Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “OCV”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

69 records · Page 4

Effect of Aluminum Oxide on the Performance of Ionic Liquid-Based Aluminum–Air Battery

The aluminum–air (or oxygen) battery has received intense attention in the past because of its excellent benefits such as low cost and high energy density, but due to the challenging issues such as hydrogen evolution and inactive oxide film formation on the Al surface, it could not be fully applied. In this study, 1-Ethyl 3-Methyl Imidazolium Chloride ([EmIm]Cl) and aluminum chloride (AlCl3) are applied to resolve the aforementioned issues. Ex situ component-level and in situ cell-level open circuit voltage (OCV) tests combined with the physics-based model analyses were conducted to investigate the electrochemical reaction behaviors of the Al–air cell. Especially, the effect of aluminum oxide formation on the anode- and cathode-side reactions were analyzed in detail. The oxide film formed at the Al surface strongly was found to significantly impede the electrochemical reaction at the surface, and the film growth was controlled by decreasing the surface tension by aggressive anions. In the cathode side, the aluminum oxide precipitated in the porous cathode electrode was found to decrease the porous reaction area and block reactant access into the reaction sites. The effects of O2 solubility in the electrolyte, initial porosity and thickness of the porous electrode are compared in detailed, and optimal thickness is suggested.

25 ENERGY STORAGE↗

Storage effects on cells

The results of an experiment to test storage effects on electric cells of a battery are presented and discussed. The type of cells were the 20 amp-hour OAO type. The various modes that were tested were the integration type mode, the trickle charge, the discharge shorted and the discharged OCV (open current voltage). Every six months the cells were reconditioned and approximately two weeks of tests were performed. The tests included three capacity checks, two zero-degree overcharge tests and an internal short test (the cells are shunted for 16 hours, the shunt removed and allowed to stand on local circuit recovery for 24 hours). The integration pack was discontinued after three years and the trickle charge shorted packs after five years.

Harkness, J. M.↗

Solar silicon from directional solidification of MG silicon produced via the silicon carbide route

A process of metallurgical grade (MG) silicon production is presented which appears particularly suitable for photovoltaic (PV) applications. The MG silicon is prepared in a 240 KVA, three electrode submerged arc furnace, starting from high grade quartz and high purity silicon carbide. The silicon smelted from the arc furnace was shown to be sufficiently pure to be directionally solidified to 10 to 15 kg. After grinding and acid leaching, had a material yield larger than 90%. With a MG silicon feedstock containing 3 ppmw B, 290 ppmw Fe, 190 ppmw Ti, and 170 ppmw Al, blended with 50% of off grade electronic grade (EG) silicon to reconduct the boron content to a concentration acceptable for solar cell fabrication, the 99% of deep level impurities were concentrated in the last 5% of the ingot. Quite remarkably this material has OCV values higher tham 540 mV and no appreciable shorts due to SiC particles.

Rustioni, M.↗

Lithium D-cell study

The purpose of this contract is to evaluate parametrically the effects of various factors including the electrolyte type, electrolyte concentration, depolarizer type, and cell configuration on lithium cell electrical performance and safety. This effort shall allow for the selection and optimization of cell design for future NASA applications while maintaining close ties with WGL's continuous improvements in manufacturing processes and lithium cell design. Taguchi experimental design techniques are employed in this task, and allow for a maximum amount of information to be obtained while requiring significantly less cells than if a full factorial design were employed. Acceptance testing for this task is modeled after the NASA Document EP5-83-025, Revision C, for cell weights, OCV's and load voltages. The performance attributes that are studied in this effort are fresh capacity and start-up characteristics evaluated at two rates and two temperatures, shelf-life characteristics including start-up and capacity retention, and iterative microcalorimetry measurements. Abuse testing includes forced over discharge at two rates with and without diode protection, temperature tolerance testing, and shorting tests at three rates with the measurement of heat generated during shorting conditions.

Size, P.↗

Performance and Safety Testing of Varta Li-Ion Polymer Cells

Varta Cell Characteristics: Voltage : 3.7 V Capacity : 1.21 Ah Dimensions : 5mm X 37mm X 38.5 mm MOSFET switches for Overvoltage and Undervoltage. Initial Screening Results 29 Cells delivered: Statistics on Ph ysical Screening: Thickness (mm): Average- 5.08; Weight(g)- 22.8938; OCV (V)- 3.787; CCV (V)- 3.491.

