SEARCH · Engineering Papers
Results for “PROJECT”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Maximal quantum mechanical symmetry: Projective representations of the inhomogeneous symplectic group
A symmetry in quantum mechanics is described by the projective representations of a Lie symmetry group that transforms between physical quantum states such that the square of the modulus of the states is invariant. The Heisenberg commutation relations that are fundamental to quantum mechanics must be valid in all of these physical states. This paper shows that the maximal quantum symmetry group, whose projective representations preserve the Heisenberg commutation relations in this manner, is the inhomogeneous symplectic group. The projective representations are equivalent to the unitary representations of the central extension of the inhomogeneous symplectic group. This centrally extended group is the semidirect product of the cover of the symplectic group and the Weyl-Heisenberg group. Its unitary irreducible representations are computed explicitly using the Mackey representation theorems for semidirect product groups.
Terrestrial laser scanning data (Levels 0 and 1) from Urban Biogeochemistry Pilot Project sites, Knoxville, Tennessee, Jul 2024 - Jul 2025
This data package contains data from terrestrial laser scanning (TLS) at five urban park sites in Knoxville, Tennessee, USA. All parks include open-grown and/or closed-canopy trees and mixed nearby land use. These study sites were established as part of the Urban Biogeochemistry Pilot Project, which has an overall goal of better understanding how hydrobiogeochemical cycling is altered within the human environment. These five sites represent a gradient of urbanization, and were instrumented to understand hydrological and biogeochemical cycling (e.g., soil moisture, soil physical properties and biogeochemistry, tree transpiration, species type). The TLS data archived here were collected to provide detailed, three-dimensional information about forest structure. Specifically, data were collected to allow tree- and stand-level characterization of woody structure and leaf area. TLS scans were placed to capture the area around trees with sap flow sensors, and as much of a 50 m radius area around the meteorological station as possible given site property limits. Derived products will allow upscaling of water content and transpiration data. This data package contains the following data: - High-level files document further details of the campaign and data package: 1_CampaignSummary.csv provides details about the campaign and study site, 2_ScanAreasDetail.csv provides details about each separate scan area (groups of scans post-processed into a single point cloud), 3_TerrestrialLidarSensor.csv provides further technical details about the Riegl VZ-400i TLS sensor, TLS_CSV_dd.csv is a CSV Data Dictionary providing information about the fields in CSV files following the ESS-DIVE CSV File Formatting Guidelines Reporting Format, TLS_flmd.csv is a File Level Metadata file providing information about each file in the data package following the ESS-DIVE File Level Metadata Reporting Format, and README.txt is a text file describing the overall project and file structure. - Level 0 data are the raw data (.PROJ folders) as recorded by the Riegl VZ-400i TLS instrument before scan co-registration and post-processing with the Riegl's proprietary RiSCAN PRO software, which requires a license. - Level 1 data contain post-processed, co-registered data from each scan area. The "PointClouds" folder for each scan area contains a .las file with 1 cm resolution point cloud data exported from RiSCAN PRO. These are the main files likely to be of interest to most users and can be further processed with any software capable of manipulating .las files (e.g. Python, R CloudCompare). The "Project Information" folder contains log files from post-processing in RiSCAN PRO that may be of interest to users who want to see detailed records of post-processing, including all PDF reports generated by RiSCAN PRO. The "ScanPositions" folder contains information about the final position of all TLS scans, after post-processing, in multiple formats. The file ScanPositions_*.csv provides final geo-referenced scan positions, and the file SOP_backup_*.csv can be used in RiSCAN PRO to restore the co-registered scan positions if users wish to re-process raw data (Level 0 .PROJ folders) with RiSCAN PRO software (e.g., subsample to a different resolution, exclude a certain scan position, or apply different filters on reflectance or deviation values) without redoing time-consuming co-registration steps.
Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership
Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.
