Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot Plant Design”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

A Domestic Program for Liquid Metal PFC Research in Fusion

While high-Z solid plasma-facing components (PFCs) are the leading candidates for reactors, it is unclear that they can survive the intense plasma material interaction (PMI). Liquid metals (LM) PFCs offer potential solutions since they are not susceptible to the same type of damage, and can be “self-healing”. Following the Fusion Energy System Study on Liquid Metal Plasma Facing Components study that recently was completed by Kessel et al. (Fusion Sci Technnol 75:886, 2019) a domestic LM PFC design program has been initiated to develop reactor-relevant LM PFC concepts. This program seeks to evaluate LM PFC concepts for a Fusion Nuclear Science Facility (FNSF) or a Compact Pilot Plant via engineering design calculations, modeling of PMI and PFC components and laboratory experiments. The latter involves experiments in dedicated test stands and confinement devices and seeks to identify and answer open questions in LM PFC design. The new national LM PFC program is first investigating lithium as the plasma facing material for a flowing divertor PFC concept. Several flow speeds will be evaluated, ranging from ~ cm/s to m/s. The surface temperature will initially be held below the strongly evaporative limit in the first design; higher temperatures with strong evaporation will be considered in future concepts. Other topics of interest include: understanding of the hydrogen and helium interaction with the liquid lithium; single effect experiments on wetting, compatibility and embrittlement; and prototypical experiments for control and characterization of flowing LM. A path to plasma and future tokamak exposure of these concepts will be developed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Comprehensive Analysis of Streaming and Shutdown Dose Rate Experiments at JET with ORNL Fusion Neutronics Workflows

Current experimental fusion systems and conceptual designs of fusion pilot plants (FPPs) are growing in complexity and size. Several radiation metrics are crucial to the safe operation of fusion machines, including neutron flux streaming through openings and the shutdown dose rate (SDDR). Most current designs of advanced experimental fusion systems—and the most probable candidates for FPPs—are based on the tokamak concept, which is prone to neutron streaming through the myriad openings needed for diagnostic and support systems. SDDR is caused by decay gamma rays from radionuclides that become activated by neutrons during the operation of a fusion system that use deuterium-deuterium (DD), tritium-tritium, or deuterium-tritium plasma. Because computational tools have become essential for determining these radiation metrics, they must be validated against reliable and applicable experimental data. Experiments at the Joint European Torus (JET) provide a unique source of experimental data for validating computational tools and nuclear data used to determine SDDR and neutron fluxes in streaming-dominated geometries. Here, this paper presents the comprehensive analysis of the high-performance DD JET SDDR, and streaming experiments performed using Oak Ridge National Laboratory (ORNL) fusion workflows. The computational results were compared with experimental results that consist of online SDDR measurements with ionization chambers and neutron fluence streaming measurements using thermoluminescent detectors. The ratio of calculated-to-experimental SDDR values ranges from 0.6 to 2.5, and the streaming results range from 0.5 to 8.0. Future work will include analyzing the JET 2021 DTE2 campaign alongside the integration of the Shift Monte Carlo transport code into all ORNL fusion neutronics workflows.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Molten Salt Oxidation of Ion Exchange and Oils in Carbonate Salts and Evaporator Residue - 16531

Molten Salt Oxidation is a well-studied and robust technology. Recently, renewed interest in the technology has been seen due to limitations on the use of incineration for hazardous and radioactive waste streams. The nuclear research center at Rez, near Prague, has been investigating a bench scale molten salt oxidation system to provide insight for the design of a pilot scale system to condition spent ion exchange resin and scintillator oils. The use of both an eutectic K/Na/Li carbonate salt and a simulated residue salt for liquid waste obtained from evaporated primary coolant of nuclear reactors was examined. In these studies the usable capacity of the salts were examined. Materials doped with surrogate radioisotopes were processed and the capture efficiency was measured. Corrosion of the reactor vessel is of significant engineering concern. Corrosion coupon tests were performed for Inconel HX and stainless steel. These tests provided corrosion rates to assist in design of pilot scale systems. While the bench scale reactor's detention time was too short to provide complete combustion, the values of emissions were tracked and showed an increase in the combustion efficiency at temperatures greater than 750 deg. C. A two part reactor has been designed and work is planned to continue to optimize the system. Additionally, further work has examined the final conditioning of salt which has been saturated with radionuclides after processing organic waste streams A conceptual pilot plant has been designed to solidify radionuclide saturated salt into a form acceptable for repositories according to EU directives. Saturated salt is milled to a powder and immobilized in a matrix with a high percentage of waste loading. Both geo-polymer and polysiloxane matrices have been methods for low temperature immobilization. Conditioning in this manner decreases operating and capital costs when compared to current conditioning technologies and procedures utilized for high volume reduction factors of final waste forms. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hybrid Combustion-Gasification Chemical Looping

