Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 73 records · Page 4

Small-scale pilot plant for gasification of coal and coal/biomass blends and conversion of derived syngas to liquid fuels via Fischer-Tropsch synthesis

This report describes the second phase of a project to design, construct and commission an integrated coal/biomass-to-liquids facility at a capacity of 1 bbl. /day at the University of Kentucky Center for Applied Energy Research (UK-CAER) – specifically for construction, commissioning and operating of the downstream process units for water-gas-shift, Fischer-Tropsch synthesis and balance of plant [BOP]. The deliverables from the operation of this pilot plant is firstly the liquid F-T products and finished fuels which are of interest to UK-CAER’s academic, government and industrial research partners. Going forward the facility will produce research quantities of F-T liquids and finished fuels for subsequent Fuel Quality Testing, Performance and Acceptability. Moreover, the facility is expected to be employed for a range of research and investigations related to: Feed Preparation, Characteristics and Quality; Coal and Biomass Gasification; Gas Clean-up/ Conditioning; Gas Conversion by -F-T Synthesis; Product Work-up and Refining; Systems Analysis and Integration; and Scale-up and Demonstration. Environmental Considerations - particularly how to manage and reduce carbon dioxide emissions from CBTL facilities and from use of the fuels will be a primary research objective. The results of this second phase study include the FEED study and detailed engineering design of the downstream processing units and BOP, the selection of a range of technologies and technology vendors, the as-built plant - its equipment and capabilities, and the results of two trial production runs, one with coal only and one with a coal/biomass blend. These are described in detail in this report.

01 COAL, LIGNITE, AND PEAT↗

Pre-Project Planning for a Flameless Pressurized Oxy-Combustion Pilot Plant (Final Technical Report)

The team of Southwest Research Institute® (SwRI®), ITEA, Electric Power Research Institute, Inc. (EPRI), GE Global Research (GE), Jacobs Engineering (Jacobs), and Peter Reineck Associates (PRA) are advancing Flameless Pressurized Oxy-Combustion (FPO), a novel coal technology. This effort seeks to complete the preliminary engineering and planning of a 50-MWth Pilot Plant that produces electricity and steam for district heating. The technology, pioneered by ITEA at the 5-MWth scale, must be brought to a higher technology readiness level (TRL) to be viable at the commercial scale. This project builds upon extensive evaluation of the techno-economic performance of the FPO technology already performed by ITEA. This includes system improvements, such as the addition of a turbo-expander to the flue gas stream. Some of the performance-enhancing components are not as well defined as others. The primary goal of this project was to bring all of the core cycle components to the same level of design maturity. Extensive cycle modeling and evaluation explored various configurations of the process. Different coals, operating conditions, and heat recovery devices were considered and modeled using Aspen Plus. The results of the cycle modeling informed the pilot plant configuration and the planned configuration at the commercial scale. The system pressurization is maintained in the flue gas clean-up and water removal. This allows for efficient and cost-effective carbon dioxide compression and sequestration package. Once the cycle was optimized, preliminary drawings, layouts, and plans defined the pilot facility. Process flow diagrams (PFD) were used to describe the pilot configuration in greater detail. A heat and mass balance with stream data was created. A master equipment list specified the operating conditions for major pieces of equipment within the pilot using this heat and mass balance. A detailed cost estimate for the planned configuration was completed with an Association for the Advancement of Cost Engineering (AACE) Class IV level of cost analysis. A site selection effort evaluated a variety of potential candidate sites. The selection effort focused on three sites for an in-depth evaluation of the merits and viability of hosting a pilot demonstration. The ability of the host site to support the project with cost sharing was also assessed. The selection process chose the University of Wyoming (UW) as the host site, and cost estimates for the pilot capital estimate were made using local data. A preliminary test plan and operation plan, which creates figures of merit, control, and instrumentation was produced. An effort that outlines methods of pilot cost reduction was completed near the end of the project. A techno-economic assessment (TEA) evaluated the FPO technology at the commercial scale in comparison to the NETL baseline cases. The reference plants were used in combination with proprietary equipment estimates to build a plant capital cost and cost of electricity evaluation. FPO performed better than the sub-bituminous post-combustion capture cases. Further preliminary estimates of improvements to the FPO cycle show even further gains when compared to conventional carbon capture methods.

