Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Power system reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A study of the selection of microcomputer architectures to automate planetary spacecraft power systems

Performance and reliability models of alternate microcomputer architectures as a methodology for optimizing system design were examined. A methodology for selecting an optimum microcomputer architecture for autonomous operation of planetary spacecraft power systems was developed. Various microcomputer system architectures are analyzed to determine their application to spacecraft power systems. It is suggested that no standardization formula or common set of guidelines exists which provides an optimum configuration for a given set of specifications.

Nauda, A.

Generation and analysis of large reliability models

An effort has been underway for several years at NASA's Langley Research Center to extend the capability of Markov modeling techniques for reliability analysis to the designers of highly reliable avionic systems. This effort has been focused in the areas of increased model abstraction and increased computational capability. The reliability model generator (RMG), a software tool which uses as input a graphical, object-oriented block diagram of the system, is discussed. RMG uses an automated failure modes-effects analysis algorithm to produce the reliability model from the graphical description. Also considered is the ASSURE software tool, a parallel processing program which uses the ASSIST modeling language and SURE semi-Markov solution technique. An executable failure modes-effects analysis is used by ASSURE. The successful combination of the power of graphical representation, automated model generation, and parallel computation leads to the conclusion that large system architectures can now be analyzed.

Aerospace electronics

Satellite altimeters after Skylab and GEOS-C - should they utilize a single transmitter or an array of pulsed amplifiers?

An attempt was made to determine if future satellite altimeters, operating at K-band, should use a single transmitter or an array of pulsed amplifiers. The two systems were compared as a function of reliability, power, service life, system requirements, and weight. Preliminary results indicate the modular system to be superior in service life and reliability although it requires more power and is substantially heavier than the single system. No concrete conclusions were reached as to which system should be used.

Greene, A. H.

Power System Redundancy Design Trends for All-Electric eVTOL Quadrotors

Electrical vertical takeoff and landing (eVTOL) vehicles promise to enable a variety of new local and intraregional air transport missions. However, there are significant challenges that must be solved to enable their use. One challenge is the relatively low reliability of power components (e.g. motors, power electronic devices, and batteries). No clear development path to create reliable eVTOL power systems has been articulated in the literature, though it is generally assumed redundancy is part of the solution. This work proposes an analysis process to examine the redundancy design space and select mass optimal designs for eVTOL power systems. The process is applied to a six passenger quadrotor vehicle, and results are used to highlight redundancy design trends for this class of vehicle. This process and associated data can help vehicle designers more effectively develop eVTOLs that meet reliability requirements.

Electric vertical takeoff and landing

Power System Redundancy Design Trends for All-Electric eVTOL Quadrotors

Electrical vertical takeoff and landing (eVTOL) vehicles promise to enable a variety of new local and intraregional air transport missions. However, there are significant challenges that must be solved to enable their use. One challenge is the relatively low reliability of power components (e.g. motors, power electronic devices, and batteries). No clear development path to create reliable eVTOL power systems has been articulated in the literature, though it is generally assumed redundancy is part of the solution. This work proposes an analysis process to examine the redundancy design space and select mass optimal designs for eVTOL power systems. The process is applied to a six passenger quadrotor vehicle, and results are used to highlight redundancy design trends for this class of vehicle. This process and associated data can help vehicle designers more effectively develop eVTOLs that meet reliability requirements.

