69 records · Page 4

Enhanced Tensor Completion Based Approaches for State Estimation in Distribution Systems

Grid state estimation is essential for effective control and management of distribution systems. While weighted least squares has been the conventional method for state estimation, sparsity-aware methods have become popular due to their superior performance with limited data. Matrix completion and compressed sensing-based state estimation approaches exploit the underlying smoothness in the state variables. However, classic matrix completion methods do not take into account the temporal correlation of system states. Compressed sensing methods, on the other hand, require an appropriate choice of sparsifying basis that may not be easy to identify. This paper proposes a blocktensor completion based framework which uses an alternative approach to estimate voltage phasor, power injections and branch currents. This approach utilizes the temporal correlation of the system states in a tensor trace-norm minimization formulation with power flow equations as constraints. Herein, feature scaling is introduced in the problem formulation to benefit from the improved sensitivity of the tensor trace norm to the matrix columns in the scaled unfoldings of the tensor. Weighted tensor norm is utilized to exploit the structures of the different unfoldings of the state measurement tensor to improve the voltage estimation. The estimation accuracy is further improved by alternatively estimating the tensor columns and increasing the available data at each stage in the tensor completion process. The proposed methods are evaluated on the IEEE-33, 37 test systems and a 100- node test system. The proposed methods are shown to provide significant performance gains relative to the classic matrix and tensor completion based approaches.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data-driven Modeling for Grid Edge IBRs: A Digital Twin Perspective of User-Defined Models

Recent events in Odessa have brought attention to the challenges associated with the interaction between Inverter- Based Resources (IBRs) and the transmission and distribution system. The NERC event diagnosis report has highlighted sev- eral issues, emphasizing the need for continuous performance monitoring of these IBRs by system operators. Key areas of concern include the mismatch of control and protection perfor- mance of IBRs between the original equipment manufacturer (OEM)-provided models and field measurements. The inability to replicate the realistic response can result in incorrect reliability and resilience studies. In this paper, we developed an approach on how to emulate the behavior of an IBR using measurement data obtained for system operators to utilize in real-time and long- term planning. Two experiments are conducted in the phasor domain and electromagnetic transients (EMT) domain to emulate the behavior for grid forming and grid following inverters under various operating conditions and the effectiveness of the proposed model is demonstrated in terms of accuracy and ease of utilizing user-defined models (UDMs)

Mahapatra, Kaveri [BATTELLE (PACIFIC NW LAB)]↗

Assessing Inverter-Based Resources Modeling Gaps in Commonly Used Short-Circuit Programs

Future bulk power systems are expected to operate with a high penetration of inverter-based resources (IBR). This is anticipated to fundamentally change the system’s short-circuit behaviors and demand a change in existing transmission line protection settings or schemes. Phasor-domain short circuit programs (e.g., ASPEN, CAPE, and CYME) remain the mainstream tools for developing protection settings. However, the system protection community has shared concerns about the accuracy of IBR models in short-circuit programs. This report compares the performance of existing generic IBR models in short-circuit programs with detailed electro-magnetic transient (EMT) models provided by several different IBR manufacturers in PSCAD, to quantify the short-circuit program’s IBR model accuracy, assess their ability to replicate individual IBR controls such as negative sequence current injections, and identify specific gaps in the existing generic phasor-domain IBR models that are currently available.

42 ENGINEERING↗

Intensity Modulated Fiber Optic Sensor: A Novel Grid Measurement Unit

This paper presents a novel approach to physical displacement-based power grid measuring via an Intensity Modulated Fiber Optic Sensor (IMFOS). An IMFOS utilizes one fiber to transmit the intensity modulation light from its Electro-Optic controller to a fiber optic probe. The power grid voltage and current can induce physical displacements in transducers via the piezoelectric effect and the Lorentz law, respectively, which then result in a distance change between the optical probe and the reflective surface of the transducers. In parallel, multiple fibers are used to collect the reflective light for electro-optic conversion. Furthermore, a National Instruments-based characterization platform is set up for performance evaluation. Here, the testing result demonstrates that the IMFOS is immune to the inherent DC and low-frequency saturation issues prevalent in conventional potential and current transformers. Finally, the IMFOS is implemented in a Universal Grid Analyzer to illustrate its applicability for phasor estimation in actual power grids.

