Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Pilot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Large Pilot Scale Testing of Linde/BASF Post-Combustion CO 2 Capture Technology at the Abbott Coal-Fired Power Plant

The work summarized in this report is the first step towards a project that will re-train and create jobs for personnel in the coal industry and continue regional economic development to benefit regions impacted by previous downturns. The larger project is aimed at capturing ~300 tons/day (272 metric tonnes/day) CO 2 at a 90% capture rate from existing coal- fired boilers at the Abbott Power Plant on the campus of University of Illinois (UI). It will employ the Linde-BASF novel amine-based advanced CO 2 capture technology, which has already shown the potential to be cost-effective, energy efficient and compact at the 0.5-1.5 MWe pilot scales. The overall objective of the project is to design and install a scaled-up system of nominal 15 MWe size, integrate it with the Abbott Power Plant flue gas, steam and other utility systems, and demonstrate the viability of continuous operation under realistic conditions with high efficiency and capacity. The project will also begin to build a workforce that understands how to operate and maintain the capture plants by including students from regional community colleges and universities in the operation and evaluation of the capture system. This project will also lay the groundwork for follow-on projects that pilot utilization of the captured CO 2 from coal-fired power plants. The net impact will be to demonstrate a replicable means to (1) use a standardized procedure to evaluate power plants for their ability to be retrofitted with a pilot capture unit; (2) design and construct reliable capture systems based on the Linde-BASF technology; (3) operate and maintain these systems; (4) implement training programs with local community colleges and universities to establish a workforce to operate and maintain the systems; and (5) prepare to evaluate at the large pilot scale level various methods to utilize the resulting captured CO 2 . Towards the larger project goal, the UI-led team, together with Linde, has completed a preliminary design for the carbon capture pilot plant with basic engineering and cost estimates, established permitting needs, identified approaches to address Environmental, Health, and Safety concerns related to pilot plant installation and operation, developed approaches for long-term use of the captured carbon, and established strategies for workforce development and job creation that will re-train coal operators to operate carbon capture plants. This report describes Phase I accomplishments and demonstrates that the project team is well-prepared for full implementation of Phase 2, to design, build, and operate the carbon capture pilot plant.

01 COAL, LIGNITE, AND PEAT↗

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

FY 2008 Next Generation Safeguards Initiative International Safeguards Education and Training Pilot Progerams Summary Report

Key component of the Next Generation Safeguards Initiative (NGSI) launched by the National Nuclear Security Administration is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. Two pilot programs at university level, involving 44 students, were initiated and implemented in spring-summer 2008 and linked to hands-on internships at LANL or LLNL. During the internships, students worked on specific safeguards-related projects with a designated Laboratory Mentor to provide broader exposure to nuclear materials management and information analytical techniques. The Safeguards and Nuclear Material Management pilot program was a collaboration between the Texas A&M University (TAMU), Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). It included a 16-lecture course held during a summer internship program. The instructors for the course were from LANL together with TAMU faculty and LLNL experts. The LANL-based course was shared with the students spending their internship at LLNL via video conference. A week-long table-top (or hands-on) exercise on was also conducted at LANL. The student population was a mix of 28 students from a 12 universities participating in a variety of summer internship programs held at LANL and LLNL. A large portion of the students were TAMU students participating in the NGSI pilot. The International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at the Monterey Institute for International Studies (MIIS) in cooperation with LLNL. It included a two-week intensive course consisting of 20 lectures and two exercises. MIIS, LLNL, and speakers from other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. Other university/organizations represented: University of California in LA, Stanford University, and the IAEA. Four of the students that completed this intensive course participated in a 2-month internship at LLNL. The conclusions of the two pilot courses and internships was a NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The Poster sessions were designed to provide a forum for sharing the results of their summer projects and providing experience in presenting their work to a varied audience of students, faculty and laboratory staff. The success of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of their two pilot efforts in the coming years.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Pilot-pressure-controlled flow valve and fluid system containing same

In a thermal fluid system, a control valve includes a flow valve and a solenoid pilot valve. The flow valve has an inlet and an outlet; a control chamber for receiving a pilot pressure; and a valve member operable by the pilot pressure to selectively open and close a fluid path from the inlet to the outlet. The pilot pressure acts in a closing direction of the flow valve. The pilot valve provides the pilot pressure to the control chamber and is a 3/2 way valve with a first port in fluid communication with the control chamber, a second port to be connected to a pressure source, and a third port. The pilot valve has a first position connecting the first port with the second port and a second position connecting the first port with the third port.

