Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Rotation-Enabled 7-Degree of Freedom Seismometer for Geothermal Resource Development. Phase 1 Final Report

Under this Department of Energy (DOE) grant, A-Tech Corporation d.b.a. Applied Technology Associates (ATA), seeks to develop a seven-degree-of-freedom (7-DOF) seismic measurement tool for high-temperature geothermal applications. The Rotational-Enabled 7-DOF Seismometer includes a conventional tri-axial accelerometer, a conventional pressure sensor or hydrophone, and a tri-axial rotational sensor. The rotational sensing capability is novel, based upon ATA's innovative research in rotational sensing technologies. The geothermal industry requires tools for high-precision seismic monitoring of crack formation associated with Enhanced Geothermal System (EGS) stimulation activity. Currently, microseismic monitoring is conducted by deploying many seismic tools at different depth levels along a 'string' within drilled observation wells. Costs per string can be hundreds of thousands of dollars. Processing data from the spatial arrays of linear seismometers allows back-projection of seismic wave states. In contrast, a Rotational-Enabled 7-DOF Seismometer would simultaneously measure p-wave velocity, s-wave velocity, and incident seismic wave direction all from a single point measurement. In addition, the Rotational-Enabled 7-DOF Seismometer will, by its nature, separate p- and s-waves into different data streams, simplifying signal processing and facilitating analysis of seismic source signatures and geological characterization. By adding measurements of three additional degrees-of-freedom at each level and leveraging the information from this new seismic observable, it is likely that an equally accurate picture of subsurface seismic activity could be garnered with fewer levels per hole. The key cost savings would come from better siting of the well due to increased information content and a decrease in the number of confirmation wells drilled, also due to the increase in information per well. Improved seismic tools may also increase knowledge, understanding, and confidence, thus removing some current blocks to feasibility and significantly increasing access to potential geothermal sites. During the Phase 1 effort summarized in this final report, the ATA Team modeled and built two TRL 3 proof-of-concept test units for two competing rotational sensor technologies. The two competing technologies were based on ATA's angular rate and angular displacement measurement technologies; Angular rate: ATA's Magnetohydrodynamic Angular Rate Sensor (Seismic MHD); and Angular displacement: ATA's Low Frequency Improved Torsional Seismometer (LFITS). In order to down-select between these two technologies and formulate a go / no go decision, the ATA Team analyzed and traded scientific performance requirements and market constraints against sensor characteristics and components, acquiring field data where possible to validate the approach and publishing results from these studies of rotational technology capability. Based on the results of Phase 1, the ATA Team finds that the Seismic MHD (SMHD) technology is the best choice for enabling rotational seismometry and significant technical potential exists for micro-seismic monitoring using a downhole 7-DOF device based on the SMHD. Recent technical papers and field data confirm the potential of rotational sensing for seismic mapping, increasing confidence that cost-reduction benefits are achievable for EGS. However, the market for geothermal rotational sensing is small and undeveloped. As a result, this report recommends modifying the Phase 2 plan to focus on prototype development aimed at partnering with early adopters within the geothermal industry and the scientific research community. The highest public benefit will come from development and deployment of a science-grade SMHD rotational seismometer engineered for geothermal downhole conditions and an integrated test tool for downhole measurements at active geothermal test sites.

15 GEOTHERMAL ENERGY↗

Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

Mattes, Karl↗

Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

Mattes, Karl↗

Materials Scorecards, Phase 1: Advanced Materials and Manufacturing Technology

This report presents preliminary material score cards (Phase 1) based on a survey of industry experts and the limited literature available on the state of advanced manufacturing of materials for nuclear applications. Seven reactor types were considered, and the data is presented in tabular form. The caveat is that the scores are based on limited data and expert judgement. Considerable work remains to be done to prioritize materials for advanced manufacturing to support existing and advanced reactors. A central database of processing conditions, resulting microstructure, post processing, properties, and performance of these materials is needed to support the accelerated adoption of advanced manufacturing by the industry.