01 COAL, LIGNITE, AND PEAT↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Primary Heat Transport System Design Considerations for Xcimer Energy’s Athena Fusion Pilot Plant

Fusion energy promises a reliable, carbon-free source of power; however, significant challenges remain before it can be deployed as an economical energy source. In addition to achieving fusion conditions, power plants must operate under extreme temperatures, radiation, and mechanical loads while maintaining high efficiency and availability. These requirements place strong demands on engineering design and plant operation. This work focuses on the engineering challenges associated with balance of plant analysis for inertial fusion energy systems. In particular, this paper examines the design considerations for primary heat transfer systems in fusion pilot plants employing molten fluoride salt coolants, with particular emphasis on system layout optimization and the balance between competing design objectives using the Xcimer Energy Athena inertial pilot plant design as a case study. Through systematic analysis of candidate system configurations and parametric sensitivity studies, we identify key engineering trade-offs governing salt inventory, pumping power requirements, and operational flexibility. The analysis employs system-level modeling tools to explore the design space and establish relationships between geometric parameters and system performance metrics.

Greenwood, Scott [ORNL] (ORCID:0000000333480736)↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Influencing future exploratory drilling rates-a potential approach for the waste isolation pilot plant - 15307

The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing activities related to the disposal of TRU and TRU-mixed waste in the geologic repository at the Waste Isolation Pilot Plant (WIPP), near Carlsbad, New Mexico. The WIPP Compliance Certification Application had a reference concerning natural resources at the site of the Waste Isolation Pilot Plant. This reference suggested that resources could be withdrawn from under the repository area from a distance and not affect the integrity of the repository. This would not eliminate, but would certainly diminish, the rate of exploratory drilling in the distant future. Currently the only scenarios that result in releases from the repository are human intrusion scenarios, without human intrusion radioactive releases to the accessible environment are essentially zero for the very long term future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Technical Assessment Team Report

This report provides the results of the Waste Isolation Pilot Plant (WIPP) technical assessment led by the Savannah River National Laboratory and conducted by a team of experts in pertinent disciplines from SRNL and Lawrence Livermore National Laboratory (LLNL), Oak Ridge National Laboratory (ORNL), Pacific Northwest National Laboratory (PNNL), and Sandia National Laboratories (SNL).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multi-scale dynamic modeling and validation of radial flow fixed bed contactors for post-combustion CO 2 capture using bench scale and pilot plant data

Here, in this work, a multi-scale model of a radial flow fixed bed contactor packed with a carbon sorbent is developed and validated with laboratory-scale and pilot plant scale dynamic data. For the lab scale system, the model results were compared with low, medium and high gas and sweep flowrates, yielding root mean square error (RMSE) of 0.80, 0.63, 0.96 CO 2 mol%, respectively, for the outlet CO 2 concentration profile considering the entire A-D cycle. For the bed outer temperature profile, maximum RMSE was found to be 5.5 °C considering all flowrates and entire A-D cycles. An experimental campaign was developed and applied to a pilot plant at Technology Center Mongstad (TCM), Norway. Approaches were developed for pre-processing of data including consideration of the effect of gas mixing, measurement delay, and determination of cyclic steady-state conditions. Considering profiles during A-D cycles for all test runs, it was found that the maximum RMSE for pressure drop, temperature for the outer section of the bed, temperature for the middle section of the bed, and outlet CO 2 concentration profile remained less than 1.5 mbar, 3.5 °C, 2.8 °C, and 1.3 CO 2 mol%, respectively. The validated model was used to perform sensitivity studies on several key design operating variables for the adsorption-desorption cycle. It was found that the flow rate and concentration of flue gas have dominant nonlinear effects on the breakthrough time while the desorption time was strongly affected by the sweep gas flowrate for the specific sorbent being evaluated in this study.