Chowdhury, Sourav↗

International Safeguards Technology and Policy Education and Training Pilot Programs

A major focus of the National Nuclear Security Administration-led Next Generation Safeguards Initiative (NGSI) is the development of human capital to meet present and future challenges to the safeguards regime. An effective university-level education in safeguards and related disciplines is an essential element in a layered strategy to rebuild the safeguards human resource capacity. NNSA launched two pilot programs in 2008 to develop university level courses and internships in association with James, Martin Center for Nonproliferation Studies (CNS) at the Monterey Institute of International Studies (MIIS) and Texas A&M University (TAMU). These pilot efforts involved 44 students in total and were closely linked to hands-on internships at Los Alamos National Laboratory (LANL) and Lawrence Livermore National Laboratory (LLNL). The Safeguards and Nuclear Material Management pilot program was a collaboration between TAMU, LANL, and LLNL. The LANL-based coursework was shared with the students undertaking internships at LLNL via video teleconferencing. A weeklong hands-on exercise was also conducted at LANL. A second pilot effort, the International Nuclear Safeguards Policy and Information Analysis pilot program was implemented at MIIS in cooperation with LLNL. Speakers from MIIS, LLNL, and other U.S. national laboratories (LANL, BNL) delivered lectures for the audience of 16 students. The majority of students were senior classmen or new master's degree graduates from MIIS specializing in nonproliferation policy studies. The two pilots programs concluded with an NGSI Summer Student Symposium, held at LLNL, where 20 students participated in LLNL facility tours and poster sessions. The value of bringing together the students from the technical and policy pilots was notable and will factor into the planning for the continued refinement of the two programs in the coming years.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Harnessing the power of supercomputers using the PanDA Pilot 2 in the ATLAS Experiment

The unprecedented computing resource needs of the ATLAS experiment at LHC have motivated the Collaboration to become a leader in exploiting High Performance Computers (HPCs). To meet the requirements of HPCs, the PanDA system has been equipped with two new components; Pilot 2 and Harvester, that were designed with HPCs in mind. While Harvester is a resource-facing service which provides resource provisioning and workload shaping, Pilot 2 is responsible for payload execution on the resource. The presentation focuses on Pilot 2, which is a complete rewrite of the original PanDA Pilot used by ATLAS and other experiments for well over a decade. Pilot 2 has a flexible and adaptive design that allows for plugins to be defined with streamlined workflows. In particular, it has plugins for specific hardware infrastructures (HPC/GPU clusters) as well as for dedicated workflows defined by the needs of an experiment. Examples of dedicated HPC workflows are discussed in which the Pilot either uses an MPI application for processing fine-grained event level service under the control of the Harvester service or acts like an MPI application itself and runs a set of job in an assemble. In addition to describing the technical details of these workflows, results are shown from its deployment on Titan (OLCF) and other HPCs in ATLAS.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Design of Experiments for Dynamic Test Runs in Solvent-Based CO 2 Capture Pilot Plants