Small Hydro Reference Model Project (Final Project Report)
Small hydropower has long been developed in the United States, but still thousands of small hydro sites remain untapped. Most of them are technically and environmentally feasible but may not be cost-effective to develop at the current level of technology and carbon and fuel markets. This report aims to identify the cost drivers for small hydro generation through cost analyses, and to improve understanding of the pathways for cost reduction and the strategies for accelerating small hydro development in the United States. Reference to the empirical cost equations in literature, an initial capital cost (ICC) equation for nonpowered dam (NPD) and conduit projects has been preliminarily developed using limited project cost data collected from the Federal Energy Regulatory Commission (FERC) e-library and directly from industrial contacts. The regression analysis shows a correlation between the project ICC and plant capacity and head. The electro-mechanical equipment costs for Francis, axial flow, Kaplan, and propeller turbines are derived from the historical budget prices of a small hydro turbine manufacturer. These cost curves show the turbine-generator cost is also associated with the plant capacity and net head. In addition, the initial cost breakdowns are analyzed based on project cost data from literature and industry. It was found that the turbine-generator and the powerhouse are often the major cost components for low-head projects, whereas water conveyance is likely to be the key cost driver for high-head projects. The ICC variations for different site features, such as new greenfield sites vs. non-powered dams, are also discussed.
Licensing Modernization Project for Advanced Reactor Technologies: FY 2018 Project Status Report
The promise of new nuclear technology and the future of commercial power in the United States (U.S.) are linked to the existence of an efficient and safety-focused regulatory review and licensing process. With an appropriate regulatory framework, reactor suppliers and regulators can design, license, build, and export advanced reactor units more effectively and efficiently and thereby help meet the growing need for clean and reliable energy. To help address the challenge of maintaining compatibility between the regulatory environment and new commercial nuclear plant designs, the U.S. Department of Energy (DOE) is supporting an industry-led effort called the Licensing Modernization Project (LMP). This cost-shared initiative, started in 2016 and scheduled to continue through mid-2019, targets amendment to key elements of the U.S. nuclear power reactor regulatory framework to specifically address licensing barriers in advanced-reactor concepts. The project is focused on updating guidance for certain technical licensing requirements that are largely incompatible with non-light-water reactors (non-LWR) and establish a new pathway for design-safety evaluations and license-application development. Upon completion, the project will have created a new pathway, founded on modern probabilistic assessment techniques, that offers developers, suppliers, regulators, and owner/operatorowner-operators greater clarity and assurance in design and licensing decisions. The LMP employs a team of advanced reactor technology and licensing subject matter experts working closely with U.S. regulators, affected industries, and interested members of the public. The project is managed by Southern Company and supported through a cost share arrangement with DOE. Technical contributions are also provided to the project from the Idaho National Laboratory (INL) Regulatory Development area, the Nuclear Energy Institute (NEI), and the U.S. Nuclear Regulatory Commission (NRC). The LMP identified a suite of high priority issues that provided significant uncertainty within the regulated non-LWR community. It was determined that much of this uncertainty could be retired by issuing updated licensing guidance founded on safety performance demonstrations and modern probabilistic methodologies. The success criteria for the project were established as: • Generate sets of technology inclusive (TI), risk-informed, and performance-based (TI-RIPB) technical requirements, recommendations, and proposals that could be reviewed, amended, and adopted for use by both NRC staff and industry. The proposals would create an optional-use regulatory framework without imposing additional (i.e., mandatory) requirements. • Support LMP the recommended updates of LMP such that they can be finalized, endorsed by NRC, and used by applicants within 5 years. This also supports the DOE advanced- reactor development and deployment goal of completing licensing reviews for technically mature non-LWR concepts sufficient to allow construction to proceed by the early 2030’s. • Further overall programmatic objectives established by DOE’s Gateway for Accelerated Innovation in Nuclear (GAIN) initiative by resolving technology-inclusive policy issues that adversely impact regulatory reviews, siting, permitting, and/or licensing of non-LWRs. This would provide significantly more regulatory certainty for advanced reactor developers.
