MEMBRANE PROCESS TO SEQUESTER CO2 FROM POWER PLANT FLUE GAS

The objective of this project was to assess the feasibility of using a membrane process to capture CO2 from coal-fired power plant flue gas. During this program, MTR developed a novel membrane (Polaris™) with a CO2 permeance tenfold higher than commercial CO2-selective membranes used in natural gas treatment. The Polaris™ membrane, combined with a process design that uses a portion of combustion air as a sweep stream to generate driving force for CO2 permeation, meets DOE post-combustion CO2 capture targets. Initial studies indicate a CO2 separation and liquefaction cost of $20 - $30/ton CO2 using about 15% of the plant energy at 90% CO2 capture from a coal-fired power plant. Production of the Polaris™ CO2 capture membrane was scaled up with MTR’s commercial casting and coating equipment. Parametric tests of cross-flow and countercurrent/sweep modules prepared from this membrane confirm their near-ideal performance under expected flue gas operating conditions. Commercial-scale, 8-inch diameter modules also show stable performance in field tests treating raw natural gas. These findings suggest that membranes are a viable option for flue gas CO2 capture. The next step will be to conduct a field demonstration treating a realworld power plant flue gas stream. The first such MTR field test will capture 1 ton CO2/day at Arizona Public Service’s Cholla coal-fired power plant, as part of a new DOE NETL funded program.

03 NATURAL GAS↗

Utility Solar Generation Valuation Methods

Tucson Electric Power (TEP) developed, tested and verified the results of a new and appropriate method for accurately evaluating the capacity credit of time variant solar generating sources and reviewed new methods to appropriately and fairly evaluate the value of solar generation to electric utilities. The project also reviewed general integrated approaches for adequately compensating owners of solar generation for their benefits to utilities. However, given the limited funding support and time duration of this project combined with the significant differences between utilities regarding rate structures, solar resource availability and coincidence of solar generation with peak load periods, it is well beyond the scope of this project to develop specific rate, rebate, and interconnection approaches to capture utility benefits for all possible utilities. The project developed computer software based evaluation method models to compare solar generation production data measured in very short term time increments called Sample Intervals over a typical utility Dispatch Cycle during an Evaluation Period against utility system load data. Ten second resolution generation production data from the SGSSS and actual one minute resolution TEP system load data for 2006 and 2007, along with data from the Pennington Street Garage 60 kW DC capacity solar unit installed in downtown Tucson will be applied to the model for testing and verification of the evaluation method. Data was provided by other utilities, but critical time periods of data were missing making results derived from that data inaccurate. The algorithms are based on previous analysis and review of specific 2005 and 2006 SGSSS production data. The model was built, tested and verified by in house TEP personnel. For this phase of the project, TEP communicated with, shared solar production data with and collaborated on the development of solar generation valuation tools with other utilities, including Arizona Public Service, Salt River Project, Xcel and Nevada Power Company as well as the Arizona electric cooperatives. In the second phase of the project, three years of 10 second power output data of the SGSSS was used to evaluate the effectiveness of frequency domain analysis, normal statistical distribution analysis and finally maximum/minimum differential output analysis to test the applicability of these mathematic methods in accurately modeling the output variations produced by clouds passing over the SGSSS array.