Test runs in the pilot plants consume significant resources, and therefore, the learning from test runs should be maximized. Test runs conducted in the pilot plants are often steady state. It takes several hours for reaching steady-state in the pilot plants, and thus, the duration of the test runs needs to be long even for collecting few steady-state data points. On the other hand, a large number of measurements can be collected through dynamic test runs in a short span of time. This paper presents a systematic design of dynamic experiments (DoDEs) for identifiability of model parameters, which is achieved by persistently exciting the inputs signals. A pseudorandom binary sequence (PRBS) is designed as the input signal for DoDE due to its efficiency in obtaining sufficient spectral content. However, due to the long sequence size of the PRBS signal, a Schroeder-phase input signal, which is a multisine signal, is also designed. Tests for both types of signals are run in the Pilot Solvent Test Unit (PSTU) at the National Carbon Capture Center in Wilsonville, Alabama. The transient data are used to solve dynamic data reconciliation and parameter estimation problem. The estimated parameters are found to be not only superior to those estimated from using data collected from hundreds of steady-state test runs in a nonreactive (air–water) system, but the parameters could be estimated by using the dynamic data collected for about 24 h from the pilot plant for the MEA-H 2 O–CO 2 system.

CO2 capture↗

Experimental Studies of Low-Load Limit in a Stoichiometric Micro-Pilot Diesel Natural Gas Engine

While operating at light loads, diesel pilot-ignited natural gas engines with lean premixed natural gas suffer from poor combustion efficiency and high methane emissions. This work investigates the limits of low-load operation for a micro-pilot diesel natural gas engine that uses a stoichiometric mixture to enable methane and nitrogen oxide emission control. By optimizing engine hardware, operating conditions, and injection strategies, this study focused on defining the lowest achievable load while maintaining a stoichiometric equivalence ratio and with acceptable combustion stability. A multi-cylinder diesel 6.7 L engine was converted to run natural gas premix with a maximum diesel micro-pilot contribution of 10%. With a base diesel compression ratio of 17.3:1, the intake manifold pressure limit was 80 kPa(absolute). At a reduced compression ratio of 15:1, this limit increased to 85 kPa, raising the minimum stable load. Retarding the combustion phasing, typically used in spark-ignition engines to achieve lower loads, was also tested but found to be limited by degraded diesel ignition at later timings. Reducing the pilot injection pressure improved combustion stability, as did increasing pilot quantity at the cost of lower substitution ratios. The lean operation further reduced load but increased NOx and hydrocarbon emissions. At loads below the practical dual-fuel limit, a transition to lean diesel operation will likely be required with corresponding implications for the aftertreatment system.

03 NATURAL GAS↗

POPs in free-ranging pilot whales, sperm whales and fin whales from the Mediterranean Sea: Influence of biological and ecological factors

The pilot whale Globicephala melas, the sperm whale Physeter macrocephalus, and the fin whale Balaenoptera physalus are large cetaceans permanently inhabiting the Mediterranean Sea. These species are subjected to numerous anthropogenic threats such as exposure to high levels of contaminants. Therefore, selected persistent organic pollutants POPs (29 PCBs, 15 organochlorine compounds, 9 PBDEs and 17 PCDD/Fs) were analysed in blubber biopsies of 49 long-finned pilot whales, 61 sperm whales and 70 fin whales sampled in the North Western Mediterranean Sea (NWMS) from 2006 to 2013. Contamination profile and species feeding ecology were then combined through the use of stable isotopes. δ{sup 13}C, δ{sup 15}N values and POPs levels were assessed through IR-MS and GC–MS respectively. To assess the toxic potency of the dioxin-like compounds, the TEQ approach was applied. δ{sup 15}N values were 12.2±1.3‰ for sperm whales, 10.5±0.7‰ for pilot whales and 7.7±0.8‰ in fin whales, positioning sperm whales at higher trophic levels. δ{sup 13}C of the two odontocetes was similar and amounted to −17.3±0.4‰ for sperm whales and −17.8±0.3‰ for pilot whales; whilst fin whales were more depleted (−18.7±0.4‰). This indicates a partial overlap in toothed-whales feeding habitats, while confirms the differences in feeding behaviour of the mysticete. Pilot whales presented higher concentrations than sperm whales for ΣPCBs (38,666±25,731 ng g{sup −1} lw and 22,849±15,566 ng g{sup −1} lw respectively), ΣPBDEs (712±412 ng g{sup −1} lw and 347±173 ng g{sup −1} lw respectively) and ΣDDTs (46,081±37,506 ng g{sup −1} lw and 37,647±38,518 ng g{sup −1} lw respectively). Fin whales presented the lowest values, in accordance with its trophic position (ΣPCBs: 5721±5180 ng g{sup −1} lw, ΣPBDEs: 177±208 ng g{sup −1} lw and ΣDDTs: 6643±5549 ng g{sup −1} lw). Each species was characterized by large inter-individual variations that are more related to sex than trophic level, with males presenting higher contaminant burden than females. The discriminant analysis (DA) confirmed how DDTs and highly chlorinated PCBs were influential in differentiating the three species. Pollutant concentrations of our species were significantly higher than both their Southern Hemisphere and North Atlantic counterparts, possibly due to the particular Mediterranean geomorphology, which influences pollutants distribution and recycle. Dioxin-like PCBs accounted for over 80% of the total TEQ. This study demonstrated (1) an important exposure to pollutants of Mediterranean cetaceans, often surpassing the estimated threshold toxicity value of 17,000 ng g{sup −1} lw for blubber in marine mammals; and (2) how the final pollutant burden in these animals is strongly influenced not only by the trophic position but also by numerous other factors such as sex, age, body size and geographical distribution. - Highlights: • We analysed POPs concentrations in cetaceans from North-western Mediterranean Sea. • We integrated δ{sup 13}C and δ{sup 15}N values to combine trophic position and contamination. • Odontocetes show PCBs level higher than the toxicity threshold of 17 μg g{sup −1} lw. • Trophic position, sex, body size and distribution affect interspecies diversity.