For the past several years Alstom Power Inc. (Alstom), a leading world-wide power system manufacturer and supplier, has been in the initial stages of developing an entirely new, ultra-clean, low cost, high efficiency power plant for the global power market. This new power plant concept is based on a hybrid combustion-gasification process utilizing high temperature chemical and thermal looping technology The process consists of the oxidation, reduction, carbonation, and calcination of calcium-based compounds, which chemically react with coal, biomass, or opportunity fuels in two chemical loops and one thermal loop. The chemical and thermal looping technology can be alternatively configured as (i) a combustion-based steam power plant with CO{sub 2} capture, (ii) a hybrid combustion-gasification process producing a syngas for gas turbines or fuel cells, or (iii) an integrated hybrid combustion-gasification process producing hydrogen for gas turbines, fuel cells or other hydrogen based applications while also producing a separate stream of CO{sub 2} for use or sequestration. In its most advanced configuration, this new concept offers the promise to become the technology link from today's Rankine cycle steam power plants to tomorrow's advanced energy plants. The objective of this work is to develop and verify the high temperature chemical and thermal looping process concept at a small-scale pilot facility in order to enable AL to design, construct and demonstrate a pre-commercial, prototype version of this advanced system. In support of this objective, Alstom and DOE started a multi-year program, under this contract. Before the contract started, in a preliminary phase (Phase 0) Alstom funded and built the required small-scale pilot facility (Process Development Unit, PDU) at its Power Plant Laboratories in Windsor, Connecticut. Construction was completed in calendar year 2003. The objective for Phase I was to develop the indirect combustion loop with CO{sub 2} separation, and also syngas production from coal with the calcium sulfide (CaS)/calcium sulfate (CaSO{sub 4}) loop utilizing the PDU facility. The results of Phase I were reported in Reference 1, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase I Report' The objective for Phase II was to develop the carbonate loop--lime (CaO)/calcium carbonate (CaCO{sub 3}) loop, integrate it with the gasification loop from Phase I, and ultimately demonstrate the feasibility of hydrogen production from the combined loops. The results of this program were reported in Reference 3, 'Hybrid Combustion-Gasification Chemical Looping Coal Power Development Technology Development Phase II Report'. The objective of Phase III is to operate the pilot plant to obtain enough engineering information to design a prototype of the commercial Chemical Looping concept. The activities include modifications to the Phase II Chemical Looping PDU, solids transportation studies, control and instrumentation studies and additional cold flow modeling. The deliverable is a report making recommendations for preliminary design guidelines for the prototype plant, results from the pilot plant testing and an update of the commercial plant economic estimates.

01 COAL, LIGNITE, AND PEAT↗

Development of the Generation 3 Particle Pilot Plant Falling Particle Receiver

A falling particle receiver (FPR) has been designed to integrate with the G3P3-USA pilot plant currently being constructed at the National Solar Thermal Test Facility (NSTTF) at Sandia National Laboratories. This receiver integrates several innovative design features including a converging tunnel (SNOUT), an optimized cavity geometry, and a multistage “catch-and-release” trough. Details about the integration of these features and the final G3P3-USA FPR design and construction are described. Ray-tracing models of the FPR utilizing the NSTTF heliostat field are developed leveraging previous modeling efforts using SolTrace. Models demonstrate that at least 1.5 MWth of incident radiative energy can be provided to the FPR on a clear day throughout a typical year in Albuquerque, NM. Spillage fluxes around the periphery of the aperture are within acceptable bounds for the majority of the year. Intercept factors are computed for each utilized heliostat at the Vernal equinox to provide guidance to heliostat operators during operation of the system.