Electric vertical takeoff and landing

Ultracapacitor-Based Uninterrupted Power Supply System

The ultracapacitor-based uninterrupted power supply (UPS) system enhances system reliability; reduces life-of-system, maintenance, and downtime costs; and greatly reduces environmental impact when compared to conventional UPS energy storage systems. This design provides power when required and absorbs power when required to smooth the system load and also has excellent low-temperature performance. The UPS used during hardware tests at Glenn is an efficient, compact, maintenance-free, rack-mount, pure sine-wave inverter unit. The UPS provides a continuous output power up to 1,700 W with a surge rating of 1,870 W for up to one minute at a nominal output voltage of 115 VAC. The ultracapacitor energy storage system tested in conjunction with the UPS is rated at 5.8 F. This is a bank of ten symmetric ultracapacitor modules. Each module is actively balanced using a linear voltage balancing technique in which the cell-to-cell leakage is dependent upon the imbalance of the individual cells. The ultracapacitors are charged by a DC power supply, which can provide up to 300 VDC at 4 A. A constant-voltage, constant-current power supply was selected for this application. The long life of ultracapacitors greatly enhances system reliability, which is significant in critical applications such as medical power systems and space power systems. The energy storage system can usually last longer than the application, given its 20-year life span. This means that the ultracapacitors will probably never need to be replaced and disposed of, whereas batteries require frequent replacement and disposal. The charge-discharge efficiency of rechargeable batteries is approximately 50 percent, and after some hundreds of charges and discharges, they must be replaced. The charge-discharge efficiency of ultracapacitors exceeds 90 percent, and can accept more than a million charges and discharges. Thus, there is a significant energy savings through the efficiency improvement, and there is far less downtime for applications and labor involved in replacing an ultracapacitor versus batteries. Also, the lengthy lifespan of this design would greatly reduce the disposal problems posed by lead acid, nickel cadmium, lithium, and nickel metal hydride batteries. This innovation is recyclable by nature, which further reduces system costs. The disposal of ultracapacitors is simple, as they are constructed of non-hazardous components. They are also safer than batteries in that they can be easily discharged, and left indefinitely in a safe, discharged state where batteries cannot.

Eichenberg, Dennis J.

Effect of Random Thermal Spikes on Stirling Convertor Heater Head Reliability

Onboard radioisotope power systems being developed to support future NASA exploration missions require reliable design lifetimes of up to 14 yr and beyond. The structurally critical heater head of the high-efficiency developmental Stirling power convertor has undergone extensive computational analysis of operating temperatures (up to 650 C), stresses, and creep resistance of the thin-walled Inconel 718 bill of material. Additionally, assessment of the effect of uncertainties in the creep behavior of the thin-walled heater head, the variation in the manufactured thickness, variation in control temperature, and variation in pressure on the durability and reliability were performed. However, it is possible for the heater head to experience rare incidences of random temperature spikes (excursions) of short duration. These incidences could occur randomly with random magnitude and duration during the desired mission life. These rare incidences could affect the creep strain rate and therefore the life. The paper accounts for these uncertainties and includes the effect of such rare incidences, random in nature, on the reliability. The sensitivities of variables affecting the reliability are quantified and guidelines developed to improve the reliability are outlined. Furthermore, the quantified reliability is being verified with test data from the accelerated benchmark tests being conducted at the NASA Glenn Research Center.

Shah, Ashwin R.

Effect of Random Thermal Spikes on Stirling Convertor Heater Head Reliability

Onboard radioisotope power systems being developed to support future NASA exploration missions require reliable design lifetimes of up to 14 yr and beyond. The structurally critical heater head of the high-efficiency developmental Stirling power converter has undergone extensive computational analysis of operating temperatures (up to 650 C), stresses, and creep resistance of the thin-walled Inconel 718 bill of material. Additionally assessment of the effect of uncertainties in the creep behavior of the thin-walled heater head, the variation in the manufactured thickness, variation in control temperature, and variation in pressure on the durability and reliability were performed. However, it is possible for the heater head to experience rare incidences of random temperature spikes (excursions) of short duration. These incidences could occur randomly with random magnitude and duration during the desired mission life. These rare incidences could affect the creep strain rate and therefore the life. The paper accounts for these uncertainties and includes the effect of such rare incidences, random in nature, on the reliability. The sensitivities of variables affecting the reliability are quantified and guidelines developed to improve the reliability are outlined. Furthermore, the quantified reliability is being verified with test data from the accelerated benchmark tests being conducted at the NASA Glenn Research Center.

Shah, Ashwin R.

A simulation model for reliability evaluation of Space Station power systems

A detailed simulation model for the hybrid Space Station power system is presented which allows photovoltaic and solar dynamic power sources to be mixed in varying proportions. The model considers the dependence of reliability and storage characteristics during the sun and eclipse periods, and makes it possible to model the charging and discharging of the energy storage modules in a relatively accurate manner on a continuous basis.

Singh, C.