54 ENVIRONMENTAL SCIENCES↗

Model calibration and optimization of a post-combustion CO 2 WAG pilot in a mature oil field

A carbon dioxide (CO 2 ) water-alternating-gas (WAG) pilot was conducted to gain insights into tertiary oil recovery potential via CO 2 flood in the West Ranch Field as part of the Petra Nova project, the world's largest postcombustion CO 2 capture and utilization initiative. With a fluvial formation geology, this is a challenging and novel application of CO 2 enhanced oil recovery. The aim of this study is two-fold. First, to build a predictive dynamic model that incorporates the data acquired during the pilot operation. Second, to utilize this model to provide guidance for optimal design for a field-wide CO 2 EOR operation. Our study began with an initialization of the pilot sector model extracted from a calibrated full-field model. The pilot model calibration follows a two-step hierarchical workflow. First, we performed a large-scale update of the permeability distribution by integrating available bottomhole pressure and multiphase production data. Next, local permeability field is fine-tuned using a streamline-based method to match CO 2 breakthrough times at the producers. The predictive capability of the calibrated model was verified through two blind validation tests: (1) the model showed good agreement with saturation logs acquired at two observation wells; and (2) the model reproduced the CO 2 recovery as a fraction of the injected CO 2 . Sensitivity studies were conducted using the calibrated pilot model to evaluate the effects of various operational parameters. Finally, we performed a Design of Experiment based multi-objective optimization of the CO 2 WAG processes using the influential operational parameters identified from the sensitivity analysis.

02 PETROLEUM↗

A Reactor Scale-Up Methodology from Lab-Scale to Pilot-Scale Operations: Numerical Modeling of THFA Dehydration to DHP in Packed-Bed Reactors

This manuscript discusses developing a model-based scale-up methodology for a successful technology transfer of gas-phase catalytic reactors from a lab-scale to a pilot-scale operation. The manuscript demonstrates the methodology for gas-phase dehydration of tetrahydrofurfuryl alcohol (THFA) to dihydropyran (DHP) process over commercial Al 2 O 3 catalysts. A two-dimensional reactor model was developed using COMSOL Multiphysics 6.1 software. The model solves heat and mass transport equations in bed-scale and particle scales simultaneously. This powerful feature enables accurate prediction of the heat and mass transfer limitations in pilot-scale reactors, if any exists. Further, the model uses isothermal lab-scale experimental data to derive and validate the reaction chemistry, flow fields and boundary conditions. The model was then scaled-up to project conversion, selectivity, yield and formation rate of DHP in a pilot-scale reactor. The results highlight the complex nature of chemistry, heat, and mass transfer effects in lab-scale and pilot-scale reactors. The model results inform the possible operational limitations of the pilot-scale reactor and design strategies to improve process efficiency. Although the scale-up approach is explained through the THFA dehydration process, the methodology is applicable to any catalytic packed-bed reactor models for a successful process scale-up.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Cognitive behavioural therapy targeting cardiac anxiety post-myocardial infarction: results from two sequential pilot studies

