Engineering PapersSearch

SEARCH · Engineering Papers

Results for “Performance tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Lessons Learned from Performance Testing of Humans in Spacesuits in Simulated Reduced Gravity

Introduction: The overarching objective of the Integrated Suit Test (IST) series is to evaluate suited human performance using reduced-gravity analogs and learn what aspects of an EVA suit system affect human performance. For this objective to be successfully achieved, the testing methodology should be valid and reproducible, and the partial-gravity simulations must be as accurate and realistic as possible. Objectives: To highlight some of the key lessons learned about partial-gravity analogs and testing methodology, and to suggest considerations for optimizing the effectiveness and quality of results of future tests. Methods: Performance testing of suited and unsuited subjects was undertaken in different reduced-gravity analogs including the Space Vehicle Mockup Facility s Partial Gravity Simulator (POGO), parabolic flight on the C-9 aircraft, underwater environments including NASA s Extreme Environment Mission Operations (NEEMO) and the Neutral Buoyancy Lab (NBL), and in field analogs including Desert Research and Technology Studies (RATS), the Haughton Mars Project (HMP), and the JSC Rock Pile. Subjects performed level walking, incline/decline walking, running, shoveling, picking up and transferring rocks, kneeling/standing, and task boards. Lessons Learned Analogs: No single analog will properly simulate all aspects of the true partial-gravity environment. The POGO is an ideal environment from the standpoint that there are no time limits or significant volumetric constraints, but it does have several limitations. It allows only 2 translational degrees of freedom (DOF) and applies true partial-gravity offload only through the subject s center of gravity (CG). Also, when a subject is doing non-stationary tasks, significant overhead inertia from the lift column seems to have a negative impact on performance. Parabolic flight allows full translational and rotational DOF and applies offload to all parts of the body, but the simulation lasts less than 30 seconds. When this is coupled with the volumetric constraints of the plane, both task selection and data collection options are significantly limited. The underwater environments also allow all 6 DOF and allow off-loading to be applied throughout the body, but the data collection capabilities are limited to little more than subjective ratings. In addition, water drag negatively affects performance of tasks requiring dynamic motion. Field analogs provide the ability to simulate lunar terrain and more realistic mission-like objectives, but all of them operate at 1-g, so suited human performance testing generally must utilize a reduced-mass or "mockup" suit, depending on study objectives. In general, the ground-based overhead-suspension partial-gravity analogs like POGO allow the most diverse data collection methods possible while still simulating partial gravity. However, as currently designed, the POGO has significant limitations. Design of the Active Response Gravity Offload System (ARGOS) has begun and is focusing on adding full x,y,z translational DOF, improved offload accuracy, increased lift capacity, and active control of the x and y axes to minimize offload system inertia. Additionally, a new gimbal is being designed to reduce mass and inertia and to be able to work with different suits, as the current gimbal only supports suited testing with the Mark III Technology Demonstrator Suit (MKIII).

Norcross, Jason R.

Cascade Distiller System Performance Testing Interim Results

The Cascade Distillation System (CDS) is a rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. Based upon the results of the 2009 distillation comparison test (DCT) and recommendations of the expert panel, the Advanced Exploration Systems (AES) Water Recovery Project (WRP) project advanced the technology by increasing reliability of the system through redesign of bearing assemblies and improved rotor dynamics. In addition, the project improved the CDS power efficiency by optimizing the thermoelectric heat pump (TeHP) and heat exchanger design. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell d International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades as compared to previous system performance. The system was challenged with Solution 1 from the NASA Exploration Life Support (ELS) distillation comparison testing performed in 2009. Solution 1 consisted of a mixed stream containing human-generated urine and humidity condensate. A secondary objective of this testing is to evaluate the performance of the CDS as compared to the state of the art Distillation Assembly (DA) used in the ISS Urine Processor Assembly (UPA). This was done by challenging the system with ISS analog waste streams. This paper details the results of the AES WRP CDS performance testing.

Callahan, Michael R.