42 ENGINEERING↗

Smart sensor for online situational awareness in power grids

Waveforms in power grids typically reveal a certain pattern with specific features and peculiarities driven by the system operating conditions, internal and external uncertainties, etc. This prompts an observation of different types of waveforms at the measurement points (substations). An innovative next-generation smart sensor technology includes a measurement unit embedded with sophisticated analytics for power grid online surveillance and situational awareness. The smart sensor brings additional levels of smartness into the existing phasor measurement units (PMUs) and intelligent electronic devices (IEDs). It unlocks the full potential of advanced signal processing and machine learning for online power grid monitoring in a distributed paradigm. Within the smart sensor are several interconnected units for signal acquisition, feature extraction, machine learning-based event detection, and a suite of multiple measurement algorithms where the best-fit algorithm is selected in real-time based on the detected operating condition. Embedding such analytics within the sensors and closer to where the data is generated, the distributed intelligence mechanism mitigates the potential risks to communication failures and latencies, as well as malicious cyber threats, which would otherwise compromise the trustworthiness of the end-use applications in distant control centers. The smart sensor achieves a promising classification accuracy on multiple classes of prevailing conditions in the power grid and accordingly improves the measurement quality across the power grid.

Dehghanian, Payman↗

A Cross-Domain Optimization Framework of PMU and Communication Placement for Multidomain Resiliency and Cost Reduction

Phasor measurement units (PMUs) play a crucial role in real-time monitoring and control of power grids. They rely on a communication network to transfer measurement data to the phasor data concentrator (PDC) for further processing and analysis. In this paper, a resilient cross-domain PMU and communication link placement method for minimizing the overall installation cost of the wide-area measurement system (WAMS) is proposed. Here, the main idea is to break down the barrier between the power grid domain and the communication domain, and consider the impact of one when design the other. The PMU placement in the power grid domain takes into account the cost of communication links by generating multiple solutions with equally minimum PMU costs for communication link placement evaluation. On the other hand, the communication link placement problem reduces the cost by customizing the routing policies based on the different roles of PMUs in grid observability. The proposed WAMS design is capable of withstanding any single component failure in the power domain (PMU failure or power branch failure) or in the communication domain (communication link failure or PDC failure). Numerical study on the IEEE 57-bus system reveals that the developed cross-domain optimization framework can significantly reduce the overall installation cost of WAMS while attaining multi-domain resiliency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MindSynchro

This report presents the developments and results of MindSynchro project as part of DOE OE FOA 1861. DOE and Pacific Northwest National Laboratory (PNNL) have made available to FOA awardees datasets containing years of real historical data recorded from various phasor measurement units (PMUs) which are installed in three large US interconnections: Texas (IC A), Western (IC B), and Eastern (IC C). The main goal of the project, which was successfully achieved, was to develop methods for detection and identification of events which are relevant for power grid operation. Tasks performed for achieving the project goals included data exploration and pre-processing, the development and application of physics-based features, data analysis and labeling based on unsupervised learning approaches, training and testing of DSSL models for classification of events which are relevant for power grid operation, and deployment of solutions to cloud environments. The methods developed in the project can potentially provide relevant benefits to power grid asset owners/operators in general in terms of situational awareness. Two main types of outcomes can be provided by these tools: Identification of specific relevant power grid event types: Semi-supervised ML methods developed in the project can adequately employ not only the relatively scarce labeled data but also the large amount of available unlabeled data to train models for detection of specific event types. Such methods enable the application of trained models for the detection of events in a population of PMUs much larger than that associated to the labeled events. Support in data labeling / label validation: Labels are critical for training of models for identification of specific types of events. However, labeling large amounts of data is a manual and tedious process. This means that such process is error prone and is not scalable. Methods developed in the project, based on ensembles of clustering models, have been successfully employed for turning manual labeling into a scalable process. Accurate identification of specific relevant events can provide the operators with immediate situational awareness that could otherwise require hours or days of analysis from domain experts. We envision that such methods could be initially employed in support of post-mortem analysis of events and, as confidence is gained, they could be employed for online/real-time support, providing, among other benefits, insights for avoiding major events which could happen due to a combination of smaller ones. On the longer term, related methods could potentially be employed to improve protection and control.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Bonneville, Power Administration Timing System