PF-4 Seismic Performance Reassessment, Los Alamos National Laboratory, Project Charter and Integrated Project Team
This report presents the charter of the Integrated Project Team for conducting the PF-4 Seismic Performance Reassessment (P-SPRa) Project. The overall objective of the project is to compute the seismic performance of the PF-4 structure. The credited safety feature of the structure is to provide tertiary confinement of hazardous materials. This document highlights major tasks to be performed as part of the project. It includes a project schedule and a work breakdown structure dictionary. It also includes roles and responsibilities for key project personnel.
Expansion of Michigan EOR Operations Using Advanced Amine Technology at a 600 MW Project Wolverine Carbon Capture and Storage Project
Wolverine Power Supply Cooperative Inc, a member owned cooperative utility based in Cadillac Michigan, proposes to demonstrate the capture, beneficial utilization and storage of CO{sub 2} in the expansion of existing Enhanced Oil Recovery operations. This project is being proposed in response to the US Department of Energy Solicitation DE-FOA-0000015 Section III D, 'Large Scale Industrial CCS projects from Industrial Sources' Technology Area 1. The project will remove 1,000 metric tons per day of CO{sub 2} from the Wolverine Clean Energy Venture 600 MW CFB power plant owned and operated by WPC. CO{sub 2} from the flue gas will be captured using Hitachi's CO{sub 2} capture system and advanced amine technology. The capture system with the advanced amine-based solvent supplied by Hitachi is expected to significantly reduce the cost and energy requirements of CO{sub 2} capture compared to current technologies. The captured CO{sub 2} will be compressed and transported for Enhanced Oil Recovery and CO{sub 2} storage purposes. Enhanced Oil Recovery is a proven concept, widely used to recover otherwise inaccessible petroleum reserves. While post-combustion CO{sub 2} capture technologies have been tested at the pilot scale on coal power plant flue gas, they have not yet been demonstrated at a commercial scale and integrated with EOR and storage operations. Amine-based CO{sub 2} capture is the leading technology expected to be available commercially within this decade to enable CCS for utility and industrial facilities firing coal and waste fuels such as petroleum coke. However, traditional CO{sub 2} capture process utilizing commercial amine solvents is very energy intensive for regeneration and is also susceptible to solvent degradation by oxygen as well as SOx and NO{sub 2} in the flue gas, resulting in large operating costs. The large volume of combustion flue gas with its low CO{sub 2} concentration requires large equipment sizes, which together with the highly corrosive nature of the typical amine-based separation process leads to high plant capital investment. According to recent DOE-NETL studies, MEA-based CCS will increase the cost of electricity of a new pulverized coal plant by 80-85% and reduce the net plant efficiency by about 30%. Non-power industrial facilities will incur similar production output and efficiency penalties when implementing conventional carbon capture systems. The proposed large scale demonstration project combining advanced amine CO{sub 2} capture integrated with commercial EOR operations significantly advances post-combustion technology development toward the DOE objectives of reducing the cost of energy production and improving the efficiency of CO{sub 2} Capture technologies. WPC has assembled a strong multidisciplinary team to meet the objectives of this project. WPC will provide the host site and Hitachi will provide the carbon capture technology and advanced solvent. Burns and Roe bring expertise in overall engineering integration and plant design to the team. Core Energy, an active EOR producer/operator in the State of Michigan, is committed to support the detailed design, construction and operation of the CO{sub 2} pipeline and storage component of the project. This team has developed a Front End Engineering Design and Cost Estimate as part of Phase 1 of DOE Award DE-FE0002477.