14 SOLAR ENERGY↗

Final Technical Report: Results of Phase 1

Arizona Public Service Company (APS) expects that by 2027, renewable energy will account for 6,590 GWh in energy consumption by its customers. While much of this future energy will come from large centrally-located power plants, distributed renewable energy, sited at the point of end-use will also play an important role in meeting the needs of APS customers and is expected to provide 1,734 GWh. With increasing penetration of residential and commercial photovoltaic (PV) systems at the point of end-use, PV power generation not only offsets the load, but could also cause significant shifts in power flow patterns through the distribution system, and could possibly cause reversal of flow through some branches of a distribution circuit. Significant changes to power flow introduced into existing distribution systems due to the increased amount of PV systems may cause operational issues, including over-voltage on the distribution feeder (loss of voltage regulation) and incorrect operation of control equipment, which may lead to an increase in the number of operations and related equipment wear that could affect equipment reliability and customer power quality. Additionally, connecting generation resources to a distribution feeder can introduce additional sources of short-circuit current to the distribution system. This could potentially result in increased short-circuit currents, potentially reaching damaging levels, causing protection desensitization and a potential loss of protection coordination. These effects may be further compounded by variability of PV production due to shading by clouds. The effects of these phenomena in distributed PV applications are not well understood, and there is a great need to characterize this variability. This project will contribute to understanding the effects of high-penetration solar electricity on the design and operation of distribution systems by demonstrating how a high penetration of PV systems affects grid operations of a working, utility distribution feeder. To address the technical challenges related to the integration of distributed PV when PV penetration levels reach or exceed 30% of the total load, technologies and methods to ensure the stable and safe operation of the feeder will be evaluated. Lessons learned will enable APS to improve the framework for future PV integration on its system and may also aid other utilities across the United States energy sector in accelerating the adoption of distributed photovoltaic generation.

14 SOLAR ENERGY↗

High Penetration of Photovoltaic Generation Study

Arizona Public Service Company (APS) expects that by 2027, renewable energy will account for 6,590 GWh in energy consumption by its customers. While much of this future energy will come from large centrally-located power plants, distributed renewable energy, sited at the point of end-use will also play an important role in meeting the needs of APS customers and is expected to provide 1,734 GWh.

14 SOLAR ENERGY↗

Lithium Ion Cell Development for Photovoltaic Energy Storage Applications

The overall project goal is to reduce the cost of home and neighborhood photovoltaic storage systems by reducing the single largest cost component the energy storage cells. Solar power is accepted as an environmentally advantaged renewable power source. Its deployment in small communities and integrated into the grid, requires a safe, reliable and low cost energy storage system. The incumbent technology of lead acid cells is large, toxic to produce and dispose of, and offer limited life even with significant maintenance. The ideal PV storage battery would have the safety and low cost of lead acid but the performance of lithium ion chemistry. Present lithium ion batteries have the desired performance but cost and safety remain the two key implementation barriers. The purpose of this project is to develop new lithium ion cells that can meet PVES cost and safety requirements using A123Systems phosphate-based cathode chemistries in commercial PHEV cell formats. The cost target is a cell design for a home or neighborhood scale at <$25/kWh. This DOE program is the continuation and expansion of an initial MPSC (Michigan Public Service Commission) program towards this goal. This program further pushes the initial limits of some aspects of the original program even lower cost anode and cathode actives implemented at even higher electrode loadings, and as well explores new avenues of cost reduction via new materials specifically our higher voltage cathode. The challenge in our materials development is to achieve parity in the performance metrics of cycle life and high temperature storage, and to produce quality materials at the production scale. Our new cathode material, M1X, has a higher voltage and so requires electrolyte reformulation to meet the high temperature storage requirements. The challenge of thick electrode systems is to maintain adequate adhesion and cycle life. The composite separator has been proven in systems having standard loading electrodes; the challenge with this material will be to maintain proven performance when this composite is coated onto a thicker electrode; as well the high temperature storage must meet application requirements. One continuing program challenge was the lack of specific performance variables for this PV application and so the low power requirements of PHEV/EV transportation markets were again used.

14 SOLAR ENERGY↗

New Jersey: New Jersey's Clean Energy Resources and Economy [Brochure]

New Jersey’s two currently predominant renewable energy resources are wind and solar, as evidenced by rapid market growth in both areas. As the state carries almost 100,000 megawatts of wind potential on land and offshore—enough to generate all of the current electricity needs of the state—it is no surprise that New Jersey is home to six facilities that manufacture components for wind turbines. Solar photovoltaic growth is also considerable, and at 1,000 megawatts, the state now ranks second in the nation in terms of installed capacity. In large part, this growth has been due to state policies that facilitate solar system installation (such as net metering) and state sales tax and rebate incentives for renewables. The state has committed to generating 22.5% of its electricity from renewable sources by 2021 through its Renewable Energy Portfolio Standard. In 2010, utility companies in New Jersey also invested an impressive $\$$198 million in energy efficiency and recorded savings of 497 million kilowatt hours or enough electricity to power more than 43,000 homes for one year. The utilities’ investment supports four grant programs for energy efficiency offered by New Jersey’s Public Service Electric & Gas Company, as well as a loan program and a rebate program offered by New Jersey Natural Gas.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Membrane Process to Capture CO 2 from Coal-Fired Power Plant Flue Gas