Time is an integral part of the Bonneville Power Administration's (BPA) operational systems. Generation and power transfers are planned in advance. Utilities coordinate with each other by making these adjustments on a timed schedule. Price varies with demand, so billing is based on time. Outages for maintenance are scheduled to assure they do not interrupt reliable power delivery. Disturbance records are aligned with recorded timetags for analysis and comparison with related information. Advanced applications like traveling wave fault location and real-time phase measurement require continuous timing with high precision. Most of BPA is served by a Central Time System (CTS) at the Dittmer Control Center near Portland, OR. This system keeps time locally and supplies time to both the control center systems and field locations via a microwave signal. It is kept synchronized to national standard time and coordinated with interconnected utilities. It is the official BPA time. Powwer system control and operation is described, followed by a description of BPA timing systems including CTS, the Fault Location Acquisition Reporter, time dissemination, and phasor measurements. References are provided for further reading.

Martin, Kenneth E.↗

Automated System-wide Event Detection and Classification Using Machine Learning on Synchrophasor Data

As the number of phasor measurement units (PMUs) deployed in a power system increases, and their data volume streamed to the control canter intensifies, operators are facing challenges related to the analysis of such data, which need to be observed and responded to as the measurements are displayed in the Control Room. Humans are generally unable to process such large amount of data efficiently and rapidly. There is an apparent need for automated ways to analyze the data, extract actionable information about occurrence of specific events, and characterize the events quickly and cost effectively. This paper discusses the use of machine learning (ML) to facilitate such tasks by providing automated, highly computationally efficient, and cost-effective ways of extracting actionable information from synchrophasor big data in real-time. We developed Big Data Smart (BDSmart) ML-based prototype tool for the Control Room use that automatically analyses data properties from synchrophasor system measurements taken across the three grid Interconnections in the USA (Western, Eastern and ERCOT). The data collected from several hundreds of PMUs located across the Interconnections over a period of two years have been made available for our extensive study. As a result, we were able to identify a number of big data properties that influence how ML methodology is applied to select, develop, train and test the data models that can eventually be used for the tool implementation. The resulting set of candidate algorithms spans unsupervised, supervised, semi-supervised and transfer-learning approaches. Many ML techniques, such as decision trees, multinomial logistic regression, feed-forward neural networks, K-nearest neighbor, multiclass support vector machine, and single and multi-channel convolutional neural networks, are implemented, and their performance is examined. We offer the results from testing the data models. The novelty of our study is in the approaches for bad data detection and mitigation, selection of a simplified feature for event detection, and data label improvements. As a result, we came up with a list of recommendations for the utilities on how to improve the PMU recording practices to cater to the future ML applications aimed at automating the analysis of synchrophasor data.

Synchrophasors, Machine Learning, System-wide Even↗

High-Performance Transmission and Distribution Co-simulation with 10,000+ Inverter-Based Resources

The inverter-based resource (IBR) has become avery important component in the distribution system. The impacts on system transient stability introduced by high IBR penetration are not fully addressed because of the lack of high-fidelity models. The aggregate IBR model at the transmission level cannot precisely reproduce the dynamics of distributed IBR at the distribution system because of the oversimplification. In this paper, we will develop a high-penetration fully-connected transmission and distribution (T&D) co-simulation platform that supports the simulation of 10,000+ dispersed IBR models. The interfacing and iterative initialization techniques for the co-simulation have been implemented to maintain stable operation and simulation of large-multitude of IBR models. The phasor-domain IBR models with grid-forming (GFM) and grid-following (GFL) control are implemented in the distribution systems simulators. The developed platform is tested on high-performance computing (HPC) resources and can be utilized to explore the hierarchical control strategies of IBRs for the large-scale T&D hybrid system.