Abstract Aims Cardiac anxiety, which is cardiac-related fear and avoidance behaviours, is common following myocardial infarction (MI) and has been associated with increased risk for cardiovascular events. However, there are currently no treatments specifically designed to target cardiac anxiety. The aim of the two pilot studies was to evaluate an exposure-based cognitive behavioural therapy protocol (MI-CBT) targeting cardiac anxiety following MI, assessing feasibility, acceptability, and the intervention's potential for reducing cardiac anxiety and improving health-related quality of life (QoL). Methods and results A series of two sequential, uncontrolled pilot studies were conducted. In Pilot Study 1 (n = 15), MI-CBT was delivered via face-to-face videoconference, while Pilot Study 2 (n = 23) was delivered online. Patients with a history of MI (≥6 months before assessment, type 1 ST- or non-ST-segment elevation MI, and elevated cardiac anxiety as per clinical interview) were included. The interventions lasted 8 weeks and were therapist-led, with key components including exposure to cardiac-related symptoms and reduction of avoidance behaviours. Participants completed self-rated assessments, including the Cardiac Anxiety Questionnaire (CAQ) and the 12-Item Short Form Health Survey (SF-12), at baseline, post-treatment, and 6-month follow-up. Treatment adherence and satisfaction were high. Cognitive behavioural therapy led to a large reduction in cardiac anxiety, as measured by the CAQ (P < 0.001), and significant improvements in health-related QoL, as measured by the SF-12 (P < 0.001), in both pilot studies. Conclusion These studies suggest that exposure-based CBT is a feasible, acceptable, and promising approach to reduce cardiac anxiety and improve QoL following MI. A randomized controlled trial should be conducted to evaluate the efficacy of the intervention.

Johnsson, Amanda (ORCID:0009000862983934)↗

Design and Performance Characterization of RADICAL-Pilot on Leadership-Class Platforms

Many extreme scale scientific applications have workloads comprised of a large number of individual highperformance tasks. The Pilot abstraction decouples workload specification, resource management, and task execution via job placeholders and late-binding. As such, suitable implementations of the Pilot abstraction can support the collective execution of large number of tasks on supercomputers. We introduce RADICAL-Pilot (RP) as a portable, modular and extensible Pilot enabled runtime system. We describe RP's design, architecture and implementation. We characterize its performance and show its ability to scalably execute workloads comprised of tens of thousands heterogeneous tasks on DOE and NSF leadership-class HPC platforms. Specifically, we investigate RP's weak/strong scaling with CPU/GPU, single/multi core, (non)MPI tasks and python functions when using most of ORNL Summit and TACC Frontera. RADICAL-Pilot can be used stand-alone, as well as the runtime for third-party workflow systems.

97 MATHEMATICS AND COMPUTING↗

The influence of pilot injection on high-temperature ignition processes and early flame structure in a high-speed direct injection diesel engine

Simultaneous high-speed natural luminosity and OH* chemiluminescence imaging is used to characterize high-temperature ignition processes in conventional diesel combustion with a pilot-main injection strategy in a single-cylinder, light-duty optical diesel engine. High-speed imaging provides temporally and spatially resolved information in terms of high-temperature ignition processes and flame structure during the combustion. Using these imaging measurements, the high-temperature inflammation and the diffusion flame development processes are analyzed. The chemiluminescence signal shows a hot, reactive mixture, which gradually decreases after the peak release of the pilot combustion and lasts long after the apparent heat release has ended. Therefore, when the reactive pilot mixture exists near the main injection jets, the high-temperature ignition of the main injection is apparently initiated through interactions with the reactive pilot mixture. High-temperature autoignition, another process by which ignition of the main injection occurs, is observed in main injection plumes where the chemiluminescence signal of the reactive pilot mixture becomes very weak or is absent at the start of main injection. As the reaction of the main injection continues, the non-premixed main injection jet structure is developed and the high-temperature reacting region expands throughout the jet.