This final report describes work conducted for the U.S. Department of Energy National Energy Technology Laboratory (DOE NETL) on development of an efficient membrane process to capture carbon dioxide (CO 2 ) from power plant flue gas (award number DE-NT0005312). The primary goal of this research program was to demonstrate, in a field test, the ability of a membrane process to capture up to 90% of CO 2 in coal-fired flue gas, and to evaluate the potential of a full-scale version of the process to perform this separation with less than a 35% increase in the levelized cost of electricity (LCOE). Membrane Technology and Research (MTR) conducted this project in collaboration with Arizona Public Services (APS), who hosted a membrane field test at their Cholla coal-fired power plant, and the Electric Power Research Institute (EPRI) and WorleyParsons (WP), who performed a comparative cost analysis of the proposed membrane CO 2 capture process.

20 FOSSIL-FUELED POWER PLANTS↗

Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals

This report presents the results of the research and development conducted on an Advanced Hydrogasification Process (AHP) conceived and developed by Arizona Public Service Company (APS) under U.S. Department of Energy (DOE) contract: DE-FC26-06NT42759 for Substitute Natural Gas (SNG) production from western coal. A double-wall (i.e., a hydrogasification contained within a pressure shell) down-flow hydrogasification reactor was designed, engineered, constructed, commissioned and operated by APS, Phoenix, AZ. The reactor is ASME-certified under Section VIII with a rating of 1150 pounds per square inch gage (psig) maximum allowable working pressure at 1950 degrees Fahrenheit (°F). The reaction zone had a 1.75 inch inner diameter and 13 feet length. The initial testing of a sub-bituminous coal demonstrated ~ 50% carbon conversion and ~10% methane yield in the product gas under 1625°F, 1000 psig pressure, with a 11 seconds (s) residence time, and 0.4 hydrogen-to-coal mass ratio. Liquid by-products mainly contained Benzene, Toluene, Xylene (BTX) and tar. Char collected from the bottom of the reactor had 9000-British thermal units per pound (Btu/lb) heating value. A three-dimensional (3D) computational fluid dynamic model simulation of the hydrodynamics around the reactor head was utilized to design the nozzles for injecting the hydrogen into the gasifier to optimize gas-solid mixing to achieve improved carbon conversion. The report also presents the evaluation of using algae for carbon dioxide (CO 2 ) management and biofuel production. Nannochloropsis, Selenastrum and Scenedesmus were determined to be the best algae strains for the project purpose and were studied in an outdoor system which included a 6-meter (6M) radius cultivator with a total surface area of 113 square meters (m 2 ) and a total culture volume between 10,000 to 15,000 liters (L); a CO 2 on-demand feeding system; an on-line data collection system for temperature, pH, Photosynthetically Activate Radiation (PAR) and dissolved oxygen (DO); and a ~2 gallons per minute (gpm) algae culture dewatering system. Among the three algae strains, Scenedesmus showed the most tolerance to temperature and irradiance conditions in Phoenix and the best self-settling characteristics. Experimental findings and operational strategies determined through these tests guided the operation of the algae cultivation system for the scale-up study. Effect of power plant flue gas, especially heavy metals, on algae growth and biomass adsorption were evaluated as well.