20 FOSSIL-FUELED POWER PLANTS↗

Waste Isolation Pilot Plant Status and Plans - 2012 - 12049

The Waste Isolation Pilot Plant (WIPP), a deep geologic repository for safe disposal of long-lived transuranic radioactive waste related to the nation's defense, is completing its 12. year of operations. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize transuranic (TRU) waste for final shipment and emplacement in WIPP. Five of the 10 disposal panels planned have been filled and sealed from ventilation. Additional small quantity sites have been de-inventoried by consolidating their waste through the certified characterization line at the Idaho National Laboratory (INL). New emplacement methods for RH waste in shielded containers are being considered for disposal by WIPP's regulatory authorities. A new large Type B shipping package, was added to the WIPP transportation fleet, and facility modifications to the WIPP waste unloading and emplacement processes for large containers were completed in 2011. Shipments from the Savannah River site in these new large rectangular packages began in August 2011. Licensing efforts are proceeding for a new criticality control over-pack container that will allow almost twice the fissile content to be shipped than previously. This will reduce the number and cost of shipments of Special Nuclear Material (SNM) declared as waste. Modifications to WIPP regulatory requirements for the disposal footprint and disposal unit closure systems are in progress. These, and other developments, make for exciting times at WIPP. This paper provides an up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository, which is completing its 12. year of operations. A record year of safe and compliant shipments to WIPP tops the list of accomplishments in 2011. Four more small quantity sites were de-inventoried by consolidating their waste through the certified characterization line at INL in 2011. A new Type B shipping package, the TRUPACT-III has been added to the transportation fleet, and large waste boxes are being shipped from SRS without the need for repackaging. New emplacement methods for remote-handled waste in shielded containers are undergoing regulatory review. WIPP plans to license a new criticality control payload container that will allow almost twice the fissile content to be shipped than previously, thereby reducing the number and cost of shipments of SNM declared as waste. Other regulatory modifications planned in 2012 include approval of a design change that would replace the disposal concept for panels 9 and 10 from using the common access drifts (the 'mains') with a new footprint south of panels 4 and 5. DOE also plans to change the panel closure design set forth in its certification by EPA and the HWFP by the NMED. The panel closure design change will be a rule making under EPA's procedures and a class 3 permit modification request under NMED procedures. Plans for achieving 90% of legacy TRU waste retrieval and emplacement in WIPP by 2015 have been developed. Key to the success of this so-called 90/15 plan is adequate funding, both for WIPP operations, as well as for TRU retrieval programs at the generator sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Temperature control in a 30 stage, 5-cm Centrifugal Contactor Pilot Plant

Temperature profile testing was performed using a 30 stage 5-cm centrifugal contactor pilot plant. These tests were performed to evaluate the ability to control process temperature by adjusting feed solution temperatures. This would eliminate the need for complex jacketed heat exchanger installation on the centrifugal contactors. Thermocouples were installed on the inlet and outlets of each stage, as well as directly in the mixing zone of several of the contactor stages. Lamp oil, a commercially available alkane mixture of C14 to C18 chains, and tap water adjusted to pH 2 with nitric acid were the solution feeds for the temperature profile testing. Temperature data profiles for an array of total throughputs and contactor rpm values for both single-phase and two-phase systems were collected with selected profiles. The total throughput ranged from 0.5-1.4 L/min with rotor speeds from 3500-4000 rpm. Inlet solution temperatures ranging from ambient up to 50 °C were tested. Results of the two-phase temperature profile testing are detailed

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MBM fuel feeding system design and evaluation for FBG pilot plant