Mills, Brantley↗

Hydrometallurgical recovery of germanium from coal gasification fly ash: pilot plant scale evaluation

In this article, a hydrometallurgical method for the selective recovery of germanium from fly ash (FA) has been tested at pilot plant scale. The pilot plant flowsheet comprised a first stage of water leaching of FA, and a subsequent selective recovery of the germanium from the leachate by solvent extraction method. The solvent extraction method was based on Ge complexation with catechol in an aqueous solution followed by the extraction of the Ge-catechol complex (Ge(C{sub 6}H{sub 4}O{sub 2}){sub 3}{sup 2-}) with an extracting organic reagent (trioctylamine) diluted in an organic solvent (kerosene), followed by the subsequent stripping of the organic extract. The process has been tested on a FA generated in an integrated gasification with combined cycle (IGCC) process. The paper describes the designed 5 kg/h pilot plant and the tests performed on it. Under the operational conditions tested, approximately 50% of germanium could be recovered from FA after a water extraction at room temperature. Regarding the solvent extraction method, the best operational conditions for obtaining a concentrated germanium-bearing solution practically free of impurities were as follows: extraction time equal to 20 min; aqueous phase/organic phase volumetric ratio equal to 5; stripping with 1 M NaOH, stripping time equal to 30 min, and stripping phase/organic phase volumetric ratio equal to 5. 95% of germanium were recovered from water leachates using those conditions.

01 COAL, LIGNITE, AND PEAT↗

TASK 3: PILOT PLANT GASIFIER TESTING

Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions for commercial operation of hybrid coal/natural gas gasification plants.

01 COAL, LIGNITE, AND PEAT↗

CREST: Center for Renewable Energy Science and Technology

The DOE project addressed an approach to the hydrogen economy by researching hydrogen generation from low cost domestic fossil fuel sources. Specifically, the CREST research team developed new processes for extracting hydrogen from southwestern lignite for the production of clean synthetic fuels such as synthetic crude oil that is free of sulfur, carbon dioxide and other pollutants that can be shipped to nearby Texas refineries and power plants for development of transportation fuels and power generation. Research was also undertaken to convert any potential by-products of this process such as CO 2 to useful chemicals and gases which may be recycled and used as feedstock to the synthetic fuel process. Finally, to ensure the proposed process is functional beyond bench scale, a detailed design of a pilot plant was completed. The overall project was divided into five tasks including a management task as outlined below.

01 COAL, LIGNITE, AND PEAT↗

A Combined Water and CO 2 Direct Air Capture System (Final Technical Report)

The primary objective of the project was to demonstrate the technical and economic performance of a technology that simultaneously captures CO 2 and water from the air – a Hybrid Direct Air Capture system (HDAC). In HDAC, air is passed over water capture section as well as a CO 2 selective sorbent to remove CO 2 from the air stream. Combining potable water generation and CO 2 capture in a single device with the unique energy conserving features of the proposed design enables long-term projected CAPEX under $\$$750/t-CO 2 and levelized cost of capture (LCOC) of $\$$140/t-CO 2 . Project DE-FE-0031970 "A Combined Water and CO 2 Direct Air Capture System" ran for four years and three months from 10/01/2020 to 12/31/2024 for three budget periods and an extension period. The total project budget at completion was $\$$3,534,408 consisting of a $\$$2,680,064 federal share and $\$$854,344 cost share. The pilot plant was successfully designed, engineered, built and commissioned during the initial three budget periods. The plant demonstrated successful water capture during this period, whereas initial CO 2 capture was well below target values. The project team requested an extension period during which alternate materials and beds were evaluated. By the end of the project, both moisture swing adsorption of CO 2 and water capture had successfully been demonstrated at target capture rates making further scale-up of the technology viable.

42 ENGINEERING↗

Project: Advanced Oxy-Combustion Technology Development and Scale Up for New and Existing Coal-Fired Power Plants (Phase II) (Final Report)