CMIP6-based Multi-model Hydropower Projection over the Conterminous US, Version 1.1
This dataset presents a suite of hydropower projections for the conterminous United States (CONUS), derived from multiple downscaled and bias-corrected Global Climate Models (GCMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). The CMIP6 GCMs are downscaled using either statistical (DBCCA) or dynamical (RegCM) approaches, based on two meteorological reference datasets (Daymet and Livneh). The resulting downscaled precipitation, temperature, and wind speed data are then used to drive two calibrated hydrologic models (VIC and PRMS), enabling simulations of projected future hydrologic responses across the CONUS. Simulated total runoff is subsequently employed to drive two hydropower models (WMP, now implemented as mosartwmpy-power, and WRES) to evaluate how climate change may affect future hydropower production for both federal and non-federal hydropower fleets. This dataset was developed to support the SECURE Water Act Section 9505 Assessment for the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO). For further details, see Broman et al. (2024), Thurber et al. (2024), Kao et al. (2022), and Zhou et al. (2023).
The Astropy Project: Sustaining and Growing a Community-oriented Open-source Project and the Latest Major Release (v5.0) of the Core Package
The Astropy Project supports and fosters the development of open-source and openly developed Python packages that provide commonly needed functionality to the astronomical community. A key element of the Astropy Project is the core package astropy, which serves as the foundation for more specialized projects and packages. In this article, we summarize key features in the core package as of the recent major release, version 5.0, and provide major updates on the Project. We then discuss supporting a broader ecosystem of interoperable packages, including connections with several astronomical observatories and missions. We also revisit the future outlook of the Astropy Project and the current status of Learn Astropy. We conclude by raising and discussing the current and future challenges facing the Project.
E2C Successful Project Implementation Cohort: Overview of Solar, Microgrid and Resilience Project Development [Slides]
The Energy to Communities (E2C) peer-learning cohort program provides technical assistance to groups of 15 community entities around a common energy topic over the course of 6 months. Every month, participants join a virtual meeting where they hear from experts and exchange strategies and best practices with their peers. This cohort, "Successful Energy Project Implementation" will explore common challenges in implementing energy projects and learn strategies to turn project plans into reality. Each participant will focus on a local energy project or priority as a cornerstone for their learning throughout the series. This presentation overviews the basics of developing solar, microgrid and resilience projects with emphasis on understanding the project development process.
Flat-plate solar array project. Volume 8: Project analysis and integration
Project Analysis and Integration (PA&I) performed planning and integration activities to support management of the various Flat-Plate Solar Array (FSA) Project R&D activities. Technical and economic goals were established by PA&I for each R&D task within the project to coordinate the thrust toward the National Photovoltaic Program goals. A sophisticated computer modeling capability was developed to assess technical progress toward meeting the economic goals. These models included a manufacturing facility simulation, a photovoltaic power station simulation and a decision aid model incorporating uncertainty. This family of analysis tools was used to track the progress of the technology and to explore the effects of alternative technical paths. Numerous studies conducted by PA&I signaled the achievement of milestones or were the foundation of major FSA project and national program decisions. The most important PA&I activities during the project history are summarized. The PA&I planning function is discussed and how it relates to project direction and important analytical models developed by PA&I for its analytical and assessment activities are reviewed.
Project Assessment Framework through Design (PAFTD) - A Project Assessment Framework in Support of Strategic Decision Making
Research and development organizations that push the innovation edge of technology frequently encounter challenges when attempting to identify an investment strategy and to accurately forecast the cost and schedule performance of selected projects. Fast moving and complex environments require managers to quickly analyze and diagnose the value of returns on investment versus allocated resources. Our Project Assessment Framework through Design (PAFTD) tool facilitates decision making for NASA senior leadership to enable more strategic and consistent technology development investment analysis, beginning at implementation and continuing through the project life cycle. The framework takes an integrated approach by leveraging design principles of useability, feasibility, and viability and aligns them with methods employed by NASA's Independent Program Assessment Office for project performance assessment. The need exists to periodically revisit the justification and prioritization of technology development investments as changes occur over project life cycles. The framework informs management rapidly and comprehensively about diagnosed internal and external root causes of project performance.