36 MATERIALS SCIENCE↗

VECTOR Phase 1 Dataset: CAV Trajectory and Energy Consumption Records

This dataset contains benchmark experimental data from Phase 1 of the VECTOR project, focusing on the energy impact of CAV hardware components. The dataset includes vehicle trajectory data (speed and position) and corresponding energy consumption records collected from a CAV platform equipped with lidar, cameras, onboard computation units, and communication modules. The primary objective is to quantify the baseline energy consumption attributable to sensing and computing systems, independent of any advanced cooperative control strategies. During experiments, the leading vehicle followed a predetermined velocity profile, and the following CAV mirrored this trajectory using a basic car-following control to ensure consistent driving behavior. This setup enables a reliable benchmark for assessing the energy cost introduced by onboard CDA hardware (e.g., lidar and GPU-based processing). The dataset is essential for evaluating energy baselines and supports future comparative studies involving additional cooperative strategies. ![system img](system.png) ![vector img](vector.png)

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Laser-induced magnetic fields in ICF capsules, Final Report, DE-FG02-08ER85128, Phase 1

Laser-induced magnetic fields in ICF capsules Final Report, DE-FG02-08ER85128, Phase 1 E. L. LINDMAN, Otowi Technical Services, Los Alamos, NM. The performance of an inertial-confinement-fusion (ICF) capsule can be improved by inserting a magnetic field into it before compressing it [Kirkpatrick, et al., Fusion Technol. 27, 205 (1995)]. To obtain standoff in an ICF power generator, a method of inserting the field without the use of low-inductance leads attached to the capsule is desired. A mechanism for generating such a field using a laser was discovered in Japan [Sakagami, et al., Phys. Rev. Lett. 42, 839 (1979), Kolodner and Yablonovitch, Phys. Rev. Lett. 43, 1402 (1979)] and studied at Los Alamos in the 1980s [M. A. Yates, et al., Phys. Rev. Lett. 49, 1702 (1982); Forslund and Brackbill, Phys. Rev. Lett. 48, 1614 (1982)]. In this mechanism, a p-polarized laser beam strikes a solid target producing hot electrons that are accelerated away from the target surface by resonant absorption. An electric field is created that returns the hot electrons to the target. But, they do not return to the target along the same trajectory on which they left. The resulting current produces a toroidal magnetic field that was observed to spread over a region outside the hot spot with a radius of a millimeter. No experimental measurements of the magnetic field strength were performed. Estimates from computer simulation suggest that field strengths in the range of 1 to 10 Mega gauss (100 to 1000 Tesla) were obtained outside of the laser spot. To use this mechanism to insert a magnetic field into an ICF capsule, the capsule must be redesigned. In one approach, a central conductor is added, a toroidal gap is cut in the outer wall and the DT fuel is frozen on the inner surface of the capsule. The capsule is dropped into the reaction chamber and struck first with the laser that generates the magnetic field. The laser hot spot is positioned at the center of the toroidal gap. As the magnetic field spreads from the hot spot over the surface that contains the toroidal gap, it will propagate through the gap and set up a steady state in the capsule. The main compression is then initiated. First, it closes the gap and crow-bars the field, then it compresses the fuel to ignition. In addition to this application, we discuss the use of this mechanism to induce Mega-gauss fields in laboratory apparatus for measurements of the effects of large magnetic fields on material samples. A preliminary target design for this purpose is presented. It is made of high-density material with no hydrogen surface contamination to minimize fast ion losses and to minimize x-ray preheat of the sample (the material, whose magnetic properties are to be measured). In it, the gap is designed to allow the magnetic field to move into the interior of the target while minimizing the flow of hot electrons into the interior. By adjusting the size of the gap as well as its configuration, the hot electron effects can be minimized. Since the strength of the magnetic field depends on the radial distance to the sample from the center of the conductor carrying the return current, the sample is located at a point of minimum conductor radius. This location also minimizes the effects on the measurement of any hot electrons that flow into the interior. Useful experiments can be accomplished with the “seed” field alone in this geometry. Compressing the capsule after the insertion of the seed field may allow experiments with even larger magnetic fields. We have used computer-simulation techniques to address a number of issues. Our conclusions include: • This magnetic-field generating mechanism is a viable method for generating magnetic fields in ICF targets and for laboratory experiments. • Useful experiments on material samples can be done with the seed field of 1 to10 Mega gauss (100 to 1000 Tesla) and higher magnetic fields can be obtained by subsequently compressing the capsule. • The results reported here can be studied experimentally with a modest CO2 laser that emits 4.5 J of energy in a 1-ns pulse focused into a 60-μm-diameter spot. • We have reproduced the published calculation of Forslund and Brackbill and extended the results to relativistic hot electrons. The difference in our peak magnetic field (1.25 Mg) versus that in the published calculation (1.3 Mg) is negligible. • We have shown that hot electrons can jump a gap while the magnetic field penetrates through the gap into an internal region. • We find that background plasma or a plasma gradient near the accelerating region is essential to the formation of the magnetic-field structures. • And, we have identified resistive losses in the surface return current as a serious issue that must be addressed in future work.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Innovative Phase Change Thermal Energy Storage Solution for Baseload Power Phase 1 Final Report