The objective of this project was to develop an advanced Oxy-Combustion Pressurized Fluidized Bed Combustor (Oxy-PFBC) technology and mature it to TRL 6 through pilot testing. Performance goals included demonstrating capture of 90% or greater of the produced carbon dioxide, with no more than a 35% increase in the cost of electricity. A 1 MWth pilot scale plant was designed, built and operated at CanmetENERGY in Ottawa. Extensive support work was carried out on component testing, analysis and commercial planning. The team members included GTI, Linde, Natural Resources Canada (CanmetENERGY), Pennsylvania State University, Electric Power Research Institute (EPRI), and General Electric. Additional research was provided by the University of Ottawa. Funding was provided by the US Department of Energy, Alberta Innovates and each of the team members. The total funding for Phase II was $\$$18.537M with $\$$12.058M. The period of performance for Phase II was from July 1, 2014 through December 31, 2018. Component testing conducted in preparation for pilot testing included cold flow testing at atmospheric and pressurized conditions, and coal and limestone reactivity tests at elevated temperatures and pressures. These tests validated in-bed heat exchanger heat transfer capability, bed stability, and coal particle residence time predictions. They also quantified coal and limestone reactivity at the expected combustor temperatures and pressures. The 1 MWth pilot testing achieved all performance goals with the exception of carbon conversion. The combustor achieved oxy-combustion at the full target pressure of 8 bar. Two key combustor performance goals that were achieved include exceeding the target sulfur capture in the combustor as well as exceeding the acid dewpoint target at full operating pressure. This validates assumptions about the pressures that can be achieved without acid gas condensation and the associated corrosion risks. The ability to achieve target operating pressures supports combustor cost assumptions. In addition, the CO 2 processing unit (CPU), demonstrated a new technology, the deoxidation (DeOxo) reactor. The CPU achieved all of its performance targets, while the DeOxo reactor demonstrated the ability to achieve 100 ppm or less of oxygen in the flue gas stream to meet CO 2 pipeline specs. The pilot combustor was damaged during testing and an incident investigation was conducted. The primary cause of the hardware damage was due to anomalous temperature readings, caused by sensors buried and insulated in bed particles trapped by heat exchanger tubes near the wall. This led to higher gas velocities than intended, which then caused lower fuel residence time, lower carbon conversion, freeboard burning, and undetected excess temperatures in the combustor. As a result, the TRL 6 goal was not achieved. Updated technoeconomic analysis predicts that the Oxy-PFBC can achieve the goal of <35% increase in COE with 90% CO 2 capture if the carbon conversion performance target can be demonstrated in future testing.

20 FOSSIL-FUELED POWER PLANTS↗

Development of a Comprehensive and Centralized Waste Management System - 19412

Information Systems Laboratories (ISL) has designed a new single, integrated, waste management and control system to administer all aspects of nuclear waste management. The overriding goal of the initiative is to provide federal, state, and local agencies with operational awareness, management, and programmatic support for all functions related to nuclear waste management. Over decades of waste management federal agencies have sponsored or directly paid for the development, operation, and control of multiple systems to track and control its waste - with varied success. Multiple contractors have generated disparate control systems/databases and literally mountains of data. Past approaches have not provided a single, integrated, real time data management system. ISL's analysis of past failed efforts has reveal four common symptoms: - Control/management systems that are not compatible; - Programmatic costs that increase with systems use and re-work; - Systems focused on specific sets of data; - Inaccurate or outdated data sets. An integrated waste management and control system that collects and displays real-time, accurate inventory, waste container certification, transportation certification, emplacement, and shipment related data improve operational awareness and overcomes these limitations. Using its vast knowledge and experience in developing numerous waste tracking and management systems, ISL has leveraged its own in-house knowledge and gathered requests from stakeholders all across the industry to design a system that meets the needs of users at all levels of the nuclear waste management process. Using the highly successful and widely used Waste Data System (WDS) designed for the Waste Isolation Pilot Plant as a core component, ISL has designed a system that greatly expands on the functionality of the WDS to exceed its current focus of management of Transuranic Waste shipments. The new system is designed to provide the ability to track a wide range of waste types from Transuranic, High Level, Low Level, Mixed, and any nuclear related material. The main focus of the system is to provide federal regulators a comprehensive and real-time oversight into the handling of all nuclear waste materials. Oversight activities include, but are not limited to, strategy development, projections, metrics, incentive development, tracking, budget review, government cost estimating, and integrated schedules. The major components of the system are summarized below: - The Centralized Waste Management System (CWMS), which will include assimilating and validating known sources of data into the CWMS. - The programmatic reporting support component, which will handle queries from regulators, track compliance with regulatory requirements, and maintain the dashboard for federal management. - Both the CWMS and the programmatic reporting support component will use a standard set of business rules that govern system operations and allow site and program specific needs and limits for all waste programs and types to be captured and maintained. This presentation will provide details of each component of the system detailing its use, interfaces with other components, and value to stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Operational Modes of a 2.0 MWth Chloride Molten-Salt Pilot-Scale System

