicator in predicting forage production in MLRA-48. Our study recommends the use of RAP in estimating potential forage, with caution for its tendency to overestimate. Our climate analysis provided our partners with greater understanding of the influence of various climatic factors in determining forage production and allows them to assist landowners in planning for future drought.

Addie Gonzalez↗

Southern Rockies Western Slope Agriculture: Identifying Drivers of Rangeland Production for Drought Planning on the Western Slope of the Southern Rockies

Over the last decade, the southern Rocky Mountains of the United States experienced severe and variable drought. Local ranchers and landowners have reported strain on their operations, citing decreasing forage for their cattle and a need to adjust their business models. This study identified Major Land Resource Area-48 (MLRA-48) and northwestern Colorado as the key region for analysis. NASA DEVELOP partnered with the BLM Colorado River Field Office, Colorado State University Extension, USDA Forest Service, and the National Drought Mitigation Center to address concerns regarding the efficacy of remotely sensed rangeland production platforms and identify early warning climatic indicators of drought. The study identified two key platforms, The Rangeland Productivity Monitoring Service (RPMS) and Rangeland Analysis Platform (RAP), which use NASA Landsat 5 TM, Landsat 7 ETM+, Landsat 8 OLI, and Landsat 9 OLI-2 to estimate rangeland biomass. We regressed these with in situ biomass data to validate their efficacy and found that RAP was more effective than RPMS in estimating rangeland biomass, though it presents a tendency to overestimate. Our study performed a random forest analysis, comparing monthly RAP biomass estimates to a variety of climate variables, including mean precipitation, temperature, Palmer Drought Severity Index, snow water equivalent, snow persistence from Terra MODIS, wind speed and direction, and vapor pressure deficit. We determined that vapor pressure deficit and precipitation are key indicators in predicting forage production in MLRA-48. Our climate analysis provided our partners with greater understanding of the influence of various climate variables in determining rangeland production and allows them to assist land managers in drought mitigation.

remote sensing↗

Mars ISPP Precursor (MIP): The First Flight Demonstration of In-Situ Propellant Production

Strategic planning for human missions of exploration to Mars has conclusively identified in-situ propellant production (ISPP) as an enabling technology. The Mars reference mission concept predeploys a robotic propellant production plant to the planet two years before the planned departure of the crew from Earth. The successful operation of this plant is necessary for the human journey to begin.

Kaplan, David↗

Production and Distribution of Global Products From MODIS

The Moderate Resolution Imaging Spectroradiometer was launched on the EOS Terra spacecraft in December 1999 and will also fly on EOS Aqua in December 2000. With 36 spectral bands from the visible through thermal infrared and spatial resolution of 250m to 1 kilometer, each MODIS instrument will image the entire Earth surface in 2 days. This paper traces the flow of MODIS data products from the receipt of Level 0 data at the EDOS facility, through the production and quality assurance process to the Distributed Active Archive Centers (DAACs), which ship products to the user community. It describes where to obtain products and plans for reprocessing MODIS products. As most components of the ground system are severely limited in their capacity to distribute MODIS products, it also describes the key characteristics of MODIS products and their metadata that allow a user to optimize their selection of products given anticipate bottlenecks in distribution.

Masuoka, Edward↗

Draft Plan for Characterizing Commercial Data Products in Support of Earth Science Research

This presentation introduces a draft plan for characterizing commercial data products for Earth science research. The general approach to the commercial product verification and validation includes focused selection of a readily available commercial remote sensing products that support Earth science research. Ongoing product verification and characterization will question whether the product meets specifications and will examine its fundamental properties, potential and limitations. Validation will encourage product evaluation for specific science research and applications. Specific commercial products included in the characterization plan include high-spatial-resolution multispectral (HSMS) imagery and LIDAR data products. Future efforts in this process will include briefing NASA headquarters and modifying plans based on feedback, increased engagement with the science community and refinement of details, coordination with commercial vendors and The Joint Agency Commercial Imagery Evaluation (JACIE) for HSMS satellite acquisitions, acquiring waveform LIDAR data and performing verification and validation.