The primary purpose of this project is to develop and validate an innovative, scalable phase change salt thermal energy storage (TES) system that can interface with Infinia’s family of free-piston Stirling engines (FPSE). This TES technology is also appropriate for Rankine and Brayton power converters. Solar TES systems based on latent heat of fusion rather than molten salt temperature differences, have mTany advantages that include up to an order of magnitude higher energy storage density, much higher temperature operation, and elimination of pumped loops for most of Infinia’s design options. DOE has funded four different concepts for solar phase change TES, including one other Infinia awarded project using heat pipes to transfer heat to and from the salt. The unique innovation in this project is an integrated TES/pool boiler heat transfer system that is the simplest approach identified to date and arguably has the best potential for minimizing the levelized cost of energy (LCOE). The Phase 1 objectives are to design, build and test a 1-hour TES proof-of-concept lab demonstrator integrated with an Infinia 3 kW Stirling engine, and to conduct a preliminary design of a 12-hour TES on-sun prototype.

14 SOLAR ENERGY↗

Gemcitabine Plus Radiation Therapy for High-Grade Glioma: Long-Term Results of a Phase 1 Dose-Escalation Study

Purpose: To evaluate the tolerability and efficacy of gemcitabine plus radiation therapy (RT) in this phase 1 study of patients with newly diagnosed malignant glioma (HGG). Patients and Methods: Between 2004 and 2012, 29 adults with HGG were enrolled. After any extent of resection, RT (60 Gy over 6 weeks) was given concurrent with escalating doses of weekly gemcitabine. Using a time-to-event continual reassessment method, 5 dose levels were evaluated starting at 500 mg/m{sup 2} during the last 2 weeks of RT and advanced stepwise into earlier weeks. The primary objective was to determine the recommended phase 2 dose of gemcitabine plus RT. Secondary objectives included progression-free survival, overall survival (OS), and long-term toxicity. Results: Median follow-up was 38.1 months (range, 8.9-117.5 months); 24 patients were evaluable for toxicity. After 2005 when standard practice changed, patients with World Health Organization grade 4 tumors were no longer enrolled. Median progression-free survival for 22 patients with grade 3 tumors was 26.0 months (95% confidence interval [CI] 15.6-inestimable), and OS was 48.5 months (95% CI 26.8-inestimable). In 4 IDH mutated, 1p/19q codeleted patients, no failures occurred, with all but 1 alive at time of last follow-up. Seven with IDH mutated, non-codeleted tumors with ATRX loss had intermediate OS of 73.5 months (95% CI 32.8-inestimable). Six nonmutated, non-codeleted patients had a median OS of 26.5 months (95% CI 25.4-inestimable). The recommended phase 2 dose of gemcitabine plus RT was 750 mg/m{sup 2}/wk given the last 4 weeks of RT. Dose reductions were most commonly due to grade 3 neutropenia; no grade 4 or 5 toxicities were seen. Conclusions: Gemcitabine concurrent with RT is well-tolerated and yields promising outcomes, including in patients with adverse molecular features. It is a candidate for further study, particularly for poor-prognosis patient subgroups with HGG.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Vorinostat and Concurrent Stereotactic Radiosurgery for Non-Small Cell Lung Cancer Brain Metastases: A Phase 1 Dose Escalation Trial