01 COAL, LIGNITE, AND PEAT↗

City of Phoenix - Energize Phoenix Program

Energize Phoenix (EPHX) was designed as an ambitious, large-scale, three-year pilot program to provide energy efficiency upgrades in buildings, along Phoenix’s new Light Rail Corridor – part of a federal effort to reduce energy consumption and stimulate job growth, while simultaneously reducing the country’s carbon footprint and promoting a shift towards a green economy. The program was created through a 2010 competitive grant awarded to the City of Phoenix who managed the program in partnership with Arizona State University (ASU), the state’s largest university, and Arizona Public Service (APS), the state’s largest electricity provider. The U.S. Department of Energy (DOE) Better Buildings Neighborhood Program (BBNP) and the American Recovery and Reinvestment Act (ARRA) of 2009 provided $25M in funding for the EPHX program. The Light Rail Corridor runs through the heart of downtown Phoenix, making most high-rise and smaller commercial buildings eligible to participate in the EPHX program, along with a diverse mix of single and multi-family residential buildings. To ensure maximum impact and deeper market penetration, Energize Phoenix was subdivided into three unique parts: i. commercial rebate program, ii. commercial financing program, and iii. residential program Each component was managed by the City of Phoenix in partnership with APS. Phoenix was fortunate to partner with APS, which already operated robust commercial and residential rebate programs within its service territory. Phoenix tapped into the existing utility contractor network, provided specific training to over 100 contracting firms, and leveraged the APS rebate program structure (energy efficiency funding) to launch the EPHX commercial and residential rebate programs. The commercial finance program was coordinated and managed through a contract with National Bank of Arizona, NBAZ, which also provided project capital leveraging EPHX finance funds. Working in unison, approved contractors jointly produced more than 161,000 labor hours in pursuit of EPHX goals over the life of the project. Labor hours were spread among electricians, heating, ventilating and air-conditioning (HVAC) technicians, marketing professionals, engineers, sales, and administrative support staff across the approved contractor workforce. Program participants received both the utility rebate along with the EPHX rebate, and depending on project size and utility rebate structure some projects resulted in low to no-cost upgrades for customers. Phoenix also partnered with ASU, a grant sub-recipient, to leverage the institution’s expertise in research and data analysis. In this partnership, ASU accepted marketing responsibilities for the grant and partnered with DRA Communications (DRA), a Phoenix-based marketing firm, to create and communicate the message out to the marketplace. The EPHX program has completed its energy upgrade activities. A review of the work completed by ASU revealed that the EPHX program substantially exceeded the program’s stated goals by retrofitting/upgrading over 33 million sq ft of commercial space (30 million sq ft goal exceeded by 11%) and 2,014 residential units (1,700 unit goal exceeded by 18%) along the Light Rail Corridor. The program helped stimulate economic growth by adding $31million to the local economy and enhanced an already robust energy efficiency contractor network. This contractor network will continue to promote utility energy incentives to sustain energy efficiency upgrade activities in the future. Finally, EPHX helped reduce participants annual energy consumption by 135 million kilowatt-hour (kWh) translating into over $12.5 million of annual energy cost avoidance for the community. This also resulted in projected payback period of 4.5 years for total investment by all parties and reduced greenhouse gas emissions by over 95,000 metric tons of carbon dioxide equivalent (CO2e).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrating Solar PV in Utility System Operations

This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, and day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.