The 100-C-7 Remediation Project. An Overview of One of DOE's Largest Remediation Projects - 13260
The U.S. Department of Energy Richland Operations Office (RL), U.S. Environmental Protection Agency (EPA) and Washington Closure Hanford LLC (WCH) completed remediation of one of the largest waste sites in the U.S. Department of Energy complex. The waste site, 100-C-7, covers approximately 15 football fields and was excavated to a depth of 85 feet (groundwater). The project team removed a total of 2.3 million tons of clean and contaminated soil, concrete debris, and scrap metal. 100-C-7 lies in Hanford's 100 B/C Area, home to historic B and C Reactors. The waste site was excavated in two parts as 100-C-7 and 100-C-7:1. The pair of excavations appear like pit mines. Mining engineers were hired to design their tiered sides, with safety benches every 17 feet and service ramps which allowed equipment access to the bottom of the excavations. The overall cleanup project was conducted over a span of almost 10 years. A variety of site characterization, excavation, load-out and sampling methodologies were employed at various stages of remediation. Alternative technologies were screened and evaluated during the project. A new method for cost effectively treating soils was implemented - resulting in significant cost savings. Additional opportunities for minimizing waste streams and recycling were identified and effectively implemented by the project team. During the final phase of cleanup the project team applied lessons learned throughout the entire project to address the final, remaining source of chromium contamination. The C-7 cleanup now serves as a model for remediating extensive deep zone contamination sites at Hanford. (authors)
Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections
Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state-of-the-art knowledge in an internally self-consistent modelling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain-specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low-emissions SSP1-1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850-1900, using an observationally-based historical warming estimate of 0.8°C between 1850-1900 and 1995-2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above pre-industrial in the long-term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.
Climate model projections from the Scenario Model Intercomparison Project (ScenarioMIP) of CMIP6
The Scenario Model Intercomparison Project (ScenarioMIP) defines and coordinates the main set of future climate projections, based on concentration-driven simulations, within the Coupled Model Intercomparison Project phase 6 (CMIP6). This paper presents a range of its outcomes by synthesizing results from the participating global coupled Earth system models. We limit our scope to the analysis of strictly geophysical outcomes: mainly global averages and spatial patterns of change for surface air temperature and precipitation. We also compare CMIP6 projections to CMIP5 results, especially for those scenarios that were designed to provide continuity across the CMIP phases, at the same time highlighting important differences in forcing composition, as well as in results. The range of future temperature and precipitation changes by the end of the century (2081–2100) encompassing the Tier 1 experiments based on the Shared Socioeconomic Pathway (SSP) scenarios (SSP1-2.6, SSP2-4.5, SSP3-7.0 and SSP5-8.5) and SSP1-1.9 spans a larger range of outcomes compared to CMIP5, due to higher warming (by close to 1.5 °C) reached at the upper end of the 5 %–95 % envelope of the highest scenario (SSP5-8.5). This is due to both the wider range of radiative forcing that the new scenarios cover and the higher climate sensitivities in some of the new models compared to their CMIP5 predecessors. Spatial patterns of change for temperature and precipitation averaged over models and scenarios have familiar features, and an analysis of their variations confirms model structural differences to be the dominant source of uncertainty. Models also differ with respect to the size and evolution of internal variability as measured by individual models' initial condition ensemble spreads, according to a set of initial condition ensemble simulations available under SSP3-7.0. These experiments suggest a tendency for internal variability to decrease along the course of the century in this scenario, a result that will benefit from further analysis over a larger set of models. Benefits of mitigation, all else being equal in terms of societal drivers, appear clearly when comparing scenarios developed under the same SSP but to which different degrees of mitigation have been applied. It is also found that a mild overshoot in temperature of a few decades around mid-century, as represented in SSP5-3.4OS, does not affect the end outcome of temperature and precipitation changes by 2100, which return to the same levels as those reached by the gradually increasing SSP4-3.4 (not erasing the possibility, however, that other aspects of the system may not be as easily reversible). Central estimates of the time at which the ensemble means of the different scenarios reach a given warming level might be biased by the inclusion of models that have shown faster warming in the historical period than the observed. Those estimates show all scenarios reaching 1.5 °C of warming compared to the 1850–1900 baseline in the second half of the current decade, with the time span between slow and fast warming covering between 20 and 27 years from present. The warming level of 2 °C of warming is reached as early as 2039 by the ensemble mean under SSP5-8.5 but as late as the mid-2060s under SSP1-2.6. The highest warming level considered (5 °C) is reached by the ensemble mean only under SSP5-8.5 and not until the mid-2090s.d-2090s.