Performance Testing of the Astro-H Flight Model 3-Stage ADR

The Soft X-ray Spectrometer (SXS) is one of four instruments that will be flown on the Japanese Astro-H satellite, planned for launch in late 2015early 2016. The SXS will perform imaging spectroscopy in the soft x-ray band using a 6x6 array of silicon micro calorimeters operated at 50 mK, cooled by an adiabatic demagnetization refrigerator (ADR). NASAGSFC is providing the detector array and ADR, and Sumitomo Heavy Industries, Inc. is providing the remainder of the cryogenic system (superfluid helium dewar (1.3 K), Stirling cryocoolers and a 4.5 K Joule-Thomson (JT) cryocooler). The ADR is unique in that it is designed to use both the liquid helium and the JT cryocooler as it heat sink. The flight detector and ADR assembly have successfully undergone vibration and performance testing at GSFC, and have now undergone initial performance testing with the flight dewar at Sumitomo Heavy Industries, Inc. in Japan. This presentation summarizes the performance of the flight ADR in both cryogen-based and cryogen-free operating modes.

adiabatic demagnetization refrigerator

SHOOT performance testing

The Superfluid Helium On-Orbit Transfer (SHOOT) Flight Demonstration is a shuttle attached payload designed to demonstrate the technology necessary to resupply liquid helium dewars in space. Many SHOOT components will also have use in other aerospace cryogenic systems. The first of two SHOOT dewar systems has been fabricated. The ground performance testing of this dewar is described. The performance tests include measurements of heat leak, impedances of the two vent lines, heat pulse mass gauging accuracy, and superfluid transfer parameters such as flow rate and efficiency. A laboratory dewar was substituted for the second flight dewar for the transfer tests. These tests enable a precise analytical model of the transfer process to be verified. SHOOT performance is thus quantified, except for components such as the liquid acquisition devices and a phase separator which cannot be verified in one gravity.

Dipirro, M. J.

Performance Testing of Lidar Components Subjected to Space Exposure in Space via MISSE 7 Mission

.The objective of the Materials International Space Station Experiment (MISSE) is to study the performance of novel materials when subjected to the synergistic effects of the harsh space environment for several months. MISSE missions provide an opportunity for developing space qualifiable materials. Several laser and lidar components were sent by NASA Langley Research Center (LaRC) as a part of the MISSE 7 mission. The MISSE 7 module was transported to the international space station (ISS) via STS 129 mission that was launched on Nov 16, 2009. Later, the MISSE 7 module was brought back to the earth via the STS 134 that landed on June 1, 2011. The MISSE 7 module that was subjected to exposure in space environment for more than one and a half year included fiber laser, solid-state laser gain materials, detectors, and semiconductor laser diode. Performance testing of these components is now progressing. In this paper, the current progress on post-flight performance testing of a high-speed photodetector and a balanced receiver is discussed. Preliminary findings show that detector characteristics did not undergo any significant degradation.

Prasad, Narasimha S.

Virtual Shaker Testing: Simulation Technology Improves Vibration Test Performance

In the field of vibration testing, the interaction between the structure being tested and the instrumentation hardware used to perform the test is a critical issue. This is particularly true when testing massive structures (e.g. satellites), because due to physical design and manufacturing limits, the dynamics of the testing facility often couples with the test specimen one in the frequency range of interest. A further issue in this field is the standard use of a closed loop real-time vibration control scheme, which could potentially shift poles and change damping of the aforementioned coupled system. Virtual shaker testing is a novel approach to deal with these issues. It means performing a simulation which closely represents the real vibration test on the specific facility by taking into account all parameters which might impact the dynamic behavior of the specimen. In this paper, such a virtual shaker testing approach is developed. It consists of the following components: (1) Either a physical-based or an equation-based coupled electro-mechanical lumped parameter shaker model is created. The model parameters are obtained from manufacturer's specifications or by carrying out some dedicated experiments; (2) Existing real-time vibration control algorithm are ported to the virtual simulation environment; and (3) A structural model of the test object is created and after defining proper interface conditions structural modes are computed by means of the well-established Craig-Bampton CMS technique. At this stage, a virtual shaker test has been run, by coupling the three described models (shaker, control loop, structure) in a co-simulation routine. Numerical results have eventually been correlated with experimental ones in order to assess the robustness of the proposed methodology.