14 SOLAR ENERGY↗

Systematic Approach to Better Understanding Integration Costs

This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

2015 Summary Report on Industrial and Regulatory Engagement Activities

The Advanced Instrumentation, Information, and Control (II&C) Systems Technologies pathway of the Light Water Reactor Sustainability(LWRS) Program conducts a vigorous engagement strategy with the U.S. nuclear power industry, including the nuclear operating companies, major support organizations, the Nuclear Regulatory Commission (NRC), and suppliers. The goal of this engagement strategy is to develop a shared vision and common understanding across the nuclear industry of the need for II&C modernization, the performance improvement that can be obtained, and the opportunities for collaboration to enact this vision. The primary means of engaging the nuclear operating companies is through a Utility Working Group (UWG), composed of utility representatives that participate in formal meetings and bi-monthly phone calls to provide input on nuclear plant needs and priorities for II&C technologies. Two working groups were initiated during FY 2015 to provide a means for UWG members to focus on particular technologies of interest. The Outage Improvement Working Group consists of eight utilities that participate in periodic conference calls and have access to a share-point web page for acccess to project materials developed in the Advanced Outage Control Center pilot project. In the area of computer-based procedures and automated work packages, the II&C Pathway has worked with the Nuclear Information Technology Strategic Leadership (NITSL) to set up a monthly conference call with interested utility members to discuss various aspects of mobile worker technologies. Twenty one technical and project reports were delivered to the UWG during FY 2015, reflecting the work of the II&C Pathway pilot projects during the year. Distribution of these reports is one of the primary means of transferring to the nuclear industry the knowledge and experience gained during the development of advanced II&C technologies in support of LWR sustainability. Site visits to discuss pilot project activities and future plans were made to Arizona Public Service, Exelon, Duke Energy, Pacific Gas & Electric, SCANA, Southern Nuclear, South Texas Project, STARS Alliance, Tennessee Valley Authority, and Xcel. Discussions were also held on the pathway goals and activities with major industry support organizations during FY 2102, including the Institute of Nuclear Power Operations (INPO), the Nuclear Information Technology Strategic Leadership (NITSL), the Nuclear Energy Institute (NEI), and the Electric Power Research Institute. The Advanced II&C Pathway work was presented at five major industry conferences and Informal discussions were held with key NRC managers at industry conferences. In addition, discussions were held with NRC senior managers on digital regulatory issues through participation on the NEI Digital I&C Working Group. Meetings were held with major industry suppliers and consultants, to explore opportunities for collaboration and to provide a means of pilot project technology transfer. In the international area, discussions were held with Electricite’ de France (EdF) concerning possible collaboration in the area NPP configuration control using intelligent wireless devices.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Seamless Digital Environment – Data Analytics Use Case Study

Multiple research efforts in the U.S Department of Energy Light Water Reactor Sustainability (LWRS) Program studies the need and design of an underlying architecture to support the increased amount and use of data in the nuclear power plant. More specifically the three LWRS research efforts; Digital Architecture for an Automated Plant, Automated Work Packages, Computer-Based Procedures for Field Workers, and the Online Monitoring efforts all have identified the need for a digital architecture and more importantly the need for a Seamless Digital Environment (SDE). A SDE provides a mean to access multiple applications, gather the data points needed, conduct the analysis requested, and present the result to the user with minimal or no effort by the user. During the 2016 annual Nuclear Information Technology Strategic Leadership (NITSL) group meeting the nuclear utilities identified the need for research focused on data analytics. The effort was to develop and evaluate use cases for data mining and analytics for employing information from plant sensors and database for use in developing improved business analytics. The goal of the study is to research potential approaches to building an analytics solution for equipment reliability, on a small scale, focusing on either a single piece of equipment or a single system. The analytics solution will likely consist of a data integration layer, predictive and machine learning layer and the user interface layer that will display the output of the analysis in a straight forward, easy to consume manner. This report describes the use case study initiated by NITSL and conducted in a collaboration between Idaho National Laboratory, Arizona Public Service – Palo Verde Nuclear Generating Station, and NextAxiom Inc.