Highlights: Black-Right-Pointing-Pointer A 1-5 g/s fuel feeding system for pilot scale FBG was designed, built and tested. Black-Right-Pointing-Pointer Multiple conveying stages improve pressure balancing, flow control and stability. Black-Right-Pointing-Pointer Secondary conveyor stage reduced output irregularity from 47% to 15%. Black-Right-Pointing-Pointer Pneumatic air sparging effective in dealing with poor flow ability of MBM powder. Black-Right-Pointing-Pointer Pneumatic injection port plugs with char at gasification temperature of 850 Degree-Sign C. - Abstract: A biomass fuel feeding system has been designed, constructed and evaluated for a fluidized bed gasifier (FBG) pilot plant at the University of Saskatchewan (Saskatoon, SK, Canada). The system was designed for meat and bone meal (MBM) to be injected into the gasifier at a mass flow-rate range of 1-5 g/s. The designed system consists of two stages of screw conveyors, including a metering stage which controlled the flow-rate of fuel, a rotary airlock and an injection conveyor stage, which delivered that fuel at a consistent rate to the FBG. The rotary airlock which was placed between these conveyors, proved unable to maintain a pressure seal, thus the entire conveying system was sealed and pressurized. A pneumatic injection nozzle was also fabricated, tested and fitted to the end of the injection conveyor for direct injection and dispersal into the fluidized bed. The 150 mm metering screw conveyor was shown to effectively control the mass output rate of the system, across a fuel output range of 1-25 g/s, while the addition of the 50 mm injection screw conveyor reduced the irregularity (error) of the system output rate from 47% to 15%. Although material plugging was found to be an issue in the inlet hopper to the injection conveyor, the addition of air sparging ports and a system to pulse air into those ports was found to successfully eliminate this issue. The addition of the pneumatic injection nozzle reduced the output irregularity further to 13%, with an air supply of 50 slpm as the minimum air supply to drive this injector. After commissioning of this final system to the FBG reactor, the injection nozzle was found to plug with char however, and was subsequently removed from the system. Final operation of the reactor continues satisfactorily with the two screw conveyors operating at matching pressure with the fluidized bed, with the output rate of the system estimated based on system characteristic equations, and confirmed by static weight measurements made before and after testing. The error rate by this method is reported to be approximately 10%, which is slightly better than the estimated error rate of 15% for the conveyor system. The reliability of this measurement prediction method relies upon the relative consistency of the physical properties of MBM with respect to its bulk density and feeding characteristics.

09 BIOMASS FUELS↗

Population dynamics of iron-oxidizing communities in pilot plants for the treatment of acid mine waters

The iron-oxidizing microbial community in two pilot plants for the treatment of acid mine water was monitored to investigate the influence of different process parameters such as pH, iron concentration, and retention time on the stability of the system to evaluate the applicability of this treatment technology on an industrial scale. The dynamics of the microbial populations were followed using T-RFLP (terminal restriction fragment length polymorphism) over a period of several months. For a more precise quantification, two TaqMan assays specific for the two prominent groups were developed and the relative abundance of these taxa in the iron-oxidizing community was verified by real-time PCR. The investigations revealed that the iron-oxidizing community was clearly dominated by two groups of Betaproteobacteria affiliated with the poorly known and not yet recognized species 'Ferrovum myxofaciens' and with strains related to Gallionella ferruginea, respectively. These taxa dominated the microbial community during the whole investigation period and accelerated the oxidation of ferrous iron despite the changing characteristics of mine waters flowing into the plants. Thus, it is assumed that the treatment technology can also be applied to other mine sites and that these organisms play a crucial role in such treatment systems. 32 refs., 4 figs. 1 tab.

01 COAL, LIGNITE, AND PEAT↗

TASK 3: PILOT PLANT GASIFIER TESTING

Aerojet Rocketdyne (AR) has developed an innovative gasifier concept incorporating advanced technologies in ultra-dense phase dry feed system, rapid mix injector, and advanced component cooling to significantly improve gasifier performance, life, and cost compared to commercially available state-of-the-art systems. Design, fabrication and initial testing of the pilot plant compact gasifier was completed in 2011 by a development team led by AR. Findings from this initial test program, as well as subsequent gasifier design and pilot plant testing by AR, identified a number of technical aspects to address prior to advancing into a demonstration-scale gasifier design. Key among these were an evaluation of gasifier ability to handle thermal environments with highly reactive coals; ability to handle high ash content, high ash fusion temperature coals with reliable slag discharge; and to develop an understanding of residual properties pertaining to gasification kinetics as carbon conversion approaches 99%. The gasifier did demonstrate the ability to withstand the thermal environments of highly reactive Powder River Basin coal, while achieving high carbon conversion in < 0.15 seconds residence time. Continuous operation with the high ash fusion temperature Xinyuan coal was demonstrated in long duration testing, validating suitability of outlet design as well as downstream slag discharge systems. Surface area and porosity data were obtained for the Xinyuan and Xinjing coals for carbon conversion ranging from 85% to 97%, and showed a pronounced downward trend in surface area per unit mass carbon as conversion increased. Injector faceplate measurements showed no incremental loss of material over the course of these experiments, validating the commercially traceable design approach and supportive of long injector life goals. Hybrid testing of PRB and natural gas was successfully completed over a wide range of natural gas feed content, providing test data to anchor predictions for commercial operation of hybrid coal/natural gas gasification plants.