Ricci, Stefano

Performance Test of Mini LVDT - ELVIS

The Institute for Energy (IFE) Technology has been a pioneer in the development of Linear Variable Differential Transformers (LVDTs) for in-pile testing, deploying over 2,200 units in various reactor environments with less than a 10% failure rate after five years of operation. This report focuses on the performance testing of IFE’s Mini LVDT, a compact sensor ideal for material test reactor experiments. The Mini LVDT, with a limited range of +/- 1.5 mm, offers excellent performance comparable to larger LVDTs, making it valuable in space-constrained applications. The development of an Enhanced Linear Variable Intrinsic Sensor (ELVIS) with internal temperature monitoring capabilities represents a significant advancement, addressing the critical need for real-time, accurate measurements in high-radiation and high-temperature environments. Two ELVIS prototypes were evaluated in terms of both temperature and displacement, showcasing promising results, though challenges with noise during temperature measurements were identified. This report summarizes the rigorous testing performed at Idaho National Laboratory (INL) and highlights the potential applications of Mini LVDTs and ELVIS in nuclear and other high-precision industries.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Performance testing of a solid propellant pulsed plasma microthruster.

Extensive performance testing has been carried out on a solid propellant, pulsed plasma microthruster essentially identical to the four units aboard the DOD, Lincoln Experimental Satellite (LES)-6. Tests include measurements of thrust, specific impulse, thrust vector, impulse bit repeatability, intermittency and endurance. The results show good impulse bit repeatability and a well defined thrust vector. The impulse bit, with a 1.85-joule input, was found to be approximately 26 micronewton-seconds at 190 seconds specific impulse. Based upon the results of the intermittency tests, a better understanding of the intermittency mechanism has been achieved.

Williams, T. E.

Computer assisted performance tests of the Lyman Alpha Coronagraph

Preflight calibration and performance tests of the Lyman Alpha Coronagraph rocket instrument in the laboratory, with the experiment in its flight configuration and illumination levels near those expected during flight were successfully carried out using a pulse code modulation telemetry system simulator interfaced in real time to a PDP 11/10 computer system. Post acquisition data reduction programs developed and implemented on the same computer system aided in the interpretation of test and calibration data.

Parkinson, W. H.

Overview of the new ASME Performance Test Code for wind turbines

The principal technical features of the ASME Performance Test Code for wind turbines are presented and such issues as what sizes and types of wind turbines should be included, what the principal measure of performance should be, and how wind speed should be measured are discussed. It is concluded that the present test code is applicable to wind turbine systems of all sizes. The principal measure of performance as defined by this code is net energy output and the primary performance parameter is the 'test energy ratio' which is based on a comparison between the measured and predicted energy output for the test period.

Spera, David A.

Performance Testing of TRL4-6 LISA Laser System

The Laser Interferometer Space Antenna (LISA) is an ESA-led future mission to measure gravitational waves from astronomical sources in space. LISA has been adopted as a formal mission by ESA in January 2024, and is expected to become a formal project at NASA within 2024. The laser system (LS), which includes four laser heads (LH) each containing a laser optical module (LOM) and laser electronics module (LEM), a frequency reference system (FRS, optical frequency reference) and four power monitor detectors (PMON), is one of the three U.S. contributions to LISA from NASA. The Lasers and Electro-Optics Branch at NASA GSFC has been developing and managing the design of the LISA LS. Currently, the TRL (technology readiness level) of the NASA LISA laser system is transitioning from 4 to 6. TRL 4/5 LISA LOM was sent to ESA in early 2023 and has undergone optical performance testing. [1] By late summer of 2024, NASA plans to deliver the TRL 6 LOM to ESA for performance evaluation. Since the delivery of the TRL4/5 LOM to ESA, we have taken steps to advance the TRL of the overall LS and have also started end-to-end system level testing involving other subsystems. They include 1) optical performance test of TRL6 LOM and TRL 5 LEM under thermal cycling, 2) end-to-end test of the laser head (LH) and the GSE (ground support equipment) FRS, driven by TRL 4 FRS electronics (FRS-E) provided by Ball Aerospace, 3) end-to-end test of the laser head (LH) with the GSE phase meter system (PMS) provided by Albert Einstein Institute, and 4) optical performance test of the LH with the PMON subsystem developed by NASA. The FRS, PMS, and PMON provide necessary frequency stability, relative phase stability between lasers, and output power stability, respectively. Since they are all vital for the sensitive laser interferometry performed in LISA, it is necessary to perform these system level testing by combining the LH and other subsystems, and to prove the optical performance at an early stage during the LS development. Our recent work has successfully demonstrated the intra-connectivity of the LS, as well as critical external interface with the PMS to meet the LISA’s performance requirements. In this talk, we will report on the latest status of the LH testing and system level test. We will also discuss the paths to bring each subsystem to TRL6+ and plans for future system level testing.