97 MATHEMATICS AND COMPUTING↗

A Public-Private-Acadmic Partnership to Advance Solar Power Forecasting

The National Center for Atmospheric Research (NCAR) is pleased to have led a partnership to advance the state-of-the-science of solar power forecasting by designing, developing, building, deploying, testing, and assessing the SunCast™ Solar Power Forecasting System. The project has included cutting edge research, testing in several geographically- and climatologically-diverse high penetration solar utilities and Independent System Operators (ISOs), and wide dissemination of the research results to raise the bar on solar power forecasting technology. The partners include three other national laboratories, six universities, and industry partners. This public-private-academic team has worked in concert to perform use-inspired research to advance solar power forecasting through cutting-edge research to advance both the necessary forecasting technologies and the metrics for evaluating them. The project has culminated in a year-long, full-scale demonstration of provide irradiance and power forecasts to utilities and ISOs to use in their operations. The project focused on providing elements of a value chain, beginning with the weather that causes a deviation from clear sky irradiance and progresses through monitoring and observations, modeling, forecasting, dissemination and communication of the forecasts, interpretation of the forecast, and through decision-making, which produces outcomes that have an economic value. The system has been evaluated using metrics developed specifically for this project, which has provided rich information on model and system performance. Research was accomplished on the very short range (0-6 hours) Nowcasting system as well as on the longer term (6-72 hour) forecasting system. The shortest range forecasts are based on observations in the field. The shortest range system, built by Brookhaven National Laboratory (BNL) and based on Total Sky Imagers (TSIs) is TSICast, which operates on the shortest time scale with a latency of only a few minutes and forecasts that currently go out to about 15 min. This project has facilitated research in improving the hardware and software so that the new high definition cameras deployed at multiple nearby locations allow discernment of the clouds at varying levels and advection according to the winds observed at those levels. Improvements over “smart persistence” are about 29% for even these very short forecasts. StatCast is based on pyranometer data measured at the site as well as concurrent meteorological observations and forecasts. StatCast is based on regime-dependent artificial intelligence forecasting techniques and has been shown to improve on “smart persistence” forecasts by 15-50%. A second category of short-range forecasting systems employ satellite imagery and use that information to discern clouds and their motion, allowing them to project the clouds, and the resulting blockage of irradiance, in time. CIRACast (the system produced by the Cooperative Institute for Atmospheric Research [CIRA] at Colorado State University) was already one of the more advanced cloud motion systems, which is the reason that team was brought to this project. During the project timeframe, the CIRA team was able to advance cloud shadowing, parallax removal, and implementation of better advecting winds at different altitudes. CIRACast shows generally a 25-40% improvement over Smart Persistence between sunrise and approximately 1600 UTC (Coordinated Universal Time) . A second satellite-based system, MADCast (Multi-sensor Advective Diffusive foreCast system), assimilates data from multiple satellite imagers and profilers to assimilate a fully three-dimensional picture of the cloud into the dynamic core of WRF. During 2015, MADCast (provided at least 70% improvement over Smart Persistence, with most of that skill being derived during partly cloudy conditions. That allows advection of the clouds via the Weather Research and Forecasting (WRF) model dynamics directly. After WRF-Solar™ showed initial success, it was also deployed in nowcasting mode with coarser runs out to 6 hours made hourly. It provided improvements on the order of 50-60% over Smart Persistence for forecasts up to 1600 UTC. The advantages of WRF-Solar-Nowcasting and MADCast were then blended to develop the new MAD-WRF model that incorporates the most important features of each of those models, both assimilating satellite cloud fields and using WRF-So far physics to develop and dissipate clouds. MAE improvements for MAD-WRF for forecasts from 3-6 hours are improved over WRF-Solar-Now by 20%. While all the Nowcasting system components by themselves provide improvement over Smart Persistence, the largest benefit is derived when they are smartly blended together by the Nowcasting Integrator to produce an integrated forecast. The development of WRF-Solar™ under this project has provided the first numerical weather prediction (NWP) model specifically designed to meet the needs of irradiance forecasting. The first augmentation improved the solar tracking algorithm to account for deviations associated with the eccentricity of the Earth’s orbit and the obliquity of the Earth. Second, WRF-Solar™ added the direct normal irradiance (DNI) and diffuse (DIF) components from the radiation parameterization to the model output. Third, efficient parameterizations were implemented to either interpolate the irradiance in between calls to the expensive radiative transfer parameterization, or to use a fast radiative transfer code that avoids computing three-dimensional heating rates but provides the surface irradiance. Fourth, a new parameterization was developed to improve the representation of absorption and scattering of radiation by aerosols (aerosol direct effect). A fifth advance is that the aerosols now interact with the cloud microphysics, altering the cloud evolution and radiative properties, an effect that has been traditionally only implemented in atmospheric computationally costly chemistry models. A sixth development accounts for the feedbacks that sub-grid scale clouds produce in shortwave irradiance as implemented in a shallow cumulus parameterization Finally, WRF-Solar™ also allows assimilation of infrared irradiances from satellites to determine the three dimensional cloud field, allowing for an improved initialization of the cloud field that increases the performance of short-range forecasts. We find that WRF-Solar™ can improve clear sky irradiance prediction by 15-80% over a standard version of WRF, depending on location and cloud conditions. In a formal comparison to the NAM baseline, WRF-Solar™ showed improvements in the Day-Ahead forecast of 22-42%. The SunCast™ system requires substantial software engineering to blend all of the new model components as well as existing publically available NWP model runs. To do this we use an expert system for the Nowcasting blender and the Dynamic Integrated foreCast (DICast®) system for the NWP models. These two systems are then blended, we use an empirical power conversion method to convert the irradiance predictions to power, then apply an analog ensemble (AnEn) approach to further tune the forecast as well as to estimate its uncertainty. The AnEn module decreased RMSE (root mean squared error) by 17% over the blended SunCast™ power forecasts and provided skill in the probabilistic forecast with a Brier Skill Score of 0.55. In addition, we have also developed a Gridded Atmospheric Forecast System (GRAFS) in parallel, leveraging cost share funds. An economic evaluation based on Production Cost Modeling in the Public Service Company of Colorado showed that the observed 50% improvement in forecast accuracy will save their customers $819,200 with the projected MW deployment for 2024. Using econometrics, NCAR has scaled this savings to a national level and shown that an annual expected savings for this 50% forecast error reduction ranges from $11M in 2015 to $43M expected in 2040 with increased solar deployment. This amounts to a $455M discounted savings over the 26 year period of analysis.