Ryan, Robert E.↗

Ground-based Validation of the EOS Multi-angle Imaging SpectroRadiometer (MISR) Aerosol Retrieval Algorithms and Science Data Products

A plan for the ground-based validation of MISR aerosol retrieval is outlined. Activities occur in two phases: (1) pre-launch, work is focused on technique development and MISR algorithm validation using conventional ground-base methods and a MISR simulator (AirMISR) operating from the ER-2 aircraft to simulate MISR on-orbit observations. (2) Post-launch, the validation program relies on ground campaigns, underflights wit the MISR simulator and the use of local measurements fo aerosol loading and properties and irradiance measurements derived from the AERONET and ISIS networks.

algorithm↗

Product Assurance for Spaceflight Hardware

This report contains information about the tasks I have completed and the valuable experience I have gained at NASA. The report is divided into two different sections followed by a program summary sheet. The first section describes the two reports I have completed for the Office of Mission Assurance (OMA). I describe the approach and the resources and facilities used to complete each report. The second section describes my experience working in the Receipt Inspection/Quality Assurance Lab (RI/QA). The first report described is a Product Assurance Plan for the Gas Permeable Polymer Materials (GPPM) mission. The purpose of the Product Assurance Plan is to define the various requirements which are to be met through completion of the GPPM mission. The GPPM experiment is a space payload which will be flown in the shuttle's SPACEHAB module. The experiment will use microgravity to enable production of complex polymeric gas permeable materials. The second report described in the first section is a Fracture Analysis for the Mir Environmental Effects Payload (MEEP). The Fracture Analysis report is a summary of the fracture control classifications for all structural elements of the MEEP. The MEEP hardware consists of four experiment carriers, each of which contains an experiment container holding a passive experiment. The MEEP hardware will be attached to the cargo bay of the space shuttle. It will be transferred by Extravehicular Activity and mounted on the Mir space station. The second section of this report describes my experiences in the RVQA lab. I listed the different equipment I used at the lab and their functions. I described the extensive inspection process that must be completed for spaceflight hardware. Included, at the end of this section, are pictures of most of the equipment used in the lab. There is a summary sheet located at the end of this report. It briefly describes the valuable experience I have gained at NASA this summer and what I will be able to take with me as I return to college. I briefly discuss the experiences I mentioned in the previous three paragraphs along with training classes I attended and courses I completed at the Learning Lab.

Monroe, Mike↗

STS payloads mission control study. Volume 2-A, Task 1: Joint products and functions for preflight planning of flight operations, training and simulations

Specific products and functions, and associated facility availability, applicable to preflight planning of flight operations were studied. Training and simulation activities involving joint participation of STS and payload operations organizations, are defined. The prelaunch activities required to prepare for the payload flight operations are emphasized.

Source record↗

Orthorectified High Resolution Multispectral Imagery for Application to Change Detection and Analysis

The project team has outlined several technical objectives which will allow the companies to improve on their current capabilities. These include modifications to the imaging system, enabling it to operate more cost effectively and with greater ease of use, automation of the post-processing software to mosaic and orthorectify the image scenes collected, and the addition of radiometric calibration to greatly aid in the ability to perform accurate change detection. Business objectives include fine tuning of the market plan plus specification of future product requirements, expansion of sales activities (including identification of necessary additional resources required to meet stated revenue objectives), development of a product distribution plan, and implementation of a world wide sales effort.

Benkelman, Cody A.↗

CO2 Data Distribution and Support from the Goddard Earth Science Data and Information Services Center (GES-DISC)

This talk will describe the support and distribution of CO2 data products from OCO-2, AIRS, and ACOS, that are archived and distributed from the Goddard Earth Sciences Data and Information Services Center. We will provide a brief summary of the current online archive and distribution metrics for the OCO-2 Level 1 products and plans for the Level 2 products. We will also describe collaborative data sets and services (e.g., matchups with other sensors) and solicit feedback for potential future services.