Park, Cheolwoong↗

Heat Loss Characteristics and Energy Use of Piperazine with the Advanced Stripper (PZAS) at the UT-SRP Pilot Plant

Heat duty and heat loss were measured at the pilot plant at UT Austin. Heat loss was measured with energy balances using water. Heat loss was studied using surface temperature measurements over 68 different locations at the pilot plant. Surface temperature measurements indicated that bare metal surfaces were the primary source of heat loss from the pilot plant. Heat loss from bare metal surfaces was at least 50% controlled by natural convection and in many cases was as high as 75% natural convection controlled. Measured heat loss at the pilot plant was 20100 BTU/hr and overall heat loss did not show any dependence on the heat rate of the plant. Compared to PZAS™ at the National Carbon Capture Center, heat loss relative to heat rate was higher at 38%. The relative heat loss at the pilot plants was found to decrease by 20% per MW of added capacity. Measured net heat duty was found to be dependent on measured lean loading and cold rich bypass flow rate. Measured net heat duty was between 2.2 and 2.4 GJ/tonne at an optimum lean loading of 0.2–0.21 mol/mol. Data reconciliation by Aspen Plus® Data Fit™ underpredicted CO2 flow rate by 20% due to an overprediction of lean loading by 19%, indicating a necessary change in thermodynamic parameters in the model. This resulted in an over prediction of heat duty by 33% on average.

Amine scrubbing, stripper, energy requirement, hea↗

Long Island Smart Metering Pilot Project

The Long Island Power Authority (LIPA) Smart Meter Pilots provided invaluable information and experience for future deployments of Advanced Metering Infrastructure (AMI), including the deployment planned as part of LIPA's Smart Grid Demonstration Project (DE-OE0000220). LIPA will incorporate lessons learned from this pilot in future deployments, including lessons relating to equipment performance specifications and testing, as well as equipment deployment and tracking issues. LIPA ultimately deployed three AMI technologies instead of the two that were originally contemplated. This enabled LIPA to evaluate multiple systems in field conditions with a relatively small number of meter installations. LIPA experienced a number of equipment and software issues that it did not anticipate, including issues relating to equipment integration, ability to upgrade firmware and software over the air (as opposed to physically interacting with every meter), and logistical challenges associated with tracking inventory and upgrade status of deployed meters. In addition to evaluating the technology, LIPA also piloted new Time-of-Use (TOU) rates to assess customer acceptance of time-differentiated pricing and to evaluate whether customers would respond by adjusting their activities from peak to non-peak periods. LIPA developed a marketing program to educate customers who received AMI in the pilot areas and to seek voluntary participation in TOU pricing. LIPA also guaranteed participating customers that, for their initial year on the rates, their electricity costs under the TOU rate would not exceed the amount they would have paid under the flat rates they would otherwise enjoy. 62 residential customers chose to participate in the TOU rates, and every one of them saved money during the first year. 61 of them also elected to stay on the TOU rate without the cost guarantee at the end of that year. The customer who chose not to continue on the rate was also the one who achieved the greatest savings. However, after the first year, the customer in question installed equipment that would have made TOU rates a more costly option than the residential flat rate. During the second year, all but one customer saved money. That customer increased usage during peak hours, and as a result saw an increase in annual costs (as compared to the flat rate) of $\$$24.17. The results were less clear for commercial customers, which LIPA attributes to rate design issues that it will take into account for future deployments. LIPA views this pilot as a complete success. Not only is LIPA better prepared for a larger deployment of AMI, but it is confident that residential customers will accept AMI and TOU rates and shift their energy consumption from peak to non-peak periods in response to pricing. On a larger scale, this will benefit LIPA and all of its customers by potentially lowering peak demand when energy costs are highest.