14 SOLAR ENERGY↗

Dispatchable Solar Power Plant Project

As penetration of intermittent renewable power increases, grid operators must manage greater variability in the supply and demand on the grid. One result is that utilities are planning to build many new natural gas peaking power plants that provide added flexibility needed for grid management. This report discusses the development of a dispatchable solar power (DSP) plant that can be used in place of natural gas peakers. Specifically, a new molten-salt tower (MST) plant has been developed that is designed to allow much more flexible operation than typically considered in concentrating solar power plants. As a result, this plant can provide most of the capacity and ancillary benefits of a conventional natural gas peaker plant but without the carbon emissions. The DSP system presented was designed to meet the specific needs of the Arizona Public Service (APS) utility 2017 peaking capacity request for proposals (RFP). The goal of the effort was to design a MST peaker plant that had the operational capabilities required to meet the peaking requirements of the utility and be cost competitive with the natural gas alternative. The effort also addresses many perceived barriers facing the commercial deployment of MST technology in the US today. These include MST project development issues such as permitting, avian impacts, visual impacts of tower CSP projects, project schedule, and water consumption. The DSP plant design is based on considerable analyses using sophisticated solar system design tools and in-depth preliminary engineering design. The resulting DSP plant design uses a 250 MW steam power cycle, with solar field designed to fit on a square mile plot of land that has a design point thermal rating of 400 MWt. The DSP plant has an annual capacity factor of about 16% tailored to deliver greater than 90% capacity during the critical Arizona summer afternoon peak. The table below compares the All-In energy cost and capacity payment of conventional combustion turbines to DSP plants. These results estimate that the cost of the DSP plant is about 10% higher than a similarly-sized and operated frame combustion turbine and slightly cheaper than an aero derivative combustion turbine when APS reference fuel and emissions costs are included. The DSP plant cost is based on a single, first-of-a-kind plant, and it is likely that subsequent plants would be less expensive.

