Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Reconstitution of Sandia's Melt Laboratory: A Strategic Approach to Address Alloy Procurement and Quality Challenges - Part 1

In recent years, the procurement of essential materials such as Stainless Steels, Ni-Alloys, and Kovar has become increasingly challenging. Lead times for these materials have extended to over 24 months, placing significant stress on the reliability of attaining these alloys. This situation is exacerbated by the supplier’s minimum purchase requirement of excessively large quantities to meet unique purchase order (PO) requirements which is usually above the maximum requirements of Sandia National Laboratories (SNL). Additionally, the reluctance of foundries to engage in small lot development for SNL specific needs further complicates the procurement process. This white paper explores the reconstitution of SNL’ Melt Laboratory as a strategic solution to mitigate these challenges.

36 MATERIALS SCIENCE↗

Standard spacecraft procurement analysis: A case study in NASA-DoD coordination in space programs

The Space Test Program Standard Satellite (STPSS), a design proposed by the Air Force, and two NASA candidates, the Applications Explorer Mission spacecraft (AEM) and the Multimission Modular Spacecraft (MMS), were considered during the first phase. During the second phase, a fourth candidate was introduced, a larger, more capable AEM (L-AEM), configured by the Boeing Company under NASA sponsorship to meet the specifications jointly agreed upon by NASA and the Air Force. Total program costs for a variety of procurement options, each of which is capable of performing all of the Air Force Space Test Program missions during the 1980-1990 time period, were used as the principal measure for distinguishing among procurement options. Program cost does not provide a basis for choosing among the AEM, STPSS, and MMS spacecraft, given their present designs. The availability of the L-AEM spacecraft, or some very similar design, would provide a basis for minimizing the cost of the Air Force Space Test Program.

Harris, E. D.↗

Remote sensing procurement package: A management report for state and local governments

An overview of the remote sensing procurement process is presented for chief executives, senior administrators, and other local and state officials responsible for purchasing remote sensing products, services, or equipment. Guidelines are provided for planning, organizing, staffing, and implementing such a procurement project. Other sections of the four-volume package are described and their benefits examined.

Source record↗

Remote sensing procurement package: A technical guide for state and local governments

The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.

Source record↗

Integrated Procurement Management System, Version II

Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

Collier, L. J.↗

Automated Procurement System (APS): Project management plan (DS-03), version 1.2

The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

Murphy, Diane R.↗

Guidelines for the Procurement of Aerospace Nickel Cadmium Cells

NASA has been using a Modular Power System containing "standard" nickel cadmium (NiCd) batteries, composed of "standard" NiCd cells. For many years the only manufacturer of the NASA "standard" NiCd cells was General Electric Co. (subsequently Gates Aerospace and now SAFT). This standard cell was successfully used in numerous missions. However, uncontrolled technical changes, and changes in industrial restructuring require a new approach. General Electric (now SAFT Aerospace Batteries) had management changes, new manufacturers entered the market (Eagle-Picher Industries, ACME Electric Corporation, Aerospace Division, Sanyo Electric Co.) and battery technology advanced. New NASA procurements for aerospace NiCd cells will have specifications unique to the spacecraft and mission requirements. This document provides the user/customer guidelines for the new approach to procuring of and specifying performance requirements for highly reliable NiCd cells and batteries. It includes details of key parameters and their importance. The appendices contain a checklist, detailed calculations, and backup information.

Thierfelder, Helmut↗

Binding Procurement

This viewgraph presentation reviews the use of the binding procurement process in purchasing Aerospace Flight Battery Systems. NASA Engineering and Safety Center (NESC) requested NASA Aerospace Flight Battery Systems Working Group to develop a set of guideline requirements document for Binding Procurement Contracts.

Rao, Gopalakrishna M.↗

Technical Oversight of the Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) Element Procurement: Opportunities, Challenges, & Lessons Learned (2024 Update)

Nancy Grace Roman Space Telescope Optical Telescope Assembly (OTA) is an out-of-house procurement from L3Harris currently being integrated and tested in Rochester, NY. Building upon L3Harris’s decades of success producing world-class optical systems for government and commercial customers offers NASA a proven partner and a tremendous opportunity for high performance and value. Inheriting significant portions of the telescope (including the primary and secondary mirror, composite metering structures and alignment drives) from a previous program presents the opportunity to save cost and schedule but constrains the design space for the unique challenges of the Roman mission. This seminar will cover a brief description of the OTA and its history, some of the challenges posed by incorporating an established product line and inherited hardware into a Class A mission, and some approaches and lessons learned that may be helpful for those structuring new missions or providing technical oversight of out-of-house procurements.

Joshua Abel↗

Corporate Renewable Energy Procurement Pathways in the Southeast: South Carolina

This state fact sheet highlights information presented in the NREL report, Existing and Potential Corporate Off-site Renewable Procurement in the Southeast. Many corporations, higher education institutions, and municipalities use off-site renewable energy purchasing to meet ambitious renewable energy goals. Limited off-site renewable projects in the Southeast United States may not be a function of limited corporate interest, but rather may reflect regulatory and market barriers. This report summarizes the status of off-site renewable procurement in South Carolina, highlighting potential for market expansion.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, Frank↗

Pro2R: Procurement of Ramping Product and Regulation in CAISO Using Probabilistic Solar Power Forecasts

This presentation summarizes the objectives and findings from the project titled, "Pro2R: Coordinated Procurement of Ramping Product & Regulation in CAISO Using Probabilistic Solar Power Forecasts," funded by DOE SETO. The goal is to develop cutting edge probabilistic solar power forecasting methods, and integrate them into ISO market operations. The team has integrated in two ways: 1) to procure ramping product and regulation requirements (ancillary services) in the California ISO market, and 2) to develop an open source visitation and ramp alert related situational awareness using probabilistic forecasts. This deck also summarizes the results from the use of machine learning methods to relate probabilistic solar forecasts to the the needs for flexible ramp product in the California ISO system.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Cavity Procurement and Qualification Plan for LCLS-II

The LCLS-II project aims to build 35 accelerating cryomodules, which are based on the European XFEL design but modified for operation in CW mode. Each cryomodule houses eight TESLA-style nine-cell superconducting radio-frequency cavities. The activities to assemble the first two prototype cryomodules are ongoing at FNAL and JLab. 264 cavities worth of cavities for the remaining 33 cryomodules will be procured from two industrial vendors in similar quantity considering the option to produce spares. The assembly of cavities into the production cryomodules will be distributed among FNAL (16 cryomodules) and JLab (17 cryomodules). In this paper the cavity procurement and qualification plan for the LCLS-II project is detailed.

Marhauser, F.↗

Cybersecurity Considerations for State Procurement of Solar Assets

This tool provides an overview of existing procurement programs and example language that prioritizes cybersecurity language and references that can readily be applied to state solar cybersecurity practices . The tool also identifies sample language for procurement agreements, contracts, and grants which can serve as lower entry points for state officials interested in pursuing this subject matter more immediately. As this approach may be novel for many states, the information therein should be considered as a model only . The programs and example language included are not exhaustive and should be evaluated in accordance with state processes and policies .

14 SOLAR ENERGY↗

Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Informationincludes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studieswith descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

14 SOLAR ENERGY↗