X-Hab 2026: LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems

This document details the timeline of the LiDAR-Powered Autonomous Charging Service Capability for Surface Rovers and Systems project, initiated by the Fall 2025 semester class and completed by the Spring 2026 semester class. This project focuses on developing a fully autonomous system composed of a mobile surface rover and an induction charging station with a robotic arm, both controlled by their own NVIDIA Jetson Orin Nano. Structural improvements to the rover suspension system and body eliminated excessive camber, reduced stress and strain on the plexiglass body, and improved maneuverability and durability of the rover. The charging station robotic arm was fully redesigned to increase reach while minimizing weight and increasing misalignment tolerance during docking on uneven terrain. Electrical system improvements addressed previous torque and power limitations of both the rover and charging station arm. High-torque servo motors were selected based on updated calculations which incorporated terrain slope and Factor of Safety, enabling zero-point turning for the rover and increased payload capacity of the charging station arm. Significant progress was made in autonomy and perception. The rover now employs 3D LiDAR and SLAM mapping for localization, mapping, and path planning. The Battery Monitoring System (BMS) was created to coordinate battery management between the rover and charging station. The BMS provides continuous monitoring of battery state of charge, temperature, current, and will enable the autonomous initiation, execution, and termination of the charging cycle via Bluetooth communication. Testing of the WIBOTIC induction charging system demonstrated reliable power transfer under both aligned and misaligned conditions. This project demonstrated the ability of an autonomously navigating surface rover to independently plan a path to the charging station, dock, and the charging station to autonomously deploy a robotic charging arm and initiate charging of the rover. This work details the progress made to demonstrate the feasibility of autonomous surface rover navigation and recharging systems.

Megan Steele

Power Systems Design for Long Duration Ballooning

The Columbia Scientific Balloon Facility has been designing and building high-altitude balloon power systems for over 26 years. With that experience, we have found certain types of PV panels, batteries, and charge controllers that are reliable in stratospheric environments. The ultimate goal is to ensure that power systems will provide power reliably throughout the duration of an LDB flight. The purpose of this presentation is to provide some general guidelines and best practices for power system design.

Long Duration Balloon

Telemetry Options for LDB Payloads

The Columbia Scientific Balloon Facility has been designing and building high-altitude balloon power systems for over 26 years. With that experience, we have found certain types of PV panels, batteries, and charge controllers that are reliable in stratospheric environments. The ultimate goal is to ensure that power systems will provide power reliably throughout the duration of an LDB flight. The purpose of this presentation is to provide some general guidelines and best practices for power system design.

Power Systems Design for Long Duration Ballooning

Thermal management system options for high power space platforms

Thermal Management System (TMS) design options for a high power (75kWe), low earth orbit, multimodule space platform were investigated. The approach taken was to establish a baseline TMS representative of current technology, and to make incremental improvements through successive subsystem trades that lead to a candidate TMS. The TMS trades included centralized and decentralized transport, single-phase and two-phase transport, alternate working fluids, liquid loop and heat pipe radiators, deployed fixed, body mounted and steerable radiators, and thermal storage. The subsystem options were evaluated against criteria such as weight, TMS power requirement, reliability, system isothermality penalty, and growth potential.

Sadunas, J. A.

Highlights of NASA/DOE photovoltaic market assessment visit to Morocco

A broad range of agricultural, rural development, and other power applications in various regions of Morocco were examined to determine the potential market for photovoltaic products in Moroccan development. The primary focus of the study was the agriculture sector which accounts for approximately 17% of the country's GNP. The country has a clear need for reliable remote power systems, but does not have the financial resources to invest in the relatively high capital cost PV equipment. A modest potential for PV use was identified in nonagricultural rural services, such as refrigerators for rural clinics and rural radio-telephones. The main potential for PV in Morocco in the next five years lies mainly in the telecommunications sector. Applications include rural TV sets, TV repeater stations, microwave relay stations, and railroad, marine, and airline signalling. Market size estimates were derived from development and expansion plans. At an average customer cost for complete installed systems from $18/Wp to $30/Wp the total potential market value is estimated in the range of $6.6 to $11 million over the 1981-1986 period.

Source record