14 SOLAR ENERGY↗

Community Solar Value Project

The Community Solar Value Project (CSVP) is designed to assist electric utilities in designing better community solar programs. Better programs seek new sources of value to promote “win-win” solutions between utilities and their customers. The CSVP focused on five “challenge areas” in identifying new sources of value: - Strategic solar design for community solar projects (including technology choices, siting, orientation, and related issues) - Market research and targeted marketing approaches (for program design and for customer recruitment) - Procurement and financing (for establishing best practices that can bring economies of scale and economies of expertise) - Integration of “companion measures” (such as storage and demand-response options that can benefit customer and utility net load shapes) - Pricing in program design (including best practices for integration of identified value in program prices or credits) The CSVP directly engaged the Sacramento Municipal Utility District (SMUD), the Public Service Company of New Mexico (PNM), and more than a dozen other utilities to develop improved community solar program designs. The outcomes include a plan at SMUD for over 100 MW or more of community and shared solar and support for new or expanded programs at 15 other utilities so far. Resulting best-practice solutions have not only informed program applications, but also have generated discussion among experts and industry associations about the new opportunities and challenges CSVP has brought forth. In these ways, the CSVP has impacted community solar programs and DER plans, competitive innovations and policies nationwide. The CSVP team has been led by Extensible Energy under John Powers, President and CEO. Jill Cliburn, of Santa Fe, NM-based Cliburn and Associates, has served as Principal Investigator. The team also benefitted from expertise from Navigant, Olivine Inc. and Millennium Energy, LLC, in addition to the collaborative and cost-sharing contributions of its utility partners. The CSVP team participated fully in the Solar Market Pathways Program, which was initiated under the U.S. Department of Energy SunShot program and reports to the U.S. Department of Energy Solar Energy Technologies Office. This report summarizes a multi-disciplinary project that took place over 33 months from January, 2015 through September, 2017.

14 SOLAR ENERGY↗

Final Technical Report DE-EE0006911 Vermont Solar Pathways

Solar PV is the fastest-growing form of energy in Vermont. From 2012 to 2017, Vermont’s solar energy capacity increased almost nine times to 227 MW, a compound annual growth rate of 54%. During this time, the portion of electricity from solar grew from 0.5% to 5%. The state is one of the national leaders in net metering, community solar, and solar jobs per capita. In 2011, the Vermont Comprehensive Energy Plan set a goal to have renewable energy supply 90% of the state’s total energy needs (including electricity, heating and cooling, and transportation) by 2050. The Department of Public Service completed a Total Energy Study to examine the feasibility and cost-effectiveness of various paths to the 90% goal and related emissions goals. The General Assembly created a Renewable Portfolio Standard (RPS) that includes credit for projects—such as electric vehicles and modern wood heating—that switch end uses away from fossil fuel, making the RPS essentially a total energy portfolio standard. Achieving the state’s energy goals will require major contributions from distributed resources and the development of supporting infrastructure such as energy storage, electric vehicle charging stations, and upgraded distribution systems. The Vermont Solar Pathways project used scenario modeling and stakeholder engagement to create a broadly supported plan to get 20% of the state’s electricity from solar by 2025. Scenario modeling provided numbers and graphs for examining issues, costs, and benefits, and spurred discussions at the 11 stakeholder meetings held over the course of the project. Stakeholders provided feedback to improve the model and made suggestions for variations on the scenarios.

14 SOLAR ENERGY↗

Final Report for the Advanced Outage Control Center Dashboard with Predictive Tools

The “Advanced Outage Control Center” (AOCC) pilot project was part of the Light Water Reactor Sustainability (LWRS) program and was a multi-year effort targeted at NPP outage improvement. The primary purpose of this pilot project was to improve management of NPP outages through the development of AOCC features and facilities designed specifically to maximize the usefulness of communication and collaboration technologies for outage coordination and problem resolution activities. Later stages of the project focused more on tools that utilize technology to improve the outage manager’s understanding of the true outage status. The primary tool that resulted from this research was an innovative outage information dashboard with built-in data analysis and predictive capabilities. In its present form, the dashboard specifically takes advantage of visualization techniques that allow users to view and understand the status of the outage at a glance, without the need to drill down to find detail information. The dashboard also incorporates historical performance data to help evaluate current performance. The key innovation in this dashboard concept is not only its ability to avoid the complexity of raw data presentation, but also to predict the completion of the current outage using data analysis of the current schedule and historical performance of the plant. Through the LWRS program, a relationship between Idaho National Laboratory and Arizona Public Service (APS) was established to investigate the application of specialized techniques to analyze and visualize complex outage information. APS has supported efforts to implement advanced methods to improve the management of outages at the three units of the Palo Verde Nuclear Generating Station (PVNGS). The project has produced the basic principles and methodology for the development of sophisticated outage information analysis and presentation tools.