The limit of traditional solar-salt thermal stability is around 600 °C with ambient air as the cover gas. Nitrate molten salt concentrating solar power (CSP) systems are currently deployed globally and are considered to be state-of the art heat transfer fluids (HTFs) for present day high-temperature operation. However, decomposition challenges occur with these salts for operation beyond 600 C. Although slightly higher limits may be possible with solar salt, to fully realize SunShot efficiency goals of $15/kWhth HTFs and an LCOE of 6¢/kWh, molten-salt technologies working at higher temperatures (e.g., 650 °C to 750 °C) will require an alternative salt chemistry composition, such as chlorides. In this investigation a 2.0MWth Pilot-scale CSP plant design is developed to assess thermodynamic performance potential for operation up to 720 C. Here, an Engineering Equation Solver (EES) model is developed with respect to 14 state-points from the base of a solar tower at the Sandia National Laboratories, National Solar Thermal Test Facility (NSTTF), to solar receiver mounted 120 ft. above the ground. The system design considers a ternary chloride ternary chloride (20%NaCl/40%MgCl/40%KCl by mol%) salt as the HTF, with 6 hrs. of storage and a 1 MWth primary salt to sCO2 heat exchanger. Preliminary system modelling results indicate a minimum non-dimensional Cv of 60 required for both cold and hot-side throttle recirculation valves for the operational pump operating between speeds of 1800 and 2400 RPM. Further receiver comparison study results suggest that the ternary salt requires an average 15.2% higher receiver flux with a slightly lower calculated receiver efficiency when compared to a binary carnelite salt to achieve a 2.0 MWth desired input power design.

associated liquids↗

HIGH FUSION PERFORMANCE IN SUPER H-MODE EXPERIMENTS ON ALCATOR C-MOD AND DIII-D

We report that the “Super H-Mode” regime is predicted to enable pedestal height and fusion performance substantially higher than standard H-Mode operation. This regime exists due to a bifurcation of the pedestal pressure, as a function of density, that is predicted by the EPED model to occur in strongly shaped plasmas above a critical pedestal density. Experiments on Alcator C-Mod and DIII-D have achieved access to the Super H-Mode (and Near Super H) regime, and obtained very high pedestal pressure, including the highest pedestal pressure ever achieved on a tokamak (p ped ~80kPa) in C-Mod experiments operating near the ITER magnetic field. DIII-D Super H experiments have demonstrated high performance, including the highest stored energy in the present configuration of DIII-D (W~2.2-3.2MJ), while utilizing only about half of the available heating power (P heat ~7-12 MW). These DIII-D experiments have obtained the highest value of peak fusion gain, Q DT,equiv ~0.5, ever achieved on a medium scale (R<2m) tokamak. Sustained high performance operation (β N ~2.9, H 98 ~1.6) has been achieved utilizing n=3 magnetic perturbations for density and impurity control. High pedestal and global performance has been maintained in the presence of deuterium and nitrogen gas puffing, which enables a more radiative divertor condition. Lastly, Super H-Mode access is predicted for ITER and expected, based on both theoretical prediction and observed normalized performance, to allow ITER to achieve its performance goals (Q=10) at I p < 15MA, and to enable more compact, cost effective pilot plant and reactor designs.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 6)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ground Control Annual Plan for the Waste Isolation Pilot Plant (Rev. 7)

The Waste Isolation Pilot Plant (WIPP) is designed to permanently dispose of transuranic radioactive waste left from the research and production of nuclear weapons. Transuranic waste consists of clothing, tools, rags, and other such items contaminated with trace amounts of radioactive elements, mostly plutonium. Located in southeastern New Mexico, 26 miles east of Carlsbad, project facilities include disposal rooms excavated in an ancient, stable salt formation 2,150 feet (655 meters) underground. This deep geologic setting requires that a comprehensive ground control program be in place to monitor and assure the stability of the underground openings and address issues of concern. The primary objective of the WIPP ground control program is to provide a safe environment for personnel and equipment in a manner that is consistent with the primary facility operational objective of waste disposal. In meeting this primary objective, the regulatory requirements specific to ground control are also satisfied. The ground control program is a concerted and centralized activity responsible for providing a continuing assessment of the capabilities of the underground openings to achieve that objective. The fundamentals on which the ground control program at WIPP is based are as follows: (1) safe access is maintained as long as access is required; (2) regular ground-control maintenance is required to maintain safe access; (3) ground control maintenance efforts increase with the age of the openings; (4) ground control plans are specific but flexible; and (5) regulatory requirements are met. The extensive geotechnical monitoring program provides a high degree of confidence in the ability to predict and mitigate ground control issues before they become safety problems. The evaluation of ground conditions is a continuous process. The Westinghouse TRU Solutions (WTS) Geotechnical Engineering Section gathers and evaluates data from various sources on a periodic basis. This information is formally presented in a variety of ways, primarily bimonthly and annual reports.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