24 POWER TRANSMISSION AND DISTRIBUTION↗

NSTAR Smart Grid Pilot

NSTAR Electric & Gas Corporation (“the Company”, or “NSTAR”) developed and implemented a Smart Grid pilot program beginning in 2010 to demonstrate the viability of leveraging existing automated meter reading (“AMR”) deployments to provide much of the Smart Grid functionality of advanced metering infrastructure (“AMI”), but without the large capital investment that AMI rollouts typically entail. In particular, a central objective of the Smart Energy Pilot was to enable residential dynamic pricing (time-of-use “TOU” and critical peak rates and rebates) and two-way direct load control (“DLC”) by continually capturing AMR meter data transmissions and communicating through customer-sited broadband connections in conjunction with a standards-based home area network (“HAN”). The pilot was supported by the U.S. Department of Energy’s (“DOE”) through the Smart Grid Demonstration program. NSTAR was very pleased to not only receive the funding support from DOE, but the guidance and support of the DOE throughout the pilot. NSTAR is also pleased to report to the DOE that it was able to execute and deliver a successful pilot on time and on budget. NSTAR looks for future opportunities to work with the DOE and others in future smart grid projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pilot testing of a membrane system for postcombustion CO 2 capture

This final report summarizes work conducted for the U.S. Department of Energy, National Energy Technology Laboratory (DOE) to scale up an efficient post-combustion CO 2 capture membrane process to the small pilot test stage (award number DE-FE0005795). The primary goal of this research program was to design, fabricate, and operate a membrane CO 2 capture system to treat coal-derived flue gas containing 20 tonnes CO 2 /day (20 TPD). Membrane Technology and Research (MTR) conducted this project in collaboration with Babcock and Wilcox (B&W), the Electric Power Research Institute (EPRI), WorleyParsons (WP), the Illinois Sustainable Technology Center (ISTC), Enerkem (EK), and the National Carbon Capture Center (NCCC). In addition to the small pilot design, build and slipstream testing at NCCC, other project efforts included laboratory membrane and module development at MTR, validation field testing on a 1 TPD membrane system at NCCC, boiler modeling and testing at B&W, a techno-economic analysis (TEA) by EPRI/WP, a case study of the membrane technology applied to a ~20 MWe power plant by ISTC, and an industrial CO 2 capture test at an Enerkem waste-to-biofuel facility. The 20 TPD small pilot membrane system built in this project successfully completed over 1,000 hours of operation treating flue gas at NCCC. The Polaris™ membranes used on this system demonstrated stable performance, and when combined with over 10,000 hours of operation at NCCC on a 1 TPD system, the risk associated with uncertainty in the durability of postcombustion capture membranes has been greatly reduced. Moreover, next-generation Polaris membranes with higher performance and lower cost were validation tested on the 1 TPD system. The 20 TPD system also demonstrated successful operation of a new low-pressure-drop sweep module that will reduce parasitic energy losses at full scale by as much as 10 MWe. In modeling and pilot boiler testing, B&W confirmed the viability of CO 2 recycle to the boiler as envisioned in the MTR process design. The impact of this CO 2 recycle on boiler efficiency was quantified and incorporated into a TEA of the membrane capture process applied to a full-scale power plant. As with previous studies, the TEA showed the membrane process to be lower cost than the conventional solvent capture process even at 90% CO 2 capture. A sensitivity study indicates that the membrane capture cost decreases significantly if the 90% capture requirement is relaxed. Depending on the process design, a minimum capture cost is achieved at 30-60% capture, values that would meet proposed CO 2 emission regulations for coal-fired power plants. In summary, this project has successfully advanced the MTR membrane capture process through small pilot testing (technology readiness level 6). The technology is ready for future scale-up to the 10 MWe size.

01 COAL, LIGNITE, AND PEAT↗