Liu, Yuan↗

Real Time Applications Using Linear State Estimation Technology (RTA/LSE)

Electric Power Group, LLC (EPG) was awarded DOE OE0000849 to design, develop, and demonstrate three real-time applications for monitoring power system stability. The applications use phasor measurements and processing by a linear state estimator (LSE) to improve system visibility and accuracy. These applications leverage the large and expanding phasor measurement systems being deployed by utilities throughout the world, and specifically in the United States. Phasor measurements provide a much more detailed view of the power systems than traditional SCADA systems, so can provide better visibility of events and an early warning of developing problems. These three applications are real-time contingency analysis (RTCA), area angle monitoring (AAM), and a voltage stability index (VSI). The project was fully completed as proposed. All three applications were successfully implemented and demonstrated. There were challenges the caused project delays, however. While the RTCA is based on well-known concepts and readily available tools, its deployment using phasor measurements meant it needed to be adapted to sometimes sparse measurements and limited coverage areas. EPG met these challenges with extensive modeling and testing. The AAM is based on unproven research, so EPG had to deal with a lot of unknowns and develop additional methods for practical implementation. These activities took more time than anticipated, so required extra time for development. In addition, there was difficulty getting adequate measurement locations for successful deployment and utility installation delays. Consequently, the project required a time extension to complete. These three real-time applications, RTCA, AAM, and VSI, use only phasor measurement input. Since they do not require the EMS or other measurement systems, they can serve as a backup and security check for the EMS. Phasor measurements are validated and extended by an LSE. The LSE will always produce an output even when some inputs are impaired, so the RT applications will operate even when the EMS state estimator does not converge and the applications it supports cannot function. Consequently, these RT applications can provide valuable additional reliability for control center operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Anomaly Detection, Localization and Classification using Drifting Synchrophasor Data Streams

With ongoing automation and digitization of the electric power system, several Phasor Measurement Units(PMUs) have been deployed for monitoring and control. PMU data can have multiple anomalies, and many of the researchers in the past have concentrated on training machine/deep learning algorithms offline for anomaly detection over PMU data (i.e., not in real time). These machine/deep learning algorithms, when trained offline on a sample rather than a population of the dataset, fail to consider the dynamic behavior of the power grid in real-time, resulting in low accuracy. Considering the dynamic behavior of the power grid (e.g., change in load, generation, distributed energy resources (DERs) switching, network, controls), the definition of data anomalies varies in time and requires online training. A fundamental challenge is to enable online (i.e., real-time) training of machine/deep learning algorithms for anomaly detection over streaming PMU data. While machine/deep learning is often desirable to manage data streams, training a deep learning algorithm over streaming PMU data is nontrivial due to changes in data statistics caused by dynamic streaming data. This paper proposes PMUNET: a novel device-level deep learning-based data-driven approach for anomaly detection, localization, and classification over streaming PMU data, using online learning and multivariate data-drift detection algorithm .Two variants of PMUNET, Dynamic data Change Driven Learning (DCDL) and Continuity Driven Learning (CDL), are proposed and compared. DCDL aims to train the deep learning algorithm whenever the definition of anomaly changes due to the power grid dynamics. On the other hand, CDL continuously trains the deep learning algorithm over the PMU data-stream. The experimental results verify that DCDL outperforms CDL and other efficient anomaly detection methods over multiple events such as faults and load/ generator/capacitor/DERs variations/switching for IEEE 14 and 39 Bus test system as well as real PMU industrial data. The result verifies that DCDL variant of PMUNET improves over existing approach with a gain of 2% - 10% in terms of accuracy, false-positive rate, and false-negative rate.

adversarial deep learning↗

Advanced Measurements for Resilient Integration of Inverter-Based Resources: PROGRESS MATRIX Final Report