LISA

Cassini Stellar Reference Unit: Performance Test Approach and Results

The Cassini Stellar Reference Unit (SRU) is the prime attitude determination sensor on the Cassini spacecraft...To ensure that the SRU will operate within specification for the entire mission, an extensive test program has been undertaken to characterize the SRU performance prior to launch and to quantify any expected performance degradation. Results from several eomplimentary test programs are presented and compared with pre-test performance predictions.

star

Performance test results of a skutterudite-based unicouple with a metallic coating

A performance test of a Skutterudite-based unicouple (MAY-04) with a metallic coating to suppress the sublimation of antimony from the legs near the hot junction is performed in vacuum (~ 9 x10-7 torr) for ~ 2,000 hours at hot and cold junction temperatures of 892.1 + 11.9 K and 316.1 + 5.5 K, respectively. The p-leg is made of CeFe3.5Co0.5Sb12 and the n-leg is made of CoSb3. Presented are the measured voltage-current characteristics, electrical power, open-circuit voltage, and Seebeck coefficients of the legs as functions of cumulative test time. Also presented is the estimate of the conversion efficiency, shortly (~ 96 hrs) after the start of test. To demonstrate the effectiveness of the metallic coating, the measurements for MAY-04 are compared with those of two uncoated unicouples of the same leg materials (MAR-03 and JUN-03), which had been tested earlier. The cross-sectional areas of the legs in MAY-04 are larger than those in MAR-03 and JUN-03, tested in argon cover gas at ~ 0.051-0.068 MPa for 450 and 1200 hours, respectively. The open circuit voltage, Voc (204 mV) of MAY-04 at Beginning-Of-Test (BOT) is almost the same as that of MAR-03, but higher than that of JUN-03 (~180 mV). Although the argon gas effectively decreased antimony loss from legs of MAR-03 and JUN-03, marked degradations in performance occurred with time in these tests. Conversely, the metallic coating in MAY-04 effectively reduced the performance degradation with cumulative test time. The estimated peak efficiency of MAY-04, shortly after BOT (10.65%) is only ~ 0.37 percentage point lower than the theoretical value, assuming zero side heat losses and zero contact resistance per leg. The peak power of MAY- 04 decreased by only ~12%, from its BOT value of ~1.6 We to ~ 1.4 We after ~ 2,000 of cumulative testing

Caillat, Thierry

End-of-Test Performance and Wear Characterization of NASA's Evolutionary Xenon Thruster (NEXT) Long-Duration Test

The NASA's Evolutionary Xenon Thruster (NEXT) program is developing the next-generation solar electric ion propulsion system with significant enhancements beyond the state-of-the-art NASA Solar Electric Propulsion Technology Application Readiness (NSTAR) ion propulsion system to provide future NASA science missions with enhanced capabilities. A Long-Duration Test (LDT) was initiated in June 2005 to validate the thruster service life modeling and to quantify the thruster propellant throughput capability. Testing was recently completed in February 2014, with the thruster accumulating 51,184 hours of operation, processing 918 kg of xenon propellant, and delivering 35.5 MN-s of total impulse.As part of the test termination procedure, a comprehensive performance characterization was performed across the entire NEXT throttle table. This was performed prior to planned repairs of numerous diagnostics that had become inoperable over the course of the test. After completion of these diagnostic repairs in November 2013, a comprehensive end-of-test performance and wear characterization was performed on the test article prior to exposure to atmosphere. These data have confirmed steady thruster performance with minimal degradation as well as mitigation of numerous life limiting mechanisms encountered in the NSTAR design. Component erosion rates compare favorably to pretest predictions based on semi-empirical models used for the thruster service life assessment. Additional data relating to ion beam density profiles, facility backsputter rates, facility backpressure effects on thruster telemetry, and modulation of the neutralizer keeper current are presented as part of the end-of-test characterization. Presently the test article for the NEXT LDT has been exposed to atmosphere and placed within a clean room environment, with post-test disassembly and inspection underway.

wear tests