Purpose: To determine the maximum tolerated dose (MTD) of vorinostat, a histone deacetylase inhibitor, given concurrently with stereotactic radiosurgery (SRS) to treat non-small cell lung cancer (NSCLC) brain metastases. Secondary objectives were to determine toxicity, local failure, distant intracranial failure, and overall survival rates. Materials and Methods: In this multicenter study, patients with 1 to 4 NSCLC brain metastases, each ≤2 cm, were enrolled in a phase 1, 3 + 3 dose escalation trial. Vorinostat dose levels were 200, 300, and 400 mg orally once daily for 14 days. Single-fraction SRS was delivered on day 3. A dose-limiting toxicity (DLT) was defined as any Common Terminology Criteria for Adverse Events version 3.0 grade 3 to 5 acute nonhematologic adverse event related to vorinostat or SRS occurring within 30 days. Results: From 2009 to 2014, 17 patients were enrolled and 12 patients completed study treatment. Because no DLTs were observed, the MTD was established as 400 mg. Acute adverse events were reported by 10 patients (59%). Five patients discontinued vorinostat early and withdrew from the study. The most common reasons for withdrawal were dyspnea (n=2), nausea (n=1), and fatigue (n=2). With a median follow-up of 12 months (range, 1-64 months), Kaplan-Meier overall survival was 13 months. There were no local failures. One patient (8%) at the 400-mg dose level with a 2.0-cm metastasis developed histologically confirmed grade 4 radiation necrosis 2 months after SRS. Conclusions: The MTD of vorinostat with concurrent SRS was established as 400 mg. Although no DLTs were observed, 5 patients withdrew before completing the treatment course, a result that emphasizes the need for supportive care during vorinostat administration. There were no local failures. A larger, randomized trial may evaluate both the tolerability and potential local control benefit of vorinostat concurrent with SRS for brain metastases.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Initial test results from the RedFlow 5 kW, 10 kWh zinc-bromide module, phase 1

In this paper the performance results of the RedFlow zinc-bromide module (ZBM) Gen 2.0 are reported for Phase 1 of testing, which includes initial characterization of the module. This included physical measurement, efficiency as a function of charge and discharge rates, efficiency as a function of maximum charge capacity, duration of maximum power supplied, and limited cycling with skipped strip cycles. The goal of this first phase of testing was to verify manufacturer specifications of the zinc-bromide flow battery. Initial characterization tests have shown that the ZBM meets the manufacturer's specifications. Further testing, including testing as a function of temperature and life cycle testing, will be carried out during Phase 2 of the testing, and these results will be issued in the final report, after Phase 2 testing has concluded.

25 ENERGY STORAGE↗

Commissioning of Phase 1 of the LANL RFQ Test Stand - Beam Characterization

A series of numerical start-to-end simulations of Phase 1 of the 750 keV RFQ Test Stand which includes the ion source (H+ duoplasmatron), a 1-Solenoid LEBT, an emittance scan station and a Faraday cup were performed to find a mechanism for the characterization of the proton beam extracted from the duoplasmatron.

43 PARTICLE ACCELERATORS↗

Phase 1 Study of Low-Dose Fractionated Whole Abdominal Radiation Therapy in Combination With Weekly Paclitaxel for Platinum-Resistant Ovarian Cancer (GCGS-01)

Low-dose fractionated whole abdominal radiation therapy (LDFWART) has synergistic activity with paclitaxel in preclinical models. The aim of this phase 1 trial was to determine the recommended phase 2 dose and preliminary activity of weekly paclitaxel (wP) concurrent with LDFWART in patients with platinum-resistant ovarian cancer (PROC).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Sorafenib Increases Tumor Hypoxia in Cervical Cancer Patients Treated With Radiation Therapy: Results of a Phase 1 Clinical Study

Purpose: Preclinical studies have shown that angiogenesis inhibition can improve response to radiation therapy (RT). The purpose of this phase 1 study was to examine the angiogenesis inhibitor sorafenib in patients with cervical cancer receiving radical RT and concurrent cisplatin (RTCT). Methods and Materials: Thirteen patients with stage IB to IIIB cervical cancer participated. Sorafenib was administered daily for 7 days before the start of standard RTCT in patients with early-stage, low-risk disease and also during RTCT in patients with high-risk disease. Biomarkers of tumor vascularity, perfusion, and hypoxia were measured at baseline and again after 7 days of sorafenib alone before the start of RTCT. The median follow-up time was 4.5 years. Results: Initial complete response was seen in 12 patients. One patient died without achieving disease control, and 4 experienced recurrent disease. One patient with an extensive, infiltrative tumor experienced pelvic fistulas during treatment. The 4-year actuarial survival was 85%. Late grade 3 gastrointestinal toxicity developed in 4 patients. Sorafenib alone produced a reduction in tumor perfusion/permeability and an increase in hypoxia, which resulted in early closure of the study. Conclusions: Sorafenib increased tumor hypoxia, raising concern that it might impair rather than improve disease control when added to RTCT.

62 RADIOLOGY AND NUCLEAR MEDICINE↗