Reduced Complexity Model Intercomparison Project Phase 2: Synthesizing Earth System Knowledge for Probabilistic Climate Projections
Abstract Over the last decades, climate science has evolved rapidly across multiple expert domains. Our best tools to capture state‐of‐the‐art knowledge in an internally self‐consistent modeling framework are the increasingly complex fully coupled Earth System Models (ESMs). However, computational limitations and the structural rigidity of ESMs mean that the full range of uncertainties across multiple domains are difficult to capture with ESMs alone. The tools of choice are instead more computationally efficient reduced complexity models (RCMs), which are structurally flexible and can span the response dynamics across a range of domain‐specific models and ESM experiments. Here we present Phase 2 of the Reduced Complexity Model Intercomparison Project (RCMIP Phase 2), the first comprehensive intercomparison of RCMs that are probabilistically calibrated with key benchmark ranges from specialized research communities. Unsurprisingly, but crucially, we find that models which have been constrained to reflect the key benchmarks better reflect the key benchmarks. Under the low‐emissions SSP1‐1.9 scenario, across the RCMs, median peak warming projections range from 1.3 to 1.7°C (relative to 1850–1900, using an observationally based historical warming estimate of 0.8°C between 1850–1900 and 1995–2014). Further developing methodologies to constrain these projection uncertainties seems paramount given the international community's goal to contain warming to below 1.5°C above preindustrial in the long‐term. Our findings suggest that users of RCMs should carefully evaluate their RCM, specifically its skill against key benchmarks and consider the need to include projections benchmarks either from ESM results or other assessments to reduce divergence in future projections.
Ford Plug-In Project: Bringing PHEVs to Market Demonstration and Validation Project
This project is in support of our national goal to reduce our dependence on fossil fuels. By supporting efforts that contribute toward the successful mass production of plug-in hybrid electric vehicles, our nation’s transportation-related fuel consumption can be offset with energy from the grid. Over four and a half years ago, when this project was originally initiated, plug-in electric vehicles were not readily available in the mass marketplace. Through the creation of a 21 unit plug-in hybrid vehicle fleet, this program was designed to demonstrate the feasibility of the technology and to help build cross-industry familiarity with the technology and interface of this technology with the grid. Ford Escape PHEV Demonstration Fleet 3 March 26, 2014 Since then, however, plug-in vehicles have become increasingly more commonplace in the market. Ford, itself, now offers an all-electric vehicle and two plug-in hybrid vehicles in North America and has announced a third plug-in vehicle offering for Europe. Lessons learned from this project have helped in these production vehicle launches and are mentioned throughout this report. While the technology of plugging in a vehicle to charge a high voltage battery with energy from the grid is now in production, the ability for vehicle-to-grid or bi-directional energy flow was farther away than originally expected. Several technical, regulatory and potential safety issues prevented progressing the vehicle-to-grid energy flow (V2G) demonstration and, after a review with the DOE, V2G was removed from this demonstration project. Also proving challenging were communications between a plug-in vehicle and the grid or smart meter. While this project successfully demonstrated the vehicle to smart meter interface, cross-industry and regulatory work is still needed to define the vehicle-to-grid communication interface.