AIRS↗

Heat Production During Countermeasure Exercises Planned for the International Space Station

This investigation's purpose was to determine the amount of heat produced when performing aerobic and resistance exercises planned as part of the exercise countermeasures prescription for the ISS. These data will be used to determine thermal control requirements of the Node 1 and other modules where exercise hardware might reside. To determine heat production during resistive exercise, 6 subjects using the iRED performed 5 resistance exercises which form the core exercises of the current ISS resistive exercise countermeasures. Each exerciser performed a warm-up set at 50% effort, then 3 sets of increasing resistance. We measured oxygen consumption and work during each exercise. Heat loss was calculated as the difference between the gross energy expenditure (minus resting metabolism) and the work performed. To determine heat production during aerobic exercise, 14 subjects performed an interval, cycle exercise protocol and 7 subjects performed a continuous, treadmill protocol. Each 30-min. exercise is similar to exercises planned for ISS. Oxygen consumption monitored continuously during the exercises was used to calculate the gross energy expenditure. For cycle exercise, work performed was calculated based on the ergometer's resistance setting and pedaling frequency. For treadmill, total work was estimated by assuming 25% work efficiency and subtracting the calculated heat production and resting metabolic rate from the gross energy expenditure. This heat production needs to be considered when determining the location of exercise hardware on ISS and designing environmental control systems. These values reflect only the human subject s produced heat; heat produced by the exercise hardware also will contribute to the heat load.

Rapley, Michael G.↗

TRMM Realtime Data Production, Transfer, and Future Plans

The Tropical Rainfall Measuring Mission, a joint US NASA and Japan NASDA mission, was launched on November 27, 1997 from Tanegashima Island, Japan on a NASDA provided H-II launch vehicle. The TRMM objectives are: to obtain and study multi-year science data sets of tropical and sub- tropical rainfall measurement; to understand how interactions between the sea, air, and land masses produce changes in global rainfall and climate; to help improve modeling of tropical rainfall processes; to test, evaluate, and improve the performance of satellite rainfall estimates measurements and techniques. The routine production and quick distribution of standard products provides an important underpinning to these objectives. The determination of standard TRMM algorithms and the requirements for routine production and distribution fall within the authority of the joint US-Japan Science Team. In April of 1998, the Joint TRMM Science team requested that TRMM data be made available in near real-time to approved international agencies and modelers. This request was an addition to the routine production of the standard TRMM data products. The science team requested that near-realtime products be as small as possible to facilitate their transfer via networks. Indeed, it was determined that only network transfer would be available. This presentation provides an overview of the type of products available from the realtime system and how the TRMM system was developed at the lowest cost in the shortest amount of time. It then describes the real-time data flow. The presentation also summarizes how the science quality of real-time data is maintained. It describes how interested groups can get access to this data and the importance of networks for the future of real-time data expansion. The presentation concludes real-time possibilities and improvements possible as part of the proposed Global Precipitation Mission. High speed network access availability is an important catalyst to real-time data flow during the proposed mission.

Stocker, Erich Franz↗

Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

Initial "Big 14" work was put to the test for the first time in 2010. Deficiencies were found in some of the planning and approaches to that work; Failure Response Assessment Team created in 2010 to address deficiencies -Identify and perform engineering analysis in operations products prior to failure; incorporate results into operations products -Identify actions for protecting ISS against a Next Worse Failure after the first failure occurs -Better document not only EVA products but also planning products, assumptions, and open actions; Pre-failure investments against critical failures best postures ISS for swift response and recovery -A type of insurance policy -Has proven effective in a number of contingency EVA cases since 2010. Planning for MBSU R&R in 2012, Second PM R&R in 2013, EXT MDM R&R in 2014; Current FRAT schedule projects completion of all analysis in 2018

Van Cise, Edward A.↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