Patel, Pranav↗

Crush Test Abuse Stand

The purpose of this system is to simulate an internal short on battery cells by causing deformation (a crushing force) in a cell without penetration. This is performed by activating a hydraulic cylinder on one side of a blast wall with a hydraulic pump located on the other. The operator can control the rate of the crush by monitoring a local pressure gauge connected to the hydraulic cylinder or a load cell digital display located at the hydraulic pump control area. The internal short simulated would be considered a worst-case scenario of a manufacturer fs defect. This is a catastrophic failure of a cell and could be a very destructive event. Fully charged cells are to have an internal short simulated at the center of the length of the cell (away from terminals). The crush can be performed with a .- to 1-in. (.0.6- to 2.5-cm) rod placed crossways to the cell axis, causing deformation of the cell without penetration. The OCV (open-circuit voltage) and temperature of the cells, as well as the pressure and crushing force, are recorded during the operation. Occurrence of an internal short accompanied by any visible physical changes such as venting, fires, or explosions is reported. Typical analytical data examined after the test would be plots of voltage, temperature, and pressure or force versus time. The rate of crushing force can be increased or decreased based on how fast the operator pumps the hydraulic pump. The size of cylinder used to compress the battery cell can be easily changed by adding larger or smaller fittings onto the end of the hydraulic cylinder based on the battery/cell size being tested. The cell is crushed remotely and videotaped, allowing the operator to closely monitor the situation from a safe distance.

Collins, Jacob↗

Predicting Maximum Thermal Response in a Li-ion Cell as a Thermal Runaway Predictor for a UAV Fight

As the energy storage devices continue to "pack" more energy in a small space, any damage, battery component failure, manufacturing defect, or electrically abusing the battery can lead to catastrophic thermal runaway events. A catastrophic thermal event in a cell leads to high temperature, in some instances to spewing of battery materials due to gas development from side reactions initiated due to high internal temperatures. Moreover, a thermal runaway can propagate from a single "failed" cell to a whole battery pack, resulting in a more serious event. The commercial and automotive sectors need to mitigate thermal runaway events. An electric aircraft (or air taxi) has no alternative in the event of a failure, so preventing such events is paramount. Currently, battery prognostics algorithms only predict the state-of-charge (SOC) and end-of-life (EOL) of a Li-ion battery in a UAV (unmanned air vehicle), but do not predict the maximum temperature during a flight or the likelihood of thermal runaway. Our current work focuses on adding the thermal model (based on Birkl's OCV model, in Ref. [1]) to the existing hybrid electrochemical model (single-particle model with lumped parameters as in Ref. [2]) to determine end-of-discharge, end-of-life, and maximum temperature during discharge.

Thermal runaway↗

Mixed hydrocarbon/fluoropolymer membrane/ionomer MEAs for durability studies

The durability of polymer electrolyte membrane (PEM) fuel cells is a major barrier to the commercialization of these systems for stationary and transportation power applications. Commercial viability depends on improving the durability of the fuel cell components to increase the system reliability. The aim of this work is to separate ionomer degradation from membrane degradation via mixed membrane/ionomer MEA experiments. The challenges of mixed MEA fabrication due to the incompatibility of the membrane and the electrode are addressed. OCV accelerated testing experiment (AST) were performed. Development of in situ diagnostics and unique experiments to characterize the performance and properties of the ionomer in the electrode as a function of time is reported. These measurements, along with extensive ex situ and post-mortem characterization, can delineate the degradation mechanisms in order to develop more durable fuel cells and fuel cell components.

30 DIRECT ENERGY CONVERSION↗

Harvesting Mechanical and Thermal Energy by Combining ZnO Nanowires and NiTi Shape Memory Alloy

In the expanding world of small scale energy harvesting, the ability to combine thermal and mechanical harvesting is growing ever more important. Here, we demonstrate the feasibility of using ZnO nanowires to harvest both mechanical and low-quality thermal energy in simple, scalable devices. These devices were fabricated on kapton films and used ZnO nanowires with the same growth direction to assure alignment of the piezoelectric potentials of all of the wires. Mechanical harvesting from these devices was demonstrated using a periodic application of force, modeling the motion of the human body. Tapping the device from the top of the device with a wood stick, for example yielded an Open Circuit Voltage (OCV) of 0.2 - 4 V, which is in an ideal range for device applications. In order to demonstrate thermal harvesting from low quality heat sources, a commercially available Nitinol (Ni-Ti alloy) foil was attached to the nanowire piezoelectric device to create a compound thermoelectric. When bent at room temperature and then heated to 50°C, the Nitinol foil was restored to its original flat shape, which yielded an output voltage of nearly 1 V from the ZnO nanowire device.

36 MATERIALS SCIENCE↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Leak test for solid oxide fuel cells and solid oxide electrolysis cells

A simple, fast, and economical alcohol penetration method for assessing the solid oxide cell to metal window frame seal in a typical planar design is presented. An alcohol such as ethanol or isopropanol is placed into the cavity of a cell sealed to the window frame. Within 3–5 min, one can determine if the glass seal is hermetic by visual observation along the seal edges on the side of the sealed frame. Cross bubbling and open circuit voltage methods for determining whether the seal failed or cracked at high temperature after final stack firing are also discussed.

25 ENERGY STORAGE↗