As nearly every aspect of the electric power grid undergoes rapid change, measurement technologies that support grid operation and planning must evolve as well. The rapid large-scale deployment of inverter-based resources (IBRs) vital to achieving the nation’s clean energy goals has in some cases led to negative impacts on the reliability and security of the bulk power system (BPS). Advanced power system measurements, including synchronized phasor and waveform measurements, are key to making IBR integration secure and reliable. To this end, the Department of Energy (DOE) initiated the PROGRESS MATRIX project to develop advanced measurement capabilities and analytics that will accelerate adoption of IBRs while improving the reliability and resilience of the BPS. This report discusses the outcomes of the project, which was a joint effort between the Pacific Northwest National Laboratory (PNNL), Oak Ridge National Laboratory (ORNL), the National Renewable Energy Laboratory (NREL), and Lawrence Berkeley National Laboratory (LBNL). In the project’s first year, PNNL, NREL, and ORNL partnered with the Bonneville Power Administration (BPA), the Western Area Power Administration (WAPA), and Kauai Island Utility Cooperative (KIUC) to understand their existing measurement capabilities and the gaps limiting deployment of IBR-focused measurement systems and analytics. The other primary activity in the first year was deployment of GridSweep instruments, which provide unprecedented precision in waveform measurement while probing distribution systems. The instruments were deployed at Dominion Energy and the University of California, Riverside. In the project’s second year, the input from partner utilities and collected measurements were used to advance measurement capabilities. Twelve analytical methods spanning disturbance analysis, power plant evaluation, feeder evaluation, and modeling were developed. Two software tools were developed, one to analyze GridSweep measurements and another to automatically evaluate the control performance of power plants connected to the BPS. Testbeds at ORNL and NREL were augmented to better enable studies of IBR integration. The project culminated in demonstrations of these analytical methods, software tools, and testbeds, both in the field and in the laboratory. This report discusses these various accomplishments and documents the significant progress in developing advanced measurement capabilities to support the secure, reliable, and accelerated adoption of IBRs in the BPS.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of Machine Learning on PMU Data for Transmission System Fault Analysis

Synchrophasor technology has been used for monitoring, control, and protection of bulk power system for over 10 years. Deployment of phasor measurement units (PMUs) in the USA power system has surpassed 3000 units installed in the transmission substations as stand-alone intelligent electronic devices (IEDs) or as a software add-on to other devices such as digital protective relays (DPRs) or digital fault recorders (DFRs). By now, thousands of terabytes of PMU data may have been captured and stored by various transmission system operators (TSOs) and independent system operators (ISOs). This creates an opportunity to deploy advanced machine learning (ML) techniques to detect and classify faults recorded by PMUs automatically to be used by the system operators for rapid, critical decision-making when manual analysis of the past or unfolding events is not feasible. In this paper we offer a brief background on how the automated fault analysis may be done using DPR and/or DFR data, and compare some of the legacy approaches to the new ML approaches in the context of the system-wide PMU recordings. We then offer insights from developing practical ML solutions that have been applied on field recordings captured by close to 450 PMUs from all three US interconnections (Western, Eastern and ERCOT) over two years (2016-2017). We identify and illustrate ML challenges we addressed: inaccurate data, data with scarce and temporally imprecise fault labels, data recorded by PMUs sparsely located at substations resulting in the fault records taken afar from the ends of the faulted lines, data containing only positive sequence values, and data taken at different voltage levels. We then illustrate the ML model results for fault analysis under different application scenarios. The novelty of this study is not only in the design, implementation, and performance analysis of the ML algorithms, but also in the use of advanced fault modelling and simulation approaches to improve the training results when developing supervised ML models for fault detection and classification. Extensive simulations of faults were conducted on a 14-bus power system to create a training dataset with over 1400 accurately labelled faults. This dataset was applied to enhance the accuracy of fault detection and classification of machine learning-based models trained with small number of labelled faults in large datasets recorded in the grid interconnections ranging from 5,000 to 70,000 buses.

Synchrophasors, Machine Learning, Fault Analysis, ↗