01 COAL, LIGNITE, AND PEAT↗

The MELISSA pilot plant facility as as integration test-bed for advanced life support systems

The different advances in the Micro Ecological Life Support System Alternative project (MELISSA), fostered and coordinated by the European Space Agency, as well as in other associated technologies, are integrated and demonstrated in the MELISSA Pilot Plant laboratory. During the first period of operation, the definition of the different compartments at an individual basis has been achieved, and the complete facility is being re-designed to face a new period of integration of all these compartments. The final objective is to demonstrate the potentiality of biological systems such as MELISSA as life support systems. The facility will also serve as a test bed to study the robustness and stability of the continuous operation of a complex biological system. This includes testing of the associated instrumentation and control for a safe operation, characterization of the chemical and microbial safety of the system, as well as tracking the genetic stability of the microbial strains used. The new period is envisaged as a contribution to the further development of more complete biological life support systems for long-term manned missions, that should be better defined from the knowledge to be gained from this integration phase. This contribution summarizes the current status of the Pilot Plant and the planned steps for the new period. c2004 COSPAR. Published by Elsevier Ltd. All rights reserved.

Waste Management/instrumentation/methods↗

Improved Modeling of Waste Isolation Pilot Plant Disposal Room Porosity

Disposal rooms at the Waste Isolation Pilot Plant (WIPP) contain waste and gas, and their porosity evolves over time. This report presents several improvements to the disposal room porosity model and presents new porosity predictions for use in future WIPP Performance Assessment activities. The improvements pertain to three sub-models: the geomechanical model, the waste compaction model, and the gas pressurization model. The impacts of each major improvement were quantified and the new porosity predictions were shown to be both mesh and domain size converged. Also, sensitivity studies on the disposal room horizon, clay seam friction coefficients, and homogenized waste representation were performed to support assumptions in the disposal room porosity model. To compare the legacy and new porosity predictions, the simulation results were plotted as a response surface, where gas pressure and time are inputs and porosity is the output. The new porosity response surface is insensitive to pressures beneath lithostatic pressure and highly sensitive to pressures above lithostatic pressure. The legacy porosity response surface, on the other hand, has moderate porosity gradients over all pressures. The new porosity response surface has a stronger scientific foundation than the legacy surface and may now be used for Compliance Decision Analyses.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dover Light & Power 10 MWe Coal Direct Chemical Looping (CDCL) (Large Pilot Plant Test - Phase I Feasibility)

A feasibility study was conducted to install a 10 MWe coal direct chemical looping large pilot plant at a host site. The coal direct chemical looping technology was based on The Ohio State University and Babcock & Wilcox iron-based metal oxide technology coupling a moving bed reduction reactor with a circulating fluidized-bed oxidation reactor. The host site was the Dover Light & power Plant in Dover, Ohio. The Electric Power Research Institute performed the host site evaluation. Trinity Consultants prepared the Environmental Information Volume. WorleyParsons Group performed the civil engineering. Clear Skies Consulting served as lead on the Industrial Advisory Committee.

20 FOSSIL-FUELED POWER PLANTS↗

PILOT PLANT EVALUATIONS OF RARE EARTH ELEMENT RECOVERY AND CONCENTRATION FROM PRE-COMBUSTION BITUMINOUS COAL SOURCES

Rare earths and other critical elements are commonly associated with coal-based sources and sometimes at concentrations that may be attractive for recovery as a byproduct of coal production. The results obtained from laboratory research performed during the past five years have led to the design, construction and testing of a pilot plant that recovered rare earth elements from several bituminous coal-based materials including coarse refuse as well as solutions from a small heap leach and acid mine drainage. From this initial design, rare earth oxide (REO) concentrates having a purity greater than 90% have been produced using solvent extraction as the primary means of concentration. Following cost reduction and process intensification efforts, the circuit was revised to include feed calcination and several selective precipitation stages as a substitute for the original direct leach-solvent extraction circuit. Pilot test results revealed that the modified circuit was ideal for treating the relatively low-grade feedstocks and provided similar final REO purities at a significantly lower cost. This communication will present the flowsheets evaluated in the pilot plant along with technical and economic analyses for each circuit.

Coal↗